CN110635388A - An eight-split large cross-section wire tension stringing pulley hanger and its disassembly method - Google Patents
An eight-split large cross-section wire tension stringing pulley hanger and its disassembly method Download PDFInfo
- Publication number
- CN110635388A CN110635388A CN201810653773.8A CN201810653773A CN110635388A CN 110635388 A CN110635388 A CN 110635388A CN 201810653773 A CN201810653773 A CN 201810653773A CN 110635388 A CN110635388 A CN 110635388A
- Authority
- CN
- China
- Prior art keywords
- hanging
- frame
- isosceles trapezoid
- wire
- tackle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Electric Cable Installation (AREA)
Abstract
本发明涉及一种八分裂大截面导线张力架线滑车挂架及其拆装方法,滑车挂架为等腰梯形的多层框架结构,等腰梯形上底的两端均设有用于与V型绝缘子串连接的挂板B,等腰梯形的下底上沿长度方向均匀安装有四个挂板A,其中的两个挂板A安装于等腰梯形下底的两端,每个挂板A上均通过平行挂板连接放线滑车,四个放线滑车等高悬挂于滑车挂架上。本发明使铁塔每极悬挂四组三轮的放线滑车布置和悬挂方式变得简单,提高了张力架线的滑车悬挂施工效率;同时很好地解决架线施工常规滑车悬挂方式导致的滑车悬挂高度难以调节等高,弧垂观测困难、附件安装效率差等关键问题;避免了单独使用钢丝绳套悬挂一个工程后基本报废的问题,可重复使用,降低施工成本;比常规悬挂滑车悬挂点减少,减低安全性隐患点。
The invention relates to an eight-split large cross-section wire tension stringing pulley hanger and a disassembly method thereof. The pulley hanger is an isosceles trapezoidal multi-layer frame structure, and both ends of the isosceles trapezoidal upper bottom are provided with V-shaped The hanging board B connected in series by insulators, four hanging boards A are evenly installed along the length direction on the lower bottom of the isosceles trapezoid, two of which are installed on the two ends of the lower bottom of the isosceles trapezoid, and each hanging board A Both of them are connected to the pay-off block through parallel hanging plates, and the four pay-off blocks are suspended on the block hanger at the same height. The present invention simplifies the layout and suspension mode of the four sets of three-wheel pay-off blocks on each pole of the iron tower, and improves the construction efficiency of the pulley suspension for tension stringing; at the same time, it well solves the problem of block suspension caused by the conventional block suspension mode in the stringing construction Difficult to adjust the height and contour, difficult to observe the sag, poor installation efficiency of accessories and other key problems; avoid the problem that a project is basically scrapped after hanging a project with a single wire rope sleeve, can be reused, and reduce construction costs; compared with conventional suspension blocks, the number of suspension points is reduced, Reduce security risks.
Description
技术领域technical field
本发明属于输变电施工领域,具体地说是一种八分裂大截面导线张力架线滑车挂架及其拆装方法。The invention belongs to the field of power transmission and transformation construction, and in particular relates to an eight-split large cross-section wire tension stringing trolley hanger and a disassembly method thereof.
背景技术Background technique
特高压是世界上最先进的输电技术,具有输送容量大、送电距离长、线路损耗低、占用土地少等特点。UHV is the most advanced power transmission technology in the world, with the characteristics of large transmission capacity, long transmission distance, low line loss, and less land occupation.
特高压直流输电线路有些工程采用八分裂1250/100mm2级大截面导线,在我国特高压直流输电线路工程上的首次应用,导线外径及计算重量大,张力放线对施工机具的性能要求高。张力架线采用的是“4×一牵二”方式,这样每个铁塔每极需悬挂四组直径为1160mm的放线滑车,一个铁塔上需悬挂八组放线滑车。常规方法单组滑车通常使用两根(约5米/根)定长钢丝绳,配合绞磨、手扳葫芦进行悬挂。这种悬挂存在以下不足:Some projects of UHV DC transmission lines use eight-split 1250/100mm Class 2 large-section conductors, which are the first application in China’s UHV DC transmission line projects. The outer diameter and calculated weight of the wires are large, and the performance requirements for construction machines and tools are high for tension release. . The tension stringing adopts the "4×one lead two" method, so that each pole of each iron tower needs to hang four sets of pay-off tackles with a diameter of 1160mm, and one iron tower needs to hang eight sets of pay-off tackles. Conventional method single group tackle usually uses two (about 5 meters/root) fixed-length steel wire ropes, cooperates winch mill, hand block to carry out suspension. There are following deficiencies in this suspension:
第一,安全性低,悬挂点太多,各点均存在安全危险。First, the safety is low, there are too many suspension points, and there are safety hazards at each point.
第二,施工效率低,滑车逐一单个悬挂。The second, construction efficiency is low, and tackle is suspended one by one.
第三,弧垂控制难,滑车高度难以调整一致,调整各子导线弧垂困难。Third, the sag control is difficult, the height of the block is difficult to be adjusted consistently, and it is difficult to adjust the sag of each sub-conductor.
第四,施工成本高,一个工程制作的七八百根定长钢丝绳使用后基本报废,难以重复用。Fourth, the construction cost is high, and the seven or eight hundred fixed-length steel wire ropes produced by one project are basically scrapped after use and are difficult to reuse.
发明内容Contents of the invention
为了解决上述单独悬挂四组滑车存在的问题,本发明的目的在于提供一种八分裂大截面导线张力架线滑车挂架及其拆装方法。In order to solve the above-mentioned problems of independently suspending four groups of tackles, the object of the present invention is to provide an eight-split large-section wire tension stringing trolley hanger and a dismounting method thereof.
本发明的目的是通过以下技术方案来实现的:The purpose of the present invention is achieved through the following technical solutions:
本发明的八分裂大截面导线张力架线滑车挂架为等腰梯形的多层框架结构,所述等腰梯形上底的两端均设有用于与V型绝缘子串连接的挂板B,该等腰梯形的下底上沿长度方向均匀安装有四个挂板A,其中的两个挂板A安装于所述等腰梯形下底的两端,每个所述挂板A上均通过平行挂板连接放线滑车,四个所述放线滑车等高悬挂于滑车挂架上;The eight-split large cross-section wire tension stringing pulley hanger of the present invention is a multi-layer frame structure of isosceles trapezoid, and both ends of the upper bottom of the isosceles trapezoid are provided with hanging plates B for connecting with V-shaped insulators in series. The lower bottom of the isosceles trapezoid is evenly equipped with four hanging boards A along the length direction, two of which are installed on the two ends of the lower bottom of the isosceles trapezoid, and each of the hanging boards A is passed through parallel The hanging plate is connected to the pay-off tackle, and the four pay-off tackles are suspended at the same height on the tackle hanger;
其中:所述滑车挂架分为呈等腰梯形的边框及位于边框内的内框,该边框的内部通过横置的内框分为上下两层;Wherein: the tackle hanger is divided into an isosceles trapezoidal frame and an inner frame positioned within the frame, and the inside of the frame is divided into upper and lower layers by the horizontal inner frame;
作为所述等腰梯形上底的边框的两端分别连接挂板B,作为所述等腰梯形下底的边框上沿长度方向均匀连接四个挂板A,连接两个挂板B的连接处与下底位于中间的连接两个挂板A的连接处之间通过内框交叉连接,即用于连接的两根内框呈“X”型,且交点与所述横置的内框的中点通过连接板相连;所述等腰梯形下底位于中间的两个挂板A的连接处分别通过内框与所述横置的内框的两端通过连接板连接;The two ends of the frame as the upper bottom of the isosceles trapezoid are respectively connected to the hanging board B, and the frame as the lower bottom of the isosceles trapezoid is evenly connected with four hanging boards A along the length direction, and the junction of two hanging boards B is connected The connection between the two hanging boards A in the middle of the lower bottom is cross-connected through the inner frame, that is, the two inner frames used for connection are in the shape of "X", and the intersection point is in the middle of the horizontal inner frame. The points are connected by a connecting plate; the connection between the two hanging plates A in the middle of the isosceles trapezoidal lower bottom is respectively connected to the two ends of the horizontal inner frame through the inner frame through the connecting plate;
所述边框为槽钢,所述内框为角钢;The frame is channel steel, and the inner frame is angle steel;
所述横置的内框与等腰梯形的上底及下底平行;The horizontal inner frame is parallel to the upper and lower bases of the isosceles trapezoid;
本发明八分裂大截面导线张力架线滑车挂架的拆装方法为:The dismounting method of the eight-split large cross-section wire tension stringing pulley hanger of the present invention is as follows:
安装时,将四组所述放线滑车的上联板通过平行挂板与等腰梯形下底上的四个挂板A分别连接,将四组放线滑车等高悬挂在滑车挂架上;然后,将两组V型绝缘子串的一端与等腰梯形上底两端的挂板B连接;利用两套机动绞磨钢丝绳连接V型绝缘子串的另一端,钢丝绳通过铁塔上的提升滑车由绞磨牵引提升到设定位置,与铁塔连接后完成四组放线滑车的悬挂;During installation, the upper connecting plates of the four groups of pay-off tackles are respectively connected with the four hangers A on the lower bottom of the isosceles trapezoid through parallel hangers, and the four sets of pay-off tackles are suspended at the same height on the tackle hanger; Then, connect one end of the two sets of V-shaped insulator strings to the hanging boards B at both ends of the upper bottom of the isosceles trapezoid; use two sets of motorized twisted steel wire ropes to connect the other end of the V-shaped insulator strings, and the steel wire ropes pass through the hoisting block on the iron tower by the winch. Lift to the set position by traction, and complete the suspension of four sets of pay-off blocks after connecting with the iron tower;
拆卸时,首先用提线器提起导线,利用机动绞磨做牵引控制,将放线滑车逐个与滑车挂架解开并放落至地面,然后用柔性尼龙吊带和手扳葫芦将V型绝缘子串固定,并调整到所需位置,利用机动绞磨控制解开滑车挂架与V型绝缘子串的连接部位,然后放下滑车挂架;最后,在手扳葫芦的配合下完成线夹联板、导线线夹的安装与导线的固定;When disassembling, first use the wire lifter to lift the wires, use the motorized winch for traction control, untie the pay-off tackles from the tackle hangers one by one and drop them to the ground, then use flexible nylon slings and lever blocks to string the V-shaped insulators Fix it and adjust it to the desired position, use the motorized winch to control the connection between the pulley hanger and the V-shaped insulator string, and then put down the pulley hanger; finally, complete the clamping plate and wire with the cooperation of the lever hoist. Installation of clamps and fixing of wires;
其中:在展放导线过程中,四组所述放线滑车均等高,且受力均匀。Wherein: during the process of laying out the wires, the four sets of pay-off tackles are of the same height and are evenly stressed.
本发明的优点与积极效果为:Advantage of the present invention and positive effect are:
1.本发明滑车挂架将四组放线滑车同时悬挂在同一挂架上,无需调整滑车高度,高度保持一致,容易调整各子导线弧垂。1. The pulley hanger of the present invention hangs four groups of pay-off tackles on the same hanger at the same time, without adjusting the height of the tackles, the height remains consistent, and it is easy to adjust the sag of each sub-conductor.
2.本发明的滑车挂架可重复使用,避免使用钢丝绳套一个工程后就报废,减少施工费用。2. The pulley hanger of the present invention can be reused, avoiding the use of wire rope sleeves and then scrapping after one project, reducing construction costs.
3.本发明在放线过程中,滑车摆动小,架线通过性好,提高安全性。3. In the process of setting out the wire, the pulley swings less, the wire passing performance is good, and the safety is improved.
4.V型绝缘子串、放线滑车同步安装和悬挂,减少了工作量和悬挂点,提高了施工效率和安全性。4. The V-type insulator string and the pay-off block are installed and suspended synchronously, which reduces the workload and suspension points, and improves the construction efficiency and safety.
5.本发明紧线完毕可直接提线,大幅减少工作量,并可减少导线损伤。5. The present invention can directly lift the thread after tightening the thread, greatly reducing the workload and reducing the damage of the wire.
附图说明Description of drawings
图1为本发明滑车挂架的结构主视图;Fig. 1 is the structural front view of tackle hanger of the present invention;
图2为图1的侧视图;Fig. 2 is the side view of Fig. 1;
图3为本发明滑车挂架安装在铁塔上的结构示意图;Fig. 3 is the structural representation that the tackle hanger of the present invention is installed on the iron tower;
其中:1为边框,2为内框,3为连接板,4为挂板A,5为挂板B,6为平行挂板,7为上联板,8为放线滑车,9为V型绝缘子串,10为铁塔。Among them: 1 is the frame, 2 is the inner frame, 3 is the connecting plate, 4 is the hanging plate A, 5 is the hanging plate B, 6 is the parallel hanging plate, 7 is the upper connecting plate, 8 is the pay-off block, 9 is V-shaped Insulator string, 10 is an iron tower.
具体实施方式Detailed ways
下面结合附图对本发明作进一步详述。The present invention will be described in further detail below in conjunction with the accompanying drawings.
如图1~3所示,本发明的滑车挂架滑车挂架为等腰梯形的多层框架结构,滑车挂架分为呈等腰梯形的边框1及位于边框1内的起支撑作用的内框2,该边框1的内部通过一根横置的内框2分为上下两层,横置的内框2与等腰梯形的上底及下底平行。As shown in Figures 1 to 3, the tackle hanger of the present invention is an isosceles trapezoidal multi-layer frame structure, and the tackle hanger is divided into an isosceles
等腰梯形上底的两端均设有用于与V型绝缘子串9连接的挂板B5,该等腰梯形的下底上沿长度方向均匀安装有四个挂板A4,其中的两个挂板A4安装于等腰梯形下底的两端,每个挂板A4上均通过平行挂板6连接放线滑车8(本发明的放线滑车8为三轮滑车),四个放线滑车8等高悬挂于滑车挂架上。作为等腰梯形上底的边框1的两端分别焊接挂板B5,作为等腰梯形下底的边框1上沿长度方向均匀焊接四个挂板A4,焊接两个挂板B5的焊接处与下底位于中间的焊接两个挂板A4的焊接处之间通过内框2交叉焊接,即用于连接的两根内框2呈“X”型,且交点与横置的内框2的中点通过连接板3焊接。等腰梯形下底位于中间的两个挂板A4的焊接处分别通过内框2与横置的内框2的两端通过连接板3焊接。本发明的边框1为槽钢,内框2为角钢。Both ends of the upper bottom of the isosceles trapezoid are equipped with hanging plates B5 for connecting with the V-
本发明八分裂大截面导线张力架线滑车挂架的拆装方法为:The dismounting method of the eight-split large cross-section wire tension stringing pulley hanger of the present invention is as follows:
安装时,将四组放线滑车8的上联板7通过平行挂板6与等腰梯形下底上的四个挂板A4分别连接,将四组放线滑车8等高悬挂在滑车挂架上;然后,将两组V型绝缘子串9的一端与等腰梯形上底两端的挂板B5连接;利用两套机动绞磨钢丝绳连接V型绝缘子串9的另一端,钢丝绳通过铁塔10上的提升滑车由绞磨牵引提升到设定位置,与铁塔10连接后完成四组放线滑车8的悬挂;此安装过程比较方便。During installation, the upper connecting
在展放导线过程中,四组放线滑车8均等高、且受力均匀,走板通过放线滑车8时,滑车挂架稳定、可靠,通过性好。During the wire spreading process, the four sets of pay-
拆卸时,在直线塔附件安装过程中,首先用提线器提起导线,利用机动绞磨做牵引控制,将放线滑车8逐个与滑车挂架解开并放落至地面,然后用柔性尼龙吊带和手扳葫芦将V型绝缘子串9固定,并调整到所需位置,利用机动绞磨控制解开滑车挂架与V型绝缘子串9的连接部位,然后放下滑车挂架;最后,在手扳葫芦的配合下完成线夹联板、导线线夹的安装与导线的固定。整个滑车挂架的拆除过程简单,线夹联板能快速、顺利地安装到位。When disassembling, during the installation process of the linear tower accessories, first use the wire lifter to lift the wire, use the motorized winch for traction control, untie the
由于铁塔每极要悬挂四组三轮的放线滑车8,为了简化滑车布置和悬挂方式,方便后续紧线施工和附件安装操作,本发明对八分裂大截面导线采用了4ד一牵2”方式的滑车悬挂方式进行了分析和改进,充分利用现有的V型绝缘子串和金具,研制出四组三轮的架线滑车挂架,将四组三轮的放线滑车同时悬挂在同一滑车挂架上的挂具,可以很好地解决采用独立悬挂滑车方式存在的不足,从而减少滑车悬挂工作量,并达到放线滑车等高、平正的目的,提高架线质量、施工效率和安全性,降低施工成本。Since four groups of three-wheel pay-off
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810653773.8A CN110635388A (en) | 2018-06-22 | 2018-06-22 | An eight-split large cross-section wire tension stringing pulley hanger and its disassembly method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810653773.8A CN110635388A (en) | 2018-06-22 | 2018-06-22 | An eight-split large cross-section wire tension stringing pulley hanger and its disassembly method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110635388A true CN110635388A (en) | 2019-12-31 |
Family
ID=68967154
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810653773.8A Pending CN110635388A (en) | 2018-06-22 | 2018-06-22 | An eight-split large cross-section wire tension stringing pulley hanger and its disassembly method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110635388A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113422322A (en) * | 2021-07-21 | 2021-09-21 | 北京国电天昱建设工程有限公司 | Stringing pulley and stringing method for overhead line |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106058740A (en) * | 2016-07-28 | 2016-10-26 | 郑州东辰科技有限公司 | Overhead line erecting method |
CN106329386A (en) * | 2016-09-23 | 2017-01-11 | 国家电网公司 | Combined paying-off tackle hanging rack |
CN207053062U (en) * | 2017-07-18 | 2018-02-27 | 国网河南省电力公司襄城县供电公司 | Releasing pulley hanger |
CN208316184U (en) * | 2018-06-22 | 2019-01-01 | 辽宁省送变电工程有限公司 | One kind eight divides large-section lead tension stringing coaster hanger |
-
2018
- 2018-06-22 CN CN201810653773.8A patent/CN110635388A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106058740A (en) * | 2016-07-28 | 2016-10-26 | 郑州东辰科技有限公司 | Overhead line erecting method |
CN106329386A (en) * | 2016-09-23 | 2017-01-11 | 国家电网公司 | Combined paying-off tackle hanging rack |
CN207053062U (en) * | 2017-07-18 | 2018-02-27 | 国网河南省电力公司襄城县供电公司 | Releasing pulley hanger |
CN208316184U (en) * | 2018-06-22 | 2019-01-01 | 辽宁省送变电工程有限公司 | One kind eight divides large-section lead tension stringing coaster hanger |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113422322A (en) * | 2021-07-21 | 2021-09-21 | 北京国电天昱建设工程有限公司 | Stringing pulley and stringing method for overhead line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103545751B (en) | Overhead transmission line ground wire optical cable fittings replacement bracket | |
CN102882153B (en) | Phase replacing insulator string method in charged for replacement circuit many times towers | |
CN107834434A (en) | Crossing method for the construction of transmission line of electricity tension stringing | |
JP2012244827A (en) | Electric wire tension reduction apparatus and electric wire tension reduction construction method | |
CN203967713U (en) | For the terminal clamping device of crane cable | |
CN102774742B (en) | Current transformer (CT) coil lifting device | |
CN103560437B (en) | A kind of optical cable pulley based on single-wheel sister block hangs and annex installation method | |
CN203998746U (en) | Portable suspension installation | |
CN203850726U (en) | Wire lifter on 10 kV power distribution telegraph pole | |
CN104022459A (en) | 10 KV distribution line pole-mounted wire suspension device | |
CN202094562U (en) | Suspension type synchronous hoisting system for pipe type bus | |
CN110635388A (en) | An eight-split large cross-section wire tension stringing pulley hanger and its disassembly method | |
CN208316184U (en) | One kind eight divides large-section lead tension stringing coaster hanger | |
CN106384964A (en) | V-type insulator-chain electrified replacing operation method | |
CN205985954U (en) | Transformer substation's " V type " suspends strain insulator string hoisting support in midair | |
CN220317073U (en) | TRD shaped steel hoist and mount stability fixture and hoist thereof | |
CN110718878A (en) | Six-bundle large-section conductor tension stringing three-pulley integral hanger and disassembling and assembling method thereof | |
CN205811418U (en) | Livewire work conduction wire riser | |
CN102237654A (en) | Tool and method for replacing jumper string at double angle hanging point | |
CN102208777A (en) | Construction method for parallel suspension of lead trolleys by using V-shaped strings | |
CN201490626U (en) | An asymmetric traction plate for "one pull three" tension pay-off | |
CN206302092U (en) | Pulling tools for overhead transmission line cables | |
CN205829038U (en) | A kind of eight division 1250mm2device for suspending line tackles | |
CN109038360A (en) | General-purpose type straight line pole double bundle conductor enhancing hook | |
CN209562017U (en) | A tight pulley block device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |