CN110644815A - Integral bathroom of precast concrete and hoist and mount apparatus thereof - Google Patents

Integral bathroom of precast concrete and hoist and mount apparatus thereof Download PDF

Info

Publication number
CN110644815A
CN110644815A CN201910871673.7A CN201910871673A CN110644815A CN 110644815 A CN110644815 A CN 110644815A CN 201910871673 A CN201910871673 A CN 201910871673A CN 110644815 A CN110644815 A CN 110644815A
Authority
CN
China
Prior art keywords
precast concrete
toilet
lifting
hoisting
concrete integral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910871673.7A
Other languages
Chinese (zh)
Other versions
CN110644815B (en
Inventor
黄莉萍
张建华
何刚
黄赟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Construction And Construction Technology Co Ltd
Original Assignee
Foshan Construction And Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Construction And Construction Technology Co Ltd filed Critical Foshan Construction And Construction Technology Co Ltd
Priority to CN201910871673.7A priority Critical patent/CN110644815B/en
Publication of CN110644815A publication Critical patent/CN110644815A/en
Application granted granted Critical
Publication of CN110644815B publication Critical patent/CN110644815B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/125Small buildings, arranged in other buildings
    • E04H1/1266Cubicles for dressing; Toilets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets

Abstract

The invention provides a precast concrete integral toilet and a hoisting tool thereof, wherein a toilet chassis in the precast concrete integral toilet is provided with a plurality of embedded anchor nodes, the embedded anchor nodes are provided with embedded anchor protection blocks, and the hoisting tool comprises a hanger, a lifting hook, a steel strand rope and a connecting piece. The embedded anchor bolt protection block is arranged in the embedded anchor bolt node of the toilet chassis of the precast concrete integral toilet, the risk of damage of the precast concrete integral toilet can be reduced, the embedded anchor bolts are adopted in each connection point, the embedded anchor bolts are prevented from being pulled out or broken in the hoisting process, the safety and the stability of the hoisting process are improved, the connecting piece of the hoisting tool is combined with the protection block and connected with the precast concrete integral toilet chassis, and the safety and the reliability of hoisting of the precast concrete integral toilet are further improved.

Description

Integral bathroom of precast concrete and hoist and mount apparatus thereof
Technical Field
The invention relates to the field of buildings, in particular to a precast concrete integral toilet and a hoisting tool thereof.
Background
The toilet is an indispensable part of a residential building, and the toilet is generally built by the following two methods: firstly, directly at building site cast in situ concrete frame and build the bathroom one by one, this is comparatively traditional and commonly used bathroom construction method, and when this kind of construction method construction cycle is long, the construction cost is high, moreover because the nonstandard quality standard that leads to the bathroom of building material's use can not obtain fine assurance. And secondly, prefabricating the concrete integral toilet in a factory, and then transporting the concrete integral toilet to a construction site for installation. The general precast concrete integral type toilet waterproof chassis and the wall body are separately precast in a factory to be assembled into a box building, waterproof and sanitary ware installation are completed, and finally the box building is transported to the site for installation. Because the wall and the chassis can be separated and fall off or cracks are generated, the precast concrete integral toilet generally cannot be hoisted from the top of the wall. Therefore, a more reliable hoisting tool is needed to ensure the safe installation and construction of the precast concrete integral toilet. In addition, the application of the precast concrete integral toilet in the market is not widely popularized, and tools matched with the precast concrete integral toilet are few, so that the research and popularization of the safe and reliable precast concrete integral toilet are needed, and corresponding safety appliances are arranged for hoisting.
For example, chinese patent No. CN201110064450.3 discloses a prefabricated toilet and a method of constructing and installing the prefabricated toilet. The construction method of the prefabricated toilet comprises the following steps: the bottom plate unit of the prefabricated toilet and the lower parts of the four wall units are built through a bottom steel die and a vertical steel die, concrete meeting requirements is poured into an inner space surrounded by the bottom steel die and the vertical steel die, the vertical steel die and a cavity pipe are removed after the concrete reaches a certain strength, so that the bottom plate unit of the prefabricated toilet and the lower half part of the prefabricated toilet are formed, structural steel bars forming the upper part of the wall unit and the outline of the ceiling unit are butted with vertically exposed steel bars at the top of the lower half part of the prefabricated toilet, and a complete frame of the four wall units and the ceiling unit is formed. When the structural steel bars of the upper parts of the wall units and the outlines of the ceiling units are lapped in the lower half part of the prefabricated toilet, upper inner side aluminum molds are required to be arranged on the inner sides of the frames of the four wall units and the ceiling units. The inner side aluminum die is installed in the profile structural steel bar of the prefabricated toilet through manpower, and the operation of workers is difficult because the inner space of the prefabricated toilet is narrow. In addition, the number of the inner side aluminum modules is large, the installation difficulty is large, and the installation time is long. Because inboard aluminium mould is through artifical installation, in order to make things convenient for the manual work to lift up the installation, the weight of inboard aluminium mould is lighter, but pours into the concrete back, and inboard aluminium mould is easily warp by the oppression of concrete, when waiting that the concrete condenses and demolish the mould, still need further polish the wall unit or the ceiling unit of concrete and make it level. And the concrete is poured manually on site, and the verticality of the side mold is difficult to adjust, so that the phenomenon of inclination often exists.
For another example, KR20180083256 relates to an assembled bathroom, but the assembly of the bathroom is performed by means of field bonding, which is technically demanding for assembly personnel, and the problem that the assembly is not smooth enough exists.
For another example, chinese patent No. CN201621347523.4 discloses a special hanging basket for an integral toilet hanging, which comprises a hanging basket bottom plate, a guardrail, a hanging basket balance frame, a hanging basket shock absorber and a hanging basket safety lock, wherein the guardrail is installed at two sides of the basket bottom plate, the hanging basket shock absorber is installed at one side of the hanging basket bottom plate facing a target building, and the hanging basket balance frame is connected with the hanging basket bottom plate through a hanging rope and is placed right above the hanging basket bottom plate; the hanging basket safety locks are arranged at the front end and the rear end of the special hanging basket. The special hanging basket for installing the integral toilet provided by the device improves the transportation efficiency of the integral toilet on one hand and improves the stability of the integral toilet in the transportation process on the other hand, but no reinforcing protection block is arranged for hoisting the hanging basket and the integral toilet, so that potential danger exists.
In the field of prefabricated integral toilets and lifting appliances thereof, a lot of practical problems to be treated urgently in practical application of the prefabricated integral toilets and the lifting appliances have not provided specific solutions.
Disclosure of Invention
The invention provides a precast concrete integral toilet and a hoisting tool thereof aiming at the defects of the prior art.
In order to overcome the defects in the prior art, the specific technical scheme of the invention is as follows:
the utility model provides an integral bathroom of precast concrete, includes sanitary equipment, four sides wall body, is located the roof of four sides wall body top and is located the bathroom chassis of four sides wall body below, the bathroom chassis set up a plurality of embedded anchor node, the embedded anchor node be provided with embedded anchor protection piece.
Optionally, the anchor bolt node further includes a plurality of anchor bolts.
Optionally, the anchor bolt protection block includes embedded penetrating bars arranged at the end of the anchor bolt and having an angle of 30 degrees, and reinforcing bars matched with the embedded penetrating bars to form reinforced protection.
A hoisting tool for a precast concrete integral toilet comprises a hanger, a lifting hook, a steel strand and a connecting piece.
Optionally, the hanger comprises a main frame, a plurality of thick upper lifting lugs arranged on the upper end surface of the main frame, a plurality of thick lower lifting lugs arranged on the lower end surface of the main frame, and channel steel fixedly connected in the main frame, wherein the thick upper lifting lugs and the thick lower lifting lugs are respectively provided with a first connecting hole.
Optionally, the thick upper lifting lug and the thick lower lifting lug are fixedly connected with the main frame.
Optionally, the connecting piece includes the steel sheet one that the level set up, steel sheet one on set up mutually perpendicular's steel sheet two and steel sheet three, just steel sheet two on set up a plurality of screw trompil, steel sheet three set up connecting hole two.
Optionally, the connecting piece further comprises a high-strength screw which penetrates through the screw opening and can be connected with the embedded anchor bolt.
Optionally, the hoisting rope can penetrate through the first connecting hole of the thick upper lifting lug and can be hoisted by the lifting hook.
Optionally, the steel strand can pass through the first connecting hole and the second connecting hole of the thick lower lifting lug to realize the connection between the connecting piece and the hanger.
The beneficial effects obtained by the invention are as follows:
1. the embedded anchor bolt protection block is arranged in the embedded anchor bolt node of the toilet chassis of the precast concrete integral type toilet, the risk of damage of the precast concrete integral type toilet can be reduced, the embedded anchor bolt protection block is matched with a hoisting tool for use, a plurality of embedded anchor bolts are adopted in each connecting point, the embedded anchor bolts are prevented from being pulled out or broken in the hoisting process, and the safety and the stability of the hoisting process are improved.
2. The first steel plate, the second steel plate and the third steel plate in the connecting piece in the hoisting tool are thick steel plates and are connected with the precast concrete integral type toilet chassis through a plurality of high-strength screws matched with the embedded anchor bolts, so that the hoisting safety and reliability of the precast concrete integral type toilet are further improved.
3. The hoisting tool disclosed by the invention can meet the hoisting requirement of the precast concrete integral toilet, and is simple to use and easy to operate.
Drawings
The invention will be further understood from the following description in conjunction with the accompanying drawings. The components in the figures are not necessarily to scale, emphasis instead being placed upon illustrating the principles of the embodiments. Like reference numerals designate corresponding parts throughout the different views.
FIG. 1 is a cross-sectional view of an anchor bolt node of a precast concrete integral toilet and a hoisting tool thereof according to the present invention;
FIG. 2 is a cross-sectional view of an anchor bolt node of the precast concrete integral toilet and a hoisting tool thereof according to the present invention;
FIG. 3 is a sectional view of the precast concrete monolithic toilet and its lifting device of the present invention;
FIG. 4 is a plan view of a hanger for a precast concrete integral toilet and a lifting tool thereof according to the present invention;
FIG. 5 is a bottom portion of a lifting section of the precast concrete integral toilet and a lifting tool thereof according to the present invention;
FIG. 6 is a sectional view of a connecting member of a precast concrete integral toilet and a lifting tool thereof according to the present invention;
FIG. 7 is a schematic structural view of a precast concrete monolithic toilet and a connecting member of a lifting tool thereof according to the present invention.
Description of the drawings: 1-hoisting a rope; 2-thick upper lifting lug; 3, connecting the first hole; 4-thick lower lifting lug; 5-double-sided fillet welding; 6-channel steel; 7-a main frame; 8-steel strand wires; 9-a connector; 10-high-strength screw; 11-width of the precast concrete integral toilet; 12-prefabricating a concrete integral toilet chassis; 13-prefabricating a concrete integral toilet wall; 14-double-sided fillet welding; 15-steel plate II; 16-steel plate III; 17-a first steel plate; 18-tapping of screws; 19-reinforcing steel bars; 20-pre-burying a penetrating rib; 21-embedded anchor bolts; 22-embedding and penetrating ribs; 23-a hoisting ring; and 24-connecting hole II.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail below with reference to embodiments thereof; it should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention. Other systems, methods, and/or features of the present embodiments will become apparent to those skilled in the art upon review of the following detailed description. It is intended that all such additional systems, methods, features and advantages be included within this description, be within the scope of the invention, and be protected by the accompanying claims. Additional features of the disclosed embodiments are described in, and will be apparent from, the detailed description that follows.
The same or similar reference numerals in the drawings of the embodiments of the present invention correspond to the same or similar components; in the description of the present invention, it should be understood that if there is an orientation or positional relationship indicated by the terms "upper", "lower", "left", "right", etc. based on the orientation or positional relationship shown in the drawings, it is only for convenience of describing the present invention and simplifying the description, but it is not intended to indicate or imply that the device or component referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and are not to be construed as limiting the present patent, and the specific meaning of the terms described above will be understood by those of ordinary skill in the art according to the specific circumstances.
The invention relates to a precast concrete integral toilet and a hoisting tool thereof, and the following embodiments are illustrated according to figures 1-7.
The first embodiment is as follows:
the utility model provides an integral bathroom of precast concrete, includes sanitary equipment, four sides wall body 13, is located the roof of four sides wall body top and is located the bathroom chassis 12 of four sides wall body below, bathroom chassis 12 set up a plurality of embedded anchor node, the embedded anchor node be provided with embedded anchor protection piece.
The embedded anchor bolt node also comprises a plurality of embedded anchor bolts; the embedded anchor bolt protection block comprises embedded penetrating bars 22 which are arranged at a perforation position at the tail end of the embedded anchor bolt and form a matched angle of 30 degrees and reinforcing steel bars 19 which are matched with the embedded penetrating bars to form reinforced protection, and the hoisting tool based on the precast concrete integral toilet comprises a hoisting frame, a lifting hook, a steel hinged rope 8 and a connecting piece 9; the hanging bracket comprises a main frame, a plurality of thick upper lifting lugs 2 arranged on the upper end surface of the main frame, a plurality of thick lower lifting lugs 4 arranged on the lower end surface of the main frame and a channel steel 6 fixedly connected in the main frame, wherein the thick upper lifting lugs 2 and the thick lower lifting lugs 4 are respectively provided with a first connecting hole 3; the thick upper lifting lug 2 and the thick lower lifting lug 4 are fixedly connected with the main frame; the connecting piece comprises a first steel plate 17 which is horizontally arranged, a second steel plate 15 and a third steel plate 16 which are perpendicular to each other are arranged on the first steel plate, a plurality of screw holes 18 are formed in the second steel plate 15, and a connecting hole 15 is formed in the third steel plate 16; the connecting piece also comprises a high-strength screw which penetrates through the screw opening and can be connected with the embedded anchor bolt; the hoisting rope 1 can penetrate through the connecting hole I3 of the thick upper lifting lug 2 and can be hoisted by the lifting hook; the steel hinge rope 8 can penetrate through the connecting hole I3 of the thick lower lifting lug 4 and the connecting hole II 24 to realize the connection of the connecting piece and the lifting frame.
Example two:
the utility model provides an integral bathroom of precast concrete, includes sanitary equipment, four sides wall body, is located the roof of four sides wall body top and is located the bathroom chassis 12 of 13 below of four sides wall body, bathroom chassis 12 set up a plurality of embedded anchor node, the embedded anchor node be provided with embedded anchor protection piece.
The embedded anchor bolt node also comprises a plurality of embedded anchor bolts; in this embodiment, two pre-buried M24 bolts of each node, tensile and shear resistance are strong, during the installation, the pre-buried anchor correspond the screw that excels in of configuration, just the pre-buried anchor protection piece wear the muscle 20 and cooperate the pre-buried muscle 19 of wearing to form the reinforcing bar of strengthening the protection including setting up at the pre-buried anchor terminal perforation department angle that matches of 30 degrees, adopt two phi 14 reinforcing bars of four phi 10U shaped steel muscle cooperations to form the reinforcement enhancement protection to the pre-buried anchor node in this embodiment. The embedded steel bar that here set up is stiffened, and each tie point adopts two embedded anchor simultaneously, prevents that the embedded anchor from being extracted or splitting to appear among the hoist and mount process. The method specifically comprises the following steps: the cavity reservation phi 40 that the embedded anchor connects has guaranteed M24 embedded anchor's harmonious operation error space. Two holes phi 50 of 235x135x15mm steel plate need to consider the shearing at the holes to meet the requirements in calculation, and the whole connecting piece basically belongs to a symmetrical member.
A hoisting tool based on a precast concrete integral toilet comprises a hoisting frame, a lifting hook, a steel strand rope and a connecting piece; the hanging bracket comprises a main frame, a plurality of thick upper lifting lugs 2 arranged on the upper end surface of the main frame, a plurality of thick lower lifting lugs 4 arranged on the lower end surface of the main frame and a channel steel 6 fixedly connected in the main frame, wherein the thick upper lifting lugs 2 and the thick lower lifting lugs 4 are respectively provided with a first connecting hole 3; the thick upper lifting lug 2 and the thick lower lifting lug 4 are fixedly connected with the main frame; in this embodiment, the thick upper lifting lug is 310x150x20mm, and the connecting hole one is Φ 50, in this embodiment, the cross section of the main frame is rectangular or square, the thick upper lifting lug 2 and the thick lower lifting lug 4 are both arranged at four corners of the main frame, and during hoisting, a hoisting rope is passed through the thick upper lifting lug and connected to a hoisting hook of a crane for hoisting. And the thick upper lifting lug 2 and the thick lower lifting lug 4 are connected with the hanger main frame by adopting double-sided fillet welding 5, the main frame is made of H-shaped steel, the channel steel and the H-shaped steel are also connected by adopting double-sided fillet welding 14, and in the embodiment, the channel steel 6 and the main frame form a triangle when being welded. The thick lower lifting lug of the hanger is 310x150x20mm, and the arranged phi 50 connecting hole I3 is connected with the phi 50 connecting hole II of the connecting piece. The connecting piece comprises a first steel plate 17 which is horizontally arranged, the contact length of the first steel plate 17 and the prefabricated concrete integrated toilet chassis is 150mm, a second steel plate 15 and a third steel plate 16 which are perpendicular to each other are arranged on the first steel plate 17, a plurality of screw openings 18 are formed in the second steel plate 15, the connecting piece further comprises high-strength screws which penetrate through the screw openings and can be connected with the embedded anchor bolts, and the connecting piece is connected with the prefabricated integrated toilet chassis through 8M 24 high-strength screws in the embodiment; the steel plate III 16 is provided with a connecting hole II 15; the steel hinge rope 8 can penetrate through the first connecting hole 3 of the thick lower lifting lug 4 and the second connecting hole 24 to realize connection of the connecting piece and the hanging bracket, and further connection of the hanging bracket and the prefabricated integral toilet chassis is realized.
The hoisting tool is suitable for hoisting operation of hoisting the precast concrete integral toilet within 10 tons, basically meets the hoisting requirement of the common toilet of a residential structure, considers the width of the toilet in at least one direction, and ensures the protection of the precast concrete integral toilet in the hoisting process.
Example three:
the utility model provides an integral bathroom of precast concrete, includes sanitary equipment, four sides wall body, is located the roof of four sides wall body top and is located the bathroom chassis 12 of 13 below of four sides wall body, bathroom chassis 12 set up a plurality of embedded anchor node, the embedded anchor node be provided with embedded anchor protection piece.
The embedded anchor bolt node also comprises a plurality of embedded anchor bolts; in this embodiment, two M24 bolts are pre-buried to each node for the tensile and the shearing resistance of embedded anchor node are strong, during the installation, the embedded anchor correspond the screw that excels in of configuration, just embedded anchor protection piece wear muscle 20 and cooperation pre-buried muscle formation reinforcing bar 19 of wearing the muscle formation to strengthen the protection including setting up at the terminal perforation department angle of embedded anchor for the pre-buried of 30 degrees matches, adopt two phi 14 reinforcing bars of four phi 10U shaped steel muscle cooperations to form the reinforcement protection to the embedded anchor node in this embodiment. The embedded steel bar that here set up is stiffened, and each tie point adopts two embedded anchor simultaneously, prevents that the embedded anchor from being extracted or splitting to appear among the hoist and mount process. The method specifically comprises the following steps: the cavity reservation phi 40 that the embedded anchor connects has guaranteed M24 embedded anchor's harmonious operation error space. Two holes phi 50 of 235x135x15mm steel plate need to consider the shearing at the holes to meet the requirements in calculation, and the whole connecting piece basically belongs to a symmetrical member.
A hoisting tool based on a precast concrete integral toilet comprises a hoisting frame, a lifting hook, a steel strand rope and a connecting piece; the hanging bracket comprises a main frame, a plurality of thick upper lifting lugs 2 arranged on the upper end surface of the main frame, a plurality of thick lower lifting lugs 4 arranged on the lower end surface of the main frame and a channel steel 6 fixedly connected in the main frame, wherein the thick upper lifting lugs 2 and the thick lower lifting lugs 4 are respectively provided with a first connecting hole 3; the thick upper lifting lug 2 and the thick lower lifting lug 4 are fixedly connected with the main frame; in this embodiment, the thick upper lifting lug is 310x150x20mm, and the connecting hole one is Φ 50, in this embodiment, the cross section of the main frame is rectangular or square, the thick upper lifting lug 2 and the thick lower lifting lug 4 are both arranged at four corners of the main frame, and during hoisting, the hoisting rope 1 is passed through the thick upper lifting lug and connected to a hoisting hook of a crane for hoisting. And the thick upper lifting lug 2 and the thick lower lifting lug 4 are connected with the hanger main frame by adopting double-sided fillet welding 5, the main frame is made of H-shaped steel, the channel steel and the H-shaped steel are also connected by adopting double-sided fillet welding 14, and in the embodiment, the channel steel 6 and the main frame form a quadrangle when being welded, but not limited to the quadrangle. The thick lower lifting lug of the hanger is 310x150x20mm, and the arranged phi 50 connecting hole I3 is connected with the phi 50 connecting hole II of the connecting piece. The connecting piece comprises a first steel plate 17 which is horizontally arranged, the contact length of the first steel plate 17 and the prefabricated concrete integrated toilet chassis is 150mm, a second steel plate 15 and a third steel plate 16 which are perpendicular to each other are arranged on the first steel plate 17, a plurality of screw openings 18 are formed in the second steel plate 15, the connecting piece further comprises high-strength screws which penetrate through the screw openings and can be connected with the embedded anchor bolts, and the connecting piece is connected with the prefabricated integrated toilet chassis through 8M 24 high-strength screws in the embodiment; the steel plate III 16 is provided with a connecting hole II 15; the steel hinge rope 8 can penetrate through the first connecting hole 3 of the thick lower lifting lug 4 and the second connecting hole 24 to achieve connection of the connecting piece and the hanging bracket, connection of the hanging bracket and the prefabricated integral toilet chassis is achieved, the reinforced protection bottom support is formed through the embedded anchor bolt protection block to be connected with the prefabricated concrete integral toilet chassis, and lifting safety is guaranteed.
The hoisting tool is suitable for hoisting operation of hoisting the precast concrete integral toilet within 10 tons, basically meets the hoisting requirement of the common toilet of a residential structure, considers the width of the toilet in at least one direction, and ensures the protection of the precast concrete integral toilet in the hoisting process.
In conclusion, the precast concrete integral toilet provided by the invention is matched with a hoisting tool thereof for use, and has higher safety, stability and reliability.
Although the invention has been described above with reference to various embodiments, it should be understood that many changes and modifications may be made without departing from the scope of the invention. That is, the methods, systems, and devices discussed above are examples. Various configurations may omit, substitute, or add various procedures or components as appropriate. For example, in alternative configurations, the methods may be performed in an order different than that described, and/or various components may be added, omitted, and/or combined. Moreover, features described with respect to certain configurations may be combined in various other configurations, as different aspects and elements of the configurations may be combined in a similar manner. Further, elements therein may be updated as technology evolves, i.e., many elements are examples and do not limit the scope of the disclosure or claims.
Specific details are given in the description to provide a thorough understanding of the exemplary configurations including implementations. However, configurations may be practiced without these specific details, for example, well-known circuits, processes, algorithms, structures, and techniques have been shown without unnecessary detail in order to avoid obscuring the configurations. This description provides example configurations only, and does not limit the scope, applicability, or configuration of the claims. Rather, the foregoing description of the configurations will provide those skilled in the art with an enabling description for implementing the described techniques. Various changes may be made in the function and arrangement of elements without departing from the spirit or scope of the disclosure.
In conclusion, it is intended that the foregoing detailed description be regarded as illustrative rather than limiting, and that it be understood that these examples are illustrative only and are not intended to limit the scope of the invention. After reading the description of the invention, the skilled person can make various changes or modifications to the invention, and these equivalent changes and modifications also fall into the scope of the invention defined by the claims.

Claims (10)

1. The utility model provides an integral bathroom of precast concrete, includes bathroom equipment, four sides wall body, is located the roof of four sides wall body top and is located the bathroom chassis of four sides wall body below, its characterized in that, the bathroom chassis set up the pre-buried anchor node that a plurality of is used for hoisting the bathroom, the pre-buried anchor node be provided with pre-buried anchor protection piece.
2. The precast concrete integrated toilet as recited in claim 1, wherein the anchor bolts further comprise a plurality of anchor bolts.
3. The precast concrete integral toilet according to any one of the preceding claims, wherein the anchor bolt protection block comprises embedded penetrating bars arranged at the end of the anchor bolt and matched with the embedded penetrating bars at an angle of 30 degrees, and reinforcing steel bars matched with the embedded penetrating bars to form reinforced protection.
4. A hoisting tool for a precast concrete integral toilet is characterized by comprising a hoisting frame, a lifting hook, a steel strand and a connecting piece.
5. The precast concrete integral type lifting tool for the bathroom as claimed in one of the preceding claims, wherein the hanger comprises a main frame, a plurality of thick upper lifting lugs arranged on the upper end surface of the main frame, a plurality of thick lower lifting lugs arranged on the lower end surface of the main frame and a channel steel fixedly connected in the main frame, and the thick upper lifting lugs and the thick lower lifting lugs are respectively provided with a first connecting hole.
6. The precast concrete integral toilet lifting appliance according to any one of the preceding claims, wherein the thick upper lifting lug and the thick lower lifting lug are fixedly connected with the main frame.
7. The precast concrete integral toilet lifting appliance according to any one of the preceding claims, wherein the connecting member comprises a first steel plate which is horizontally arranged, a second steel plate and a third steel plate which are perpendicular to each other are arranged on the first steel plate, a plurality of screw openings are formed in the second steel plate, and a connecting hole is formed in the third steel plate.
8. The precast concrete integral toilet lifting appliance according to any one of the preceding claims, wherein the connecting member further comprises a high-strength screw which passes through the screw opening and can be connected with the anchor bolt.
9. The precast concrete integral toilet lifting appliance according to any one of the preceding claims, wherein the lifting rope can pass through the first connecting hole of the thick upper lifting lug and can be lifted by the lifting hook.
10. The precast concrete integral toilet lifting appliance according to any one of the preceding claims, wherein the steel strand can pass through the first connecting hole and the second connecting hole of the thick lower lifting lug to realize the connection of the connecting piece and the lifting frame.
CN201910871673.7A 2019-09-16 2019-09-16 Integral bathroom of precast concrete and hoist and mount apparatus thereof Active CN110644815B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910871673.7A CN110644815B (en) 2019-09-16 2019-09-16 Integral bathroom of precast concrete and hoist and mount apparatus thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910871673.7A CN110644815B (en) 2019-09-16 2019-09-16 Integral bathroom of precast concrete and hoist and mount apparatus thereof

Publications (2)

Publication Number Publication Date
CN110644815A true CN110644815A (en) 2020-01-03
CN110644815B CN110644815B (en) 2021-10-29

Family

ID=69010530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910871673.7A Active CN110644815B (en) 2019-09-16 2019-09-16 Integral bathroom of precast concrete and hoist and mount apparatus thereof

Country Status (1)

Country Link
CN (1) CN110644815B (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4048775A (en) * 1975-10-22 1977-09-20 The Sanymetal Products Co., Inc. Anchor assembly for pilasters
CN201077715Y (en) * 2007-08-13 2008-06-25 天津港第一港埠公司 Container lifting base angle lockhole sling with localization
AU2004290609B2 (en) * 2003-11-20 2010-01-21 Brisbane Bathroom Hire Pty Ltd Portable bathroom
CN201704766U (en) * 2010-03-31 2011-01-12 周毅 Mobile toilet capable of integrally folding, hoisting, assembling and disassembling
CN201907919U (en) * 2010-12-27 2011-07-27 李奎阳 Lifting appliance for foundation ring of wind power tower cylinder
CN102777032A (en) * 2011-03-17 2012-11-14 有利华建筑预制件有限公司 Installation method of prefabricated toilet
CN203586820U (en) * 2013-11-12 2014-05-07 河南省宏达炉业有限公司 Pre-buried lifting device for prefabricated member
CN104669434A (en) * 2013-11-27 2015-06-03 五冶集团上海有限公司 Construction method of large reinforced concrete prefabricated column and beam lifting auxiliary embedded part
CN205894291U (en) * 2016-05-23 2017-01-18 河北合创建筑节能科技有限责任公司 Assemble integral precast prestressed reinforced concrete roof beam and frame support connnection structure
CN106592986A (en) * 2016-12-09 2017-04-26 中建安装工程有限公司 Modular lifting method for integral type bathroom
CN107298371A (en) * 2017-06-23 2017-10-27 中冶天工集团有限公司 A kind of steel structure modularization house universal hanger and on-site hoisting installation method
CN109779310A (en) * 2019-02-21 2019-05-21 北京工业大学 A kind of co-layer draining blank integral vacuum toilet of outer wall provided pipe line groove hole
CN109968500A (en) * 2019-03-15 2019-07-05 湖南恒运建筑科技发展有限公司 Prefabricated integration toilet mold

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4048775A (en) * 1975-10-22 1977-09-20 The Sanymetal Products Co., Inc. Anchor assembly for pilasters
AU2004290609B2 (en) * 2003-11-20 2010-01-21 Brisbane Bathroom Hire Pty Ltd Portable bathroom
CN201077715Y (en) * 2007-08-13 2008-06-25 天津港第一港埠公司 Container lifting base angle lockhole sling with localization
CN201704766U (en) * 2010-03-31 2011-01-12 周毅 Mobile toilet capable of integrally folding, hoisting, assembling and disassembling
CN201907919U (en) * 2010-12-27 2011-07-27 李奎阳 Lifting appliance for foundation ring of wind power tower cylinder
CN102777032A (en) * 2011-03-17 2012-11-14 有利华建筑预制件有限公司 Installation method of prefabricated toilet
CN203586820U (en) * 2013-11-12 2014-05-07 河南省宏达炉业有限公司 Pre-buried lifting device for prefabricated member
CN104669434A (en) * 2013-11-27 2015-06-03 五冶集团上海有限公司 Construction method of large reinforced concrete prefabricated column and beam lifting auxiliary embedded part
CN205894291U (en) * 2016-05-23 2017-01-18 河北合创建筑节能科技有限责任公司 Assemble integral precast prestressed reinforced concrete roof beam and frame support connnection structure
CN106592986A (en) * 2016-12-09 2017-04-26 中建安装工程有限公司 Modular lifting method for integral type bathroom
CN107298371A (en) * 2017-06-23 2017-10-27 中冶天工集团有限公司 A kind of steel structure modularization house universal hanger and on-site hoisting installation method
CN109779310A (en) * 2019-02-21 2019-05-21 北京工业大学 A kind of co-layer draining blank integral vacuum toilet of outer wall provided pipe line groove hole
CN109968500A (en) * 2019-03-15 2019-07-05 湖南恒运建筑科技发展有限公司 Prefabricated integration toilet mold

Also Published As

Publication number Publication date
CN110644815B (en) 2021-10-29

Similar Documents

Publication Publication Date Title
CN101481935B (en) Prestressed reinforcement concrete double T plate, tire shuttering thereof and production method
CN108678220B (en) Concrete shear wall with integrally installed reinforcing steel bar templates
CN210685444U (en) Quick leveling, mounting and supporting device for prefabricated external wall panel
CN110735530A (en) external wall steel formwork and internal wall aluminum formwork combination system and operation method thereof
JP3196043B2 (en) Construction method of stairs and staircase, construction method of stairs, and stair members
CN110644815B (en) Integral bathroom of precast concrete and hoist and mount apparatus thereof
CN109895239B (en) Fabricated concrete stair slow platform beam slab and construction method thereof
CN104727469A (en) Staircase prefabricated reinforced concrete fireproof bulkhead structure and construction method thereof
CN211813046U (en) Hoisting device of pi shaped steel mixes combination bridge girder steel
CN109372239A (en) A kind of basket type builder's jack
CN108755974A (en) The connection structure and construction method of the integral prefabricated partition plate of cantilever stair
CN109184032A (en) A kind of vertical connecting structure of fabricated shear wall and installation method being easily installed
CN210713568U (en) Parapet component of prefabricated building
CN209244222U (en) A kind of basket type builder's jack
CN212836355U (en) Prefabricated staircase
CN210713437U (en) Composite floor slab of fabricated building
CN210507768U (en) Novel prefabricated balcony
CN103628673B (en) A kind of floor aluminum alloy pattern plate splicing formwork erecting structure system
CN209228053U (en) Large cantilever combined type anchor curable type steel operation platform
CN209040478U (en) A kind of out-hung panel fixed structure
CN216866121U (en) Interim steel stair operation platform device in assembly type structure stairwell
CN110080518A (en) Face the cast-in-place position template of side precast wall body and its installation method
CN212837323U (en) Combined bay window component
CN220395203U (en) Outer wall die block strutting arrangement
CN212507046U (en) Assembled composite outer wall enclosure system with good heat insulation effect

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant