CN110593259A - An anti-floating anchor construction structure and an anti-floating anchor construction method - Google Patents
An anti-floating anchor construction structure and an anti-floating anchor construction method Download PDFInfo
- Publication number
- CN110593259A CN110593259A CN201910868434.6A CN201910868434A CN110593259A CN 110593259 A CN110593259 A CN 110593259A CN 201910868434 A CN201910868434 A CN 201910868434A CN 110593259 A CN110593259 A CN 110593259A
- Authority
- CN
- China
- Prior art keywords
- anchor rod
- anchor
- floating
- section
- floating anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/10—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
- E02D31/12—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
技术领域technical field
本发明涉及建筑工程地下结构领域,具体而言,涉及一种抗浮锚杆施工结构及抗浮锚杆施工方法。The invention relates to the field of underground structures of construction engineering, in particular to an anti-floating anchor construction structure and an anti-floating anchor construction method.
背景技术Background technique
目前抗浮锚杆施工采用传统的施工工艺,成孔后下放抗浮锚杆钢筋,抗浮锚杆钢筋下放困难才提出锚杆钢筋进行清孔,若是少量沉渣不易发现,影响施工质量,钻孔机械已移位,再移动钻孔机械清底易对周边孔口泥土落入孔内,造成恶性循环,如图1和图2所示。At present, the anti-floating anchor construction adopts the traditional construction technology. After the hole is formed, the anti-floating anchor reinforcement is lowered. If it is difficult to lower the anti-floating anchor reinforcement, the anchor reinforcement is raised to clean the hole. If a small amount of sediment is not easy to find, it will affect the construction quality. The machine has been displaced, and moving the drilling machine to clear the bottom will easily cause the soil around the hole to fall into the hole, causing a vicious circle, as shown in Figure 1 and Figure 2.
发明内容Contents of the invention
本发明提供了一种抗浮锚杆施工结构及抗浮锚杆施工方法,旨在解决现有技术中抗浮锚杆施工结构及抗浮锚杆施工方法存在的上述问题。The invention provides an anti-floating anchor construction structure and an anti-floating anchor construction method, aiming at solving the above-mentioned problems existing in the anti-floating anchor construction structure and anti-floating anchor construction method in the prior art.
本发明是这样实现的:The present invention is achieved like this:
一种抗浮锚杆施工结构,包括锚杆成孔和抗浮锚杆;An anti-floating anchor construction structure, comprising anchor holes and anti-floating anchors;
开设在承力地层的所述锚杆成孔包括固定段和沉渣段,所述沉渣段设置在所述固定段的下方用于接纳沉渣;The bolt forming hole opened in the bearing formation includes a fixed section and a sediment section, and the sediment section is arranged below the fixed section for receiving sediment;
所述抗浮锚杆包括注浆管、锚杆主筋和至少一根钢筋支架;The anti-floating anchor includes a grouting pipe, an anchor main reinforcement and at least one reinforcement support;
多根所述锚杆主筋固定设置在所述注浆管的外侧,所述锚杆主筋的一端插入所述固定段内并形成露出所述固定段的外接段;A plurality of anchor rod main tendons are fixedly arranged on the outside of the grouting pipe, and one end of the anchor rod main tendons is inserted into the fixed section to form an external section exposing the fixed section;
所述钢筋支架与所述锚杆主筋在所述外接段的部分固定连接,所述钢筋支架用于阻止所述锚杆主筋进入所述沉渣段。The reinforcement bracket is fixedly connected with the main reinforcement of the anchor rod at the outer section, and the reinforcement bracket is used to prevent the main reinforcement of the anchor rod from entering the sediment section.
在本发明的一种实施例中,所述承力地层具有阻挡面,所述锚杆成孔从所述阻挡面向下延伸,所述阻挡面用于与所述钢筋支架接触,以阻止所述钢筋支架向所述锚杆成孔的深度方向移动。In one embodiment of the present invention, the load-bearing formation has a blocking surface, and the bolt forming hole extends downward from the blocking surface, and the blocking surface is used to contact with the steel support to prevent the The reinforcing steel support moves to the depth direction of the hole formed by the anchor rod.
在本发明的一种实施例中,还包括隔离环,所述隔离环设置多根所述锚杆主筋之间,用于隔离相邻的所述抗浮锚杆。In one embodiment of the present invention, it further includes an isolating ring, the isolating ring is arranged between the main tendons of the plurality of anchor rods, and is used for isolating the adjacent anti-floating anchor rods.
在本发明的一种实施例中,所述承力地层的表层还设置有垫层。In one embodiment of the present invention, the surface layer of the bearing formation is further provided with a cushion layer.
在本发明的一种实施例中,所述固定段远离所述沉渣段的一端在所述承力地层上形成防水凹槽。In an embodiment of the present invention, the end of the fixed section away from the sediment section forms a waterproof groove on the bearing formation.
在本发明的一种实施例中,所述锚杆主筋为三根,三根所述锚杆主筋均布在所述注浆管的外侧。In one embodiment of the present invention, there are three main tendons of the anchor rod, and the three main tendons of the anchor rod are evenly distributed on the outside of the grouting pipe.
一种抗浮锚杆施工方法,其特征在于,使用上述的抗浮锚杆施工结构,包括步骤:A kind of anti-floating anchor construction method is characterized in that, using above-mentioned anti-floating anchor construction structure, comprises steps:
a.根据所述抗浮锚杆的长度增加10-30cm作为所述锚杆成孔的预设深度;a. According to the length of the anti-floating anchor rod, increase 10-30cm as the preset depth of the hole forming of the anchor rod;
b.按照所述预设深度钻设所述锚杆成孔,清理所述锚杆成孔;b. Drilling the anchor rod to form a hole according to the preset depth, and cleaning the anchor rod to form a hole;
c.固定所述锚杆主筋和所述注浆管;c. fixing the main reinforcement of the anchor rod and the grouting pipe;
d.在所述锚杆主筋上焊接所述钢筋支架,所述钢筋支架与所述锚杆主筋垂直设置;d. Welding the reinforcement bracket on the main reinforcement of the anchor rod, the reinforcement bracket is vertically arranged with the main reinforcement of the anchor rod;
e.插入所述抗浮锚杆直到所述钢筋支架接触所述承力地层表面;e. inserting the anti-floating anchor until the steel support contacts the bearing formation surface;
f.通过所述注浆管向所述锚杆成孔内注入水泥浆。f. Injecting cement slurry into the hole formed by the anchor rod through the grouting pipe.
本发明的有益效果是:通过本发明提供的抗浮锚杆施工结构及抗浮锚杆施工方法能有效的解决孔底一定量的孔底沉渣和积水对质量的影响,提高施工效率。避免抗浮锚杆施工常伴有地下水,成孔后易出现塌孔的现象。同时可以防止孔口土质松动容易向孔内掉落泥土,地下和地表水流入孔底等降低抗浮锚杆作用的小事故。The beneficial effects of the present invention are: the anti-floating anchor construction structure and the anti-floating anchor construction method provided by the present invention can effectively solve the impact of a certain amount of bottom sediment and water at the bottom of the hole on the quality, and improve the construction efficiency. Avoid the construction of anti-floating anchor rods often accompanied by groundwater, which is prone to collapse after the hole is formed. At the same time, it can prevent the loosening of the soil at the hole and the soil falling into the hole, and the underground and surface water flowing into the bottom of the hole and other small accidents that reduce the effect of the anti-floating anchor rod.
附图说明Description of drawings
为了更清楚地说明本发明实施方式的技术方案,下面将对实施方式中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本发明的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。In order to illustrate the technical solutions of the embodiments of the present invention more clearly, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of the present invention, and therefore do not It should be regarded as a limitation on the scope, and those skilled in the art can also obtain other related drawings based on these drawings without creative work.
图1是现有技术中的抗浮锚杆施工结构的结构示意图;Fig. 1 is the structural representation of the anti-floating anchor construction structure in the prior art;
图2是现有技术中的抗浮锚杆施工结构的锚杆断面示意图;Fig. 2 is the schematic diagram of the anchor section of the anti-floating anchor construction structure in the prior art;
图3是本发明实施方式提供的抗浮锚杆施工结构的结构示意图;Fig. 3 is a structural schematic diagram of the anti-floating anchor construction structure provided by the embodiment of the present invention;
图4是本发明实施方式提供的抗浮锚杆施工结构的锚杆断面示意图。Fig. 4 is a schematic cross-sectional diagram of the anchor rod construction structure of the anti-floating anchor rod provided by the embodiment of the present invention.
图标:001-抗浮锚杆施工结构;100-锚杆成孔;200-抗浮锚杆;110-固定段;130-沉渣段;210-注浆管;230-锚杆主筋;250-钢筋支架;270-隔离环;300-承力地层;301-阻挡面;400-垫层;310-防水凹槽。Icon: 001-Anti-floating anchor construction structure; 100-Anti-floating anchor hole; 200-Anti-floating anchor; 110-Fixed section; 130-Sediment section; 210-Grouting pipe; Bracket; 270-isolating ring; 300-bearing formation; 301-blocking surface; 400-cushion; 310-waterproof groove.
具体实施方式Detailed ways
为使本发明实施方式的目的、技术方案和优点更加清楚,下面将结合本发明实施方式中的附图,对本发明实施方式中的技术方案进行清楚、完整地描述,显然,所描述的实施方式是本发明一部分实施方式,而不是全部的实施方式。基于本发明中的实施方式,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施方式,都属于本发明保护的范围。因此,以下对在附图中提供的本发明的实施方式的详细描述并非旨在限制要求保护的本发明的范围,而是仅仅表示本发明的选定实施方式。基于本发明中的实施方式,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施方式,都属于本发明保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments It is some embodiments of the present invention, but not all of them. Based on the implementation manners in the present invention, all other implementation manners obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention. Accordingly, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the invention. Based on the implementation manners in the present invention, all other implementation manners obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
在本发明的描述中,需要理解的是,指示方位或位置关系的术语为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的设备或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In the description of the present invention, it should be understood that the terms indicating orientation or positional relationship are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying No device or element must have a particular orientation, be constructed, and operate in a particular orientation, and therefore should not be construed as limiting the invention.
在本发明中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。In the present invention, unless otherwise clearly specified and limited, terms such as "installation", "connection", "connection" and "fixation" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection , or integrated; it can be directly connected or indirectly connected through an intermediary, it can be the internal communication of two elements or the interaction relationship between two elements. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention according to specific situations.
在本发明中,除非另有明确的规定和限定,第一特征在第二特征之上或之下可以包括第一和第二特征直接接触,也可以包括第一和第二特征不是直接接触而是通过它们之间的另外的特征接触。而且,第一特征在第二特征之上、上方和上面包括第一特征在第二特征正上方和斜上方,或仅仅表示第一特征水平高度高于第二特征。第一特征在第二特征之下、下方和下面包括第一特征在第二特征正下方和斜下方,或仅仅表示第一特征水平高度小于第二特征。In the present invention, unless otherwise clearly specified and limited, the first feature above or below the second feature may include that the first and second features are in direct contact, and may also include that the first and second features are not in direct contact but is through additional feature contacts between them. Moreover, the first feature on, above and above the second feature includes the first feature directly above and obliquely above the second feature, or simply means that the first feature is horizontally higher than the second feature. The first feature being below, below and below the second feature includes the first feature being directly below and obliquely below the second feature, or simply means that the first feature has a lower level than the second feature.
实施例一Embodiment one
本实施例提供了一种抗浮锚杆施工结构001,请参阅图3和图4,这种抗浮锚杆施工结构001包括锚杆成孔100和抗浮锚杆200;This embodiment provides an anti-floating anchor construction structure 001, please refer to Figure 3 and Figure 4, this anti-floating anchor construction structure 001 includes an anchor hole 100 and an anti-floating anchor 200;
开设在承力地层300的锚杆成孔100包括固定段110和沉渣段130,沉渣段130设置在固定段110的下方用于接纳沉渣;The bolt forming hole 100 opened in the bearing formation 300 includes a fixed section 110 and a sediment section 130, and the sediment section 130 is arranged below the fixed section 110 for receiving sediment;
抗浮锚杆200包括注浆管210、锚杆主筋230和至少一根钢筋支架250;The anti-floating anchor 200 includes a grouting pipe 210, an anchor main reinforcement 230 and at least one reinforcement support 250;
多根锚杆主筋230固定设置在注浆管210的外侧,锚杆主筋230的一端插入固定段110内并形成露出固定段110的外接段;A plurality of anchor rod main ribs 230 are fixedly arranged on the outside of the grouting pipe 210, and one end of the anchor rod main ribs 230 is inserted into the fixed section 110 to form an external section exposing the fixed section 110;
钢筋支架250与锚杆主筋230在外接段的部分固定连接,钢筋支架250用于阻止锚杆主筋230进入沉渣段130。The steel bar support 250 is fixedly connected with the anchor rod main reinforcement 230 at the outer section, and the steel bar support 250 is used to prevent the anchor rod main reinforcement 230 from entering the sediment section 130 .
通过沉渣段130的设置在施工减少清孔的过程,提高施工质量和施工进度,因抗浮锚杆200是通过锚杆钢筋通过水泥砂浆或细石混凝土与土体作用产生的共同抗拔力,不是向下的压力,沉渣段130不影响其受力。Through the setting of the sediment section 130, the process of clearing holes can be reduced during construction, and the construction quality and construction progress can be improved. Because the anti-floating anchor 200 is the common pull-out force generated by the action of the anchor reinforcement through the cement mortar or fine stone concrete and the soil, Instead of downward pressure, the sediment section 130 does not affect its force.
在本实施例中,抗浮锚杆200还包括隔离环270,隔离环270设置多根锚杆主筋230之间,用于隔离相邻的抗浮锚杆200。In this embodiment, the anti-floating anchor 200 further includes an isolation ring 270 , and the isolation ring 270 is arranged between a plurality of main tendons 230 of the anchor for isolating adjacent anti-floating anchors 200 .
具体的,承力地层300具有阻挡面301,锚杆成孔100从阻挡面301向下延伸,阻挡面301用于与钢筋支架250接触,以阻止钢筋支架250向锚杆成孔100的深度方向移动Specifically, the load-bearing formation 300 has a blocking surface 301 from which the bolt forming hole 100 extends downward. move
在本实施例中,承力地层300的表层还设置有垫层400,垫层400为后续的防水施工提供基础。In this embodiment, a cushion layer 400 is provided on the surface of the load-bearing formation 300, and the cushion layer 400 provides a foundation for subsequent waterproof construction.
在本实施例中,固定段110远离沉渣段130的一端在承力地层300上形成防水凹槽310。In this embodiment, the end of the fixed section 110 away from the sediment section 130 forms a waterproof groove 310 on the bearing formation 300 .
在本实施例中,锚杆主筋230为三根,三根锚杆主筋230均布在注浆管210的外侧。In this embodiment, there are three anchor rod main ribs 230 , and the three anchor rod main ribs 230 are evenly distributed on the outside of the grouting pipe 210 .
通过本发明提供的抗浮锚杆施工结构001能有效的解决孔底一定量的孔底沉渣和积水对质量的影响,提高施工效率。避免抗浮锚杆200施工常伴有地下水,成孔后易出现塌孔的现象。同时可以防止孔口土质松动容易向孔内掉落泥土,地下和地表水流入孔底等降低抗浮锚杆200作用的小事故。The anti-floating bolt construction structure 001 provided by the present invention can effectively solve the impact of a certain amount of sediment and accumulated water at the bottom of the hole on the quality, and improve the construction efficiency. Avoid the construction of anti-floating anchor rod 200, which is often accompanied by groundwater, and the hole is prone to collapse after the hole is formed. Simultaneously, it can prevent the soil from loosening in the hole from easily dropping soil in the hole, and the small accidents that reduce the effect of the anti-floating anchor rod 200 such as underground and surface water flowing into the bottom of the hole.
实施例二Embodiment two
本实施例提供了一种抗浮锚杆施工方法,请参阅图3和图4,这种抗浮锚杆施工方法使用实施例一中提供的抗浮锚杆施工结构001,包括步骤:This embodiment provides an anti-floating anchor construction method, please refer to Figure 3 and Figure 4, this anti-floating anchor construction method uses the anti-floating anchor construction structure 001 provided in the first embodiment, including steps:
a.根据抗浮锚杆200的长度增加10-30cm作为锚杆成孔100的预设深度;具体增加深度根据当地的土质情况和地下水情况确定,主要是能够承载足够多的积土积水,避免影响后续抗浮锚杆200的插入深度。a. Increase the length of the anti-floating anchor 200 by 10-30cm as the preset depth of the anchor hole 100; the specific increased depth is determined according to the local soil quality and groundwater conditions, mainly because it can carry enough accumulated soil and water, Avoid affecting the insertion depth of the subsequent anti-floating anchor rod 200 .
b.按照预设深度钻设锚杆成孔100,清理锚杆成孔100;b. Drill and set the anchor rod to form a hole 100 according to the preset depth, and clean the anchor rod to form a hole 100;
c.将锚杆主筋230固定在注浆管210外周,并通过隔离环270将相邻两根锚杆主筋230隔离;c. Fix the anchor rod main reinforcement 230 on the outer periphery of the grouting pipe 210, and isolate two adjacent anchor rod main reinforcements 230 through the isolation ring 270;
d.在锚杆主筋230上焊接钢筋支架250,钢筋支架250与锚杆主筋230垂直设置;d. Weld the steel bar support 250 on the anchor rod main reinforcement 230, and the steel bar support 250 is vertically arranged with the anchor rod main reinforcement 230;
e.插入抗浮锚杆200直到钢筋支架250接触阻挡面301;e. Insert the anti-floating anchor rod 200 until the reinforcement support 250 touches the blocking surface 301;
f.通过注浆管210向锚杆成孔100内注入水泥浆,水泥浆养护干燥将抗浮锚杆200彻底固定;f. Inject cement slurry into the bolt forming hole 100 through the grouting pipe 210, and cure and dry the cement slurry to completely fix the anti-floating bolt 200;
g.拆除钢筋支架250,开始施工垫层400。g. Remove the reinforcement support 250 and start construction of the cushion 400 .
通过本发明提供的抗浮锚杆施工方法能有效的解决孔底一定量的孔底沉渣和积水对质量的影响,提高施工效率。避免抗浮锚杆200施工常伴有地下水,成孔后易出现塌孔的现象。同时可以防止孔口土质松动容易向孔内掉落泥土,地下和地表水流入孔底等降低抗浮锚杆200作用的小事故。The anti-floating bolt construction method provided by the invention can effectively solve the influence of a certain amount of bottom sediment and accumulated water at the bottom of the hole on the quality, and improve the construction efficiency. Avoid the construction of anti-floating anchor rod 200, which is often accompanied by groundwater, and the hole is prone to collapse after the hole is formed. Simultaneously, it can prevent the soil from loosening in the hole from easily dropping soil in the hole, and the small accidents that reduce the effect of the anti-floating anchor rod 200 such as underground and surface water flowing into the bottom of the hole.
以上所述仅为本发明的优选实施方式而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910868434.6A CN110593259A (en) | 2019-09-12 | 2019-09-12 | An anti-floating anchor construction structure and an anti-floating anchor construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910868434.6A CN110593259A (en) | 2019-09-12 | 2019-09-12 | An anti-floating anchor construction structure and an anti-floating anchor construction method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110593259A true CN110593259A (en) | 2019-12-20 |
Family
ID=68859428
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910868434.6A Pending CN110593259A (en) | 2019-09-12 | 2019-09-12 | An anti-floating anchor construction structure and an anti-floating anchor construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110593259A (en) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN203654303U (en) * | 2013-12-18 | 2014-06-18 | 中国矿业大学(北京) | Side slope reinforcing structure |
| US20140314503A1 (en) * | 2013-04-11 | 2014-10-23 | Henan Polytech Infrastructure Rehabilitation LTD. | Grouting method for anchoring with polymer |
| CN104131560A (en) * | 2013-10-21 | 2014-11-05 | 中国建筑第四工程局有限公司 | Anti-floating anchor and construction method thereof |
| CN206986886U (en) * | 2017-06-19 | 2018-02-09 | 湖北中江建筑设计院有限公司 | A kind of anti-float anchor rod waterproofing node |
-
2019
- 2019-09-12 CN CN201910868434.6A patent/CN110593259A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20140314503A1 (en) * | 2013-04-11 | 2014-10-23 | Henan Polytech Infrastructure Rehabilitation LTD. | Grouting method for anchoring with polymer |
| CN104131560A (en) * | 2013-10-21 | 2014-11-05 | 中国建筑第四工程局有限公司 | Anti-floating anchor and construction method thereof |
| CN203654303U (en) * | 2013-12-18 | 2014-06-18 | 中国矿业大学(北京) | Side slope reinforcing structure |
| CN206986886U (en) * | 2017-06-19 | 2018-02-09 | 湖北中江建筑设计院有限公司 | A kind of anti-float anchor rod waterproofing node |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102011404B (en) | Pit supporting structure and construction method thereof | |
| CN101250886B (en) | Method for reinforcing masonry structure building base | |
| CN103510510B (en) | A kind of enhancement mode long auger cast-with-pressure concrete pile and construction method | |
| CN111851513A (en) | Construction method of self-sinking deep foundation pit retaining wall structure and underground space structure | |
| KR101045625B1 (en) | Underground continuous wall construction method using CIP method | |
| JP3725403B2 (en) | Construction method of cast-in-place steel pipe concrete pile by all casing method. | |
| CN110629794B (en) | A kind of construction method of outer wall formwork of swirl well | |
| CN204662494U (en) | Highway retaining wall reinforced structure | |
| CN113494294B (en) | Reinforcing method for shield launching or arrival end | |
| CN115772899A (en) | A device and method for drilling and cleaning the collapsed hole of cast-in-situ pile reinforcement cage | |
| CN103498567B (en) | Dark collar tie beam Shockproof reinforcing method and ruggedized construction thereof is increased after in masonry panel | |
| CN110792077A (en) | Supporting disc pile device suitable for muddy soft soil and construction process thereof | |
| CN106545008A (en) | A kind of cast-in-situ bored pile pile making method | |
| CN206015717U (en) | The underground pipe gallery of soft soil foundation | |
| CN112982395A (en) | Stiff composite pile body anchor rod device and construction process | |
| CN113529765A (en) | Rapid precipitation construction method of anti-floating anchor rod | |
| CN110593259A (en) | An anti-floating anchor construction structure and an anti-floating anchor construction method | |
| CN106968677A (en) | Method for tunnel construction based on pipe shed support | |
| CN111962522A (en) | A combined support structure of inclined wedge piles and vertical pipe piles and construction method thereof | |
| KR101138499B1 (en) | Method for Head Setting of Micro-Pile and Apparatus for the Same | |
| KR100779988B1 (en) | Construction method of small diameter pile | |
| KR100699359B1 (en) | Underground continuous wall with post tension device and construction method | |
| CN212248261U (en) | Foundation pit support structure using steel sheet piles and precast concrete piles | |
| CN115492588A (en) | A construction method for channel culvert reconstruction and reinforcement | |
| CN206570799U (en) | A kind of grouting behind shaft or drift lining end cone formula bored concrete pile |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191220 |