CN110530344A - Utilize the method for the keel installation that total station and three-dimensional laser scanner assist - Google Patents

Utilize the method for the keel installation that total station and three-dimensional laser scanner assist Download PDF

Info

Publication number
CN110530344A
CN110530344A CN201910878713.0A CN201910878713A CN110530344A CN 110530344 A CN110530344 A CN 110530344A CN 201910878713 A CN201910878713 A CN 201910878713A CN 110530344 A CN110530344 A CN 110530344A
Authority
CN
China
Prior art keywords
keel
total station
laser scanner
dimensional laser
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910878713.0A
Other languages
Chinese (zh)
Inventor
肖坦树
王坤
杜立鹏
谭凯龙
李兴锋
李来委
原学琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
People's Liberation Army 63926
Original Assignee
People's Liberation Army 63926
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by People's Liberation Army 63926 filed Critical People's Liberation Army 63926
Priority to CN201910878713.0A priority Critical patent/CN110530344A/en
Publication of CN110530344A publication Critical patent/CN110530344A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00

Abstract

The invention discloses a kind of methods of keel installation assisted using total station and three-dimensional laser scanner, comprising the following steps: (a) measures unwrapping wire using total station, determines keel installation position;(b) it checks concrete inner mold face, installation region concrete surface is pre-processed;(c) monomer carinal dot solid welding is scheduled on ring foundation built-in fitting by monomer keel Primary Location using total station;(d) after every layer of keel installation, this layer of keel group's inner mold face is scanned using three-dimensional laser scanner, the installation error of each monomer keel is obtained by the poster processing soft;(e) according to specific deviation position and error amount, secondary adjustment is carried out to monomer keel using total station;(f) after to whole keel installations, the interior surface contour error of entire keel group is obtained using three-dimensional laser scanner.The measurement of " point+face " double high-precision can be achieved in the present invention, carries out comprehensively and accurate monolithic devices face high-acruracy survey to keel group.

Description

Utilize the method for the keel installation that total station and three-dimensional laser scanner assist
Technical field
The method that the present invention relates to the use of the keel installation of total station and three-dimensional laser scanner auxiliary, belongs to vertical shaft and tunnel The installing area of complicated built-in fitting group in road engineering.
Background technique
The installation of noise reduction board keel group, required precision is high, monomer weight and flexibility are larger, after installation process and installation Overall precision detection difficulty is big, is the key points and difficulties work of work shaft construction.Conventional method is usually during the installation process Control is measured using total station, rear primary welding is completed in place, and installation accuracy is difficult to reach design requirement.Meanwhile pacifying After dress, the great keel group of quantity can not be carried out comprehensively and accurate monolithic devices face precision measure, restrict acoustical panel Processing and installation, increase lot of materials, time and cost of labor.
Three-dimensional laser scanning technique continues to develop, and has gradually been applied and has been led in mapping, foundation pit detection, commercial measurement etc. Domain.The spatial position coordinate of a large amount of sampled points of 3 D laser scanning energy quick obtaining target object surface obtains a description three The point set of entity is tieed up, i.e. point cloud.The point cloud data of acquisition is handled, can be obtained object holonmic space geometric dimension and Characteristic parameter, and point cloud model and master pattern can be compared, comparing result is shown with visual deviation chromatography cloud atlas. Therefore, three-dimensional laser scanning technique is solves the problems, such as that the high accuracy install of noise reduction board keel group provides new thinking.
Summary of the invention
Goal of the invention: in order to overcome the deficiencies in the prior art, the present invention provides a kind of utilization total station and three-dimensional The method of the keel installation of laser scanner auxiliary is, it can be achieved that the measurement of " point+face " double high-precision, carries out keel group comprehensively smart True monolithic devices face high-acruracy survey.And installation method is welded by two steps of " Primary Location spot welding, later period adjustment are fully welded ", It avoids and is difficult to the problem of adjusting after the completion of being once fully welded.This method measurement accuracy is high, save a large amount of cost of labor and when Between cost, and can for later period acoustical panel install provide basic data support.
Technical solution: it is assisted in order to solve the above technical problems, of the invention using total station and three-dimensional laser scanner The method of keel installation, includes the following steps:
(a) total station is placed on Construction of Steel Structure platform in the shaft, finds the bottom vertical shaft center of circle, passes through laser lead Hang down instrument, and the bottom center of circle is projected to reception target, total station is positioned.According to construction drawing, each monomer is determined using total station Position of the keel on vertical shaft inner wall launches 11 central axes of monomer keel on vertical shaft concrete inner wall;Single layer unwrapping wire finishes Afterwards, it is hung using row and moves down steel structure platform, repeated the above steps, complete next layer of setting-out work, until entire vertical shaft Unwrapping wire finishes;
(b) after unwrapping wire, horizontal measurement is carried out by total station, checks whether keel installation region concrete-type face deposits In error, installation region concrete surface is pre-processed, rejects concrete outstanding;
(c) monomer carinal dot solid welding is scheduled on ring foundation built-in fitting by monomer keel Primary Location using total station;
(d) after every layer of keel installation, this layer of keel group's inner mold face is scanned using three-dimensional laser scanner, is led to Later processing software obtains the installation error of each monomer keel;
(e) according to specific error amount and deviation position, secondary adjustment is carried out to monomer keel using total station;
(f) after to whole keel installations, the interior surface contour error of entire keel group is obtained using three-dimensional laser scanner, Data are provided for acoustical panel installation to support.
Preferably, passing through when the step (c) includes measurement using keel upper end two o'clock and lower end two o'clock as control point 4 control points keep monomer keel (11) vertical, and do not generate corner along own central axis line.
Preferably, the step (f) includes being placed in three-dimensional laser scanner inside noise reduction board keel group, make three-dimensional sharp The laser of the laser transmitter projects of photoscanner scans keel group inner mold face along noise reduction board keel group's axis direction, obtains keel The point cloud data in group's inner mold face, is received by three-dimensional laser scanner receiver.
Preferably, the three-dimensional laser scanner is phase type three-dimensional laser scanner.
Preferably, when the step (e) adjusts, it, will be imperial first in one and the position of ring foundation built-in fitting spot welding Bone carries out being fully welded connection, then discharges other spot welding positions, presses down on when inner mold face drum is convex, while being used according to the deviation Steel Ruler measurement, after meeting the requirements, will close on junction and is welded and fixed;When type face recess, steel chock from keel two sides It is inserted into respectively, is inwardly hammered with hammer, depressed area is jacked up, two sides measure simultaneously, and junction weldering will be closed on after meeting the requirements Connect fixation;It is repeated in, until entire keel are adjusted in place;When ring foundation built-in fitting protrudes, adjustment and fixed adjacent connection After point, monomer keel are cut off using oxygen acetylene flame, according to error value, adjust cut-off part upper and lower side, when adjustment utilizes Keel are fully welded fixation, deviation symbol to ring foundation built-in fitting, keel adjustment is welded to afterwards in place by Steel Ruler measurement after meeting the requirements Requirement is closed, directly carries out being fully welded fixation at spot welding position.
The utility model has the advantages that the method for the keel installation of the invention assisted using total station and three-dimensional laser scanner, is had Following advantages:
(1) total station provided by the invention+three-dimensional laser scanner auxiliary noise reduction board keel high accuracy install method, benefit With two high-acruracy survey equipment of total station and three-dimensional laser scanner, the original mistake of measuring device bring is further reduced Difference.
(2) Primary Location is carried out to monomer keel by control point coordinates using total station, it is convenient and efficient.
(3) it is measured after spot welding is fixed using three-dimensional laser scanner, obtains the error in keel group's whole inner mold face As a result, providing more fully data for keel installation and last positioning, and can be conveniently and efficiently real after keel installation The late detection in existing keel group whole type face provides pedestal error data for the processing and installation of later period acoustical panel, realizes two The seamless connection of work.
(4) two key steps are fully welded by Primary Location spot welding, later period adjustment, realize the adjustable of monomer keel Installation, avoids and is disposably fully welded rear nonadjustable defect in conventional method.
Detailed description of the invention
Fig. 1 is keel group structure schematic diagram described in one embodiment of the invention.
Fig. 2 is keel group front view described in one embodiment of the invention.
Fig. 3 is keel group cross-section schematic diagram described in one embodiment of the invention.
Fig. 4 is that keel protrusion and depressed area adjust schematic diagram.
Fig. 5 is flow diagram of the invention.
In figure, 11- monomer keel, 12- ring foundation built-in fitting, 41- vertical shaft inner wall, 42- Steel Ruler.
Specific embodiment
The present invention will be further explained with reference to the accompanying drawing.
As shown in Figures 1 to 4, the side of the keel installation of the invention assisted using total station and three-dimensional laser scanner Method includes the following steps:
(a) total station is placed on Construction of Steel Structure platform in the shaft, finds the bottom vertical shaft center of circle, passes through laser lead Hang down instrument, and the bottom center of circle is projected to reception target, total station is positioned.According to construction drawing, each monomer is determined using total station Position of the keel 11 on vertical shaft inner wall launches 11 central axes of monomer keel on vertical shaft concrete inner wall 41.Single layer unwrapping wire After, it is hung using row and moves down steel structure platform, repeated the above steps, complete next layer of setting-out work, until entire Vertical shaft unwrapping wire finishes.
(b) after unwrapping wire, horizontal measurement is carried out by total station, checks whether keel installation region concrete-type face deposits In error.The region convex to vertical shaft center position drum occurs for concrete-type face, is unsatisfactory for the internal diameter requirement of silencer wall keel group, benefit Go out error value with total station survey, then the concrete for protruding part is rejected using electric hammer or electric pick, makes keel installation area Domain meets design requirement.For invagination or satisfactory concrete region, then no longer handled.
(c) after concrete inner mold surface treatment, the noise reduction board keel 11 that anti-corrosion finishes is hung to Construction of Steel Structure platform. Operator is placed on installation region according to unwrapping wire, by monomer keel 11, and then survey crew utilizes total station survey, makes monomer Keel 11 are preliminary in place.When measurement, make dragon by 4 control points using 11 upper end two o'clock of keel and lower end two o'clock as control point Bone 11 is vertical, does not generate the corner along own central axis line.In measurement process, installation personnel continuously adjusts 11 position of keel, Until meeting drawing requirement.
(d) after monomer keel 11 are preliminary in place, keel 11 are connect with 12 spot welding of ring foundation built-in fitting.Work as ring foundation When built-in fitting 12 protrudes, adjusts and post-process to the later period.When ring foundation built-in fitting 12 is recessed, the steel plate of cushioning suitable thickness. When spot welding connects, on the one hand it is noted that careful operation, prevent it is firmly excessive in welding process so that keel 11 are displaced;Separately On the one hand, it is necessary to ensure that the intensity of spot welding, it is ensured that monomer keel 11 can be fixed safely, prevent to fall, and avoid again a little Weldering excessively influences subsequent adjustment process.
(e) 11 spot welding of monomer keel connection finishes, and carries out the installation of next keel 11.It is repeated in step (c), (d), The fixation of keel 11 all in single layer is finished.
(f) it after 11 spot welding of single layer keel is fixed, is scanned using three-dimensional laser scanner.Reply is three-dimensional before scanning Laser scanner is checked and is verified, and guarantees that scanner is in shape, while flood keel 11 are in three-dimensional laser The effective scanning range of scanner.Target ball is laid in scanning slice inner wall.Three-dimensional laser scanner is erected at Construction of Steel Structure Platform middle position, by instrument leveling.Condition depending on the site environment selects suitable scan pattern, resolution ratio and precision, and beats Open camera, starting scanning.Three-dimensional laser scanner is automatically scanned the layer, and after the end of scan, machine is automatically stopped.It will Scanning result imports pretreatment software, removes extraneous region and noise spot, carries out pumping analysis, noise reduction process, obtains three-dimensional point cloud Model.Using 3 d modeling software, 11 threedimensional model of silencer wall keel is established.To reduce workload, the letter of a vertical shaft can be built Single model is compared with single layer keel group's inner mold face.After three-dimensional point cloud model and vertical shaft model are imported analysis software progress Processing.Obtain this layer of deviation cloud atlas, extent of deviation can be observed on the whole, then to the type face deviation of each monomer keel 11 into Row analysis, obtains specific deviation data, provides data for secondary adjustment and supports.
(g) bias contribution provided according to analysis software, to there are the monomer keel 11 of type face deviation to carry out secondary adjustment. When adjustment, first in one and the position of 12 spot welding of ring foundation built-in fitting, keel 11 are carried out to be fully welded connection.Followed by it discharges Other spot welding positions are pressed down on when inner mold face drum is convex, while being measured according to deviation Steel Ruler 42, are met the requirements Afterwards, junction will be closed on to be welded and fixed;When type face recess when, steel chock is inserted into respectively from 11 two sides of keel, with hammer to Interior hammering, depressed area is jacked up, and two sides measure simultaneously, and junction will be closed on after meeting the requirements and is welded and fixed.It is repeated in, directly It is adjusted in place to entire keel 11.When ring foundation built-in fitting 12 protrudes, after adjustment and fixed adjacent attachment points, oxygen second is utilized Alkynes flame cuts off monomer keel 11, according to error value, adjusts cut-off part upper and lower side, and when adjustment is measured using Steel Ruler 42, In place afterwards by keel 11 to being welded to ring foundation built-in fitting 12.The adjustment of keel 11 is fully welded fixation after meeting the requirements.Deviation conforms to It asks, directly carries out being fully welded fixation at spot welding position.
(h) all adjustment after the installation is completed, the installation of next layer of keel is carried out according to the step of (c)-(g) to one layer of keel. It is repeated in, until entire noise reduction board keel group installs.
(i) entire keel group after the installation is completed, carries out entire scan and post-treatment procedures to keel group, it is inclined to obtain type face Difference, single two-way verticality, the circumferentially deviation informations such as angular displacement and whole concentricity, make and are installed for subsequent acoustical panel Data are provided to support.

Claims (5)

1. a kind of method of the keel installation assisted using total station and three-dimensional laser scanner, which is characterized in that including as follows Step:
(a) total station is placed on Construction of Steel Structure platform in the shaft, finds the bottom vertical shaft center of circle, passes through laser plumb The bottom center of circle is projected to reception target, total station is positioned by instrument, according to construction drawing, determines each monomer dragon using total station Position of the bone on vertical shaft inner wall launches 11 central axes of monomer keel on vertical shaft concrete inner wall;After single layer unwrapping wire, It is hung using row and moves down steel structure platform, repeated the above steps, complete next layer of setting-out work, until entire vertical shaft unwrapping wire It finishes;
(b) after unwrapping wire, horizontal measurement is carried out by total station, checks keel installation region concrete-type face with the presence or absence of mistake Difference pre-processes installation region concrete surface, rejects concrete outstanding;
(c) monomer carinal dot solid welding is scheduled on ring foundation built-in fitting by monomer keel Primary Location using total station;
(d) after every layer of keel installation, this layer of keel group's inner mold face is scanned using three-dimensional laser scanner, by rear Processing software obtains the installation error of each monomer keel;
(e) according to specific error amount and deviation position, secondary adjustment is carried out to monomer keel using total station;
(f) after to whole keel installations, the interior surface contour error of entire keel group is obtained, using three-dimensional laser scanner to disappear Soundboard installation provides data and supports.
2. the method for the keel installation according to claim 1 assisted using total station and three-dimensional laser scanner, special Sign is: making list by 4 control points using keel upper end two o'clock and lower end two o'clock as control point when step (c) includes measurement Body keel (11) are vertical, and do not generate corner along own central axis line.
3. the method for the keel installation according to claim 1 assisted using total station and three-dimensional laser scanner, special Sign is: step (f) includes being placed in three-dimensional laser scanner inside noise reduction board keel group, makes the laser of three-dimensional laser scanner The laser of transmitter transmitting scans keel group inner mold face along noise reduction board keel group's axis direction, obtains the point cloud in keel group inner mold face Data are received by three-dimensional laser scanner receiver.
4. the method for the keel installation according to claim 1 assisted using total station and three-dimensional laser scanner, special Sign is: the three-dimensional laser scanner is phase type three-dimensional laser scanner.
5. the method for the keel installation according to claim 1 assisted using total station and three-dimensional laser scanner, special Sign is: when the step (e) adjusts, first in one and the position of ring foundation built-in fitting spot welding, keel being fully welded Connection, then discharges other spot welding positions, presses down on when inner mold face drum is convex, while being surveyed according to the deviation with Steel Ruler Amount, after meeting the requirements, will close on junction and is welded and fixed;When type face recess, steel chock is inserted into respectively from keel two sides, It is inwardly hammered with hammer, depressed area is jacked up, two sides measure simultaneously, and junction will be closed on after meeting the requirements and is welded and fixed;According to Secondary repetition, until entire keel are adjusted in place;When ring foundation built-in fitting protrudes, after adjustment and fixed adjacent attachment points, utilize Oxygen acetylene flame cuts off monomer keel, according to error value, adjusts cut-off part upper and lower side, and when adjustment is surveyed using Steel Ruler Keel are fully welded fixation after meeting the requirements to ring foundation built-in fitting, keel adjustment is welded to afterwards in place by amount, and deviation meets the requirements , it directly carries out being fully welded fixation at spot welding position.
CN201910878713.0A 2019-09-18 2019-09-18 Utilize the method for the keel installation that total station and three-dimensional laser scanner assist Pending CN110530344A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910878713.0A CN110530344A (en) 2019-09-18 2019-09-18 Utilize the method for the keel installation that total station and three-dimensional laser scanner assist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910878713.0A CN110530344A (en) 2019-09-18 2019-09-18 Utilize the method for the keel installation that total station and three-dimensional laser scanner assist

Publications (1)

Publication Number Publication Date
CN110530344A true CN110530344A (en) 2019-12-03

Family

ID=68668937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910878713.0A Pending CN110530344A (en) 2019-09-18 2019-09-18 Utilize the method for the keel installation that total station and three-dimensional laser scanner assist

Country Status (1)

Country Link
CN (1) CN110530344A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410335A (en) * 2013-08-30 2013-11-27 南通八建集团有限公司 Front-supporting rear-pulling large cantilevered beam overall-embedded type hoisting construction method
CN105082863A (en) * 2015-09-08 2015-11-25 苏州金螳螂建筑装饰股份有限公司 Indoor large overhanging type wooden boat structure and installing method
CN105737751A (en) * 2014-12-06 2016-07-06 中国石油化工股份有限公司 Vertical storage tank deformation monitoring system and method
CN106193514A (en) * 2016-08-23 2016-12-07 中建八局第二建设有限公司 Irregular hyperboloid bamboo aluminum composite plate construction method
CN108460189A (en) * 2018-02-06 2018-08-28 华北水利水电大学 A kind of curtain wall mounting design method based on BIM technology
CN108842928A (en) * 2018-07-06 2018-11-20 中国人民解放军63926部队 A kind of the disc type positioning device and localization method pre-buried suitable for vertical shaft bar shaped keel high-precision
CN110056106A (en) * 2019-04-17 2019-07-26 中建八局第二建设有限公司 A kind of frame curtain wall quick assembling construction method and system based on BIM

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410335A (en) * 2013-08-30 2013-11-27 南通八建集团有限公司 Front-supporting rear-pulling large cantilevered beam overall-embedded type hoisting construction method
CN105737751A (en) * 2014-12-06 2016-07-06 中国石油化工股份有限公司 Vertical storage tank deformation monitoring system and method
CN105082863A (en) * 2015-09-08 2015-11-25 苏州金螳螂建筑装饰股份有限公司 Indoor large overhanging type wooden boat structure and installing method
CN106193514A (en) * 2016-08-23 2016-12-07 中建八局第二建设有限公司 Irregular hyperboloid bamboo aluminum composite plate construction method
CN108460189A (en) * 2018-02-06 2018-08-28 华北水利水电大学 A kind of curtain wall mounting design method based on BIM technology
CN108842928A (en) * 2018-07-06 2018-11-20 中国人民解放军63926部队 A kind of the disc type positioning device and localization method pre-buried suitable for vertical shaft bar shaped keel high-precision
CN110056106A (en) * 2019-04-17 2019-07-26 中建八局第二建设有限公司 A kind of frame curtain wall quick assembling construction method and system based on BIM

Similar Documents

Publication Publication Date Title
CN104792274B (en) A kind of measuring method of circular tunnel convergent deformation
CN108871266B (en) Automatic settlement monitoring method based on intermediate method triangle elevation method
CN101571379B (en) Method for measuring diameter and straightness accuracy parameters of seamless round steel pipe
CN110888143B (en) Bridge through measurement method based on unmanned aerial vehicle airborne laser radar
CN108844522A (en) A kind of shield tunnel section center extraction method based on 3 D laser scanning
CN102564393A (en) Method for monitoring and measuring full section of tunnel through three-dimensional laser
CN111578916B (en) Intelligent paying-off construction method in decoration engineering based on BIM technology
CN109459439A (en) A kind of Tunnel Lining Cracks detection method based on mobile three-dimensional laser scanning technique
Bryn et al. Geodetic monitoring of deformation of building surrounding an underground construction
CN103389136A (en) External floating top vertical metal can volume measuring method based on three-dimensional laser scanning technology
CN201031704Y (en) Tunnel wireless laser setting-out work device
CN107270814A (en) A kind of prefabricated assembled wind-tunnel high accuracy install control method
CN103114732A (en) Cast steel penetration pipe node space positioning method
CN110646159A (en) Construction method for high-precision control and measurement of cast-in-place bare concrete wind tunnel
CN207907883U (en) A kind of airplane horizontal survey system of high-efficiency high-accuracy
CN106017319A (en) Coordinate transformation tool and method of 3D laser scanning data based on high-precision point measurement
CN112884647A (en) Embedded part construction positioning method based on BIM point cloud technology guidance
CN108592877A (en) A kind of change size dome radius detection method
CN108174442A (en) A kind of underwater works crack repair robot Sensor Network position finding and detection method
CN106646498B (en) A kind of development machine lateral shift measurement method
CN114136226B (en) High-precision measurement method for vertical compression deformation of super high-rise building
CN110530344A (en) Utilize the method for the keel installation that total station and three-dimensional laser scanner assist
CN114923433B (en) Method for improving paying-off efficiency and precision of special-shaped structure curtain wall
CN113649534B (en) Slab continuous casting sector section space positioning measurement method
CN112605646B (en) Installation method for installation and alignment of supporting roller of rotary hearth furnace

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191203

RJ01 Rejection of invention patent application after publication