CN110644788A - A method and device for controlling the lifting and lowering of the bottom mold of a cast-in-place wet joint of a prefabricated beam - Google Patents

A method and device for controlling the lifting and lowering of the bottom mold of a cast-in-place wet joint of a prefabricated beam Download PDF

Info

Publication number
CN110644788A
CN110644788A CN201911037836.8A CN201911037836A CN110644788A CN 110644788 A CN110644788 A CN 110644788A CN 201911037836 A CN201911037836 A CN 201911037836A CN 110644788 A CN110644788 A CN 110644788A
Authority
CN
China
Prior art keywords
cast
wet joint
place wet
lifting
bottom mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911037836.8A
Other languages
Chinese (zh)
Inventor
陈宽
陈建光
刘帮
付皓
王应鹏
晏克珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Investment And Construction Co Ltd
China Construction Fourth Division Guizhou Investment and Construction Co Ltd
Original Assignee
Guizhou Investment And Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Investment And Construction Co Ltd filed Critical Guizhou Investment And Construction Co Ltd
Priority to CN201911037836.8A priority Critical patent/CN110644788A/en
Publication of CN110644788A publication Critical patent/CN110644788A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G19/00Auxiliary treatment of forms, e.g. dismantling; Cleaning devices
    • E04G19/003Arrangements for stabilising the forms or for moving the forms from one place to another
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/12Chain or like hand-operated tackles with or without power transmission gearing between operating member and lifting rope, chain or cable
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a method and a device for controlling the lifting of a bottom die of a cast-in-place wet joint of a precast beam, wherein before the cast-in-place wet joint is poured between two adjacent precast beams, a temporary support is erected on the two precast beams in advance, a steel bar roller is arranged on the temporary support, an anti-falling lifting rope is connected to the steel bar roller, and one end of the anti-falling lifting rope penetrates through a PVC sleeve arranged between the two precast beams and then is connected with the bottom die below the two precast beams; therefore, pouring wet joints can be formed between the two precast beams, and after the pouring of the poured wet joints is completed, the lifting of the bottom die below the precast beams is controlled by shaking the rotating handle on the steel bar idler wheel. The invention can conveniently pull the bottom die of the cast-in-place wet joint, is convenient for operators to control the bottom die to fall, and can greatly reduce the labor capacity and shorten the construction period. The invention can be detached for repeated use, saves materials and reduces cost. And the falling speed of the bottom die can be manually controlled, and the safety of a construction site is effectively improved.

Description

一种控制预制梁现浇湿接缝底模升降的方法及装置A method and device for controlling the lifting and lowering of the bottom mold of a cast-in-place wet joint of a prefabricated beam

技术领域technical field

本发明涉及一种控制预制梁现浇湿接缝底模升降的方法及装置,属于建筑施工技术领域。The invention relates to a method and a device for controlling the lifting and lowering of a bottom mold of a cast-in-place wet joint of a prefabricated beam, and belongs to the technical field of building construction.

背景技术Background technique

现有技术在进行现浇湿接缝搭设或拆卸模板时,是通过工人高空作业,人工传递模板作业。搭设或拆卸过程中容易造成模板砸伤下方拆模工作人员的安全事故。通常湿接缝沿水平方向作业路线长,模板下方的拆模人员须仰着头传递模板,导致拆模传递模板人员作业难度大,作业效率低等问题。因此,现有的技术还不够完善,有待于进一步提高。In the prior art, when the cast-in-place wet seam is erected or the formwork is disassembled, workers are operated at high altitudes and the formwork is transferred manually. In the process of erection or disassembly, it is easy to cause the safety accident of the formwork smashing the formwork dismantling workers below. Usually, the wet seam has a long working route in the horizontal direction, and the formwork dismantling personnel under the formwork must lift their heads to transfer the formwork, which leads to problems such as difficult work and low work efficiency for the formwork dismantling and transfer formwork personnel. Therefore, the existing technology is not perfect and needs to be further improved.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于,提供一种控制预制梁现浇湿接缝底模升降的方法及装置,使搭设或拆卸模板安全可靠,并可提高作业效率,从而克服现有技术存在的不足。The purpose of the present invention is to provide a method and device for controlling the lifting and lowering of the cast-in-situ wet joint bottom form of a prefabricated beam, so that the erection or disassembly formwork is safe and reliable, and the operation efficiency can be improved, thereby overcoming the deficiencies of the prior art.

为实现上述目的,本发明采用如下技术方案:To achieve the above object, the present invention adopts the following technical solutions:

本发明的一种控制预制梁现浇湿接缝底模升降的方法,该方法是在相邻的两块预制梁之间浇筑现浇湿接缝前,预先在两块预制梁上搭设临时支架,并在临时支架上安装钢筋滚轮,同时在钢筋滚轮上连接有防坠吊绳,并使防坠吊绳的一端穿过设置在两块预制梁之间的PVC套管后与两块预制梁下方的底模连接;这样即可在两块预制梁之间浇筑出现浇湿接缝,并在现浇湿接缝浇筑完工后,通过摇动钢筋滚轮上的转动手柄控制预制梁下方的底模的升降。The present invention is a method for controlling the lifting and lowering of the bottom mold of the cast-in-place wet joint of prefabricated beams. The method is to set up temporary supports on the two prefabricated beams in advance before pouring the cast-in-place wet joint between two adjacent prefabricated beams. , and install the steel roller on the temporary bracket, and connect the anti-falling rope on the steel roller, and make one end of the anti-falling rope pass through the PVC casing set between the two prefabricated beams and the two prefabricated beams. The bottom form below is connected; in this way, a wet joint can be poured between the two precast beams, and after the pouring of the cast-in-place wet joint is completed, the bottom form below the precast beam can be controlled by shaking the rotating handle on the rebar roller. the lift.

上述控制预制梁现浇湿接缝底模升降的方法中,所述PVC套管顶端应高出两块预制梁上表面的混凝土面5cm以上,以防止在浇筑现浇湿接缝时混凝土流入PVC套管中将防坠吊绳凝住。In the above-mentioned method for controlling the lifting and lowering of the bottom form of the cast-in-place wet joint of the prefabricated beam, the top of the PVC casing should be higher than the concrete surface of the upper surfaces of the two prefabricated beams by more than 5 cm, so as to prevent the concrete from flowing into the PVC during the pouring of the cast-in-place wet joint. The anti-fall sling is condensed in the casing.

根据上述方法构成的本发明的一种控制预制梁现浇湿接缝底模升降的装置,包括相邻的两块预制梁,在相邻的两块预制梁上搭设有临时支架,在临时支架上安装有钢筋滚轮,在钢筋滚轮上连接有防坠吊绳,防坠吊绳的一端缠绕在钢筋滚轮上,防坠吊绳的另一端穿过用于预埋在两块预制梁之间的现浇湿接缝中的PVC套管后与现浇湿接缝下方的底模连接;通过摇动钢筋滚轮上的转动手柄控制现浇湿接缝下方的底模的升降。A device of the present invention for controlling the lifting and lowering of the cast-in-place wet joint bottom mold of a prefabricated beam constructed according to the above method includes two adjacent prefabricated beams, and a temporary bracket is placed on the adjacent two prefabricated beams. A steel roller is installed on the steel bar, and an anti-falling rope is connected to the steel roller. The PVC casing in the cast-in-place wet joint is connected with the bottom mold under the cast-in-place wet joint; the bottom mold under the cast-in-place wet joint is controlled by shaking the rotating handle on the rebar roller.

上述控制预制梁现浇湿接缝底模升降的装置中,所述临时支架包括一对角钢支腿;该一对角钢支腿的顶部经封端角钢连接;封端角钢底部焊接有一对与角钢支腿位置对称的一对钢管支腿;角钢支腿与钢管支腿之间设有横向连杆;角钢支腿上部设有用于安装钢筋滚轮的安装孔;钢筋滚轮两端的转动手柄从安装孔穿过与角钢支腿转动连接。In the above device for controlling the lifting and lowering of the cast-in-place wet joint bottom mold of a prefabricated beam, the temporary support includes a pair of angle steel legs; the tops of the pair of angle steel legs are connected by the end angle steel; the bottom of the end angle steel is welded with a pair of and angle steel A pair of steel pipe outriggers with symmetrical positions of the outriggers; a transverse link is arranged between the angle steel outriggers and the steel pipe outriggers; the upper part of the angle steel outriggers is provided with mounting holes for installing the rebar rollers; the rotating handles at both ends of the rebar rollers pass through the mounting holes By rotating with the angle steel legs.

上述装置中,在底模下端的防坠吊绳上连接有能将托住底模托住的模板底托。In the above device, a formwork bottom bracket capable of supporting the bottom mold is connected to the anti-falling rope at the lower end of the bottom mold.

由于采用了上述技术方案,本发明与现有技术相比,本发明可将现浇湿接缝的底模拉住,并根据施工需要进行底模的升降操作,大大方便了作业人员控制底模降落或提升,能大大减少劳动量、缩短工期。本发明中所用材料均可拆卸重复使用,节约材料,降低成本。采用防坠吊绳降落模板可以人工控制降落速度,有效地提高了施工现场的安全性。Due to the adoption of the above technical solution, compared with the prior art, the present invention can pull the bottom mold of the cast-in-place wet joint, and perform the lifting operation of the bottom mold according to the construction needs, which greatly facilitates the operator to control the bottom mold Landing or lifting can greatly reduce the amount of labor and shorten the construction period. The materials used in the present invention can be disassembled and reused, saving materials and reducing costs. The use of anti-fall rope drop formwork can manually control the drop speed, which effectively improves the safety of the construction site.

附图说明Description of drawings

图1是本发明的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of the present invention;

图2是图1的主视图。FIG. 2 is a front view of FIG. 1 .

附图中的标记为:1-转动手柄,2-钢筋滚轮,3-横向连杆,4-防坠吊绳,5-封端角钢,6-角钢支腿,7-钢管支腿,8-PVC套管,9-底模,10-模板底托,11-预制预制梁翼缘板,12-现浇湿接缝。The markings in the drawings are: 1-rotating handle, 2-steel roller, 3-transverse connecting rod, 4-anti-falling rope, 5-capped angle steel, 6-angle steel leg, 7-steel pipe leg, 8- PVC casing, 9- bottom formwork, 10- formwork bottom bracket, 11- prefabricated prefabricated beam flange plate, 12- cast-in-place wet joint.

具体实施方式Detailed ways

下面结合附图和实施例对本发明作进一步的详细说明。The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.

本发明的一种控制预制梁现浇湿接缝底模升降的方法,如图1和图2所示:该方法是在相邻的两块预制梁11之间浇筑现浇湿接缝12前,预先在两块预制梁11上搭设临时支架,并在临时支架上安装钢筋滚轮2,同时在钢筋滚轮2上连接有防坠吊绳4,并使防坠吊绳4的一端穿过设置在两块预制梁11之间的PVC套管8后与两块预制梁11下方的底模9连接;这样即可在两块预制梁11之间浇筑现浇湿接缝12,并在现浇湿接缝12浇筑完工后,通过摇动钢筋滚轮2上的转动手柄1控制预制梁11下方的底模9的升降;制作时,使所述PVC套管8顶端应高出两块预制梁上表面的混凝土面5cm以上,这样可以防止在浇筑现浇湿接缝12时混凝土流入PVC套管8中将防坠吊绳4凝住。A method of controlling the lifting and lowering of the cast-in-place wet joint bottom mold of a prefabricated beam according to the present invention is shown in Figures 1 and 2: the method is to place the cast-in-place wet joint 12 between two adjacent prefabricated beams 11 before casting. , set up temporary brackets on the two prefabricated beams 11 in advance, and install the steel bar roller 2 on the temporary bracket, and connect the anti-falling rope 4 on the steel roller 2 at the same time, and make one end of the anti-falling hanging rope 4 pass through and set in the The PVC casing 8 between the two prefabricated beams 11 is then connected to the bottom mold 9 below the two prefabricated beams 11; in this way, the cast-in-place wet joint 12 can be poured between the two prefabricated beams 11, and the cast-in-place wet joint 12 can be poured between the two prefabricated beams 11. After the joint 12 is poured, the bottom mold 9 under the prefabricated beam 11 is controlled by shaking the rotating handle 1 on the rebar roller 2; during production, the top of the PVC sleeve 8 should be higher than the upper surface of the two prefabricated beams. The concrete surface should be more than 5 cm, so as to prevent the concrete from flowing into the PVC casing 8 when the cast-in-place wet joint 12 is poured, so that the anti-falling suspender 4 is frozen.

根据上述方法构成的本发明的一种控制预制梁现浇湿接缝底模升降的装置,如图1和图2所示:该装置包括包括已经制作好的相邻的两块预制梁11,在相邻的两块预制梁11上搭设临时支架,并在临时支架上安装钢筋滚轮2,钢筋滚轮2上连接有防坠吊绳4,防坠吊绳4缠绕在钢筋滚轮2上,防坠吊绳4另一端穿过两块预制梁11之间的现浇湿接缝12,并与现浇湿接缝12下方的底模9连接;通过摇动钢筋滚轮2上的转动手柄1控制预制梁现浇湿接缝底模的升降。临时支架包括一对角钢支腿6;一对角钢支腿6顶部经封端角钢5连接;封端角钢5底部焊接有一对与角钢支腿6位置对称的一对钢管支腿7;角钢支腿6与钢管支腿7之间设有横向连杆3;角钢支腿6上部设有用于安装钢筋滚轮2的安装孔;钢筋滚轮2两端的转动手柄1从安装孔穿过与角钢支腿6转动连接。防坠吊绳4设有模板底托10,通过模板底托10托住底模9。防坠吊绳4穿过现浇湿接缝12段设有PVC套管8,以防止混凝土浇筑在防坠吊绳4上。PVC套管8顶端应高出混凝土面5cm,防止浇筑混凝土时,混凝土流入PVC套管8内将防坠吊绳4凝住。A device for controlling the lifting and lowering of the cast-in-situ wet joint bottom mold of a prefabricated beam according to the present invention constituted according to the above method, as shown in Figures 1 and 2: the device includes two adjacent prefabricated beams 11 that have been fabricated. Temporary brackets are set up on the two adjacent prefabricated beams 11, and steel bar rollers 2 are installed on the temporary brackets. The steel bar rollers 2 are connected with anti-dropping ropes 4, and the anti-dropping ropes 4 are wound on the steel bar rollers 2 to prevent falling. The other end of the hanging rope 4 passes through the cast-in-place wet joint 12 between the two prefabricated beams 11, and is connected to the bottom mold 9 below the cast-in-place wet joint 12; the prefabricated beam is controlled by shaking the rotating handle 1 on the rebar roller 2 Lifting of cast-in-place wet seam bottom molds. The temporary support includes a pair of angle steel legs 6; the top of the pair of angle steel legs 6 is connected by the end angle steel 5; the bottom of the end angle steel 5 is welded with a pair of steel pipe legs 7 that are symmetrical with the angle steel legs 6; angle steel legs There is a transverse link 3 between 6 and the steel pipe outrigger 7; the upper part of the angle steel outrigger 6 is provided with a mounting hole for installing the rebar roller 2; connect. The anti-falling rope 4 is provided with a template bottom bracket 10 , and the bottom mold 9 is supported by the template bottom bracket 10 . The anti-falling rope 4 is provided with a PVC sleeve 8 through the cast-in-place wet joint 12 to prevent concrete from being poured on the anti-falling rope 4 . The top of the PVC casing 8 should be 5 cm above the concrete surface to prevent the concrete from flowing into the PVC casing 8 to condense the anti-falling rope 4 when pouring concrete.

具体实施时,转动手柄1和钢筋滚轮2焊接在一起,角钢支腿6和钢管支腿7通过横向连杆3相连,并采用封端角钢5固定封端形成成临时支架。将转动手柄1和钢筋滚轮2套接在临时支架之上,结合防坠吊绳4、PVC套管8、模板底托10组合成的底模提升装置。In specific implementation, the rotating handle 1 and the steel bar roller 2 are welded together, the angle steel legs 6 and the steel pipe legs 7 are connected by the transverse link 3, and the end-sealing angle steel 5 is used to fix and seal the ends to form a temporary support. Sleeve the rotating handle 1 and the rebar roller 2 on the temporary bracket, and combine with the anti-falling rope 4, the PVC sleeve 8, and the formwork bottom bracket 10 to form a bottom mold lifting device.

在支模施工时,转动手柄1和钢筋滚轮2通过角钢支腿6和钢筋支腿7架立套接;横向连杆3与角钢支腿6和钢筋支腿7焊接成三角形;封端角钢5将两榀支腿组合固定形成临时支架。模板底托10与钢筋滚轮2通过防坠吊绳4相连,防坠吊绳4与现浇湿接缝12之间采用PVC套管8隔离,防止现浇湿接缝12凝固锁死。模板底托10将底模9托住防止拆模期间底模9掉落造成安全事故。转动手柄1与钢筋滚轮2焊接在一起,在角钢支腿6上钻孔套接可转动。防坠吊绳4通过现浇湿接缝12内的一段采用PVC套管8隔离,PVC套管8顶端应高出混凝土面5cm,防止浇筑混凝土时,混凝土流入PVC套管将防坠吊绳凝住。确保拆模过程让防坠吊绳4顺利穿过现浇湿接缝12。During the construction of the formwork, the rotating handle 1 and the steel bar roller 2 are connected vertically through the angle steel leg 6 and the steel bar support leg 7; the transverse link 3 is welded with the angle steel support leg 6 and the steel bar support leg 7 to form a triangle; the end angle steel 5 The two outriggers are combined and fixed to form a temporary bracket. The formwork bottom bracket 10 is connected with the rebar roller 2 by the anti-falling rope 4, and the PVC casing 8 is used to isolate the anti-falling rope 4 from the cast-in-place wet joint 12 to prevent the cast-in-place wet joint 12 from freezing and locking. The formwork bottom bracket 10 supports the bottom mold 9 to prevent the bottom mold 9 from falling off during demolding and causing safety accidents. The rotating handle 1 is welded with the steel bar roller 2, and the angle steel leg 6 is drilled and socketed so that it can be rotated. The anti-fall hanging rope 4 is isolated by a PVC casing 8 through a section of the cast-in-place wet joint 12. The top of the PVC casing 8 should be 5cm higher than the concrete surface to prevent the concrete from flowing into the PVC casing to condense the anti-fall hanging rope when pouring concrete. live. Make sure that the demolition process allows the anti-fall rope 4 to pass through the cast-in-place wet seam 12 smoothly.

PVC套管8可预先在底模9上,PVC套管8贯穿底模9,PVC套管8顶端应高出混凝土面5cm。待现浇湿接缝12强度达到拆模条件时,将防坠吊绳4穿过PVC套管8在底模9下与底模9顶托相连,拆除底模支撑时由人工控制转动手柄1,将底模9安全降落。The PVC sleeve 8 can be pre-installed on the bottom mold 9, the PVC sleeve 8 runs through the bottom mold 9, and the top of the PVC sleeve 8 should be 5 cm above the concrete surface. When the strength of the cast-in-place wet seam 12 reaches the mold removal condition, the anti-falling rope 4 is passed through the PVC sleeve 8 and connected to the bottom mold 9 under the bottom mold 9. When the bottom mold support is removed, the handle 1 is manually controlled to rotate. , drop the bottom mold 9 safely.

本发明结构简单,制造成本低,耗材较少,后期维护方便;使用过程中可将现浇湿接缝底模拉住,方便作业人员控制底模降落,能大大减少劳动量、缩短工期。本发明中所用材料均可拆卸重复使用,节约材料,降低成本。采用防坠吊绳降落模板可以人工控制降落速度,提高了施工现场的安全性。The invention has the advantages of simple structure, low manufacturing cost, less consumables and convenient maintenance in the later stage; the cast-in-place wet seam bottom mold can be pulled during use, which is convenient for operators to control the bottom mold to descend, and can greatly reduce labor and shorten construction period. The materials used in the present invention can be disassembled and reused, saving materials and reducing costs. The use of anti-fall rope drop formwork can manually control the drop speed, which improves the safety of the construction site.

Claims (5)

1.一种控制预制梁现浇湿接缝底模升降的方法,其特征在于:该方法是在相邻的两块预制梁之间浇筑现浇湿接缝前,预先在两块预制梁上搭设临时支架,并在临时支架上安装钢筋滚轮,同时在钢筋滚轮上连接有防坠吊绳,并使防坠吊绳的一端穿过设置在两块预制梁之间的PVC套管后与两块预制梁下方的底模连接;这样即可在两块预制梁之间浇筑出现浇湿接缝,并在现浇湿接缝浇筑完工后,通过摇动钢筋滚轮上的转动手柄控制预制梁下方的底模的升降。1. a method for controlling the lifting and lowering of the cast-in-place wet joint bottom mould of prefabricated beams, is characterized in that: the method is that before the cast-in-place wet joint is poured between adjacent two prefabricated beams, on the two prefabricated beams in advance Set up a temporary support, install a steel roller on the temporary support, and connect an anti-falling rope to the steel roller, and make one end of the anti-falling rope pass through the PVC casing set between the two prefabricated beams and the two. Bottom form connection under the block precast beams; this allows the pouring of the wet joint between the two precast beams, and after the pouring of the cast-in-place wet joint is completed, the lower part of the precast beam can be controlled by shaking the rotating handle on the rebar roller The lifting of the bottom mold. 2.根据权利要求1所述控制预制梁现浇湿接缝底模升降的方法,其特征在于:所述PVC套管顶端应高出两块预制梁上表面的混凝土面5cm以上,以防止在浇筑现浇湿接缝时混凝土流入PVC套管中将防坠吊绳凝住。2. The method for controlling the lifting and lowering of the cast-in-place wet joint bottom form of a prefabricated beam according to claim 1, wherein the top of the PVC casing should be higher than the concrete surface of the upper surface of the two prefabricated beams by more than 5cm to prevent When pouring the cast-in-place wet joint, the concrete flows into the PVC casing to solidify the anti-falling rope. 3.一种控制预制梁现浇湿接缝底模升降的装置,包括相邻的两块预制梁(11),其特征在于:在相邻的两块预制梁(11)上搭设有临时支架,在临时支架上安装有钢筋滚轮(2),在钢筋滚轮(2)上连接有防坠吊绳(4),防坠吊绳(4)的一端缠绕在钢筋滚轮(2)上,防坠吊绳(4)的另一端穿过用于预埋在两块预制梁(11)之间的现浇湿接缝(12)中的PVC套管(8)后与现浇湿接缝(12)下方的底模(9)连接;通过摇动钢筋滚轮(2)上的转动手柄(1)控制现浇湿接缝(12)下方的底模(9)的升降。3. A device for controlling the lifting and lowering of a cast-in-place wet joint bottom mold of a prefabricated beam, comprising two adjacent prefabricated beams (11), characterized in that: a temporary support is placed on the adjacent two prefabricated beams (11). , a steel roller (2) is installed on the temporary bracket, an anti-falling rope (4) is connected to the steel roller (2), and one end of the anti-falling rope (4) is wound on the steel roller (2) to prevent falling The other end of the suspending rope (4) passes through the PVC sleeve (8) used for pre-buying in the cast-in-place wet joint (12) between the two prefabricated beams (11), and then connects with the cast-in-place wet joint (12). ) is connected with the bottom mold (9) below; the bottom mold (9) under the cast-in-place wet joint (12) is controlled to rise and fall by shaking the rotating handle (1) on the rebar roller (2). 4.根据权利要求3所述的控制预制梁现浇湿接缝底模升降的装置,其特征在于:临时支架包括一对角钢支腿(6);该一对角钢支腿(6)的顶部经封端角钢(5)连接;封端角钢(5)底部焊接有一对与角钢支腿(6)位置对称的一对钢管支腿(7);角钢支腿(6)与钢管支腿(7)之间设有横向连杆(3);角钢支腿(6)上部设有用于安装钢筋滚轮(2)的安装孔;钢筋滚轮(2)两端的转动手柄(1)从安装孔穿过与角钢支腿(6)转动连接。4. The device for controlling the lifting and lowering of the cast-in-place wet joint bottom mold of a prefabricated beam according to claim 3, wherein the temporary support comprises a pair of angle steel legs (6); the top of the pair of angle steel legs (6) Connected by the capped angle steel (5); the bottom of the capped angle steel (5) is welded with a pair of steel pipe legs (7) symmetrical with the angle steel legs (6); A transverse connecting rod (3) is arranged between ); the upper part of the angle steel leg (6) is provided with a mounting hole for installing the rebar roller (2); the rotating handles (1) at both ends of the rebar roller (2) pass through the Angle steel legs (6) are connected in rotation. 5.根据权利要求3所述的控制预制梁现浇湿接缝底模升降的装置,其特征在于:在底模(9)下端的防坠吊绳(4)上连接有能将托住底模(9)托住的模板底托(10)。5. The device for controlling the lifting and lowering of the bottom mold of the cast-in-place wet seam of a prefabricated beam according to claim 3, characterized in that: the anti-falling rope (4) at the lower end of the bottom mold (9) is connected with a device capable of supporting the bottom mold. The formwork base (10) held by the formwork (9).
CN201911037836.8A 2019-10-29 2019-10-29 A method and device for controlling the lifting and lowering of the bottom mold of a cast-in-place wet joint of a prefabricated beam Pending CN110644788A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911037836.8A CN110644788A (en) 2019-10-29 2019-10-29 A method and device for controlling the lifting and lowering of the bottom mold of a cast-in-place wet joint of a prefabricated beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911037836.8A CN110644788A (en) 2019-10-29 2019-10-29 A method and device for controlling the lifting and lowering of the bottom mold of a cast-in-place wet joint of a prefabricated beam

Publications (1)

Publication Number Publication Date
CN110644788A true CN110644788A (en) 2020-01-03

Family

ID=68994973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911037836.8A Pending CN110644788A (en) 2019-10-29 2019-10-29 A method and device for controlling the lifting and lowering of the bottom mold of a cast-in-place wet joint of a prefabricated beam

Country Status (1)

Country Link
CN (1) CN110644788A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113818715A (en) * 2021-09-27 2021-12-21 成都城投建筑工程有限公司 Filling device and filling method for remaining gaps of laminated slab
CN114197310A (en) * 2021-11-02 2022-03-18 福建建工基础设施建设集团有限公司 An integrated bridge wet joint formwork device
CN115977384A (en) * 2022-12-23 2023-04-18 南通华荣建设集团有限公司 A beam body pre-buried hole pre-buried pipe adjustable device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0988348A (en) * 1995-09-27 1997-03-31 Taisei Corp Foundation beam construction method
CN202416184U (en) * 2011-12-29 2012-09-05 中建七局第一建筑有限公司 Construction device for formwork for longitudinal wet joint of box girder
CN203768803U (en) * 2014-04-10 2014-08-13 中核华泰建设有限公司 Bridge wet joint formwork lifting device
CN204310745U (en) * 2014-11-29 2015-05-06 中铁三局集团有限公司 High pier bridge wet joint template lifting system
CN205636498U (en) * 2016-04-27 2016-10-12 中铁六局集团有限公司 Wet seam construction equipment
CN205822018U (en) * 2016-06-27 2016-12-21 中铁建大桥工程局集团第三工程有限公司 A kind of Gullied, lake bridge wet seam match plate pattern upset peace tears combination unit open
CN209368686U (en) * 2018-12-08 2019-09-10 中建五局土木工程有限公司 A kind of wet seam mortar leakage prevention of precast beam quickly pacifies demoulding system
CN211114849U (en) * 2019-10-29 2020-07-28 中建四局贵州投资建设有限公司 Device for controlling lifting of cast-in-place wet joint bottom die of precast beam

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0988348A (en) * 1995-09-27 1997-03-31 Taisei Corp Foundation beam construction method
CN202416184U (en) * 2011-12-29 2012-09-05 中建七局第一建筑有限公司 Construction device for formwork for longitudinal wet joint of box girder
CN203768803U (en) * 2014-04-10 2014-08-13 中核华泰建设有限公司 Bridge wet joint formwork lifting device
CN204310745U (en) * 2014-11-29 2015-05-06 中铁三局集团有限公司 High pier bridge wet joint template lifting system
CN205636498U (en) * 2016-04-27 2016-10-12 中铁六局集团有限公司 Wet seam construction equipment
CN205822018U (en) * 2016-06-27 2016-12-21 中铁建大桥工程局集团第三工程有限公司 A kind of Gullied, lake bridge wet seam match plate pattern upset peace tears combination unit open
CN209368686U (en) * 2018-12-08 2019-09-10 中建五局土木工程有限公司 A kind of wet seam mortar leakage prevention of precast beam quickly pacifies demoulding system
CN211114849U (en) * 2019-10-29 2020-07-28 中建四局贵州投资建设有限公司 Device for controlling lifting of cast-in-place wet joint bottom die of precast beam

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113818715A (en) * 2021-09-27 2021-12-21 成都城投建筑工程有限公司 Filling device and filling method for remaining gaps of laminated slab
CN114197310A (en) * 2021-11-02 2022-03-18 福建建工基础设施建设集团有限公司 An integrated bridge wet joint formwork device
CN115977384A (en) * 2022-12-23 2023-04-18 南通华荣建设集团有限公司 A beam body pre-buried hole pre-buried pipe adjustable device

Similar Documents

Publication Publication Date Title
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN112458918A (en) High-pier hydraulic jacking integral steel frame platform formwork turnover construction system and construction method
CN102345381A (en) Hydraulic creeping formwork system and creeping formwork construction method
CN202055516U (en) Integral mold board elevating system of vertical shaft
CN110886488B (en) An intelligent integrated high-rise building machine
WO2022237482A1 (en) Construction apparatus and method for hanging, integrally assembling, and integrally lifting building vertical formwork
CN110644788A (en) A method and device for controlling the lifting and lowering of the bottom mold of a cast-in-place wet joint of a prefabricated beam
CN208122371U (en) On across the high-speed rail safe guarding shed fast dismounting device of operation line
CN111809528A (en) A construction method for a pier column vertical back cage platform channel and a back cage platform channel device
CN113927729A (en) Automatic production system of prefabricated hollow pier
JP3074765U (en) Pillar building construction system equipment
CN112761187B (en) Electric lifting movable die carrier for large-diameter working well
CN216634842U (en) Automatic production system of prefabricated hollow pier
CN100365237C (en) A self-elevating deformable and detachable overall lifting steel platform system and construction method
CN113502756B (en) A thin-wall pier hydraulic climbing formwork system and construction method thereof
CN119330198B (en) Prefabricated stand hoist and mount positioner
CN114561873A (en) Bridge high pier construction method
CN110792038B (en) A self-propelled hanging formwork tool and method for high-altitude cast-in-place beams of tied arch bridges
CN221168651U (en) Single-side hydraulic automatic climbing external hanging type climbing die system
CN108277994A (en) On across the high ferro safe guarding shed quick method for dismounting of operation line
CN211114849U (en) Device for controlling lifting of cast-in-place wet joint bottom die of precast beam
CN209760761U (en) A construction platform in the core tube and the construction structure of the elevator core tube
CN119465812A (en) A bridge cantilever construction hanging basket and construction method thereof
CN220352874U (en) Steel sleeve box template for water pile group concrete bearing platform
CN216515147U (en) Wet seam template device of integral type bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200103

RJ01 Rejection of invention patent application after publication