CN110616717A - Sectional anchor cable design method - Google Patents
Sectional anchor cable design method Download PDFInfo
- Publication number
- CN110616717A CN110616717A CN201910947960.1A CN201910947960A CN110616717A CN 110616717 A CN110616717 A CN 110616717A CN 201910947960 A CN201910947960 A CN 201910947960A CN 110616717 A CN110616717 A CN 110616717A
- Authority
- CN
- China
- Prior art keywords
- anchor
- anchor cable
- horn
- clip type
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
Abstract
A sectional anchor cable design method divides an anchor cable (2) at a free section into a plurality of sectional anchor cables with equal length, and each two sections of anchor cables are connected through a clip type anchorage device (7) and a horn lock catch (8); each anchor cable segment is connected through a clip type anchor, and every two adjacent clip type anchors are connected through three horn lock catches which form an angle of 120 degrees with each other to form an anchor cable bundle. The sectional anchor cable consists of an end anchor section, a free section and an anchoring section. After the sectional anchor cable is used as a temporary supporting structure to lose the function, when foundation pit excavation is carried out on the periphery of the temporary supporting structure, the sectional anchor cable can be separated by using machinery to unlock or break the ox horn lock handle, and then the separated sectional anchor cable far away from the anchoring end side is pulled out by using machinery, so that construction excavation is continuously carried out while part of the anchor cable structure is recovered; the method and the device have the advantages that the obstruction of the existing anchor cable to the excavation of the foundation pit at the periphery of the later stage is reduced under the condition that the anchor cable is not recycled, and the cost of the foundation pit construction at the later stage is reduced.
Description
Technical Field
The invention relates to a sectional anchor cable design method, and belongs to the technical field of anchor cable support of building foundation pits.
Background
With the rapid development of urban construction in China, the construction foundation pit engineering becomes a normality, the pit body reinforcement mode is more and more, and the anchor cable support is an important form for geotechnical engineering reinforcement, so that the anchor cable support has the advantages of safety, high efficiency, low cost and the like, and is widely applied to the field of geotechnical engineering at home and abroad, particularly the field of the construction foundation pit support engineering. However, the anchor cable support is used as a temporary support, and the anchor cable support loses its function after the foundation pit engineering construction is completed. However, the supporting anchor cable is usually not recyclable, but is kept in the original soil to bring obstruction to the subsequent excavation of the foundation pit at the periphery, so that the recyclable anchor cable appears in the engineering. Due to the factors of urgent construction period, complex recovery technology, high cost, high risk and the like, in the actual engineering, the recovery rate of the anchor cable is still very low, most of the recoverable anchor cables are not completely recovered, and the anchor head of the bearing body and the metal anchor head are usually left underground.
Disclosure of Invention
The invention aims to provide a sectional anchor cable design method for solving the problem that the excavation of a subsequent peripheral foundation pit is difficult after the anchor cable support loses effect in actual engineering.
The anchor cable at the free section is divided into a plurality of sectional anchor cables with equal length, and each two anchor cables are connected through a clamping piece type anchorage device and a horn lock catch; each anchor cable segment is connected through a clip type anchor, and every two adjacent clip type anchors are connected through three horn lock catches which mutually form 120 degrees, and the steps are repeated to form an anchor cable bundle.
The sectional anchor cable consists of an end anchor section, a free section and an anchoring section:
the end anchor section comprises a grouting pipe, an anchor cable bundle, an anchorage device, a gasket and a pressure dividing plate; the anchor cable bundles are arranged around the grouting pipe to form a inclusion, and the anchor cable bundles are uniformly arranged around the grouting pipe. The pressure dividing plate is of a circular plate type structure, and the grouting pipe and the anchor cable bundle vertically penetrate through and are fixed on the pressure dividing plate; the grouting pipe is located at the center of the pressure dividing plate, and the anchor cable bundles are uniformly distributed in the circumferential direction outside the grouting pipe.
The free section comprises a clamping piece type anchorage device, a ox horn lock catch, a grouting pipe, an anchor cable bundle and an anchor cable bundle stringing ring; the anchor cable of the free section is divided into a plurality of sections with equal length, each two sections of anchor cables are connected through a clip type anchor and a ox horn lock catch, namely, the anchor cable at the right end penetrates through the clip type anchor, the anchor cable at the left end penetrates through another clip type anchor, the two clip type anchors are oppositely arranged and are connected by three ox horn lock catches arranged outside, and the included angle between each two ox horn lock catches is 120 degrees(ii) a Similarly, each anchor cable segment is connected through a clip type anchor, and each two clip type anchors are connected through a horn lock catch, and the process is repeated to form an anchor cable bundle; the grouting pipe penetrates through a small hole in the middle of the clip type anchorage device, and the anchor cable bundle penetrates through a small hole on the periphery of the clip type anchorage device.
The anchoring section comprises an anchor cable bundle switching supporting body, a perforated switching anchor cable bundle, an anchor cable bundle steel supporting body, an anchoring section grouting outlet section, an anchoring section stirrup and an anchor head. The anchor rope bundle switching bearing body is respectively connected with the perforated switching anchor rope bundles of the free section and the anchoring section, and the grouting outlet section of the anchoring section is externally wrapped with a stirrup of the anchoring section; the end part of the anchor cable bundle steel bearing body is an anchor head.
The clamping piece type anchorage device comprises an anchor ring and a clamping piece; the whole clip type anchorage device has 6 clips which are spliced into a conical body with holes, an anchor cable bundle and a grouting pipe are sequentially inserted into the holes of the conical body and then inserted into the anchor ring, so that the anchor cable bundle and the grouting pipe are tightly locked in the clip type anchorage device.
The horn lock catch comprises a first chassis, a second chassis, a horn handle, a handle plug, a pin and a bolt hole; the first chassis is fixed on the clamp piece type anchorage device close to the near-end anchor section through the bolt, the second chassis is fixed on the clamp piece type anchorage device close to the anchor section through the bolt, a pin is arranged on the second chassis, a hole is formed in the pin, the head of the ox horn handle is positioned on the first chassis, the tail of the ox horn handle extends out of the second chassis, a plug is arranged in the middle of the ox horn handle, the ox horn handle is held by a hand and rotates when the ox horn handle is used, and the plug penetrates through the pin hole, so that the two clamp piece type anchorage devices are connected together.
The invention has the beneficial effects that after the anchor cable is used as a temporary supporting structure to lose effect, when the periphery of the anchor cable is excavated, part of the sectional anchor cable is exposed in a sectional manner. The anchor clamps formula ground tackle of anchor rope segmentation department is connected by the ox horn hasp, can use machinery to untie or abolish ox horn hasp handle when peripheral foundation ditch construction, just enables the separation of sectional type anchor rope, can use machinery to extract the distolateral segmentation anchor rope of keeping away from the anchor afterwards for retrieve partial anchor rope structure when the construction excavation continues to go on, for later stage foundation ditch excavation brings the facility, reduce the construction degree of difficulty, reduce treatment cost and reduction of erection time.
Drawings
FIG. 1 is a schematic view of a segmented cable bolt construction; FIG. 2 is a schematic view of a clip-type anchor;
FIG. 3 is a schematic view of a structure of a ox horn lock catch; FIG. 4 is a side view of a clip-type anchor;
FIG. 5 is a schematic view of a clip of the clip type anchor;
in the figure, 1 is a grouting pipe; 2, anchor cable bundles; 3 is an anchorage device; 4 is a gasket; 5 is a pressure dividing plate; 6 is an anchor cable tie wire ring; 7 is a clip type anchorage device; 8 is a oxhorn lock catch; 9 is an anchor cable bundle switching supporting body; 10 is a perforated adapter anchor cable bundle; 11, an anchor cable bundle steel bearing body; 12 is an anchoring section grouting outlet section; 13 is an anchoring section stirrup; 14 is an anchor head; 7-1 is an anchor ring; 7-2 is a clamping piece; 8-1 is a chassis A; 8-2 is a chassis B; 8-3 is a horn handle; 8-4 is a plug; 8-5 is a pin; 8-6 are bolt holes.
Detailed Description
The specific embodiment of the present invention is shown in fig. 1 to 5.
As shown in fig. 1, the segmented cable bolt comprises a cable bolt bundle 2, a clip anchor 7 and a bullhorn lock 8.
The sectional anchor cable of the embodiment comprises an end anchor section, a free section and an anchoring section.
In the embodiment, the end anchor section comprises a grouting pipe 1, an anchor rope bundle 2, an anchorage device 3, a gasket 4 and a pressure distributing plate 5; the anchor cable bundles 2 are arranged around the grouting pipe 1 to form a inclusion, and the anchor cable bundles 2 are uniformly arranged around the grouting pipe 1.
In this embodiment, the free section includes a clip type anchor 7, a horn lock 8, a grouting pipe 1, an anchor cable bundle 2, and an anchor cable bundle stringing ring 6. The anchor cable of the free section is divided into a plurality of sections with equal length, each two sections of anchor cables are connected through a clip type anchor 7 and a horn lock catch, namely the anchor cable at the right end penetrates through the clip type anchor 7, the anchor cable at the left end penetrates through the other clip type anchor 7, the two clip type anchors 7 are oppositely arranged, three horn locks 8 are arranged outside to connect the anchor cables, and the included angle between each horn lock 8 is 120 degrees。
Similarly, each anchor cable segment is connected through a clip type anchor 7, each two clip type anchors 7 are connected through a horn lock catch 8, and the steps are repeated to form an anchor cable bundle 2; the grouting pipe 1 penetrates through a small hole in the middle of the clip type anchorage device 7, and the anchor cable bundle 2 penetrates through a small hole on the periphery of the clip type anchorage device 7.
In the embodiment, the clamping piece type anchorage device 7 comprises an anchor ring 7-1 and a clamping piece 7-2; the whole clip type anchorage device 7 has 6 clips 7-2 which are spliced into a conical body with holes, the anchor cable bundle 2 and the grouting pipe 1 are sequentially inserted into the holes of the conical body and then are inserted into the anchor ring 7-1, so that the anchor cable bundle 2 and the grouting pipe 1 are tightly locked in the clip type anchorage device 7.
In the embodiment, the ox horn lock catch 8 consists of a first chassis 8-1, a second chassis 8-2, an ox horn handle 8-3, a handle plug 8-4, a pin 8-5 and a bolt hole 8-6.
The first chassis 8-1 is fixed on a clamping piece type anchorage device 7 close to the anchor section through a bolt, the second chassis 8-2 is fixed on the clamping piece type anchorage device 7 close to the anchor section through a bolt, a pin 8-5 is arranged on the second chassis 8-2, a hole is arranged in the pin 8-5, the head of the ox horn handle 8-3 is positioned on the first chassis 8-1, the tail of the ox horn handle 8-3 extends out of the second chassis 8-2, a plug 8-4 is arranged in the middle of the ox horn handle 8-3, when the ox horn handle 8-3 is used, the user holds the ox horn handle 8-3 and rotates, the plug 8-4 penetrates through the hole of the pin 8-5, and therefore the two clamping piece type anchorage devices 7 are connected together.
The anchoring section comprises an anchor cable bundle adapting bearing body 9, a perforated adapting anchor cable bundle 10, an anchor cable bundle steel bearing body 11, an anchoring section grouting outlet section 12, an anchoring section stirrup 13 and an anchor head 14.
The above description is only for the purpose of illustration in combination with the above embodiments, and is not intended to limit the invention, and all similar structures and variations using the present invention are within the scope of the invention.
Claims (4)
1. A design method of a sectional anchor cable is characterized in that the anchor cable at a free section is divided into a plurality of sectional anchor cables with equal length, and each two sections of anchor cables are connected with each other through a clip type anchor and a horn lock catch; each anchor cable segment is connected through a clip type anchor, and every two adjacent clip type anchors are connected through three horn lock catches which mutually form 120 degrees, and the steps are repeated to form an anchor cable bundle.
2. The method of claim 1, wherein the segmented cable bolt is composed of an end anchor segment, a free segment and an anchor segment;
the end anchor section comprises a grouting pipe, an anchor cable bundle, an anchorage device, a gasket and a pressure dividing plate; the anchor cable bundles are arranged around the grouting pipe to form a inclusion, and the anchor cable bundles are uniformly arranged around the grouting pipe; the pressure dividing plate is of a circular plate type structure, and the grouting pipe and the anchor cable bundle vertically penetrate through and are fixed on the pressure dividing plate; the grouting pipe is positioned in the center of the pressure dividing plate, and the anchor cable bundles are uniformly distributed in the circumferential direction outside the grouting pipe;
the free section comprises a clamping piece type anchorage device, a ox horn lock catch, a grouting pipe, an anchor cable bundle and an anchor cable bundle stringing ring; the anchor cable of the free section is divided into a plurality of sections with equal length, each two sections of anchor cables are connected through a clip type anchor and a ox horn lock catch, namely, the anchor cable at the right end penetrates through the clip type anchor, the anchor cable at the left end penetrates through another clip type anchor, the two clip type anchors are oppositely arranged and are connected by three ox horn lock catches arranged outside, and the included angle between each two ox horn lock catches is 120 degrees(ii) a Similarly, each anchor cable segment is connected through a clip type anchor, and each two clip type anchors are connected through a horn lock catch, and the process is repeated to form an anchor cable bundle; the grouting pipe penetrates through a small hole in the middle of the clip type anchorage device, and the anchor cable bundle penetrates through small holes around the clip type anchorage device;
the anchoring section comprises an anchor cable bundle switching supporting body, a switching anchor cable bundle with holes, an anchor cable bundle steel supporting body, an anchoring section grouting outlet section, an anchoring section stirrup and an anchor head; the anchor rope bundle switching bearing body is respectively connected with the perforated switching anchor rope bundles of the free section and the anchoring section, and the grouting outlet section of the anchoring section is externally wrapped with a stirrup of the anchoring section; the end part of the anchor cable bundle steel bearing body is an anchor head.
3. The method of claim 2, wherein the clip-type anchor comprises an anchor ring, a clip; the whole clip type anchorage device has 6 clips which are spliced into a conical body with holes, an anchor cable bundle and a grouting pipe are sequentially inserted into the holes of the conical body and then inserted into the anchor ring, so that the anchor cable bundle and the grouting pipe are tightly locked in the clip type anchorage device.
4. The method for designing a sectional anchor cable according to claim 2, wherein the horn lock comprises a first chassis, a second chassis, a horn handle, a handle plug, a pin and a bolt hole; the first chassis is fixed on the clamp piece type anchorage device close to the near-end anchor section through the bolt, the second chassis is fixed on the clamp piece type anchorage device close to the anchor section through the bolt, a pin is arranged on the second chassis, a hole is formed in the pin, the head of the ox horn handle is positioned on the first chassis, the tail of the ox horn handle extends out of the second chassis, a plug is arranged in the middle of the ox horn handle, the ox horn handle is held by a hand and rotates when the ox horn handle is used, and the plug penetrates through the pin hole, so that the two clamp piece type anchorage devices are connected together.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910947960.1A CN110616717A (en) | 2019-10-08 | 2019-10-08 | Sectional anchor cable design method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910947960.1A CN110616717A (en) | 2019-10-08 | 2019-10-08 | Sectional anchor cable design method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110616717A true CN110616717A (en) | 2019-12-27 |
Family
ID=68925369
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910947960.1A Pending CN110616717A (en) | 2019-10-08 | 2019-10-08 | Sectional anchor cable design method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110616717A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT315084B (en) * | 1971-06-04 | 1974-05-10 | Zschokke Ag Conrad | Method for creating an anchorage in loose or solid ground |
CA2154607C (en) * | 1994-08-05 | 2003-01-28 | Stephen H. Getz | Remedial wall anchor system |
US20040179901A1 (en) * | 2002-09-17 | 2004-09-16 | Kulchin Steven A. | Soil nailing system |
CN205444186U (en) * | 2015-12-24 | 2016-08-10 | 北京建筑大学 | Anchor rope |
CN206070525U (en) * | 2016-09-20 | 2017-04-05 | 天津大学 | A kind of conveniently reusable steel strand anchorage of dismounting |
CN108708368A (en) * | 2018-09-13 | 2018-10-26 | 上海建工集团股份有限公司 | Multistage anchoring prestress muscle continuous underground wall structure and its construction method |
CN108868854A (en) * | 2018-08-30 | 2018-11-23 | 沈阳建筑大学 | Expansion shell type friction bolt-anchor cable combined support structure |
CN109353784A (en) * | 2018-11-23 | 2019-02-19 | 浙江宏日自动化科技有限公司 | Ox horn latch hook kludge egative film feed device |
-
2019
- 2019-10-08 CN CN201910947960.1A patent/CN110616717A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT315084B (en) * | 1971-06-04 | 1974-05-10 | Zschokke Ag Conrad | Method for creating an anchorage in loose or solid ground |
CA2154607C (en) * | 1994-08-05 | 2003-01-28 | Stephen H. Getz | Remedial wall anchor system |
US20040179901A1 (en) * | 2002-09-17 | 2004-09-16 | Kulchin Steven A. | Soil nailing system |
CN205444186U (en) * | 2015-12-24 | 2016-08-10 | 北京建筑大学 | Anchor rope |
CN206070525U (en) * | 2016-09-20 | 2017-04-05 | 天津大学 | A kind of conveniently reusable steel strand anchorage of dismounting |
CN108868854A (en) * | 2018-08-30 | 2018-11-23 | 沈阳建筑大学 | Expansion shell type friction bolt-anchor cable combined support structure |
CN108708368A (en) * | 2018-09-13 | 2018-10-26 | 上海建工集团股份有限公司 | Multistage anchoring prestress muscle continuous underground wall structure and its construction method |
CN109353784A (en) * | 2018-11-23 | 2019-02-19 | 浙江宏日自动化科技有限公司 | Ox horn latch hook kludge egative film feed device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104790392A (en) | Construction device and method for reverse bamboo joint type anti-floating anchor rod | |
CN104674811B (en) | A kind of ground tackle and locking and unlock method | |
CN105544603A (en) | Construction method for underground pipeline reinforcement | |
CN104532836A (en) | Anchor cable construction device combining hole forming, mounting and grouting into one | |
CN107542086B (en) | Anchor cable construction method for filling slope | |
CN110004927A (en) | Prestressing force miniature pile construction method | |
CN110616717A (en) | Sectional anchor cable design method | |
CN206408611U (en) | A kind of adaptive Recyclable anchor rope system | |
CN107246030A (en) | Construction method based on steel sheet pile device for plugging | |
CN206626283U (en) | A kind of new concrete push pipe | |
CN104074189A (en) | Recyclable slip casting expansion enlarged head pre-stressed anchor cable | |
CN205314100U (en) | Autonomic pressure boost anchor rope | |
CN213709492U (en) | Novel concrete pipe pile structure | |
CN209873807U (en) | Suspension structure of deep foundation pit engineering underground socket concrete pipe | |
CN204491575U (en) | Fast vacuum dewatering installation under high-fill roadbed | |
CN209975518U (en) | Device for centering in anchor bar pile hole | |
CN210127858U (en) | A lining cutting back of body uide tube slip casting water shutoff device for muddy stratum | |
CN107165186A (en) | A kind of power transmission tower single anchor cable mat foundation and construction method | |
CN214331560U (en) | Valve body capable of realizing annular grouting and centering support function | |
CN208219638U (en) | A kind of deep foundation pit precast stake | |
CN207739247U (en) | A kind of bored concrete pile grouting behind shaft or drift lining structure | |
CN105569601A (en) | Underground rock engineering testing drill hole orifice protection device adapted to different hole diameters | |
CN107476287B (en) | Deformed steel for SMW construction method and construction method using same | |
CN211256970U (en) | Recoverable anchor cable | |
CN215860313U (en) | High-level drainage structure of high-water-pressure water-rich stratum tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191227 |