CN110529049A - A kind of workover rig concubine holder device - Google Patents

A kind of workover rig concubine holder device Download PDF

Info

Publication number
CN110529049A
CN110529049A CN201910802570.5A CN201910802570A CN110529049A CN 110529049 A CN110529049 A CN 110529049A CN 201910802570 A CN201910802570 A CN 201910802570A CN 110529049 A CN110529049 A CN 110529049A
Authority
CN
China
Prior art keywords
frame column
room
base
support
partial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910802570.5A
Other languages
Chinese (zh)
Inventor
汪洋
张茗奎
张帅
董生政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN KUNLUN PETROLEUM EQUIPMENT MANUFACTURING Co Ltd
Original Assignee
SICHUAN KUNLUN PETROLEUM EQUIPMENT MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN KUNLUN PETROLEUM EQUIPMENT MANUFACTURING Co Ltd filed Critical SICHUAN KUNLUN PETROLEUM EQUIPMENT MANUFACTURING Co Ltd
Priority to CN201910802570.5A priority Critical patent/CN110529049A/en
Publication of CN110529049A publication Critical patent/CN110529049A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Packaging Of Machine Parts And Wound Products (AREA)

Abstract

本发明公开了一种修井机偏房支架装置,主要解决石油修井机偏房支架零碎,偏房安装及井场运输过程中费时费力的问题。该偏房支架包括支架底座,与支架底座相连的下框架立柱,一端与支架底座相连且另一端与下框架立柱上端相连的下拉杆,与下框架立柱上端相连的上框架立柱,与上框架立柱顶端相连的偏房底座,以及一端与偏房底座相连且另一端与下框架立柱下端和下拉杆均相连的上拉杆。通过上述设计,本发明的偏房支架采用可折叠的框架结构,上拉杆与下拉杆组成菱形结构,工作时通过炮弹销将拉杆与框架立柱连接成稳定的三角结构。运输时,将偏房支架进行折叠,使偏房支架及偏房整体运输更加方便。因此,具有很高的使用价值和推广价值。

The invention discloses a support device for a side room of a workover rig, which mainly solves the problems of fragmentation of the support of the side room of the oil workover rig, time-consuming and labor-intensive problems in the installation of the side room and the transportation of the well site. The partial room support includes a support base, a lower frame column connected to the support base, a pull-down rod connected to the support base and the other end to the upper end of the lower frame column, an upper frame column connected to the upper end of the lower frame column, and the upper frame column top. A connected partial room base, and an upper tie rod whose one end is connected with the partial room base and the other end is connected with the lower end of the lower frame column and the lower rod. Through the above design, the partial room support of the present invention adopts a foldable frame structure, and the upper pull rod and the lower rod form a rhombus structure. During operation, the pull rod and the frame column are connected to form a stable triangular structure by shell pins. During transportation, the partial room support is folded, so that the partial room support and the partial room are transported more conveniently. Therefore, it has high use value and promotion value.

Description

一种修井机偏房支架装置Partial room support device for workover rig

技术领域technical field

本发明涉及石油钻采设备制造技术领域,具体地说,是涉及一种修井机偏房支架装置。The invention relates to the technical field of oil drilling and production equipment manufacturing, in particular to a partial room support device for a workover rig.

背景技术Background technique

随着石油装备业的不断发展,车载钻修机的使用要求也越来越高,集成化、模块化、高效率的装备也越来越受到企业的青睐。钻台偏房作为车载钻修机井口底座区域的辅助配套设备,由于底座结构的限制,现阶段钻台偏房一般通过辅助支架安装在与钻台工作相同高度的位置,实现与底座的配合。With the continuous development of the petroleum equipment industry, the requirements for the use of vehicle-mounted drilling and repairing machines are getting higher and higher, and integrated, modular, and high-efficiency equipment is also more and more favored by enterprises. The partial room on the drill floor is used as auxiliary equipment in the wellhead base area of the vehicle-mounted drilling and repairing machine. Due to the limitation of the base structure, the partial room on the drill floor is generally installed at the same height as the working height of the drill floor through auxiliary brackets at this stage to achieve cooperation with the base.

为了解决石油修井机偏房支架零碎,偏房安装及井场运输过程中费时费力的问题。现有的技术是偏房安装在两到三个箱型底座上,通过吊车先将箱型底座叠装在一起,再将偏房高位吊装到叠好的箱型底座上。运输时,箱型底座及偏房分别用车运输。整个过程费工费时、还有高空作业,存在安全隐患。工人的劳动强度也大。In order to solve the time-consuming and labor-intensive problems in the partial housing support of the oil workover rig, the installation of the partial housing and the transportation of the well site. The existing technology is that the partial room is installed on two to three box-shaped bases, and the box-shaped bases are first stacked together by a crane, and then the partial room is hoisted on the stacked box-shaped base at a high position. When transporting, the box-shaped base and the side room are transported by car separately. The whole process is labor-intensive and time-consuming, and there are high-altitude operations, which pose potential safety hazards. The labor intensity of workers is also high.

发明内容Contents of the invention

本发明的目的在于一种修井机偏房支架装置,主要解决石油修井机偏房支架零碎,偏房安装及井场运输过程中费时费力的问题。The object of the present invention is a support device for a side room of a workover rig, which mainly solves the problems of fragmentation of the side room support of a petroleum workover rig, time-consuming and labor-intensive problems in the installation of the side room and the transportation of the well site.

为实现上述目的,本发明采用的技术方案如下:To achieve the above object, the technical scheme adopted in the present invention is as follows:

一种修井机偏房支架装置,包括支架底座,与支架底座相连的下框架立柱,一端与支架底座相连且另一端与下框架立柱上端相连的下拉杆,与下框架立柱上端相连的上框架立柱,与上框架立柱顶端相连的偏房底座,以及一端与偏房底座相连且另一端与下框架立柱下端和下拉杆均相连的上拉杆。A support device for a side room of a workover rig, comprising a support base, a lower frame column connected to the support base, a pull rod with one end connected to the support base and the other end connected to the upper end of the lower frame column, and an upper frame column connected to the upper end of the lower frame column , the partial room base connected to the top of the upper frame column, and the upper pull rod connected to the partial room base at one end and connected to the lower end of the lower frame column and the lower rod at the other end.

进一步地,所述支架底座上侧和偏房底座下侧均设置有多个双耳连接座;所述下框架立柱、下拉杆均通过双耳连接座与支架底座相连,所述上框架立柱、上拉杆均通过双耳连接座与偏房底座相连。Further, the upper side of the support base and the lower side of the side room base are provided with a plurality of double-ear connection seats; the lower frame column and the lower rod are connected to the support base through the double-ear connection seats, and the upper frame column, upper The pull rods are all connected to the side room base through the double-ear connection seat.

进一步地,所述下框架立柱、下拉杆的一端设置有第一连接舌且另一端设置有连接耳板。Further, one end of the lower frame column and the lower rod is provided with a first connecting tongue and the other end is provided with a connecting ear plate.

进一步地,所述上框架立柱、上拉杆的两端均设置第二连接舌。Further, both ends of the upper frame column and the upper pull rod are provided with second connecting tongues.

进一步地,所述第一连接舌与支架底座的双耳连接座通过炮弹销连接。Further, the first connecting tongue is connected to the double-ear connecting seat of the bracket base through a shell pin.

进一步地,所述第二连接舌分别与连接耳板和偏房底座上的双耳连接座通过炮弹销连接。Further, the second connecting tongue is respectively connected to the connecting lug plate and the two-ear connecting seat on the base of the side room through a shell pin.

进一步地,所述上拉杆和上框架立柱、下拉杆和下框架立柱均通过炮弹销连接。Further, the upper tie rod and the upper frame column, the lower rod and the lower frame column are all connected by shell pins.

与现有技术相比,本发明具有以下有益效果:Compared with the prior art, the present invention has the following beneficial effects:

(1)本发明的偏房支架的上、下框架立柱通过第二连接舌和连接耳板利用炮弹销进行连接,形成可折叠的框架结构,上、下框架立柱的外侧由两根上拉杆和两根下拉杆组成菱形结构,工作时通过炮弹销将拉杆与框架立柱连接成稳定的三角结构。运输时,将偏房支架进行折叠,使偏房支架及偏房整体运输更加方便。(1) The upper and lower frame columns of the partial room support of the present invention are connected by shell pins through the second connecting tongue and the connecting ear plate to form a foldable frame structure. The pull rods form a rhombus structure, and the pull rods are connected to the frame columns by shell pins to form a stable triangular structure during work. During transportation, the partial room support is folded, so that the partial room support and the partial room are transported more conveniently.

(2)本发明结构简单,安装及运输省时省力,不需要使用吊车等大型设备,消除高空作业安全隐患,减轻工人的劳动强度。(2) The present invention is simple in structure, saves time and effort in installation and transportation, does not need to use large-scale equipment such as cranes, eliminates safety hazards in high-altitude operations, and reduces labor intensity of workers.

附图说明Description of drawings

图1为本发明的使用状态图。Fig. 1 is the use state chart of the present invention.

图2为图1中的A部放大图。Fig. 2 is an enlarged view of part A in Fig. 1 .

图3为图1中的B部放大图。Fig. 3 is an enlarged view of part B in Fig. 1 .

图4为本发明的折叠运输状态图。Fig. 4 is a diagram of the folded transportation state of the present invention.

其中,附图标记对应的名称为:Among them, the names corresponding to the reference signs are:

1-支架底座,2-下框架立柱,3-下拉杆,4-上框架立柱,5-偏房底座,6-上拉杆,7-双耳连接座,8-第一连接舌,9-连接耳板,10-第二连接舌,11-炮弹销。1-bracket base, 2-lower frame column, 3-lower rod, 4-upper frame column, 5-partial room base, 6-upper rod, 7-two-ear connecting seat, 8-first connecting tongue, 9-connecting ear Plate, 10-the second connecting tongue, 11-cannonball pin.

具体实施方式Detailed ways

下面结合附图说明和实施例对本发明作进一步说明,本发明的方式包括但不仅限于以下实施例。The present invention will be further described below with reference to the accompanying drawings and embodiments, and the mode of the present invention includes but not limited to the following embodiments.

实施例Example

如图1~3所示,本发明公开的一种修井机偏房支架装置,包括支架底座1,所述支架底座1上设置有八个双耳连接座7,两侧边缘的四个用于连接四个下框架立柱2,中间的四个双耳连接座7用于连接四个下拉杆3。下框架立柱2和下拉杆3均是通过第一连接舌8和炮弹销11实现与双耳连接座7的连接。并且,下拉杆3的另一端与下框架立柱2上端也通过炮弹销11连接在一起。As shown in Figures 1 to 3, a workover rig partial room support device disclosed by the present invention includes a support base 1, and eight double-ear connection seats 7 are arranged on the support base 1, and four of the two side edges are used for The four lower frame columns 2 are connected, and the four double-ear connecting seats 7 in the middle are used to connect the four pull-down rods 3 . Both the lower frame column 2 and the lower rod 3 are connected to the two-ear connection seat 7 through the first connection tongue 8 and the shell pin 11 . And, the other end of the lower rod 3 and the upper end of the lower frame column 2 are also connected together by the shell pin 11 .

并且,偏房支架上方的偏房底座5上设置有与支架底座1上的八个双耳连接座7位置相对应的八个双耳连接座7,用于对应连接上框架立柱4和上拉杆6。上框架立柱4下端设置的第二连接舌10与下框架立柱2上端设置的连接耳板9通过炮弹销11连接;上拉杆6下端设置的第二连接舌10与下拉杆3上端设置的连接耳板9也通过炮弹销11连接。由此,同侧的上拉杆6和下拉杆3组成菱形结构,工作时通过炮弹销11将拉杆与框架立柱连接成稳定的三角结构。此外,相邻最近的两根框架立柱之间设置有加强梁,增加整个偏房支架的支撑强度。Moreover, eight double-ear connection seats 7 corresponding to the positions of the eight double-ear connection seats 7 on the support base 1 are provided on the partial room base 5 above the partial room support, for correspondingly connecting the upper frame column 4 and the upper tie rod 6 . The second connecting tongue 10 provided at the lower end of the upper frame column 4 is connected with the connecting ear plate 9 provided at the upper end of the lower frame column 2 through the shell pin 11; The plates 9 are also connected by shell pins 11 . Thus, the same-side upper pull rod 6 and lower pull rod 3 form a rhombus structure, and the pull rod and the frame column are connected by the shell pin 11 to form a stable triangular structure during operation. In addition, reinforcing beams are arranged between the two closest frame columns to increase the supporting strength of the whole partial room support.

如图4所示,在需要对偏房支架进行整体运输时,为降低整个支架的占地空间,砸下下拉杆3、上拉杆6和下框架立柱1、上框架立柱2之间的炮弹销11,下放偏房底座5到低位后。整个偏房支架形成折叠结构,便于运输。As shown in Figure 4, when it is necessary to carry out the overall transportation of the partial room bracket, in order to reduce the floor space of the whole bracket, the shell pin 11 between the lower rod 3, the upper rod 6, the lower frame column 1, and the upper frame column 2 is smashed down. , after lowering the side room base 5 to the low position. The entire side room support forms a folded structure, which is convenient for transportation.

通过上述设计,本发明的偏房支架的上、下框架立柱通过第二连接舌和连接耳板利用炮弹销进行连接,形成可折叠的框架结构,上、下框架立柱的外侧由两根上拉杆和两根下拉杆组成菱形结构,工作时通过炮弹销将拉杆与框架立柱连接成稳定的三角结构。运输时,将偏房支架进行折叠,使偏房支架及偏房整体运输更加方便。因此,具有很高的使用价值和推广价值。Through the above design, the upper and lower frame columns of the partial room bracket of the present invention are connected by shell pins through the second connecting tongue and the connecting ear plate to form a foldable frame structure. The outer sides of the upper and lower frame columns are formed by two upper pull rods and two The root pull rods form a rhombus structure, and the pull rods are connected to the frame columns by shell pins to form a stable triangular structure during work. During transportation, the partial room support is folded, so that the partial room support and the partial room are transported more conveniently. Therefore, it has high use value and promotion value.

上述实施例仅为本发明的优选实施方式之一,不应当用于限制本发明的保护范围,但凡在本发明的主体设计思想和精神上作出的毫无实质意义的改动或润色,其所解决的技术问题仍然与本发明一致的,均应当包含在本发明的保护范围之内。The above-mentioned embodiment is only one of the preferred implementation modes of the present invention, and should not be used to limit the scope of protection of the present invention, but any modification or embellishment without substantive significance made on the main design concept and spirit of the present invention shall be solved by it. If the technical problems are still consistent with the present invention, all should be included in the protection scope of the present invention.

Claims (7)

1.一种修井机偏房支架装置,其特征在于,包括支架底座(1),与支架底座(1)相连的下框架立柱(2),一端与支架底座(1)相连且另一端与下框架立柱(2)上端相连的下拉杆(3),与下框架立柱(2)上端相连的上框架立柱(4),与上框架立柱(4)顶端相连的偏房底座(5),以及一端与偏房底座(5)相连且另一端与下框架立柱(4)下端和下拉杆(3)均相连的上拉杆(6)。1. A workover rig partial room support device, characterized in that it comprises a support base (1), a lower frame column (2) that links to each other with the support base (1), one end links to each other with the support base (1) and the other end connects to the lower The lower link (3) connected to the upper end of the frame column (2), the upper frame column (4) connected to the upper end of the lower frame column (2), the partial room base (5) connected to the top of the upper frame column (4), and one end connected to the The partial room base (5) is connected and the upper tie rod (6) that the other end is all connected with the lower end of the lower frame column (4) and the lower rod (3). 2.根据权利要求1所述的一种修井机偏房支架装置,其特征在于,所述支架底座(1)上侧和偏房底座(5)下侧均设置有多个双耳连接座(7);所述下框架立柱(2)、下拉杆(3)均通过双耳连接座(7)与支架底座(1)相连,所述上框架立柱(4)、上拉杆(6)均通过双耳连接座(7)与偏房底座(5)相连。2. A workover rig partial room support device according to claim 1, characterized in that, the upper side of the support base (1) and the lower side of the partial room base (5) are provided with a plurality of double-ear connection seats (7 ); the lower frame column (2) and the lower rod (3) are all connected to the support base (1) through the double-ear connection seat (7), and the upper frame column (4) and the upper pull rod (6) are all connected through the double-ear connection seat (7). The ear connecting seat (7) links to each other with the side room base (5). 3.根据权利要求2所述的一种修井机偏房支架装置,其特征在于,所述下框架立柱(2)、下拉杆(3)的一端设置有第一连接舌(8)且另一端设置有连接耳板(9)。3. A kind of workover rig partial room support device according to claim 2, characterized in that, one end of the lower frame column (2) and the pull rod (3) is provided with a first connecting tongue (8) and the other end A connection ear plate (9) is provided. 4.根据权利要求3所述的一种修井机偏房支架装置,其特征在于,所述上框架立柱(4)、上拉杆(6)的两端均设置第二连接舌(10)。4. A workover rig eccentric room support device according to claim 3, characterized in that, both ends of the upper frame column (4) and the upper tie rod (6) are provided with second connecting tongues (10). 5.根据权利要求4所述的一种修井机偏房支架装置,其特征在于,所述第一连接舌(8)与支架底座(1)的双耳连接座(7)通过炮弹销(11)连接。5. A workover rig partial room support device according to claim 4, characterized in that, the first connecting tongue (8) and the double-ear connection seat (7) of the support base (1) pass through the shell pin (11 )connect. 6.根据权利要求5所述的一种修井机偏房支架装置,其特征在于,所述第二连接舌(10)分别与连接耳板(9)和偏房底座(5)上的双耳连接座(7)通过炮弹销(11)连接。6. A partial housing support device for a workover rig according to claim 5, characterized in that the second connecting tongue (10) is respectively connected to the connecting ear plate (9) and the two ears on the partial housing base (5) Seat (7) is connected by shell pin (11). 7.根据权利要求6所述的一种修井机偏房支架装置,其特征在于,所述上拉杆(3)和上框架立柱(2)、下拉杆(6)和下框架立柱(4)均通过炮弹销(11)连接。7. A kind of workover rig partial room support device according to claim 6, characterized in that, the upper tie rod (3) and the upper frame column (2), the lower rod (6) and the lower frame column (4) are all Connection via shell pin (11).
CN201910802570.5A 2019-08-28 2019-08-28 A kind of workover rig concubine holder device Pending CN110529049A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910802570.5A CN110529049A (en) 2019-08-28 2019-08-28 A kind of workover rig concubine holder device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910802570.5A CN110529049A (en) 2019-08-28 2019-08-28 A kind of workover rig concubine holder device

Publications (1)

Publication Number Publication Date
CN110529049A true CN110529049A (en) 2019-12-03

Family

ID=68664861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910802570.5A Pending CN110529049A (en) 2019-08-28 2019-08-28 A kind of workover rig concubine holder device

Country Status (1)

Country Link
CN (1) CN110529049A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2644657Y (en) * 2003-07-06 2004-09-29 胡学升 Folding vertically displaceable drilling machine base
CN201013247Y (en) * 2007-02-11 2008-01-30 辽河石油勘探局 Drilling rig foundation capable of carrying out parallelogram or vertical folding rising
US20080247827A1 (en) * 2007-03-30 2008-10-09 Remedial (Cyprus) Pcl Work-over rig assembly and methods thereof
CN201144414Y (en) * 2007-09-07 2008-11-05 中国石化集团江汉石油管理局第四机械厂 Split folding drill floor
CN205134917U (en) * 2015-11-25 2016-04-06 张彦斌 Foldable scaffold
US20170234079A1 (en) * 2014-08-11 2017-08-17 Pioneer Energy Services Corp. Drilling rig and method of use
CN207127412U (en) * 2017-06-16 2018-03-23 湖州科创机械有限公司 A kind of retractable supports platform for aiding in thin-wall pipe welding
CN210888814U (en) * 2019-08-28 2020-06-30 四川昆仑石油设备制造有限公司 Workover rig inclined to one side room support device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2644657Y (en) * 2003-07-06 2004-09-29 胡学升 Folding vertically displaceable drilling machine base
CN201013247Y (en) * 2007-02-11 2008-01-30 辽河石油勘探局 Drilling rig foundation capable of carrying out parallelogram or vertical folding rising
US20080247827A1 (en) * 2007-03-30 2008-10-09 Remedial (Cyprus) Pcl Work-over rig assembly and methods thereof
CN201144414Y (en) * 2007-09-07 2008-11-05 中国石化集团江汉石油管理局第四机械厂 Split folding drill floor
US20170234079A1 (en) * 2014-08-11 2017-08-17 Pioneer Energy Services Corp. Drilling rig and method of use
CN205134917U (en) * 2015-11-25 2016-04-06 张彦斌 Foldable scaffold
CN207127412U (en) * 2017-06-16 2018-03-23 湖州科创机械有限公司 A kind of retractable supports platform for aiding in thin-wall pipe welding
CN210888814U (en) * 2019-08-28 2020-06-30 四川昆仑石油设备制造有限公司 Workover rig inclined to one side room support device

Similar Documents

Publication Publication Date Title
CN104947850B (en) Shuttle-shaped roof truss and construction method thereof
WO2017045625A1 (en) Pile frame and method of using and mounting same
CN204434123U (en) Tower body in tower crane resistance to deformation
CN202944437U (en) Frame and construction machinery
CN110529049A (en) A kind of workover rig concubine holder device
CN214031383U (en) Extended hanging frame
CN204152527U (en) The combined type preliminary bracing system of wall multiple-arch tunnel in implicit expression
CN201144414Y (en) Split folding drill floor
CN212127336U (en) Parallel double-upper-string trapezoidal arm support
CN210888814U (en) Workover rig inclined to one side room support device
WO2024244301A1 (en) Central-drilling, rotary-excavation and reverse-circulation all-in-one machine
CN204643543U (en) The lifting tool of marine low speed diesel engine support assembly
CN110562848B (en) A high-low position conversion device for box beam transportation
CN219058362U (en) A standard section of tower crane
CN201635663U (en) Drilling platform of workover rig
CN108639933B (en) Lifting method for flipping bracket and shield main drive
CN203715125U (en) Crane as well as guying device thereof
CN203654762U (en) Boom and Concrete Pump Trucks
CN216788417U (en) Folding walking platform applied to earth pressure balance type shield machine
CN204715542U (en) A kind of steel beam coupling device
CN202022658U (en) Frame and crane with same
CN221703658U (en) A foldable oil drilling rig derrick base section
CN2075255U (en) Ordinary h shaped steel derrick
CN211173999U (en) A device for storing drill pipe of a drilling rig
CN215626352U (en) BOP and casing head hoisting and moving device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Country or region after: China

Address after: No. 39 Baiyun Road, Xindu Street, Xindu District, Chengdu City, Sichuan Province (Industrial East Zone)

Applicant after: Sichuan Zhongman Petroleum Equipment Manufacturing Co.,Ltd.

Address before: East Zone of Industrial Development Zone, Xindu District, Chengdu City, Sichuan Province

Applicant before: SICHUAN KUNLUN PETROLEUM EQUIPMENT MANUFACTURING Co.,Ltd.

Country or region before: China

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20191203

RJ01 Rejection of invention patent application after publication