CN110508761A - A kind of quick casting pig technique of 180 tons of iron packets - Google Patents

A kind of quick casting pig technique of 180 tons of iron packets Download PDF

Info

Publication number
CN110508761A
CN110508761A CN201910751254.XA CN201910751254A CN110508761A CN 110508761 A CN110508761 A CN 110508761A CN 201910751254 A CN201910751254 A CN 201910751254A CN 110508761 A CN110508761 A CN 110508761A
Authority
CN
China
Prior art keywords
pig
iron
machine
ladle
tons
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910751254.XA
Other languages
Chinese (zh)
Inventor
李秀
王建兵
张树江
孟令学
李波
施同新
蒋裕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lu'an Iron And Steel Holding Group Special Steel Co Ltd
Original Assignee
Lu'an Iron And Steel Holding Group Special Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lu'an Iron And Steel Holding Group Special Steel Co Ltd filed Critical Lu'an Iron And Steel Holding Group Special Steel Co Ltd
Priority to CN201910751254.XA priority Critical patent/CN110508761A/en
Publication of CN110508761A publication Critical patent/CN110508761A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C3/00Selection of compositions for coating the surfaces of moulds, cores, or patterns
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D3/00Pig or like casting

Abstract

The invention discloses a kind of quick casting pig techniques of 180 tons of iron packets comprising the steps of: (1) by 310/80t ladle carne, slings ladle and be transported to above pig machine;(2) ladle is hoisted on hydraulic dumping device, starts hydraulic dumping device for iron melt tank, bolt locking, ladle, which starts to topple over cast iron, to be started;(3) start chain belt of pig machine, pig mold travels forward along track, and pig mold fills iron;(4) it opens cooling water progress spraying cooling and waits for that entire chain belt reaches pig machine head, first piece of iron block falls off from pig mold falls into pig iron stockyard, opens head spraying cooling water installations;(5) when pig mold is returned by lower layer, pig machine middle position is marched to, opens slurrying, spraying system;(6) casting pig is oriented to through chute and imports iron block stockyard, and iron block is filled automobile outward transport by forklift.The application can shorten the cast iron period by quick cast iron, reduce labor intensity of workers, increase casting machine operating efficiency, improve yield.

Description

A kind of quick casting pig technique of 180 tons of iron packets
Technical field
The present invention relates to a kind of quick casting pig techniques of 180 tons of iron packets, are applied to molten iron casting iron technology field.
Background technique
Pig machine is to smelt iron a kind of equipment for pig iron of casting in workshop, is made of a series of endless-chain band equipped with casting molds, Iron liquid injects running casting mold one by one at one end, water-spraying control in painting, when reaching cast iron drive end unit chain belt and making counter motion, The iron block of solidification falls off from casting mold automatically.Currently on the market, casting iron craft transformation is directed to tumble dress mainly in pig machine It sets, spray cooling device and relevant scrap build, not being transformed to casting pig process aspect, existing iron-founder The skill period is longer, and the labor intensity of worker is larger, and operating efficiency is not high.
Summary of the invention
To solve the problem above-mentioned, it to include following step that the invention discloses a kind of quick casting pig techniques of 180 tons of iron packets It is rapid:
(1) molten iron that blast fumance comes out is transported to steelshop charging across then in steelshop 310/ with hot-metal ladle and carriage 80t ladle carne is sling ladle and is transported to above pig machine;
(2) ladle is hoisted on hydraulic dumping device, and overhead traveling crane breaks off relations, and comes back for other lifting jobs, while starting molten iron Tank hydraulic dumping device, bolt locking, ladle starts to topple over, and when turning angle is to 25 degree, ladle starts tapping and flow to In Molten iron chute impact zone, when molten iron net weight reaches 2~5 ton hours in chute, chute baffle is pushed aside rapidly, molten iron is equal along slag runner Uniform flow enters in pig machine swage, and cast iron starts;
(3) start chain belt of pig machine, pig mold travels forward along track, keeps chain tape running speed in 8~16m/min, chain belt Frequency control frequency is initially increased to 40HZ from 0, and pig mold fills iron;
(4) 1 section of cooling water valve is opened, 2 ~ 5 pairs of pig molds is filled to pig machine, opens 2~4 sections of cooling water valves, to filling 8 After~10 pairs of pig molds, 5 ~ 6 sections of cooling water valves are opened, reach pig machine head to entire chain belt, first piece of iron block is from cast iron Mould, which falls off, falls into pig iron stockyard, opens head spraying cooling water installations;
(5) when pig mold is returned by lower layer, pig machine middle position is marched to, opens slurrying, spraying system, pig mold inner surface Mortar is sprayed, by the residual heat drying of pig mold, layer protecting film is formed in pig mold inner surface, makes the high temperature liquid iron of casting not It is directly contacted with pig mold, avoids being sintered together, iron block is made to be easy to demould;
(6) casting pig is oriented to through chute and imports iron block stockyard, and iron block is filled automobile by forklift
Outward transport, chute top is equipped with spraying cooling, when the angle of tumbling of hydraulic dumping device reaches 90 °, after 90 ° of zero load of tumbling Hydraulic dumping device resets, and resetting time 2-5min, maximum is tumbled 92 ° of angle=, and 310/80t overhead traveling crane hangs away empty packet to pig machine Lower section designated place, cast iron terminate, after pig machine spraying cooling use leading portion slow cooling, middle section is cold by force, cold mode in back segment.
Further, in above-mentioned steps 1, molten steel quality requires to be tapping temperature >=1480 DEG C;Molten iron Si(%)≤0.45; Molten iron S(%)≤0.045, tapping temperature is measured in blast furnace iron notch, and molten iron can generate temperature during being hoisted to pig machine Drop answers the tapping temperature of strict control molten iron to guarantee that iron packet has higher temperature when cast iron starts.
Further, single iron clad water Weight control is in 120t~180t.
Further, Molten iron chute is mounted in tail steel platform, i.e., hot-metal bottle slips mouth lower section and pig machine driven sprocket Between the pour point of top, the molten iron in ladle is diverted to the pig mold of two upper layer chain belts of pig machine by Molten iron chute It is interior.
Further, remaining scum in cleaning Molten iron chute, builds slag runner using ramming mass reparation, entirely before cast iron starts Clear up repair time requirement≤30min.
Further, pig machine drive control uses variable-frequency governor, and each chain belt is separately controlled, and chain tape running speed is wanted 8-16m/min is sought, controls and requires on station in control room, frequency≤50HZ.
Further, after hydraulic dumping device starting, tipping speed is kept constant, and is at the uniform velocity toppled over, and 0~25 ° of angle of tumbling Used time≤10min, 25~60 ° of used time≤25min, 60~90 ° of used time≤25min.
Further, in above-mentioned steps 5, mortar raw material uses lime, coal slime, and weight is mixed according to 2:1 and is added, according to ash Starching sticky situation can appropriate adjustment ratio.
The technical program is used, the beneficial effects of the present invention are: the application can shorten the cast iron period by quick cast iron, Labor intensity of workers is reduced, casting machine operating efficiency is increased, improves yield.
Detailed description of the invention
The step of Fig. 1 is of the invention a kind of 180 tons of iron packets quick casting pig technique figure;
Fig. 2 is a kind of timing diagram of the quick casting pig technique of 180 tons of iron packets of the invention.
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, tie below Specific embodiment is closed, the present invention is further explained.
Embodiment one: iron wraps 1420 DEG C of platform temperature <, and molten iron temperature is low when cast iron starts comprising the steps of:
(1) every iron clad water net weight requires 150~180t, molten iron Si(%)≤0.45;Molten iron S(%)≤0.045;
(2) cast iron starts 0~5mim, and chain belt electric machine frequency 45HZ is arranged in variable-frequency governor;5~45min electric machine frequency 50HZ;Casting 45~55min of iron later period, electric machine frequency 40HZ;
(3) hydraulic dumping device, angle of tumbling 0~25 ° of used time≤5mim, 25~60 ° of used time≤25mim, 60~90 ° of used times≤ 25mim resets after 90 ° of zero load of tumbling, and 2~5min of resetting time, maximum is tumbled 92 ° of angle=;
(4) pig machine spraying cooling water is opened: 1 section of cooling water valve opens 1/3 after pig mold fills iron, fills 2 ~ 5 pairs to pig machine Pig mold, 2~4 sections of cooling water valves open 1/2, and to after filling 8~10 pairs of pig molds, 5 ~ 6 sections of cooling water valves open 1/2, to whole A chain belt reaches pig machine head, and first piece of iron block falls off from pig mold falls into pig iron stockyard, opens head spraying cooling water Device;
(5) mortar raw material uses lime, coal slime, and weight is mixed according to 2:1 and is added;It is interior according to iron block stripping result in pig mold Surface quality situation adjusts lime, coal slime dosage, guarantees that mortar is not uniform, tacky;
(6) during cast iron, scum in Molten iron chute is cleared up in time, guarantees that molten iron flow is smooth;
(7) it tumbles to hydraulic to 90 °, quantity of slag situation in field observation iron packet starts to be precipitated, cast iron terminates to packet floor iron slag;
(8) within cast iron time control 55mim.
Embodiment two: iron wraps 1480 DEG C of platform temperature >, and molten iron temperature is high when cast iron starts, and includes
Following steps:
(1) every iron clad water net weight requires 150~180t, molten iron Si(%)≤0.45;Molten iron S(%)≤0.045;
(2) cast iron starts 0~5mim, and chain belt electric machine frequency 40HZ is arranged in variable-frequency governor;5~40min electric machine frequency 50HZ;Casting 40~65min of iron later period, electric machine frequency 40HZ;
(3) hydraulic dumping device, angle of tumbling 0~25 ° of used time≤10mim, 25~60 ° of used time≤30mim, 60~90 ° of used times ≤ 30mim resets after 90 ° of zero load of tumbling, and 2~5min of resetting time, maximum is tumbled 92 ° of angle=;
(4) pig machine spraying cooling water is opened: 1 section of cooling water valve opens 1/2 after pig mold fills iron, fills 2 ~ 5 pairs to pig machine Pig mold, 2~4 sections of cooling water valve standard-sized sheets, to after filling 8~10 pairs of pig molds, 5 ~ 6 sections of cooling water valve standard-sized sheets, to entire Chain belt reaches pig machine head, and first piece of iron block falls off from pig mold falls into pig iron stockyard, opens head spraying cooling water dress It sets;
(5) mortar raw material uses lime, coal slime, and weight is mixed according to 2:1 and is added;It is interior according to iron block stripping result in pig mold Surface quality situation adjusts lime, coal slime dosage, guarantees that mortar is not uniform, tacky;
(6) during cast iron, scum in Molten iron chute is cleared up in time, guarantees that molten iron flow is smooth;
(7) it tumbles to hydraulic to 90 °, quantity of slag situation in field observation iron packet starts to be precipitated, cast iron terminates to packet floor iron slag;
(8) within cast iron time control 65mim.
Embodiment three: iron wraps platform temperature at 1420~1480 DEG C, and molten iron temperature is normal when cast iron starts, and includes following step It is rapid:
(1) single iron clad water net weight 150~180t, molten iron Si(%)≤0.45;Molten iron S(%)≤0.045;
(2) cast iron starts 0~5mim, and chain belt electric machine frequency 40HZ is arranged in variable-frequency governor;5~40min electric machine frequency 50HZ;Casting 40~60min of iron later period, electric machine frequency 40HZ;
(3) hydraulic dumping device, angle of tumbling 0~25 ° of used time≤10mim, 25~60 ° of used time≤25mim, 60~90 ° of used times ≤ 25mim resets after 90 ° of zero load of tumbling, and 2~5min of resetting time, maximum is tumbled 92 ° of angle=;
(4) pig machine spraying cooling water is opened: 1 section of cooling water valve opens 1/2 after pig mold fills iron, fills 2 ~ 5 pairs to pig machine Pig mold, 2~4 sections of cooling water valve standard-sized sheets, to after filling 8~10 pairs of pig molds, 5 ~ 6 sections of cooling water valves open 1/2, to whole A chain belt reaches pig machine head, and first piece of iron block falls off from pig mold falls into pig iron stockyard, opens head spraying cooling water Device;
(5) mortar raw material uses lime, coal slime, and weight is mixed according to 2:1 and is added;It is interior according to iron block stripping result in pig mold Surface quality situation adjusts lime, coal slime dosage, guarantees that mortar is not uniform, tacky;
(6) during cast iron, scum in Molten iron chute is cleared up in time, guarantees that molten iron flow is smooth;
(7) it tumbles to hydraulic to 90 °, quantity of slag situation in field observation iron packet starts to be precipitated, cast iron terminates to packet floor iron slag;
(8) within cast iron time control 60mim.
Finally, it should be noted that above embodiments are only to illustrate the present invention and not limit technology described in the invention Scheme;Therefore, although this specification is referring to above-mentioned each embodiment, the present invention has been described in detail, this Field it is to be appreciated by one skilled in the art that still can modify to the present invention or equivalent replacement;And all do not depart from this The technical solution and its improvement of the spirit and scope of invention, should all cover within the scope of the claims of the present invention.

Claims (8)

1. a kind of quick casting pig technique of 180 tons of iron packets, which is characterized in that comprise the steps of:
Molten iron that blast fumance comes out is transported to steelshop charging across then with 310/80t in steelshop with hot-metal ladle and carriage Ladle carne is sling ladle and is transported to above pig machine;
Ladle is hoisted on hydraulic dumping device, and overhead traveling crane breaks off relations, and comes back for other lifting jobs, while starting hot-metal bottle liquid Tipple is pressed, bolt locking, ladle starts to topple over, and when turning angle is to 25 degree, ladle starts tapping and flow to molten iron In chute impact zone, when molten iron net weight reaches 2~5 ton hours in chute, chute baffle is pushed aside rapidly, molten iron is along slag runner uniform flow Enter in pig machine swage, cast iron starts;
Start chain belt of pig machine, pig mold travels forward along track, keeps chain tape running speed in 8~16m/min, chain belt frequency conversion Speed regulation frequency is initially increased to 40HZ from 0, and pig mold fills iron;
Open 1 section of cooling water valve, fill 2 ~ 5 pairs of pig molds to pig machine, open 2~4 sections of cooling water valves, to fill 8~ After 10 pairs of pig molds, 5 ~ 6 sections of cooling water valves are opened, reach pig machine head to entire chain belt, first piece of iron block is from pig mold It falls off and falls into pig iron stockyard, open head spraying cooling water installations;
When pig mold is returned by lower layer, pig machine middle position is marched to, opens slurrying, spraying system, the spray of pig mold inner surface Buttering forms layer protecting film in pig mold inner surface, keeps the high temperature liquid iron of casting not straight by the residual heat drying of pig mold It connects and is contacted with pig mold, avoid being sintered together, iron block is made to be easy to demould;
Casting pig is oriented to through chute and imports iron block stockyard, and iron block is filled automobile by forklift
Outward transport, chute top is equipped with spraying cooling, when the angle of tumbling of hydraulic dumping device reaches 90 °, after 90 ° of zero load of tumbling Hydraulic dumping device resets, and resetting time 2-5min, maximum is tumbled 92 ° of angle=, and 310/80t overhead traveling crane hangs away empty packet to pig machine Lower section designated place, cast iron terminate, after pig machine spraying cooling use leading portion slow cooling, middle section is cold by force, cold mode in back segment.
2. a kind of quick casting pig technique of 180 tons of iron packets according to claim 1,
It is characterized by: molten steel quality requires to be tapping temperature >=1480 DEG C in above-mentioned steps 1;Molten iron Si(%)≤0.45;Iron Water S(%)≤0.045.
3. a kind of quick casting pig technique of 180 tons of iron packets according to claim 1,
It is characterized by: single iron clad water Weight control is in 120t~180t.
4. a kind of quick casting pig technique of 180 tons of iron packets according to claim 1,
It is characterized by: Molten iron chute is mounted in tail steel platform, i.e., hot-metal bottle slips below mouth and on pig machine driven sprocket Between the pour point of side, the molten iron in ladle is diverted in the pig mold of two upper layer chain belts of pig machine by Molten iron chute.
5. a kind of quick casting pig technique of 180 tons of iron packets according to claim 1,
It is characterized by: cast iron clears up remaining scum in Molten iron chute before starting, slag runner is built using ramming mass reparation, it is entire clear Manage repair time requirement≤30min.
6. a kind of quick casting pig technique of 180 tons of iron packets according to claim 1,
It is characterized by: pig machine drive control uses variable-frequency governor, each chain belt is separately controlled, the requirement of chain tape running speed 8-16m/min is controlled on station in control room and is required, frequency≤50HZ.
7. a kind of quick casting pig technique of 180 tons of iron packets according to claim 1,
It is characterized by: tipping speed is kept constant, and is at the uniform velocity toppled over after hydraulic dumping device starting, 0~25 ° of angle of tumbling with When≤10min, 25~60 ° of used time≤25min, 60~90 ° of used time≤25min.
8. a kind of quick casting pig technique of 180 tons of iron packets according to claim 1,
It is characterized by: mortar raw material uses lime, coal slime, and weight is mixed according to 2:1 and is added, according to mortar in above-mentioned steps 5 Sticky situation can appropriate adjustment ratio.
CN201910751254.XA 2019-08-15 2019-08-15 A kind of quick casting pig technique of 180 tons of iron packets Pending CN110508761A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910751254.XA CN110508761A (en) 2019-08-15 2019-08-15 A kind of quick casting pig technique of 180 tons of iron packets

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910751254.XA CN110508761A (en) 2019-08-15 2019-08-15 A kind of quick casting pig technique of 180 tons of iron packets

Publications (1)

Publication Number Publication Date
CN110508761A true CN110508761A (en) 2019-11-29

Family

ID=68625140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910751254.XA Pending CN110508761A (en) 2019-08-15 2019-08-15 A kind of quick casting pig technique of 180 tons of iron packets

Country Status (1)

Country Link
CN (1) CN110508761A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113680956A (en) * 2020-05-19 2021-11-23 中冶宝钢技术服务有限公司 Guniting material for cast iron process, manufacturing method thereof and cast iron process

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000271702A (en) * 1999-03-26 2000-10-03 Kawasaki Steel Corp Production of molded pig iron
JP2000271703A (en) * 1999-03-26 2000-10-03 Kawasaki Steel Corp Pig iron casting machine
EP1881082A1 (en) * 2006-07-20 2008-01-23 Linde Aktiengesellschaft Method of cooling magnesium castings
JP4276362B2 (en) * 2000-07-05 2009-06-10 新日本製鐵株式会社 Manufacturing method of casting mold
CN101758172A (en) * 2009-11-25 2010-06-30 世林(漯河)冶金设备有限公司 High-efficiency long-life safety rolling-wheel fixed casting machine
KR20100127566A (en) * 2009-05-26 2010-12-06 현대제철 주식회사 Method of producing pig iron ingot
CN201791919U (en) * 2010-09-30 2011-04-13 黄石新兴管业有限公司 Pig machine for casting spheroidized iron
KR20110098151A (en) * 2010-02-26 2011-09-01 현대제철 주식회사 Mold for pig casting machine
CN202045346U (en) * 2011-04-27 2011-11-23 辽宁鼎世达冶金设备制造有限公司 Ferroalloy granule casting machine
KR20120061270A (en) * 2010-12-03 2012-06-13 주식회사 포스코 Pig casting machine and method for manufacturing cold pig iron using the same
CN102909361A (en) * 2012-11-14 2013-02-06 北京首钢国际工程技术有限公司 Hot-metal bottle tipping device with weighing

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000271702A (en) * 1999-03-26 2000-10-03 Kawasaki Steel Corp Production of molded pig iron
JP2000271703A (en) * 1999-03-26 2000-10-03 Kawasaki Steel Corp Pig iron casting machine
JP4276362B2 (en) * 2000-07-05 2009-06-10 新日本製鐵株式会社 Manufacturing method of casting mold
EP1881082A1 (en) * 2006-07-20 2008-01-23 Linde Aktiengesellschaft Method of cooling magnesium castings
KR20100127566A (en) * 2009-05-26 2010-12-06 현대제철 주식회사 Method of producing pig iron ingot
CN101758172A (en) * 2009-11-25 2010-06-30 世林(漯河)冶金设备有限公司 High-efficiency long-life safety rolling-wheel fixed casting machine
KR20110098151A (en) * 2010-02-26 2011-09-01 현대제철 주식회사 Mold for pig casting machine
CN201791919U (en) * 2010-09-30 2011-04-13 黄石新兴管业有限公司 Pig machine for casting spheroidized iron
KR20120061270A (en) * 2010-12-03 2012-06-13 주식회사 포스코 Pig casting machine and method for manufacturing cold pig iron using the same
CN202045346U (en) * 2011-04-27 2011-11-23 辽宁鼎世达冶金设备制造有限公司 Ferroalloy granule casting machine
CN102909361A (en) * 2012-11-14 2013-02-06 北京首钢国际工程技术有限公司 Hot-metal bottle tipping device with weighing

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中国冶金百科全书总编辑委员会《冶金建设》卷编辑委员会等: "《中国冶金百科全书 冶金建设(上)》", 31 January 1999 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113680956A (en) * 2020-05-19 2021-11-23 中冶宝钢技术服务有限公司 Guniting material for cast iron process, manufacturing method thereof and cast iron process

Similar Documents

Publication Publication Date Title
CN110923394B (en) Steelmaking apparatus and steelmaking method
CN100424189C (en) Method for reclaiming and cyclic utilizing residue molten steel slag in steel making
CN103447482B (en) A kind of quantitative automatic casting machine of biserial chain type
CN106513658A (en) High-efficiency and energy-saving aluminum alloy evaporative pattern casting production line
CN206382557U (en) Energy-efficient aluminium alloy lost foam foundry production line
CN108421969B (en) Automatic casting system
CN110508761A (en) A kind of quick casting pig technique of 180 tons of iron packets
CN103350211B (en) Full-automatic die casting production line for granulated die casting part with corners after die casting
CN114317870A (en) Method for directly returning hot-state casting residue to converter
CN209334677U (en) A kind of two-wire continuous casting system
CN110756777B (en) Foamed aluminum production process line and production process thereof
CN109304434A (en) A kind of two-wire continuous casting system and the method for controlling two-wire continuous casting system
CN113798450B (en) Automatic pouring system for casting process
CN207138842U (en) Hypsokinesis is skimmed pouring ladle
CN205996135U (en) Coloured light metal plate ingot continuous casting apparatus
CN211135488U (en) Foamed aluminum production process line
US3502313A (en) Steel producing plant with umbilically operative furnace top means
CN209555265U (en) A kind of liquid slag device without interruption
CN109226729B (en) Device and method for realizing continuous casting of vacuum induction furnace
CN213162973U (en) High-purity pig iron scheduling and casting system for smelting reduction process
CN214867246U (en) Copper mold casting system
CN111041154B (en) Slag-iron separation device on slag conveyor and use method thereof
CN104911285B (en) The processing method of slag more than a kind of casting
CN219852045U (en) Zinc ingot integrated production line
CN218026198U (en) Ladle jetting desulfurization mechanism

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191129