CN110514911A - A kind of system and method for power plant high voltage bus power supply nuclear phase - Google Patents
A kind of system and method for power plant high voltage bus power supply nuclear phase Download PDFInfo
- Publication number
- CN110514911A CN110514911A CN201910804493.7A CN201910804493A CN110514911A CN 110514911 A CN110514911 A CN 110514911A CN 201910804493 A CN201910804493 A CN 201910804493A CN 110514911 A CN110514911 A CN 110514911A
- Authority
- CN
- China
- Prior art keywords
- voltage
- power supply
- working power
- voltage transformer
- transformer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R29/00—Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
- G01R29/18—Indicating phase sequence; Indicating synchronism
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Stand-By Power Supply Arrangements (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明公开了一种发电厂高压母线电源核相的系统及方法,包括工作电源单元、发电机断路器单元、工作电源共箱母线、工作电源进线软连接、工作电源进线开关、工作电源进线电压互感器、备用电源单元、备用电源共箱母线、备用电源进线软连接、备用电源进线开关、备用电源进线电压互感器、高压母线电压互感器及高压母线,该系统及方法能够实现高压母线电源核相,且安全性及可靠性较高。
The invention discloses a system and method for phase verification of a high-voltage bus power supply in a power plant. Incoming line voltage transformer, backup power supply unit, backup power common box bus, backup power inlet soft connection, backup power inlet switch, backup power inlet voltage transformer, high-voltage bus voltage transformer and high-voltage bus, the system and method It can realize high-voltage bus power supply nuclear phase, and has high safety and reliability.
Description
技术领域technical field
本发明属于电力调试和电力试验技术领域,涉及一种发电厂高压母线电源核相的系统及方法。The invention belongs to the technical field of electric power debugging and electric power testing, and relates to a system and method for phase verification of a high-voltage bus power supply in a power plant.
背景技术Background technique
发电厂和大型厂矿通常设置6kV或者10kV高压厂用母线满足厂用高压负荷的需要。通常高压母线设置两路电源供电,工作电源进线通过工作电源进线开关取自高压厂用变压器低压侧;备用电源通过备用电源进线开关取自备用变低压侧,主变和备用变通过高压断路器和高压母线相连。高压母线运行时通常由一路电源供电,电源切换由厂用电快切装置完成。工作电源和备用电源切换方式有三种:并联切换、同时切换和串联切换。并联切换和同时切换过程中都有两路电源合环运行的情景,因此需要提前对工作电源和备用电源进行核相,预防由于非同期并联造成的相间短路事故。Power plants and large-scale factories and mines are usually equipped with 6kV or 10kV high-voltage factory busbars to meet the needs of factory high-voltage loads. Usually, the high-voltage busbar is provided with two power supplies. The working power supply line is taken from the low-voltage side of the high-voltage factory transformer through the working power supply line switch; the standby power supply is taken from the low-voltage side of the standby transformer through the standby power supply line switch, and the main The circuit breaker is connected to the high voltage bus. When the high-voltage bus is running, it is usually powered by one power supply, and the power supply switching is completed by the factory power fast switching device. There are three ways to switch between the working power supply and the standby power supply: parallel switching, simultaneous switching and series switching. During parallel switching and simultaneous switching, there are scenarios where the two power supplies are closed-loop, so it is necessary to check the phases of the working power supply and the backup power supply in advance to prevent phase-to-phase short-circuit accidents caused by non-synchronous parallel connection.
正常情况,按照设计,高压电源经过主变压器、高压厂用变压器角度转换后得到的工作电源进线电源和高压电源通过备用变转角后的备用电源应该同相位、同相序,同角度。然后,由于工作变压器接线方式与设计不符,变压器低压侧共箱母线接线错误造成的非同相事故时有发生,这种情况下,一旦发生双电源并列则会造成相间短路事故发生。Under normal circumstances, according to the design, the high-voltage power supply through the angle conversion of the main transformer and the high-voltage plant transformer should obtain the working power input power supply and the standby power supply after the high-voltage power supply passes through the standby angle conversion should be in the same phase, in the same phase sequence, and at the same angle. Then, because the wiring mode of the working transformer does not conform to the design, non-in-phase accidents caused by wrong wiring of the common box bus on the low-voltage side of the transformer occur from time to time.
当前的高压母线电源核相方式是:将工作或者备用电源的进线开关拉出开关室,人为撑起开关内触头的挡板,使用高压核相棒进行一次核相。这种方法核相准确,但是在开关室内,人为的撑起挡板违反了安规,在狭小的空间内用核相棒进行核相,接线多有交叉,危险性大,发生过多起事故。因此,寻找一种安全可靠的高压母线电源核相的系统和方法,就具有十分重要的意义了。The current phase verification method of the high-voltage bus power supply is: pull the incoming switch of the working or standby power out of the switch room, artificially prop up the baffle of the contact inside the switch, and use a high-voltage phase verification rod to perform a phase verification. This method is accurate in phase verification, but in the switch room, artificially propping up the baffle violates safety regulations. In a small space, phase verification is performed with a phase verification rod. The wiring is often crossed, which is very dangerous and many accidents have occurred. Therefore, it is of great significance to find a safe and reliable high-voltage bus power supply phase nuclear system and method.
发明内容Contents of the invention
本发明的目的在于克服上述现有技术的缺点,提供了一种发电厂高压母线电源核相的系统及方法,该系统及方法能够实现高压母线电源核相,且安全性及可靠性较高。The purpose of the present invention is to overcome the above-mentioned shortcomings of the prior art, and provide a system and method for phase verification of high-voltage bus power in a power plant. The system and method can realize phase verification of high-voltage bus power, and have high safety and reliability.
为达到上述目的,本发明所述的发电厂高压母线电源核相的系统包括工作电源单元、发电机断路器单元、工作电源共箱母线、工作电源进线软连接、工作电源进线开关、工作电源进线电压互感器、备用电源单元、备用电源共箱母线、备用电源进线软连接、备用电源进线开关、备用电源进线电压互感器、高压母线电压互感器及高压母线;In order to achieve the above-mentioned purpose, the high-voltage bus power nuclear phase system of the power plant according to the present invention includes a working power unit, a generator circuit breaker unit, a working power common box bus, a working power incoming soft connection, a working power incoming switch, a working Power inlet voltage transformer, backup power unit, backup power common box bus, backup power inlet soft connection, backup power inlet switch, backup power inlet voltage transformer, high-voltage bus voltage transformer and high-voltage bus;
发电机断路器单元与工作电源单元相连接,工作电源单元的输出端经工作电源共箱母线及工作电源进线软连接与工作电源进线开关的一端及工作电源进线电压互感器相连接;备用电源单元经备用电源共箱母线及备用电源进线软连接与备用电源进线开关的一端及备用电源进线电压互感器相连接;备用电源进线开关的另一端、工作电源进线开关的另一端及高压母线电压互感器与高压母线相连接,工作电源进线开关位置节点、备用电源进线开关位置节点、工作电源进线电压互感器的二次电压侧、备用电源进线电压互感器的二次电压侧及高压母线电压互感器的二次电压侧均与母线快切装置相连接。The generator circuit breaker unit is connected with the working power supply unit, and the output end of the working power supply unit is connected with one end of the working power supply incoming line switch and the working power supply incoming line voltage transformer through the working power common box busbar and the working power supply incoming line soft connection; The backup power supply unit is connected to one end of the backup power inlet switch and the backup power inlet voltage transformer through the backup power common box busbar and the backup power inlet soft connection; the other end of the backup power inlet switch is connected to the working power inlet switch. The other end and the high-voltage bus voltage transformer are connected to the high-voltage bus, the working power incoming switch position node, the backup power incoming switch position node, the secondary voltage side of the working power incoming voltage transformer, and the standby power incoming voltage transformer The secondary voltage side of the high-voltage busbar voltage transformer and the secondary voltage side of the high-voltage busbar voltage transformer are both connected to the busbar quick-cutting device.
工作电源单元包括工作电源高压母线、工作电源高压侧断路器、主变压器及高压工作变压器,工作电源高压母线经工作电源高压侧断路器及主变压器与高压工作变压器的一端及发电机断路器单元相连接,高压工作变压器的另一端与工作电源共箱母线相连接。The working power supply unit includes the working power high-voltage busbar, the working power high-voltage side circuit breaker, the main transformer and the high-voltage working transformer. Connection, the other end of the high-voltage working transformer is connected to the common box bus of the working power supply.
备用电源单元包括备用电源高压侧母线、备用电源高压侧断路器及备用变压器,其中,备用电源高压侧母线经备用电源高压侧断路器及备用变压器与备用电源共箱母线相连接。The backup power supply unit includes a backup power high-voltage side bus, a backup power high-voltage side circuit breaker and a backup transformer, wherein the backup power high-voltage side bus is connected to the backup power common box bus through the backup power high-voltage side circuit breaker and backup transformer.
发电机断路器单元包括发电机及发电机出口断路器,其中,发电机的输出端经发电机出口断路器与高压工作变压器相连接。The generator circuit breaker unit includes a generator and a generator outlet circuit breaker, wherein the output end of the generator is connected to the high-voltage working transformer through the generator outlet circuit breaker.
本发明所述的发电厂高压母线电源核相的方法包括以下步骤:The method for nuclear phase of power plant high-voltage bus power supply of the present invention comprises the following steps:
1)进行高压母线电源核相试验的准备工作;1) Preparatory work for nuclear phase test of high-voltage bus power supply;
2)闭合备用电源高压侧断路器及工作电源高压侧断路器,使得工作电源共箱母线及备用电源共箱母线带电稳定;2) Close the circuit breaker on the high-voltage side of the standby power supply and the high-voltage side circuit breaker of the working power supply, so that the busbar of the common box of the working power supply and the busbar of the common box of the standby power supply are charged stably;
3)通过相位表检测工作电源进线电压互感器及备用电源进线电压互感器的电压、幅值及相序,并判断工作电源进线电压互感器及备用电源进线电压互感器的电压、幅值及相序是否正确,判断工作电源进线电压互感器的二次侧测量值与系统额定电压时工作电源进线电压互感器的二次侧理论计算值是否一致,当工作电源进线电压互感器的二次侧测量值与系统额定电压时工作电源进线电压互感器的二次侧理论计算值一致时,则说明工作电源单元接线正确;判断备用电源进线电压互感器的二次侧测量值与系统额定电压时备用电源进线电压互感器的二次侧理论计算值是否一致,当备用电源进线电压互感器的二次侧测量值与系统额定电压时备用电源进线电压互感器的二次侧理论计算值一致时,则说明备用电源单元接线正确,当备用电源单元的接线与工作电源单元的接线均正确时,说明二次回路接线完整无误,则转至步骤5);否则,则转至步骤4);3) Detect the voltage, amplitude and phase sequence of the voltage transformer of the incoming line of the working power supply and the incoming voltage transformer of the backup power supply through the phase meter, and judge the voltage, Whether the amplitude and phase sequence are correct, judge whether the measured value of the secondary side of the voltage transformer of the working power supply line is consistent with the theoretical calculation value of the secondary side of the voltage transformer of the working power supply line at the rated voltage of the system, when the voltage transformer of the working power supply line When the measured value of the secondary side of the transformer is consistent with the theoretical calculation value of the secondary side of the voltage transformer of the working power supply line at the rated voltage of the system, it means that the wiring of the working power supply unit is correct; judge the secondary side of the voltage transformer of the standby power supply line Whether the measured value is consistent with the theoretical calculation value of the secondary side of the backup power input voltage transformer at the rated voltage of the system, and whether the secondary side measured value of the backup power input voltage transformer is consistent with the system rated voltage When the theoretical calculation value of the secondary side of the circuit is consistent, it means that the wiring of the standby power supply unit is correct. When the wiring of the standby power supply unit and the wiring of the working power supply unit are correct, it means that the wiring of the secondary circuit is complete and correct, and then go to step 5); otherwise , go to step 4);
4)当工作电源单元接线错误时,则断开工作电源高压侧断路器;当备用电源单元接线错误时,则断开备用电源高压侧断路器,查找并消除异常单元缺陷后返回步骤2);4) When the wiring of the working power supply unit is incorrect, disconnect the circuit breaker on the high voltage side of the working power supply; when the wiring of the standby power supply unit is incorrect, disconnect the circuit breaker on the high voltage side of the standby power supply, find and eliminate the defect of the abnormal unit and return to step 2);
5)闭合工作电源进线开关及备用电源进线开关,使得工作电源进线开关、备用电源进线开关、高压母线、工作电源进线电压互感器及备用电源进线电压互感器带电;5) Close the incoming switch of the working power supply and the incoming switch of the standby power supply, so that the incoming switch of the working power supply, the incoming switch of the standby power supply, the high-voltage busbar, the voltage transformer of the incoming line of the working power supply and the voltage transformer of the incoming line of the standby power supply are charged;
6)测量高压母线电压互感器、工作电源进线电压互感器及备用电源进线电压互感器的二次侧实际电压;6) Measure the actual voltage of the secondary side of the high-voltage bus voltage transformer, the working power inlet voltage transformer and the backup power inlet voltage transformer;
7)分别判断高压母线电压互感器、工作电源进线电压互感器及备用电源进线电压互感器的二次侧实际电压与其二次侧电压理论计算值是否一致,同时分别判断高压母线电压互感器、工作电源进线电压互感器及备用电源进线电压互感器的相序是否为正确相序,以完成对高压母线电压互感器、工作电源进线电压互感器及备用电源进线电压互感器的同源核相,当高压母线电压互感器、工作电源进线电压互感器及备用电源进线电压互感器的同源核相结果均为正确时,则说明工作电源单元进线、高压母线和备用电源单元进线的一次设备及二次设备均正常,则转至步骤9),否则,则转至步骤8);7) Separately judge whether the actual voltage on the secondary side of the voltage transformer on the high-voltage bus, the voltage transformer on the incoming line of the working power supply, and the voltage transformer on the incoming line of the backup power supply are consistent with the theoretically calculated value of the voltage on the secondary side, and at the same time judge the voltage transformers on the high-voltage bus , Whether the phase sequence of the voltage transformer of the working power incoming line and the voltage transformer of the backup power incoming line is the correct phase sequence, in order to complete the voltage transformer of the high-voltage bus, the voltage transformer of the working power incoming line and the voltage transformer of the standby power incoming line Homologous nuclear phase, when the results of the homologous nuclear phase of the high-voltage bus voltage transformer, working power incoming line voltage transformer and backup power incoming line voltage transformer are all correct, it means that the working power unit incoming line, high-voltage bus and standby If the primary equipment and secondary equipment of the power supply unit are normal, go to step 9); otherwise, go to step 8);
8)断开工作电源进线开关及备用电源进线开关,使得工作电源进线开关、备用电源进线开关、高压母线、工作电源进线电压互感器及备用电源进线电压互感器失电,再查找并消除异常单元缺陷后返回步骤5);8) Disconnect the incoming switch of the working power supply and the incoming switch of the standby power supply, so that the incoming switch of the working power supply, the incoming switch of the standby power supply, the high-voltage busbar, the voltage transformer of the incoming line of the working power supply and the voltage transformer of the incoming line of the standby power supply are de-energized, Find and eliminate the abnormal unit defect and return to step 5);
9)断开工作电源进线开关及备用电源进线开关,恢复工作电源进线开关与工作电源共箱母线之间的软连接,同时恢复备用电源进线开关与备用电源共箱母线之间的软连接,然后转至步骤10);9) Disconnect the incoming switch of the working power supply and the incoming switch of the backup power supply, restore the soft connection between the incoming switch of the working power supply and the busbar of the common box of the working power supply, and restore the connection between the incoming switch of the standby power supply and the busbar of the common box of the standby power supply. Soft connection, then go to step 10);
10)闭合工作电源高压侧断路器及备用电源高压侧断路器,当备用电源单元、工作电源单元、工作电源共箱母线及备用电源共箱母线带电稳定后转至步骤11);10) Close the circuit breaker on the high-voltage side of the working power supply and the high-voltage side circuit breaker of the standby power supply, and go to step 11 when the standby power supply unit, the working power supply unit, the busbar of the common box of the working power supply and the busbar of the common box of the standby power supply are charged stably;
11)对工作电源单元及备用电源单元进行非同源核相,检查工作电源单元进线电压的极性与备用电源单元进线电压的极性是否一致,当工作电源单元进线电压的极性与备用电源单元进线电压的极性一致时,则转至步骤13),否则,则转至步骤12);11) Perform a non-homologous phase check on the working power unit and the standby power unit, check whether the polarity of the incoming voltage of the working power unit is consistent with that of the standby power unit, and check whether the polarity of the incoming voltage of the working power unit is When the polarity of the incoming line voltage of the standby power supply unit is the same, go to step 13); otherwise, go to step 12);
12)断开工作电源高压侧断路器及备用电源高压侧断路器,使得工作电源单元及备用电源单元失电,再查找并消除异常单元缺陷后返回步骤10);12) Disconnect the high-voltage side circuit breaker of the working power supply and the high-voltage side circuit breaker of the backup power supply, so that the working power supply unit and the backup power supply unit are de-energized, and then return to step 10 after finding and eliminating abnormal unit defects;
13)高压母线电源核相试验结束。13) The nuclear phase test of the high-voltage bus power supply is over.
步骤1)的具体操作过程为:The specific operation process of step 1) is:
101)安装工作电源单元、备用电源单元、备用电源共箱母线、工作电源共箱母线、高压母线和工作电源进线电压互感器、备用电源进线电压互感器及高压母线电压互感器范围内的一次设备及二次设备,确定二次设备接线正确,工作电源进线电压互感器、备用电源进线电压互感器及高压母线电压互感器二次回路无开路现象,工作电源进线电压互感器、备用电源进线电压互感器及高压母线电压互感器的一次保险接线良好,工作电源进线电压互感器、备用电源进线电压互感器及高压母线电压互感器的二次空开处于合闸状态;101) Install the working power supply unit, backup power supply unit, standby power common box bus, working power common box bus, high voltage bus and working power incoming line voltage transformer, standby power incoming line voltage transformer and high voltage bus voltage transformer within the range For primary equipment and secondary equipment, make sure that the wiring of the secondary equipment is correct. The primary safety wiring of the backup power incoming voltage transformer and the high-voltage bus voltage transformer is in good condition, and the secondary circuit breaker of the working power incoming voltage transformer, the backup power incoming voltage transformer and the high-voltage bus voltage transformer is in the closed state;
102)发电机停机,发电机出口断路器处于分闸状态,拆除工作电源进线软连接及备用电源进线软连接;102) The generator is shut down, the generator outlet circuit breaker is in the off state, and the soft connection of the working power incoming line and the standby power incoming line are removed;
103)进行母线快切装置的静态调试,并进行母线快切装置带工作电源进线开关及备用电源进线开关的传动实验;103) Perform static debugging of the busbar quick-cutting device, and carry out the transmission experiment of the busbar quick-cutting device with the working power inlet switch and the backup power inlet switch;
104)将工作电源进线开关与备用电源进线开关的分合闸状态调节为相反状态,将工作电源高压侧断路器及备用电源高压侧断路器调节至热备用状态。104) Adjust the opening and closing states of the working power inlet switch and the backup power inlet switch to the opposite state, and adjust the working power high-voltage side circuit breaker and the backup power high-voltage side circuit breaker to the hot standby state.
步骤3)的具体操作为:利用相位表测量并记录高压母线电压互感器、工作电源进线电压互感器及备用电源进线电压互感器的就地端子箱中各组电压互感器的电压值及相序,判断该相序是否为正相序,同时确定该电压值是否与额定条件下的正常输出电压值一致;The specific operation of step 3) is: use the phase meter to measure and record the voltage values and Phase sequence, to determine whether the phase sequence is a positive phase sequence, and at the same time determine whether the voltage value is consistent with the normal output voltage value under rated conditions;
在母线快切装置上核对高压母线电压互感器、工作电源进线电压互感器及备用电源进线电压互感器的就地端子箱中各组电压互感器的电压值及相序,并将其分别与相位表采集的电压值及相序进行对比,确保工作电源进线电压互感器及备用电源进线电压互感器的接线与极性配置正确。Check the voltage value and phase sequence of each group of voltage transformers in the local terminal box of the high-voltage bus voltage transformer, the working power inlet voltage transformer and the backup power inlet voltage transformer on the bus quick-cutting device, and separate them Compare with the voltage value and phase sequence collected by the phase meter to ensure that the wiring and polarity configuration of the working power incoming line voltage transformer and the backup power incoming line voltage transformer are correct.
步骤7)中,工作电源进线开关、工作电源进线电压互感器、备用电源进线开关、备用电源进线电压互感器、高压母线、高压母线电压互感器均处于同源系统中,该同源系统处于额定电压下,此时理论上,工作电源进线电压互感器的电压极性、高压母线电压互感器8的电压极性及备用电源进线电压互感器的电压极性均一致,当任一电压互感器的电压极性与其他两个不一致时,则该电压互感器存在接线或者性能问题,此时需查找并消除异常电压互感器的缺陷再次继续进行同源核相试验;In step 7), the working power inlet switch, the working power inlet voltage transformer, the backup power inlet switch, the backup power inlet voltage transformer, the high-voltage busbar, and the high-voltage busbar voltage transformer are all in the homologous system. The source system is under the rated voltage. At this time, theoretically, the voltage polarity of the voltage transformer of the working power supply line, the voltage polarity of the high-voltage bus voltage transformer 8 and the voltage polarity of the backup power supply line voltage transformer are consistent. When the voltage polarity of any voltage transformer is inconsistent with the other two, there is a wiring or performance problem in the voltage transformer. At this time, it is necessary to find and eliminate the defects of the abnormal voltage transformer and continue the homologous nuclear phase test again;
在母线快切装置的屏幕上,读取工作电源进线电压与高压母线电压的角度差、压差及频差,当工作电源进线电压与高压母线电压的角度差、压差及频差均零时,则不做处理,当工作电源进线电压与高压母线电压的角度差、压差及频差中任一项不为零时,则需查找并消除异常电压互感器的缺陷再次继续进行同源核相试验。On the screen of the bus quick switch device, read the angle difference, voltage difference and frequency difference between the input voltage of the working power supply and the high-voltage bus voltage. When it is zero, no processing will be done. When any of the angle difference, voltage difference and frequency difference between the working power input line voltage and the high-voltage bus voltage is not zero, it is necessary to find and eliminate the defects of the abnormal voltage transformer and continue. homologous nuclear phase test.
步骤9)的具体操作为:断开工作电源进线开关及备用电源进线开关,备用电源共箱母线、工作电源共箱母线、工作电源进线开关及备用电源进线开关处于失电状态,再悬挂接地线,然后恢复工作电源进线开关与工作电源共箱母线之间的软连接,同时恢复备用电源进线开关与备用电源共箱母线之间的软连接,再拆除接地线,然后转至步骤10)。The specific operation of step 9) is: disconnect the incoming line switch of the working power supply and the incoming line switch of the standby power supply. Then hang the grounding wire, then restore the soft connection between the working power incoming switch and the working power common box bus, and at the same time restore the soft connection between the standby power incoming switch and the standby power common box bus, then remove the grounding wire, and then switch to Go to step 10).
步骤11)还包括以下步骤:Step 11) also includes the following steps:
1101)检查工作电源进线电压互感器的二次电压幅值是否为额定电压除以工作电源进线电压互感器的变比,相序是否为正相序,零序电压是否为零;1101) Check whether the secondary voltage amplitude of the voltage transformer of the incoming line of the working power supply is the rated voltage divided by the transformation ratio of the voltage transformer of the incoming line of the working power supply, whether the phase sequence is a positive phase sequence, and whether the zero-sequence voltage is zero;
1102)检查备用电源进线电压互感器的二次电压幅值是否为额定电压除以备用电源进线电压互感器的变比,相序是否为正相序,零序电压是否为零;1102) Check whether the secondary voltage amplitude of the incoming voltage transformer of the standby power supply is the rated voltage divided by the transformation ratio of the voltage transformer of the incoming line of the standby power supply, whether the phase sequence is a positive phase sequence, and whether the zero-sequence voltage is zero;
1103)检查高压母线电压互感器的二次电压幅值是否为额定电压除以高压母线电压互感器的变比,相序是否为正相序,零序电压是否为零;1103) Check whether the secondary voltage amplitude of the high-voltage bus voltage transformer is the rated voltage divided by the transformation ratio of the high-voltage bus voltage transformer, whether the phase sequence is positive phase sequence, and whether the zero-sequence voltage is zero;
1104)检查工作电源进线电压互感器、备用电源进线电压互感器及高压母线电压互感器的二次电压频差是否为零,相角差是否小于3°,同相之间压差是否小于5V;1104) Check whether the secondary voltage frequency difference of the working power incoming line voltage transformer, backup power incoming line voltage transformer and high-voltage bus voltage transformer is zero, whether the phase angle difference is less than 3°, and whether the voltage difference between the same phases is less than 5V ;
1105)检查母线快切装置15上读取的工作电源进线电压互感器、备用电源进线电压互感器及高压母线电压互感器的二次电压频差是否为零,相角差是否小于3°,同相之间压差是否小于5V。1105) Check whether the secondary voltage frequency difference of the working power inlet voltage transformer, backup power inlet voltage transformer and high-voltage bus voltage transformer read on the bus quick-cutting device 15 is zero, and whether the phase angle difference is less than 3° , Whether the voltage difference between the same phases is less than 5V.
本发明具有以下有益效果:The present invention has the following beneficial effects:
本发明所述的发电厂高压母线电源核相的系统及方法在具体操作时,先采用工作电源单元及备用电源单元作为电压源,对工作电源进线、工作电源进线电压互感器、高压母线、高压母线电压互感器、备用电源进线及备用电源进线电压互感器进行同源核相,确认二次系统准确反映一次系统的情况后,再利用备用电源单元与工作电源单元进行非同源核相,试验效率高,试验正确性高,排除人为操作一次设备的危险,能够快速、准确识别出电压互感器接线缺陷、共箱母线安装缺陷和变压器接线方式缺陷,杜绝因非同期并联造成的相间短路现象,安全性及可靠性较高,且本发明以工作电源单元为基准,可以对多个备用电源单元进行核相,适用于高压母线采用双电源进线、三电源进线和其他多电源进线的高压母线电源核相工作,适用于不同接线方式的发电厂及大型厂矿,另外,本发明通过相位表测量与母线快切装置读数互相印证,准确性及可靠性较高。另外,采用工作电源单元或备用电源单元作为同源核相的电源,不需要外加电源,经济性较好,避免人为撑开电源进线开关隔板的违规操作,避免在狭小空间内进行一次核相的风险,大大降低人员受伤害的概率,安全性高。The system and method for the nuclear phase of the high-voltage bus power supply of the power plant described in the present invention, in the specific operation, first use the working power supply unit and the backup power supply unit as the voltage source, and the working power supply incoming line, the working power supply incoming line voltage transformer, the high-voltage bus , high-voltage busbar voltage transformer, standby power supply incoming line, and standby power supply incoming line voltage transformer for homologous phase verification. After confirming that the secondary system accurately reflects the situation of the primary system, use the standby power supply unit and the working power supply unit for non-homologous Phase verification, high test efficiency, high test accuracy, eliminates the danger of manual operation of primary equipment, can quickly and accurately identify voltage transformer wiring defects, common box bus installation defects and transformer wiring defects, and eliminate phase-to-phase failures caused by non-synchronous parallel connections Short circuit phenomenon, high safety and reliability, and the present invention is based on the working power supply unit, and can perform phase verification on multiple backup power supply units, and is suitable for high-voltage busbars that use dual power supply incoming lines, three power supply incoming lines, and other multiple power supplies The high-voltage bus power supply of the incoming line works with phase verification, which is suitable for power plants and large-scale factories and mines with different wiring methods. In addition, the present invention confirms each other through the phase meter measurement and the reading of the bus quick-cut device, which has high accuracy and reliability. In addition, the working power unit or backup power unit is used as the power supply of the same source nuclear phase, no external power supply is required, the economy is better, and the illegal operation of artificially opening the switch partition of the power supply line is avoided, and a nuclear operation in a small space is avoided. Relative risk, greatly reducing the probability of personal injury, high safety.
附图说明Description of drawings
图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;
图2为本发明的流程图。Fig. 2 is a flowchart of the present invention.
其中,1为工作电源单元、2为工作电源共箱母线、3为工作电源进线软连接、4为工作电源进线电压互感器、5为工作电源进线开关、6为工作电源进线开关位置节点、7为高压母线、8为高压母线电压互感器、9为备用电源进线开关、10为备用电源进线开关位置节点、11为备用电源进线电压互感器、12为备用电源进线软连接、13为备用电源共箱母线、14为备用电源单元、15为母线快切装置、16为发电机断路器单元、1DL为工作电源进线开关、2DL为备用电源进线开关、3DL为工作电源高压侧断路器、4DL为备用电源高压侧断路器、GCB为发电机出口断路器。Among them, 1 is the working power supply unit, 2 is the common box bus of the working power supply, 3 is the soft connection of the working power incoming line, 4 is the voltage transformer of the working power incoming line, 5 is the working power incoming line switch, and 6 is the working power incoming line switch Position node, 7 is the high-voltage bus, 8 is the voltage transformer of the high-voltage bus, 9 is the backup power inlet switch, 10 is the position node of the backup power inlet switch, 11 is the backup power inlet voltage transformer, 12 is the backup power inlet Soft connection, 13 is the backup power common box bus, 14 is the backup power unit, 15 is the bus quick switch device, 16 is the generator circuit breaker unit, 1DL is the working power inlet switch, 2DL is the backup power inlet switch, 3DL is The high-voltage side circuit breaker of the working power supply, 4DL is the high-voltage side circuit breaker of the backup power supply, and the GCB is the generator outlet circuit breaker.
具体实施方式Detailed ways
下面结合附图对本发明做进一步详细描述:The present invention is described in further detail below in conjunction with accompanying drawing:
参考图1,本发明所述的发电厂高压母线电源核相的系统包括工作电源单元1、发电机断路器单元16、工作电源共箱母线2、工作电源进线软连接3、工作电源进线开关5、工作电源进线电压互感器4、备用电源单元14、备用电源共箱母线13、备用电源进线软连接12、备用电源进线开关9、备用电源进线电压互感器11、高压母线电压互感器8及高压母线7;发电机断路器单元16与工作电源单元1相连接,工作电源单元1的输出端经工作电源共箱母线2及工作电源进线软连接3与工作电源进线开关5的一端及工作电源进线电压互感器4相连接;备用电源单元14经备用电源共箱母线13及备用电源进线软连接12与备用电源进线开关9的一端及备用电源进线电压互感器11相连接;备用电源进线开关9的另一端、工作电源进线开关5的另一端及高压母线电压互感器8与高压母线7相连接,工作电源进线开关位置节点6、备用电源进线开关位置节点10、工作电源进线电压互感器4的二次电压侧、备用电源进线电压互感器11的二次电压侧及高压母线电压互感器8的二次电压侧均与母线快切装置15相连接。With reference to Fig. 1, the system of the high-voltage bus power supply nuclear phase of the power plant according to the present invention includes a working power unit 1, a generator circuit breaker unit 16, a working power common box bus 2, a working power inlet soft connection 3, and a working power inlet Switch 5, Working power incoming line voltage transformer 4, Standby power supply unit 14, Standby power common box busbar 13, Standby power supply incoming line soft connection 12, Standby power supply incoming line switch 9, Standby power supply incoming line voltage transformer 11, High voltage busbar The voltage transformer 8 and the high-voltage bus 7; the generator circuit breaker unit 16 is connected to the working power supply unit 1, and the output end of the working power supply unit 1 is connected to the working power supply incoming line through the working power common box bus 2 and the working power supply incoming line soft connection 3 One end of the switch 5 is connected to the voltage transformer 4 of the working power input line; the backup power unit 14 is connected to one end of the backup power input switch 9 and the backup power input voltage The transformers 11 are connected; the other end of the backup power inlet switch 9, the other end of the working power inlet switch 5, and the high-voltage bus voltage transformer 8 are connected with the high-voltage bus 7, the working power inlet switch position node 6, the backup power supply Incoming line switch position node 10, the secondary voltage side of the working power incoming line voltage transformer 4, the secondary voltage side of the standby power incoming line voltage transformer 11 and the secondary voltage side of the high-voltage bus voltage transformer 8 are all connected to the bus fast Cutting device 15 is connected.
工作电源单元1包括工作电源高压母线、工作电源高压侧断路器1DL、主变压器及高压工作变压器,工作电源高压母线经工作电源高压侧断路器1DL及主变压器与高压工作变压器的一端及发电机断路器单元16相连接,高压工作变压器的另一端与工作电源共箱母线2相连接;备用电源单元14包括备用电源高压侧母线、备用电源高压侧断路器2DL及备用变压器,其中,备用电源高压侧母线经备用电源高压侧断路器2DL及备用变压器与备用电源共箱母线13相连接;发电机断路器单元16包括发电机及发电机出口断路器GCB,其中,发电机的输出端经发电机出口断路器GCB与高压工作变压器相连接。The working power supply unit 1 includes the high-voltage busbar of the working power supply, the high-voltage side circuit breaker 1DL of the working power supply, the main transformer and the high-voltage working transformer. The other end of the high-voltage working transformer is connected to the common box bus bar 2 of the working power supply; the backup power supply unit 14 includes a backup power high-voltage side bus, a backup power high-voltage side circuit breaker 2DL and a backup transformer, wherein the backup power high-voltage side The busbar is connected to the common-box busbar 13 of the standby power supply through the backup power high-voltage side circuit breaker 2DL and the backup transformer; the generator circuit breaker unit 16 includes the generator and the generator outlet circuit breaker GCB, wherein the output end of the generator passes through the generator outlet The circuit breaker GCB is connected with the high voltage working transformer.
参考图2,本发明所述的发电厂高压母线电源核相的方法包括以下步骤:With reference to Fig. 2, the method for nuclear phase of power plant high-voltage bus power supply of the present invention comprises the following steps:
1)进行高压母线电源核相试验的准备工作;1) Preparatory work for nuclear phase test of high-voltage bus power supply;
2)闭合备用电源高压侧断路器2DL及工作电源高压侧断路器1DL,使得工作电源共箱母线2及备用电源共箱母线13带电稳定;2) Close the circuit breaker 2DL on the high-voltage side of the standby power supply and the circuit breaker 1DL on the high-voltage side of the working power supply, so that the busbar 2 of the common box for the working power supply and the busbar 13 for the common box of the standby power supply are charged stably;
3)通过相位表检测工作电源进线电压互感器4及备用电源进线电压互感器11的电压、幅值及相序,并判断工作电源进线电压互感器4及备用电源进线电压互感器11的电压、幅值及相序是否正确,判断工作电源进线电压互感器4的二次侧测量值与系统额定电压时工作电源进线电压互感器4的二次侧理论计算值是否一致,当工作电源进线电压互感器4的二次侧测量值与系统额定电压时工作电源进线电压互感器4的二次侧理论计算值一致时,则说明工作电源单元1接线正确;判断备用电源进线电压互感器11的二次侧测量值与系统额定电压时备用电源进线电压互感器11的二次侧理论计算值是否一致,当备用电源进线电压互感器11的二次侧测量值与系统额定电压时备用电源进线电压互感器11的二次侧理论计算值一致时,则说明备用电源单元14接线正确,当备用电源单元14的接线与工作电源单元1的接线均正确时,说明二次回路接线完整无误,则转至步骤5);否则,则转至步骤4);3) Detect the voltage, amplitude and phase sequence of the voltage transformer 4 of the incoming line of the working power supply and the voltage transformer 11 of the incoming line of the standby power supply through the phase table, and judge the voltage transformer 4 of the incoming line of the working power supply and the voltage transformer of the incoming line of the standby power supply Whether the voltage, amplitude and phase sequence of 11 are correct, judge whether the measured value of the secondary side of the voltage transformer 4 of the working power supply line is consistent with the theoretical calculation value of the secondary side of the voltage transformer 4 of the working power supply line at the rated voltage of the system, When the measured value of the secondary side of the voltage transformer 4 of the working power supply line is consistent with the theoretical calculation value of the secondary side of the voltage transformer 4 of the working power supply line at the rated voltage of the system, it means that the wiring of the working power supply unit 1 is correct; judge the standby power supply Whether the measured value of the secondary side of the incoming line voltage transformer 11 is consistent with the theoretically calculated value of the secondary side of the backup power incoming line voltage transformer 11 at the rated voltage of the system, when the measured value of the secondary side of the standby power incoming line voltage transformer 11 When it is consistent with the theoretically calculated value of the secondary side of the backup power input voltage transformer 11 at the rated voltage of the system, it means that the backup power supply unit 14 is connected correctly. When the connection of the backup power supply unit 14 and the working power supply unit 1 are both correct, If the wiring of the secondary circuit is complete and correct, go to step 5); otherwise, go to step 4);
4)当工作电源单元1接线错误时,则断开工作电源高压侧断路器1DL;当备用电源单元14接线错误时,则断开备用电源高压侧断路器2DL,查找并消除异常单元缺陷后返回步骤2);4) When the wiring of the working power supply unit 1 is wrong, disconnect the circuit breaker 1DL at the high voltage side of the working power supply; when the wiring of the standby power supply unit 14 is wrong, disconnect the circuit breaker 2DL at the high voltage side of the standby power supply, find and eliminate the defect of the abnormal unit and return step 2);
5)闭合工作电源进线开关5及备用电源进线开关9,使得工作电源进线开关5、备用电源进线开关9、高压母线7、工作电源进线电压互感器4及备用电源进线电压互感器11带电;5) Close the working power inlet switch 5 and the backup power inlet switch 9, so that the working power inlet switch 5, the backup power inlet switch 9, the high-voltage bus 7, the working power inlet voltage transformer 4 and the backup power inlet voltage Transformer 11 is electrified;
6)测量高压母线电压互感器8、工作电源进线电压互感器4及备用电源进线电压互感器11的二次侧实际电压;6) Measuring the secondary side actual voltages of the high-voltage bus voltage transformer 8, the voltage transformer 4 for the incoming line of the working power supply and the voltage transformer 11 for the incoming line of the backup power supply;
7)分别判断高压母线电压互感器8、工作电源进线电压互感器4及备用电源进线电压互感器11的二次侧实际电压与其二次侧电压理论计算值是否一致,同时分别判断高压母线电压互感器8、工作电源进线电压互感器4及备用电源进线电压互感器11的相序是否为正确相序,以完成对高压母线电压互感器8、工作电源进线电压互感器4及备用电源进线电压互感器11的同源核相,当高压母线电压互感器8、工作电源进线电压互感器4及备用电源进线电压互感器11的同源核相结果均为正确时,则说明工作电源单元1进线、高压母线7和备用电源单元14进线的一次设备及二次设备均正常,则转至步骤9),否则,则转至步骤8);7) Determine whether the actual voltage on the secondary side of the voltage transformer 8 of the high-voltage bus, the voltage transformer 4 of the incoming line of the working power supply, and the voltage transformer 11 of the incoming line of the backup power supply are consistent with the theoretically calculated value of the voltage on the secondary side, and at the same time judge whether the voltage transformer of the high-voltage bus Whether the phase sequence of the voltage transformer 8, the voltage transformer 4 of the incoming line of the working power supply and the voltage transformer 11 of the incoming line of the backup power supply is the correct phase sequence, so as to complete the phase sequence of the voltage transformer 8 of the high voltage bus, the voltage transformer 4 of the incoming line of the working power supply and The homologous nuclear phase of the standby power incoming line voltage transformer 11, when the homologous nuclear phase results of the high-voltage bus voltage transformer 8, the working power incoming line voltage transformer 4 and the standby power incoming line voltage transformer 11 are all correct, Then it shows that the primary equipment and secondary equipment of the incoming line of the working power supply unit 1, the high-voltage bus bar 7 and the standby power supply unit 14 are all normal, then go to step 9), otherwise, then go to step 8);
8)断开工作电源进线开关5及备用电源进线开关9,使得工作电源进线开关5、备用电源进线开关9、高压母线7、工作电源进线电压互感器4及备用电源进线电压互感器11失电,再查找并消除异常单元缺陷后返回步骤5);8) Disconnect the working power inlet switch 5 and the backup power inlet switch 9, so that the working power inlet switch 5, the backup power inlet switch 9, the high-voltage bus 7, the working power inlet voltage transformer 4 and the backup power inlet Potential transformer 11 is de-energized, then find and eliminate the abnormal unit defect and return to step 5);
9)断开工作电源进线开关5及备用电源进线开关9,恢复工作电源进线开关5与工作电源共箱母线2之间的软连接,同时恢复备用电源进线开关9与备用电源共箱母线13之间的软连接,然后转至步骤10);9) Disconnect the working power inlet switch 5 and the backup power inlet switch 9, restore the soft connection between the working power inlet switch 5 and the working power common box bus 2, and simultaneously restore the backup power inlet switch 9 and the backup power common Soft connection between box bus bars 13, then go to step 10);
10)闭合工作电源高压侧断路器1DL及备用电源高压侧断路器2DL,当备用电源单元14、工作电源单元1、工作电源共箱母线2及备用电源共箱母线13带电稳定后转至步骤11);10) Close the circuit breaker 1DL on the high-voltage side of the working power supply and the circuit breaker 2DL on the high-voltage side of the standby power supply. When the standby power supply unit 14, the working power supply unit 1, the busbar 2 of the working power supply box and the busbar 13 of the backup power supply box are charged and stable, go to step 11 );
11)对工作电源单元1及备用电源单元14进行非同源核相,检查工作电源单元1进线电压的极性与备用电源单元14进线电压的极性是否一致,当工作电源单元1进线电压的极性与备用电源单元14进线电压的极性一致时,则转至步骤13),否则,则转至步骤12);11) Perform non-homologous phase verification on the working power supply unit 1 and the standby power supply unit 14, check whether the polarity of the incoming line voltage of the working power supply unit 1 is consistent with the polarity of the incoming line voltage of the standby power supply unit 14, when the working power supply unit 1 enters When the polarity of the line voltage is consistent with the polarity of the incoming line voltage of the standby power supply unit 14, then go to step 13), otherwise, go to step 12);
12)断开工作电源高压侧断路器1DL及备用电源高压侧断路器2DL,使得工作电源单元1及备用电源单元14失电,再查找并消除异常单元缺陷后返回步骤10);12) Disconnect the high-voltage side circuit breaker 1DL of the working power supply and the high-voltage side circuit breaker 2DL of the backup power supply, so that the working power supply unit 1 and the backup power supply unit 14 are de-energized, and then return to step 10 after finding and eliminating abnormal unit defects);
13)高压母线电源核相试验结束。13) The nuclear phase test of the high-voltage bus power supply is over.
步骤1)的具体操作过程为:The specific operation process of step 1) is:
101)安装工作电源单元1、备用电源单元14、备用电源共箱母线13、工作电源共箱母线2、高压母线7和工作电源进线电压互感器4、备用电源进线电压互感器11及高压母线电压互感器8范围内的一次设备及二次设备,确定二次设备接线正确,工作电源进线电压互感器4、备用电源进线电压互感器11及高压母线电压互感器8二次回路无开路现象,工作电源进线电压互感器4、备用电源进线电压互感器11及高压母线电压互感器8的一次保险接线良好,工作电源进线电压互感器4、备用电源进线电压互感器11及高压母线电压互感器8的二次空开处于合闸状态;101) Install working power supply unit 1, backup power supply unit 14, backup power common box busbar 13, working power supply common box busbar 2, high voltage busbar 7, working power incoming line voltage transformer 4, standby power incoming line voltage transformer 11 and high voltage For the primary equipment and secondary equipment within the range of bus voltage transformer 8, make sure that the secondary equipment is connected correctly, the working power input voltage transformer 4, the standby power input voltage transformer 11 and the secondary circuit of high voltage bus voltage transformer 8 Open circuit phenomenon, the voltage transformer 4 of the incoming line of the working power supply, the voltage transformer 11 of the incoming line of the backup power supply and the primary insurance connection of the voltage transformer 8 of the high-voltage busbar are good, the voltage transformer 4 of the incoming line of the working power supply, and the voltage transformer 11 of the incoming line of the standby power supply And the secondary circuit breaker of the high-voltage bus voltage transformer 8 is in the closing state;
102)发电机停机,发电机出口断路器GCB处于分闸状态,拆除工作电源进线软连接3及备用电源进线软连接12;102) The generator is shut down, the generator outlet circuit breaker GCB is in the off state, and the soft connection 3 of the incoming line of the working power supply and the soft connection 12 of the incoming line of the backup power supply are removed;
103)进行母线快切装置15的静态调试,并进行母线快切装置15带工作电源进线开关5及备用电源进线开关9的传动实验;103) Carry out the static debugging of the busbar quick-cutting device 15, and carry out the transmission experiment of the busbar quick-cutting device 15 with the working power inlet switch 5 and the backup power inlet switch 9;
104)将工作电源进线开关5与备用电源进线开关9的分合闸状态调节为相反状态,将工作电源高压侧断路器1DL及备用电源高压侧断路器2DL调节至热备用状态。104) Adjust the opening and closing states of the working power incoming switch 5 and the backup power incoming switch 9 to the opposite state, and adjust the working power high-voltage side circuit breaker 1DL and the backup power high-voltage side circuit breaker 2DL to the hot standby state.
步骤3)的具体操作为:利用相位表测量并记录高压母线电压互感器8、工作电源进线电压互感器4及备用电源进线电压互感器11的就地端子箱中各组电压互感器的电压值及相序,判断该相序是否为正相序,同时确定该电压值是否与额定条件下的正常输出电压值一致;The specific operation of step 3) is: use the phase meter to measure and record the voltage transformers of each group in the local terminal box of the high-voltage bus voltage transformer 8, the working power incoming line voltage transformer 4 and the backup power incoming line voltage transformer 11. Voltage value and phase sequence, to determine whether the phase sequence is a positive phase sequence, and at the same time determine whether the voltage value is consistent with the normal output voltage value under rated conditions;
在母线快切装置15上核对高压母线电压互感器8、工作电源进线电压互感器4及备用电源进线电压互感器11的就地端子箱中各组电压互感器的电压值及相序,并将其分别与相位表采集的电压值及相序进行对比,确保工作电源进线电压互感器4及备用电源进线电压互感器11的接线与极性配置正确。Check the voltage value and phase sequence of each group of voltage transformers in the local terminal box of the high-voltage bus voltage transformer 8, the working power inlet voltage transformer 4 and the standby power inlet voltage transformer 11 on the bus quick-cutting device 15, And compare it with the voltage value and phase sequence collected by the phase meter to ensure that the wiring and polarity configuration of the working power incoming line voltage transformer 4 and the backup power incoming line voltage transformer 11 are correct.
步骤7)中,工作电源进线开关5、工作电源进线电压互感器4、备用电源进线开关9、备用电源进线电压互感器11、高压母线7、高压母线电压互感器8均处于同源系统中,该同源系统处于额定电压下,此时理论上,工作电源进线电压互感器4的电压极性、高压母线电压互感器8的电压极性及备用电源进线电压互感器11的电压极性均一致,当任一电压互感器的电压极性与其他两个不一致时,则该电压互感器存在接线或者性能问题,此时需查找并消除异常电压互感器的缺陷再次继续进行同源核相试验;In step 7), the working power inlet switch 5, the working power inlet voltage transformer 4, the backup power inlet switch 9, the backup power inlet voltage transformer 11, the high-voltage bus 7, and the high-voltage bus voltage transformer 8 are all in the same position. In the source system, the same-source system is under the rated voltage. At this time, theoretically, the voltage polarity of the working power input voltage transformer 4, the voltage polarity of the high-voltage bus voltage transformer 8 and the backup power input voltage transformer 11 When the voltage polarity of any voltage transformer is inconsistent with the other two, there is a wiring or performance problem in the voltage transformer. At this time, it is necessary to find and eliminate the defects of the abnormal voltage transformer and continue. homologous nuclear phase test;
在母线快切装置15的屏幕上,读取工作电源进线电压与高压母线7电压的角度差、压差及频差,当工作电源进线电压与高压母线7电压的角度差、压差及频差均零时,则不做处理,当工作电源进线电压与高压母线7电压的角度差、压差及频差中任一项不为零时,则需查找并消除异常电压互感器的缺陷再次继续进行同源核相试验。On the screen of the busbar quick-cutting device 15, read the angle difference, pressure difference and frequency difference between the working power inlet voltage and the high-voltage bus 7 voltage, when the angle difference, the pressure difference and the voltage difference between the working power inlet voltage and the high-voltage bus 7 voltage When the frequency difference is zero, no processing will be done. When any of the angle difference, voltage difference and frequency difference between the working power input line voltage and the voltage of the high-voltage bus 7 is not zero, it is necessary to find and eliminate the abnormal voltage transformer. Defects again continue with homologous nuclear phase testing.
步骤9)的具体操作为:断开工作电源进线开关5及备用电源进线开关9,备用电源共箱母线13、工作电源共箱母线2、工作电源进线开关5及备用电源进线开关9处于失电状态,再悬挂接地线,然后恢复工作电源进线开关5与工作电源共箱母线2之间的软连接,同时恢复备用电源进线开关9与备用电源共箱母线13之间的软连接,再拆除接地线,然后转至步骤10)。The specific operations of step 9) are: disconnect the working power inlet switch 5 and the backup power inlet switch 9, the backup power common box bus 13, the working power common box bus 2, the working power inlet switch 5 and the backup power inlet switch 9 is in the power-off state, then hang the grounding wire, then restore the soft connection between the working power incoming switch 5 and the working power common box bus 2, and simultaneously restore the standby power incoming switch 9 and the standby power common box bus 13. Soft connect, then remove the ground wire, then go to step 10).
步骤11)还包括以下步骤:Step 11) also includes the following steps:
1101)检查工作电源进线电压互感器4的二次电压幅值是否为额定电压除以工作电源进线电压互感器4的变比,相序是否为正相序,零序电压是否为零;1101) Check whether the secondary voltage amplitude of the voltage transformer 4 of the incoming line of the working power supply is the rated voltage divided by the transformation ratio of the voltage transformer 4 of the incoming line of the working power supply, whether the phase sequence is a positive phase sequence, and whether the zero-sequence voltage is zero;
1102)检查备用电源进线电压互感器11的二次电压幅值是否为额定电压除以备用电源进线电压互感器11的变比,相序是否为正相序,零序电压是否为零;1102) Check whether the secondary voltage amplitude of the standby power supply incoming line voltage transformer 11 is the rated voltage divided by the transformation ratio of the standby power supply incoming line voltage transformer 11, whether the phase sequence is positive phase sequence, and whether the zero sequence voltage is zero;
1103)检查高压母线电压互感器8的二次电压幅值是否为额定电压除以高压母线电压互感器8的变比,相序是否为正相序,零序电压是否为零;1103) Check whether the secondary voltage amplitude of the high-voltage bus voltage transformer 8 is the rated voltage divided by the transformation ratio of the high-voltage bus voltage transformer 8, whether the phase sequence is positive phase sequence, and whether the zero-sequence voltage is zero;
1104)检查工作电源进线电压互感器4、备用电源进线电压互感器11及高压母线电压互感器8的二次电压频差是否为零,相角差是否小于3°,同相之间压差是否小于5V;1104) Check whether the secondary voltage frequency difference of the working power supply incoming line voltage transformer 4, the backup power supply incoming line voltage transformer 11 and the high-voltage bus voltage transformer 8 is zero, whether the phase angle difference is less than 3°, and whether the voltage difference between the same phases Is it less than 5V;
1105)检查母线快切装置15上读取的工作电源进线电压互感器4、备用电源进线电压互感器11及高压母线电压互感器8的二次电压频差是否为零,相角差是否小于3°,同相之间压差是否小于5V。1105) Check whether the secondary voltage frequency difference of the working power inlet voltage transformer 4, the backup power inlet voltage transformer 11 and the high-voltage bus voltage transformer 8 read on the bus quick-cutting device 15 is zero, and whether the phase angle difference Less than 3°, whether the voltage difference between the same phase is less than 5V.
步骤12)中查找并消除异常单元缺陷的具体操作过程为:The specific operation process of finding and eliminating abnormal unit defects in step 12) is:
1201)检查备用变压器、主变压器及高压工作变压器的接线方式和设计是否一致;1201) Check whether the wiring mode and design of the standby transformer, the main transformer and the high-voltage working transformer are consistent;
1202)检查备用变压器、主变压器、高压工作变压器、工作电源共箱母线2及备用电源共箱母线13是否按图纸施工,检查备用变压器各相与备用电源进线开关9各相接线是否对应;同时检查高压工作变压器各相与工作电源进线开关5各相接线是否对应。1202) Check whether the backup transformer, the main transformer, the high-voltage working transformer, the common box bus 2 of the working power supply and the common box bus 13 of the standby power supply are constructed according to the drawings, and check whether each phase of the standby transformer corresponds to the wiring of each phase of the standby power inlet switch 9; at the same time Check whether each phase of the high-voltage working transformer corresponds to the wiring of each phase of the working power input switch 5.
本发明进行高压母线电源核相试验时,采用工作电源单元1作为电压源对工作电源进线、工作电源进线电压互感器4、高压母线7、高压母线电压互感器8、备用电源进线及备用电源进线电压互感器11进行同源核相,确认二次系统准确反映一次系统的情况后,再用备用电源单元14与工作电源单元1进行非同源核相,试验效率高,试验正确性高,排除了人为操作一次设备的危险,能够快速、准确识别出,电压互感器接线缺陷、共箱母线安装缺陷和变压器接线方式缺陷,杜绝因非同期并联造成的相间短路现象。另外,本发明以工作电源单元1为基准,可以对多个备用电源单元14进行核相,可适用于高压母线7采用双电源进线、三电源进线和其他多电源进线的高压母线电源核相工作。When the present invention carries out the nuclear phase test of the high-voltage bus power supply, the working power supply unit 1 is used as the voltage source to connect the working power supply line, the working power supply line voltage transformer 4, the high-voltage bus bar 7, the high-voltage bus bar voltage transformer 8, the standby power supply line and the The voltage transformer 11 of the incoming line of the backup power supply is subjected to homologous phase verification. After confirming that the secondary system accurately reflects the situation of the primary system, the backup power supply unit 14 and the working power supply unit 1 are used for non-homologous phase verification. The test efficiency is high and the test is correct. High reliability, eliminates the danger of manual operation of primary equipment, can quickly and accurately identify, voltage transformer wiring defects, common box bus installation defects and transformer wiring defects, and eliminate phase-to-phase short circuits caused by non-synchronous parallel connections. In addition, the present invention is based on the working power supply unit 1, and can perform phase verification on multiple backup power supply units 14, and is applicable to high-voltage bus power supplies with dual power supply incoming lines, three power supply incoming lines, and other multi-power supply incoming lines for the high-voltage bus 7 nuclear phase work.
以上所述,仅是本发明的较佳实施例,并非对本发明作任何限制,凡是根据本发明技术实质对以上实施例所作的任何简单修改、变更以及等效结构变化,均仍属于本发明技术方案的保护范围内。The above are only preferred embodiments of the present invention, and do not limit the present invention in any way. All simple modifications, changes and equivalent structural changes made to the above embodiments according to the technical essence of the present invention still belong to the technical aspects of the present invention. within the scope of protection of the scheme.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910804493.7A CN110514911B (en) | 2019-08-28 | 2019-08-28 | A system and method for nuclear phase of high voltage busbar power supply in power plant |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910804493.7A CN110514911B (en) | 2019-08-28 | 2019-08-28 | A system and method for nuclear phase of high voltage busbar power supply in power plant |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110514911A true CN110514911A (en) | 2019-11-29 |
| CN110514911B CN110514911B (en) | 2021-08-24 |
Family
ID=68627685
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910804493.7A Active CN110514911B (en) | 2019-08-28 | 2019-08-28 | A system and method for nuclear phase of high voltage busbar power supply in power plant |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110514911B (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110854925A (en) * | 2019-11-04 | 2020-02-28 | 中国能源建设集团华东电力试验研究院有限公司 | One-time voltage-on synchronous nuclear phase inspection system and inspection method for electrical system |
| CN111342464A (en) * | 2020-04-21 | 2020-06-26 | 西安热工研究院有限公司 | A system and method for checking the phase of a single bus system wiring mode unit |
| CN111521860A (en) * | 2020-06-02 | 2020-08-11 | 西安热工研究院有限公司 | A system and method for checking the polarity of bus differential protection using transformer excitation inrush current |
| CN111521888A (en) * | 2020-05-07 | 2020-08-11 | 西安热工研究院有限公司 | High-voltage station bus power supply phase checking system and method |
| CN111521887A (en) * | 2020-05-07 | 2020-08-11 | 西安热工研究院有限公司 | 380V power supply-based high-voltage station service power supply nuclear phase system and method |
| CN111541276A (en) * | 2020-05-12 | 2020-08-14 | 西安热工研究院有限公司 | A generator synchronous phasing system and method |
| CN113162040A (en) * | 2021-04-29 | 2021-07-23 | 西安热工研究院有限公司 | System and method for non-pressure nuclear phase of high-voltage station power supply of power plant |
| CN113189411A (en) * | 2021-02-04 | 2021-07-30 | 华能(天津)煤气化发电有限公司 | Phase checking method for synchronous voltage loop of generator set with outlet circuit breaker |
| CN114252710A (en) * | 2021-09-18 | 2022-03-29 | 华电电力科学研究院有限公司 | Method for homologous nuclear phase of unit grid-connected synchronous system |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH02232908A (en) * | 1989-03-06 | 1990-09-14 | Aichi Electric Co Ltd | Phase detection of traveling transformer and device therefor |
| JP2004170093A (en) * | 2002-11-18 | 2004-06-17 | Toshiba Corp | Test equipment and test method for electrical equipment protection circuit |
| CN101943719A (en) * | 2010-09-09 | 2011-01-12 | 上海希明电气技术有限公司 | Shared-frequency asynchronous phase-checking method |
| CN102944762A (en) * | 2012-12-01 | 2013-02-27 | 新余钢铁集团有限公司 | Debugging method of phase sequences of loops at two sides of synchronization point before commissioning of generator set |
| CN202817885U (en) * | 2012-08-27 | 2013-03-20 | 新疆中泰化学(集团)股份有限公司 | Switching apparatus between dual supply systems for isolated network operation |
| CN104198832A (en) * | 2014-07-09 | 2014-12-10 | 中冶建工集团有限公司 | Comprehensive inspecting and testing method for high voltage power transformer and distribution substation |
| CN204028234U (en) * | 2014-08-07 | 2014-12-17 | 国网山东省电力公司日照供电公司 | The automatic nuclear phase monitoring device of a kind of online voltage |
| CN104505863A (en) * | 2014-11-21 | 2015-04-08 | 国家电网公司 | A method for determining and adjusting wireless phase detection |
| CN105588987A (en) * | 2016-01-29 | 2016-05-18 | 国网浙江省电力公司嘉兴供电公司 | Three-phase phase checking device applied to power distribution network 10 kV switch cabinets and phase checking method |
| CN206378526U (en) * | 2016-12-30 | 2017-08-04 | 国网天津市电力公司 | A kind of use A/D automatic electricity-testing and phase checking device |
| CN207096346U (en) * | 2017-08-24 | 2018-03-13 | 国家电网公司 | A kind of online phase checking device of high-tension switch cabinet |
-
2019
- 2019-08-28 CN CN201910804493.7A patent/CN110514911B/en active Active
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH02232908A (en) * | 1989-03-06 | 1990-09-14 | Aichi Electric Co Ltd | Phase detection of traveling transformer and device therefor |
| JP2004170093A (en) * | 2002-11-18 | 2004-06-17 | Toshiba Corp | Test equipment and test method for electrical equipment protection circuit |
| CN101943719A (en) * | 2010-09-09 | 2011-01-12 | 上海希明电气技术有限公司 | Shared-frequency asynchronous phase-checking method |
| CN202817885U (en) * | 2012-08-27 | 2013-03-20 | 新疆中泰化学(集团)股份有限公司 | Switching apparatus between dual supply systems for isolated network operation |
| CN102944762A (en) * | 2012-12-01 | 2013-02-27 | 新余钢铁集团有限公司 | Debugging method of phase sequences of loops at two sides of synchronization point before commissioning of generator set |
| CN104198832A (en) * | 2014-07-09 | 2014-12-10 | 中冶建工集团有限公司 | Comprehensive inspecting and testing method for high voltage power transformer and distribution substation |
| CN204028234U (en) * | 2014-08-07 | 2014-12-17 | 国网山东省电力公司日照供电公司 | The automatic nuclear phase monitoring device of a kind of online voltage |
| CN104505863A (en) * | 2014-11-21 | 2015-04-08 | 国家电网公司 | A method for determining and adjusting wireless phase detection |
| CN105588987A (en) * | 2016-01-29 | 2016-05-18 | 国网浙江省电力公司嘉兴供电公司 | Three-phase phase checking device applied to power distribution network 10 kV switch cabinets and phase checking method |
| CN206378526U (en) * | 2016-12-30 | 2017-08-04 | 国网天津市电力公司 | A kind of use A/D automatic electricity-testing and phase checking device |
| CN207096346U (en) * | 2017-08-24 | 2018-03-13 | 国家电网公司 | A kind of online phase checking device of high-tension switch cabinet |
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110854925A (en) * | 2019-11-04 | 2020-02-28 | 中国能源建设集团华东电力试验研究院有限公司 | One-time voltage-on synchronous nuclear phase inspection system and inspection method for electrical system |
| CN110854925B (en) * | 2019-11-04 | 2021-06-08 | 中国能源建设集团华东电力试验研究院有限公司 | One-time voltage-on synchronous nuclear phase inspection system and inspection method for electrical system |
| CN111342464A (en) * | 2020-04-21 | 2020-06-26 | 西安热工研究院有限公司 | A system and method for checking the phase of a single bus system wiring mode unit |
| CN111521888A (en) * | 2020-05-07 | 2020-08-11 | 西安热工研究院有限公司 | High-voltage station bus power supply phase checking system and method |
| CN111521887A (en) * | 2020-05-07 | 2020-08-11 | 西安热工研究院有限公司 | 380V power supply-based high-voltage station service power supply nuclear phase system and method |
| CN111521887B (en) * | 2020-05-07 | 2022-06-07 | 西安热工研究院有限公司 | A nuclear phase system and method for high-voltage factory power supply based on 380V power supply |
| CN111521888B (en) * | 2020-05-07 | 2022-07-08 | 西安热工研究院有限公司 | High-voltage station bus power supply phase checking system and method |
| CN111541276A (en) * | 2020-05-12 | 2020-08-14 | 西安热工研究院有限公司 | A generator synchronous phasing system and method |
| CN111521860A (en) * | 2020-06-02 | 2020-08-11 | 西安热工研究院有限公司 | A system and method for checking the polarity of bus differential protection using transformer excitation inrush current |
| CN113189411A (en) * | 2021-02-04 | 2021-07-30 | 华能(天津)煤气化发电有限公司 | Phase checking method for synchronous voltage loop of generator set with outlet circuit breaker |
| CN113162040A (en) * | 2021-04-29 | 2021-07-23 | 西安热工研究院有限公司 | System and method for non-pressure nuclear phase of high-voltage station power supply of power plant |
| CN114252710A (en) * | 2021-09-18 | 2022-03-29 | 华电电力科学研究院有限公司 | Method for homologous nuclear phase of unit grid-connected synchronous system |
| CN114252710B (en) * | 2021-09-18 | 2023-08-18 | 华电电力科学研究院有限公司 | Method for unit grid-connected synchronous system homologous nuclear phase |
Also Published As
| Publication number | Publication date |
|---|---|
| CN110514911B (en) | 2021-08-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110514911A (en) | A kind of system and method for power plant high voltage bus power supply nuclear phase | |
| CN111007439B (en) | Transformer substation bus protection secondary circuit commissioning on-load test method | |
| Gao et al. | Design and evaluation of a directional algorithm for transmission-line protection based on positive-sequence fault components | |
| CN110504712A (en) | A gas-fired power plant π-type homologous nuclear phase system and method | |
| CN107300684B (en) | A Check Method of Transformer Differential Protection Secondary Circuit | |
| CN105388385A (en) | Bus differential protection vector concentrated test method | |
| CN111323670B (en) | A transformer differential protection polarity test system and method | |
| CN105785157A (en) | Double main transformer longitudinal differential protection loop closing testing method | |
| CN104345245B (en) | Method for checking voltage transformer wiring correctness by using transformer turn ratio & group tester | |
| CN104515934A (en) | HHT (Hilbert-Huang transform)-based microcomputer small-current earth-fault line selection device | |
| CN107121614B (en) | Method for measuring polarity of current loop through bus protection double transformation | |
| CN103439656A (en) | Generator stator winding and electric major loop grounding fault diagnosis method of generator stator winding based on flow direction of failure current | |
| CN109683106B (en) | Short circuit test system for different-capacity impact generator grid-connected power supply | |
| CN110824388A (en) | A method for judging the polarity of 4PT wiring in a small current grounding system | |
| CN105974226A (en) | Portable power device test power source device and detection method thereof | |
| CN108051699A (en) | A kind of secondary loop of mutual inductor of transformer substation exception live detection method and system | |
| CN106324397A (en) | Ultrahigh-voltage direct-current transmission project converter transformer alternating-current loop system on-site inspection method | |
| CN111624488A (en) | Generator-transformer unit differential protection polarity test system and method | |
| CN103245842B (en) | 10 ~ 35kV new clothes electric device total system dry run detection method | |
| CN113162040B (en) | A system and method for non-voltage nuclear phase of high-voltage utility power supply in power plant | |
| CN103048586B (en) | The verification method of voltage transformer (VT) wiring correctness | |
| CN103616581B (en) | The method of without disconnecting power lead test reactive power compensator | |
| CN106771841B (en) | A kind of through-flow system of substation S type and method | |
| CN203191498U (en) | Undercurrent grounding line selecting device | |
| CN104267276A (en) | Method for inspecting high-voltage motor longitudinal differential protection by means of low-voltage locked-rotor currents |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20191129 Assignee: HUANENG POWER INTERNATIONAL CO.,LTD. SHANGHAI SHIDONGKOU FIRST POWER PLANT Assignor: Xi'an Thermal Power Research Institute Co.,Ltd. Contract record no.: X2024980031935 Denomination of invention: A System and Method for Nuclear Phase of High Voltage Bus Power Supply in Power Plants Granted publication date: 20210824 License type: Common License Record date: 20241204 |
|
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20191129 Assignee: Zhuhai Shenneng Hongwan Power Co.,Ltd. Assignor: Xi'an Thermal Power Research Institute Co.,Ltd. Contract record no.: X2025980001392 Denomination of invention: A System and Method for Nuclear Phase of High Voltage Bus Power Supply in Power Plants Granted publication date: 20210824 License type: Common License Record date: 20250115 Application publication date: 20191129 Assignee: JINGNENG SHIYAN THERMOELECTRICITY CO.,LTD. Assignor: Xi'an Thermal Power Research Institute Co.,Ltd. Contract record no.: X2025980001190 Denomination of invention: A System and Method for Nuclear Phase of High Voltage Bus Power Supply in Power Plants Granted publication date: 20210824 License type: Common License Record date: 20250115 |
|
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20191129 Assignee: Dalat banner power generation branch of North United Power Co.,Ltd. Assignor: Xi'an Thermal Power Research Institute Co.,Ltd. Contract record no.: X2025980002988 Denomination of invention: A System and Method for Nuclear Phase of High Voltage Bus Power Supply in Power Plants Granted publication date: 20210824 License type: Common License Record date: 20250127 |
|
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20191129 Assignee: Sichuan Energy Investment Guangyuan Gas Power Generation Co.,Ltd. Assignor: Xi'an Thermal Power Research Institute Co.,Ltd. Contract record no.: X2025980003137 Denomination of invention: A System and Method for Nuclear Phase of High Voltage Bus Power Supply in Power Plants Granted publication date: 20210824 License type: Common License Record date: 20250207 |
|
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20191129 Contract record no.: X2026980001541 Denomination of invention: A System and Method for Nuclear Phase of High Voltage Bus Power Supply in Power Plants Granted publication date: 20210824 License type: Common License Record date: 20260122 |