CN110509415A - The maintenance cellar of precast concrete and curing system - Google Patents
The maintenance cellar of precast concrete and curing system Download PDFInfo
- Publication number
- CN110509415A CN110509415A CN201910917202.5A CN201910917202A CN110509415A CN 110509415 A CN110509415 A CN 110509415A CN 201910917202 A CN201910917202 A CN 201910917202A CN 110509415 A CN110509415 A CN 110509415A
- Authority
- CN
- China
- Prior art keywords
- precast concrete
- maintenance
- production line
- piler
- guide rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 69
- 239000011178 precast concrete Substances 0.000 title claims abstract description 57
- 238000004519 manufacturing process Methods 0.000 claims abstract description 64
- 238000003860 storage Methods 0.000 claims abstract description 33
- 230000005540 biological transmission Effects 0.000 claims description 17
- 230000002093 peripheral effect Effects 0.000 claims description 3
- 238000005096 rolling process Methods 0.000 claims 1
- 239000004567 concrete Substances 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 230000005484 gravity Effects 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 230000001737 promoting effect Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000010410 dusting Methods 0.000 description 1
- 238000002194 freeze distillation Methods 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000009738 saturating Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B11/00—Apparatus or processes for treating or working the shaped or preshaped articles
- B28B11/24—Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
- B28B11/245—Curing concrete articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B11/00—Apparatus or processes for treating or working the shaped or preshaped articles
- B28B11/24—Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
- B28B11/248—Supports for drying
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
Abstract
The present invention relates to a kind of maintenance cellar of precast concrete and curing systems.The maintenance cellar of the precast concrete includes: two storage racks, is laid along first direction;Each storage rack is provided with the guide rail that lengthwise extends in a second direction;And piler, it is located between two storage racks;The two sides of piler are provided with support portion, and each support portion support is set to corresponding guide rail, and can move along guide rail;Wherein, the lower section of piler has the space that the production line for precast concrete passes through.Need to be laid with track below piler in the prior art, piler is moved along track below, thus production line cannot pass through, and causes a production line that can only be equipped with a maintenance cellar.However, since the production line of precast concrete can be passed through from the lower section at maintenance cellar in the present invention, thus the production line of a precast concrete can be equipped with multiple maintenance cellars, to eliminate influence of the maintenance cellar production capacity to production line production capacity, be greatly improved the production capacity of production line.
Description
Technical field
The present invention relates to assembled architecture technical fields, and the maintenance more particularly to a kind of precast concrete is stored and maintenance
System.
Background technique
Concrete need under certain temperature and humidity environment could normal freezing, be otherwise easy to appear strength reduction,
Phenomena such as contraction fissure, peeling, dusting, seriously affect concrete quality.Therefore, in the production process of precast concrete,
After the completion of pouring, need to keep the temperature precast concrete, moisture-keeping maintaining.
Generally, precast concrete needs longer curing time, and the production capacity for conserving cellar is entire precast concrete
Production line production capacity promoted bottleneck.However, existing maintenance cellar can not allow production line to pass through, therefore, a production line can only
It is equipped with a maintenance cellar, seriously limits the production capacity of production line.
Summary of the invention
Based on this, it is necessary to a maintenance can only be equipped with for the production line of a precast concrete in the prior art
The technical issues of storing, seriously limiting the production capacity of production line provides a kind of maintenance of precast concrete for improving drawbacks described above
Cellar and curing system.
A kind of maintenance cellar of precast concrete, comprising:
Two storage racks are laid along first direction interval;Each storage rack is provided with edge and the first direction
The guide rail that perpendicular second direction lengthwise extends;And
Piler is located between two storage racks;The piler is all provided with towards the two sides of two storage racks
It is equipped with support portion, each support portion support is set to the corresponding guide rail, and can move along the guide rail;
Wherein, the lower section of the piler has the space that the production line for precast concrete passes through.
The maintenance of above-mentioned precast concrete is stored, and two storage racks being intervally arranged are arranged.Piler is located at two storages
It between frame, and is set on the guide rail of two storage racks by the support of the support portion of two sides, so that piler can be stored at two
It is moved between frame along guide rail, the die station for having precast concrete for transporting pouring molding.Since guide rail is set on storage rack,
And the lower section of piler has the space that the production line for precast concrete passes through, therefore, the production of precast concrete
Line can be passed through from the lower section at maintenance cellar.
Need to be laid with track below piler in the prior art, piler is moved along track below, thus is produced
Line cannot pass through, and cause a production line that can only be equipped with a maintenance cellar.However, due to the life of precast concrete in the present invention
Producing line can be passed through from the lower section at maintenance cellar, thus the production line of a precast concrete can be equipped with multiple maintenance cellars, to disappear
Influence in addition to maintenance cellar production capacity to production line production capacity, is greatly improved the production capacity of production line.
In one embodiment, the maintenance cellar further includes idler wheel, and the bottom of each support portion is rotatablely connected
There is the idler wheel, and the idler wheel is matched with the corresponding guide rail.In this way, idler wheel is rotated and is advanced along guide rail, thus real
It is removable along guide rail piler has been showed.
In one embodiment, the peripheral surface of the idler wheel has the limit for cooperating with the corresponding guide rail
Slot.In this way, the setting of limiting slot be so that idler wheel can advance along guide rail, and effectively prevent idler wheel derailing, piler work is improved
The safety of industry.
In one embodiment, two support portions extend along the second direction lengthwise, each support portion edge
Its longitudinally is provided at least two idler wheels.In this way, making piler more stable, the peace of piler is further increased
Quan Xing.
In one embodiment, the maintenance cellar further includes driving assembly, at least one institute on each support portion
It states idler wheel and is sequentially connected with the driving component.
In one embodiment, the driving component includes actuator and transmission component, and the actuator is fixedly connected on
The storage rack, the transmission component transmission connection is in the actuator and the corresponding idler wheel.
In one embodiment, the transmission component is gear transmission structure or belt transmission structure.
In one embodiment, the rotation axis of each idler wheel is parallel to the first direction.
A kind of curing system, the cellar of maintenance described in production line and any embodiment as above including precast concrete;
The production line of the precast concrete is passed through along the first direction by the bottom at the maintenance cellar.
In one embodiment, the maintenance cellar includes multiple, and multiple maintenance cellars are along the precast concrete
Production line arrangement.
Detailed description of the invention
Fig. 1 is the front view at the maintenance cellar of the precast concrete in one embodiment of the invention;
Fig. 2 is the enlarged drawing of the maintenance JiaoAChu of precast concrete shown in FIG. 1;
Fig. 3 is the top view at the maintenance cellar of precast concrete shown in FIG. 1;
Fig. 4 is the curing system in one embodiment of the invention.
Specific embodiment
To facilitate the understanding of the present invention, a more comprehensive description of the invention is given in the following sections with reference to the relevant attached drawings.In attached drawing
Give preferred embodiment of the invention.But the invention can be realized in many different forms, however it is not limited to herein
Described embodiment.On the contrary, purpose of providing these embodiments is keeps the understanding to the disclosure more saturating
It is thorough comprehensive.
It should be noted that it can directly on the other element when element is referred to as " being fixed on " another element
Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it, which can be, is directly connected to
To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ",
" right side " and similar statement are for illustrative purposes only.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention
The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool
The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more phases
Any and all combinations of the listed item of pass.
As shown in Figure 1 to Figure 3, a kind of maintenance cellar 100 of the precast concrete provided in one embodiment of the invention, including
Storage rack 10 and piler 20.
Storage rack 10 includes two, and two storage racks 10 are laid along the interval first direction a.The storage rack 10 is poured for storing
The die station for forming precast concrete is built, to conserve to precast concrete.Each storage rack 10 is provided with edge
The guide rail 12 that the second direction b lengthwise perpendicular with first direction a extends (see Fig. 2).Piler 20 is located at two storage racks 10
Between, and piler 20 is provided with support portion 22 towards the two sides of two storage racks 10 (see Fig. 2).Each support portion 22 supports
It is set to corresponding guide rail 12, and can be moved along guide rail 12.The life that the lower section of the piler 20 has for precast concrete
The space B that producing line passes through.
The maintenance cellar 100 of above-mentioned precast concrete, is arranged two storage racks 10 being intervally arranged.Piler 20 is located at two
It between a storage rack 10, and is set on the guide rail 12 of two storage racks 10 by the support of the support portion 22 of two sides, thus stacking
Machine 20 can move between two storage racks 10 along guide rail 12, the die station for having precast concrete for transporting pouring molding.By
It is set on storage rack 10 in guide rail 12, and the lower section of piler 20 has the sky that the production line for precast concrete passes through
Between B, therefore, the production line of precast concrete can be passed through from the lower section at maintenance cellar.
Need to be laid with track below piler in the prior art, piler is moved along track below, thus is produced
Line cannot pass through, and cause a production line that can only be equipped with a maintenance cellar.However, due to the life of precast concrete in the present invention
Producing line can be passed through from the lower section at maintenance cellar 100, thus the production line of a precast concrete can be equipped with multiple maintenance cellars 100,
To eliminate the influence for conserving the production capacity for storing 100 to the production capacity of production line, it is greatly improved the production capacity of production line.
It should be pointed out that in the prior art, the lower section of piler is laid with track, piler is moved along track below
It is dynamic.Piler needs together (generally about 20 tons) to promote precast concrete and die station, also, needs at the top of piler
Bear huge load, therefore the beam structure for needing design structure sturdy at the top of piler.Promoting precast concrete
When with die station, the center of gravity of piler is higher, causes disequilibration fixed, is easy to happen and topples over accident, greatly limit piler
The speed of travel reduces production efficiency.
In the embodiment of the present invention, guide rail 12 is located at the top of storage rack 10.Support portion 22 is located at the top of piler 20.
In this way, promoting precast concrete and when die station, the center of gravity of piler 20 being closer in the vertical direction with guide rail 12,
It is smaller that torque is toppled over when walking to piler 20, balance and stability can be walked along guide rail 12 with biggish speed, improve safety
Property and production efficiency.
In the embodiment of the present invention, maintenance cellar 100 further includes idler wheel 24.The bottom of each support portion 22 is rotatablely connected
There is the idler wheel 24, and idler wheel 24 is matched with corresponding guide rail 12.In this way, idler wheel 24 is rotated and is advanced along guide rail 12, thus
It is removable along guide rail 12 to realize piler 20.Optionally, the rotation axis of each idler wheel 24 puts direction each parallel to first.
Specific in embodiment, the peripheral surface of idler wheel 24 has the limiting slot 242 for cooperating with corresponding guide rail 12.
In this way, the setting of limiting slot 242 be so that idler wheel 24 can advance along guide rail 12, and effectively prevent the derailing of idler wheel 24, heap is improved
The safety of 20 operation of stack machine.
Specific in embodiment, idler wheel 24 can be rotatably installed on the bottom of support portion 22 by bearing.In this way, using
Bearing installs idler wheel 24, so that 24 stability of rotation of idler wheel, further increases the safety of piler 20.
In some embodiments, b lengthwise extends two support portions 22 in a second direction.Each support portion 22 is along its longitudinally
It is provided at least two idler wheels 24.In this way, making piler 20 more stable, the safety of piler 20 is further increased.It can
Selection of land, the idler wheel 24 being located on two support portions 22 are arranged symmetrically in relation to each other.Optionally, support portion 22 can be to be connected to fixation
It is connected to the girder steel at 20 top of piler.Channel steel etc. can be used in the girder steel, is not limited thereto.
Specific in embodiment, maintenance cellar 100 further includes driving assembly (not shown).At least one on each support portion 22
A idler wheel 24 is sequentially connected with the driving assembly.Driving assembly is used to that corresponding idler wheel 24 to be driven to rotate, and then with mechanical pilar
20 move along guide rail 12.
Further, driving assembly includes actuator and transmission component.Actuator is fixedly connected on storage rack 10, transmission group
Part is sequentially connected in actuator and corresponding idler wheel 24, and the power that actuator is exported is transferred to idler wheel 24.Optionally, it is driven
Component can be gear transmission structure or belt transmission structure.The specific structure for being placed in gear transmission structure and belt transmission structure needs
It to be designed as the case may be, therefore not to repeat here.Optionally, actuator can be driving motor.
Please also refer to Fig. 4, based on above-mentioned maintenance cellar 100, of the invention also provides a kind of curing system, including concrete
The production line 200 of prefabricated component and the as above cellar of maintenance described in any embodiment 100.200 edge of production line of precast concrete
First direction a is passed through by the bottom at maintenance cellar 100.
In this way, the precast concrete on production line 200 is transported to maintenance cellar 100, the piler 20 at maintenance cellar 100 will
Precast concrete and die station are transported together to being conserved on storage rack 10, and piler 20 is again by the concrete after the completion of maintenance
Prefabricated component and die station are transported back to production line 200.
It should be noted that production line 200 is passed through from the bottom at maintenance cellar 100, i.e. production line 200 is from two storage racks 10
Bottom and the space of the lower section of piler 20 pass through, to take full advantage of the space of 200 top of production line, substantially reduce
The area occupied required for curing system.
Specific in embodiment, maintenance cellar 100 includes multiple (two or more), and multiple maintenance cellars 100 are along coagulation
The production line 200 of native prefabricated component is arranged.It is carried out in this way, production line 200 can transport precast concrete to any maintenance cellar 100
Maintenance, substantially increases maintenance production capacity.That is, cannot be further added by concrete prefabricated when one of maintenance cellar 100 is fully loaded
When part is conserved, production line 200 can transport concrete prefabricated component pass through fully loaded maintenance cellar 100, stored to other maintenances
100 are conserved.
In fact, the maintenance cellar 100 for being adapted quantity can be cooperated according to the production capacity of production line 200, reaches and make full use of
Maintenance cellar 100, and maximize the purpose of the production capacity of production line 200.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality
It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention
Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.
Claims (10)
1. a kind of maintenance of precast concrete is stored characterized by comprising
Two storage racks are laid along first direction interval;Each storage rack is provided with edge and mutually hangs down with the first direction
The guide rail that straight second direction lengthwise extends;And
Piler is located between two storage racks;The piler is provided with towards the two sides of two storage racks
Support portion, each support portion support is set to the corresponding guide rail, and can move along the guide rail;
Wherein, the lower section of the piler has the space that the production line for precast concrete passes through.
2. the maintenance of precast concrete according to claim 1 is stored, which is characterized in that the maintenance cellar further includes rolling
Wheel, the bottom of each support portion is rotatably connected to the idler wheel, and the idler wheel matches with the corresponding guide rail
It closes.
3. the maintenance of precast concrete according to claim 2 is stored, which is characterized in that the peripheral surface of the idler wheel has
There is the limiting slot for cooperating with the corresponding guide rail.
4. the maintenance of precast concrete according to claim 2 is stored, which is characterized in that two support portions are described in
Second direction lengthwise extends, and each support portion is provided at least two idler wheels along its longitudinally.
5. the maintenance of precast concrete according to claim 4 is stored, which is characterized in that the maintenance cellar further includes driving
Component, at least one described idler wheel on each support portion are sequentially connected with the driving component.
6. the maintenance of precast concrete according to claim 5 is stored, which is characterized in that the driving component includes driving
Part and transmission component, the actuator are fixedly connected on the storage rack, and the transmission component transmission connection is in the actuator
And the corresponding idler wheel.
7. the maintenance of precast concrete according to claim 5 is stored, which is characterized in that the transmission component is gear biography
Dynamic structure or belt transmission structure.
8. the maintenance of precast concrete according to claim 2 is stored, which is characterized in that the rotary shaft of each idler wheel
Line is parallel to the first direction.
9. a kind of curing system, which is characterized in that any in production line and such as claim 1 to 8 including precast concrete
Maintenance cellar described in;
The production line of the precast concrete is passed through along the first direction by the bottom at the maintenance cellar.
10. curing system according to claim 9, which is characterized in that the maintenance cellar includes multiple, multiple maintenances
The production line stored along the precast concrete is arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910917202.5A CN110509415A (en) | 2019-09-26 | 2019-09-26 | The maintenance cellar of precast concrete and curing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910917202.5A CN110509415A (en) | 2019-09-26 | 2019-09-26 | The maintenance cellar of precast concrete and curing system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110509415A true CN110509415A (en) | 2019-11-29 |
Family
ID=68633743
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910917202.5A Pending CN110509415A (en) | 2019-09-26 | 2019-09-26 | The maintenance cellar of precast concrete and curing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110509415A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112428402A (en) * | 2020-10-27 | 2021-03-02 | 中宏检验认证集团有限公司 | Automatic sample device that passes in and out of full-automatic curing room of intelligence |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1430049A (en) * | 1973-05-18 | 1976-03-31 | Kesting Interprefab Ag | Method for transporting pallets during the production of large concrete panels and a plant for carrying out the method |
CN206937583U (en) * | 2017-07-21 | 2018-01-30 | 湖南三一快而居住宅工业有限公司 | A kind of intelligence and storehouse system and the piler with the system and curing kilns |
CN207645366U (en) * | 2017-11-30 | 2018-07-24 | 纽科伦(新乡)起重机有限公司 | A kind of tray stacking machine for conveying pallet to curing kilns |
CN211333819U (en) * | 2019-09-26 | 2020-08-25 | 长沙远大住宅工业集团股份有限公司 | Curing cellar and curing system for concrete prefabricated member |
-
2019
- 2019-09-26 CN CN201910917202.5A patent/CN110509415A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1430049A (en) * | 1973-05-18 | 1976-03-31 | Kesting Interprefab Ag | Method for transporting pallets during the production of large concrete panels and a plant for carrying out the method |
CN206937583U (en) * | 2017-07-21 | 2018-01-30 | 湖南三一快而居住宅工业有限公司 | A kind of intelligence and storehouse system and the piler with the system and curing kilns |
CN207645366U (en) * | 2017-11-30 | 2018-07-24 | 纽科伦(新乡)起重机有限公司 | A kind of tray stacking machine for conveying pallet to curing kilns |
CN211333819U (en) * | 2019-09-26 | 2020-08-25 | 长沙远大住宅工业集团股份有限公司 | Curing cellar and curing system for concrete prefabricated member |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112428402A (en) * | 2020-10-27 | 2021-03-02 | 中宏检验认证集团有限公司 | Automatic sample device that passes in and out of full-automatic curing room of intelligence |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104842962B (en) | Electricity exchanging equipment | |
CN103826993B (en) | A container handling and flow system, use thereof and method of handling containers | |
CN210883783U (en) | Warehousing system | |
CN204659694U (en) | Change electric installation and change electric equipment | |
CN205367593U (en) | Multi -functional stacker | |
CN109733774B (en) | Steel coil three-dimensional bin based on movable conveying device goods shelf | |
CN104787011A (en) | Battery exchange device and battery exchange equipment | |
CN103057886B (en) | Gravity drive-in self-moving intensive warehouse rack allowing for convenient delivery | |
CN207645366U (en) | A kind of tray stacking machine for conveying pallet to curing kilns | |
CN106276005A (en) | Vertical storage facilities | |
DE2113202B2 (en) | Goods stores with vertically movable transfer equipment - has self-propelling transport units on rails of individual floors of vertical shelf rows | |
JP6291228B2 (en) | Automatic storage equipment and automatic warehouse | |
CN104766640A (en) | Nuclear fuel fast transfer device | |
CN108516497A (en) | Transport vehicle for concrete precast slab | |
CN112520285A (en) | Warehousing system | |
CN104555318A (en) | Circulatory transportation system using super capacitor powered car | |
CN110509415A (en) | The maintenance cellar of precast concrete and curing system | |
CN110282373A (en) | Coil of strip conveying system | |
CN208577065U (en) | Automatic material frame material conveyor | |
CN107472788A (en) | Without tunnel tiered warehouse facility | |
CN203921785U (en) | The intensive storing/conveying system of a kind of filter tip stick | |
CN210001066U (en) | conveyer for loading and unloading cable reel | |
CN207174612U (en) | Without tunnel tiered warehouse facility | |
CN206051033U (en) | A kind of transfer platform and unloading system | |
CN108792383B (en) | Intelligent casting model warehouse system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |