- CN110504637A CN110504637A CN201910884389.3A CN201910884389A CN110504637A CN 110504637 A CN110504637 A CN 110504637A CN 201910884389 A CN201910884389 A CN 201910884389A CN 110504637 A CN110504637 A CN 110504637A
- Authority
- CN
- China
- Prior art keywords
- voltage
- box
- mechanical lock
- switch
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E05—LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
- E05B—LOCKS; ACCESSORIES THEREFOR; HANDCUFFS
- E05B15/00—Other details of locks; Parts for engagement by bolts of fastening devices
-
- E—FIXED CONSTRUCTIONS
- E05—LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
- E05B—LOCKS; ACCESSORIES THEREFOR; HANDCUFFS
- E05B63/00—Locks or fastenings with special structural characteristics
- E05B63/14—Arrangement of several locks or locks with several bolts, e.g. arranged one behind the other
- E05B63/143—Arrangement of several locks, e.g. in parallel or series, on one or more wings
-
- E—FIXED CONSTRUCTIONS
- E05—LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
- E05B—LOCKS; ACCESSORIES THEREFOR; HANDCUFFS
- E05B65/00—Locks or fastenings for special use
- E05B65/46—Locks or fastenings for special use for drawers
- E05B65/462—Locks or fastenings for special use for drawers for two or more drawers
-
- E—FIXED CONSTRUCTIONS
- E05—LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
- E05B—LOCKS; ACCESSORIES THEREFOR; HANDCUFFS
- E05B65/00—Locks or fastenings for special use
- E05B65/52—Other locks for chests, boxes, trunks, baskets, travelling bags, or the like
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B11/00—Switchgear having carriage withdrawable for isolation
- H02B11/02—Details
- H02B11/10—Indicating electrical condition of gear; Arrangement of test sockets
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B11/00—Switchgear having carriage withdrawable for isolation
- H02B11/12—Switchgear having carriage withdrawable for isolation with isolation by horizontal withdrawal
- H02B11/127—Withdrawal mechanism
- H02B11/133—Withdrawal mechanism with interlock
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Structural Engineering (AREA)
- Patch Boards (AREA)
Abstract
本发明公开了一种具有主动安保功能的高压远供电源设备及互锁防护方法,包括:多组电源变换器;通过背板进而与电源变换器电连接的电子负载;与电源变换器相配合的高压输出段;电缆终端盒;电源配电盒;机柜,其底部设置有底层空盒;所述电源配电盒被配置为包括多路电源输出,每路电源输出通过的断路器实现输出状态的切换;各路电源输出根据其连接设备电流大小划分主断路器组、副断路器;所述主断路器上设置有第一机械锁;所述第一机械锁的转杆下方通过枢接的曲柄连接有滑板。本发明提供一种具有主动安保功能的高压远供电源设备,其能够通过电源配电盒的结构设计,变被动防护为主动防护,以具有更高的安全性能。
The invention discloses a high-voltage remote power supply device with an active security function and an interlocking protection method, comprising: multiple sets of power converters; electronic loads electrically connected to the power converters through a backboard; cooperating with the power converters The high-voltage output section of the cable terminal box; the power distribution box; the cabinet, the bottom of which is provided with a bottom empty box; the power distribution box is configured to include multiple power outputs, and each power output passes through the circuit breaker to achieve the output state switching; each power supply output is divided into main circuit breaker group and auxiliary circuit breaker according to the current size of the connected equipment; the main circuit breaker is provided with a first mechanical lock; The crank is connected with a slide plate. The invention provides a high-voltage remote power supply device with an active security function, which can change passive protection into active protection through the structural design of a power distribution box, so as to have higher safety performance.
Description
技术领域technical field
本发明涉及高压供电领域。更具体地说,本发明涉及一种具有主动安保功能的高压远供电源设备及互锁防护方法。The invention relates to the field of high-voltage power supply. More specifically, the present invention relates to a high-voltage remote power supply device with an active security function and an interlock protection method.
背景技术Background technique
高压远供电源设备是指输入低压直流(如±48V)或交流(如~220V或~380V)经电源变换后输出直流电压数千伏或者数万伏,输出功率数千瓦或者数万瓦的恒压或恒流远程供电系统。而由于高压远供电源输出的直流电压很高,具有很大的安全危害性,故设备检修时严格禁止维修人员带电操作,避免发生触电事故,影响操作人员生命健康。High-voltage remote power supply equipment refers to input low-voltage DC (such as ±48V) or AC (such as ~220V or ~380V) after power conversion, output DC voltage of thousands of volts or tens of thousands of volts, and output power of thousands of watts or tens of thousands of watts. Voltage or constant current remote power supply system. However, because the DC voltage output by the high-voltage remote power supply is very high, it has great safety hazards. Therefore, it is strictly forbidden for maintenance personnel to operate with power on during equipment maintenance, so as to avoid electric shock accidents and affect the life and health of operators.
而现有的高压远供电源设备在设备检修时,其安全防护取决取操作人员的安全防护意识,无法实现主动防护以保证操作人员的安全,现有技术中通常是通过断路器来实现高压供电源设备各部件的断电,以实现安全防护,但其断路器中各手柄的工作状态无法控制,进而会在现场出现误操作时,发生触电事故,造成人员伤亡,为了杜绝这一现象的发生,这就需要通过后期的研究,使高压远供电源设备具有安全保护装置,来赋予高压远供电源设备检修时的主动安全保护功能。However, when the existing high-voltage remote power supply equipment is overhauled, its safety protection depends on the safety protection awareness of the operator, and it is impossible to realize active protection to ensure the safety of the operator. In the prior art, the high-voltage power supply is usually realized through a circuit breaker The components of the power supply equipment are cut off to achieve safety protection, but the working status of each handle in the circuit breaker cannot be controlled, and then when misoperation occurs on site, electric shock accidents will occur, causing casualties. In order to prevent this phenomenon from happening , which requires later research to make the high-voltage remote power supply equipment have safety protection devices to endow the high-voltage remote power supply equipment with active safety protection functions during maintenance.
发明内容Contents of the invention
本发明的一个目的是解决至少上述问题和/或缺陷,并提供至少后面将说明的优点。An object of the present invention is to solve at least the above problems and/or disadvantages and to provide at least the advantages as will be described hereinafter.
本发明还有一个目的是提供一种具有主动安保功能的高压远供电源设备,其能够通过电源配电盒的结构设计,通过第一机械锁与滑板的结构设计,使得第一机械锁中的钥匙拔出后,第一机械锁的锁芯则不能转动,导致滑板不能再向上滑动,这样就卡住断路器的手柄不能上扳,这样互锁曲柄滑板机构就保证了检修设备必须关闭电源配电盒的主断路器,变被动防护为主动防护,以具有更高的安全性能。Another object of the present invention is to provide a high-voltage remote power supply device with active security function, which can make the first mechanical lock through the structural design of the power distribution box and the structural design of the first mechanical lock and the slide plate. After the key is pulled out, the lock cylinder of the first mechanical lock cannot be rotated, causing the slide plate to no longer slide upwards, so that the handle of the circuit breaker cannot be pulled up, and the interlocking crank slide mechanism ensures that the maintenance equipment must be powered off. The main circuit breaker of the electrical box is changed from passive protection to active protection to have higher safety performance.
为了实现根据本发明的这些目的和其它优点,提供了一种具有主动安保功能的高压远供电源设备,包括:In order to achieve these objects and other advantages according to the present invention, a high-voltage remote power supply device with an active security function is provided, including:
用于将低压的直流或交流变换成数千伏或者数万伏直流高压输出的多组电源变换器;Multiple sets of power converters for converting low-voltage DC or AC into thousands of volts or tens of thousands of volts of DC high-voltage output;
通过背板进而与电源变换器电连接,以检测设备高压输出的电子负载;Through the backplane and then electrically connected to the power converter to detect the electronic load of the high-voltage output of the device;
与电源变换器相配合实现向电缆供电的高压输出段;Cooperate with the power converter to realize the high-voltage output section that supplies power to the cable;
用于将电缆正负极、电缆保护地、站点地接入的电缆终端盒;The cable terminal box used to connect the positive and negative poles of the cable, the cable protection ground and the site ground;
为电子负载、电源变换器、本地控制单元、DCD I/O组件盒供电的电源配电盒;Power distribution box for electronic load, power converter, local control unit, DCD I/O component box;
用于对设备组件进行封装的机柜,其底部设置有连接高压输出段和电缆终端盒,且在拉出后能将电缆和高压输出彻底断开的底层空盒;The cabinet used for encapsulating equipment components has a bottom empty box that connects the high-voltage output section and the cable terminal box, and can completely disconnect the cable and the high-voltage output after being pulled out;
其中,所述电源配电盒被配置为包括至少一组输入电源,每组输入电源被被配置为采用多路电源输出,每路电源输出通过相配合的断路器实现输出状态的切换;Wherein, the power distribution box is configured to include at least one group of input power sources, each group of input power sources is configured to adopt multiple power outputs, and each power output can switch the output state through a matched circuit breaker;
各路电源输出根据其连接设备电流大小划分主断器组、副断路器;The output of each power supply is divided into main breaker group and auxiliary circuit breaker according to the current size of the connected equipment;
所述主断路器上设置有相配合的封装面板,所述封装面板上设置有第一机械锁;The main circuit breaker is provided with a matching packaging panel, and the packaging panel is provided with a first mechanical lock;
所述第一机械锁的转杆下方通过枢接的曲柄连接有滑板,所述封装面板上相对设置有可供滑板上下滑动的滑槽,以在第一机械锁转动时,通过滑板的上下运动,对主断路器的工作状态进行干涉。A slide plate is connected to the bottom of the rotating rod of the first mechanical lock through a pivoted crank, and a chute for the slide plate to slide up and down is arranged on the packaging panel, so that when the first mechanical lock rotates, the slide plate moves up and down. , to interfere with the working state of the main circuit breaker.
优选的是,其中,各所述电源变换器通过相配合的双路高压真空继电器来实现输出方向的控制,向上对电子负载供电,向下通过高压输出段对电缆供电;Preferably, each of the power converters controls the output direction through a matched dual-channel high-voltage vacuum relay, supplies power to the electronic load upward, and supplies power to the cable downward through the high-voltage output section;
各电源变换器、电子负载的面板上分别设置有对其电源通断状态进行切换的第一开关。The panels of the power converters and electronic loads are respectively provided with first switches for switching the on-off states of their power supplies.
优选的是,其中,所述机柜包括机架以及通过可拆卸方式设置于机架各侧面的侧板;Preferably, wherein, the cabinet includes a rack and side panels that are detachably arranged on each side of the rack;
所述电子负载、电源变换器、本地控制单元、高压输出段、底层空盒分别通过相配合的第一滑轨设置在机架正面;The electronic load, the power converter, the local control unit, the high-voltage output section, and the empty box at the bottom are respectively arranged on the front of the rack through the matching first slide rails;
所述电缆终端盒通过第二滑轨设置在机架背面,且机架背面还分别通过相配合的第三滑轨设置有高压汇接盒、电源配电盒、DCD I/O组件盒,电源输入/高压输出接线盒;The cable terminal box is arranged on the back of the rack through the second slide rail, and the back of the rack is also provided with a high-voltage junction box, a power distribution box, a DCD I/O component box, a power supply Input/high voltage output junction box;
所述机架上的各部件通过相配合的安装螺钉进而与机架实现可拆卸连接,所述机架在与各部件安装螺钉相配合的位置上,设置有与DCD I/O组件盒连接,以对安装螺钉状态位置进行监测的第二开关;Each component on the frame is detachably connected to the frame through matching mounting screws, and the frame is provided with a DCD I/O component box at a position matched with the mounting screws of each component, A second switch for monitoring the state and position of the mounting screws;
所述电源变换器、电子负载对应面板上的安装螺钉还设置有对其位置状态进行监测的第三开关;The mounting screws on the panels corresponding to the power converter and the electronic load are also provided with a third switch for monitoring their position and state;
所述DCD I/O组件盒通信连接至本地控制单元,所述本地控制单元分别通信连接至各电源变换器的高压开关管以及高压真空继电器。The DCD I/O component box is communicatively connected to a local control unit, and the local control unit is respectively communicatively connected to the high-voltage switch tube and the high-voltage vacuum relay of each power converter.
优选的是,其中,所述高压输出段被配置为包括:Preferably, wherein, the high-voltage output section is configured to include:
用于将多组电源变换器输出高压进行汇接形成一组高压输出,并对高压输出进行极性转换、整流滤波、测量的上段;It is used to connect multiple sets of high voltage output of power converters to form a set of high voltage output, and perform polarity conversion, rectification and filtering, and measurement of the high voltage output;
用于将输出高压与电缆的汇接,将电缆保护地与站点地进行转换,以及对电缆电压进行测量的下段;It is used to connect the output high voltage to the cable, convert the cable protection ground to the station ground, and measure the cable voltage;
其中,所述上段被配置为包括:Wherein, the above paragraph is configured to include:
第一箱体,其上设置有对输出高压进行极性转换的极性开关;The first box is provided with a polarity switch for polarity conversion of the output high voltage;
用于对极性开关的安装位置进行封装的铰链翻盖,所述铰链翻盖内侧壁错开极性开关的一侧上设置有测量板,以及对铰链翻盖的打开状态进行监测的第四开关;A hinge flip cover for encapsulating the installation position of the polarity switch, a measurement board is provided on the side of the inner wall of the hinge flip cover staggered from the polarity switch, and a fourth switch for monitoring the opening state of the hinge flip cover;
设置在铰链翻盖上的第二机械锁。Secondary mechanical lock on hinged flap.
优选的是,其中,所述下段被配置为包括:Preferably, wherein, the lower paragraph is configured to include:
第二箱体,其底座上通过第四滑轨安装有开关抽屉盒和测试抽屉盒;The second box, the switch drawer box and the test drawer box are installed on the base through the fourth slide rail;
设置于第二箱体内部并与开关抽屉盒、测试抽屉盒相对应的支架;A bracket arranged inside the second box body and corresponding to the switch drawer box and the test drawer box;
安装在支架上,并与测试抽屉盒后端相配合的第一弹簧短路器;Installed on the bracket and matched with the first spring short circuit at the rear end of the test drawer;
其中,所述开关抽屉盒、测试抽屉盒在与支架相配合的一端上分别设置有第一六芯高压插头,第二六芯高压插头,所述支架上分别设置有与第一六芯高压插头、第二六芯插头相配合的六芯高压插座;Wherein, the switch drawer box and the test drawer box are respectively provided with a first six-pin high-voltage plug and a second six-pin high-voltage plug on one end matched with the bracket, and the bracket is respectively provided with a first six-pin high-voltage plug. , The six-core high-voltage socket matched with the second six-core plug;
所述第一六芯插头中的六个内导体通过第一高压电缆实现两两连接,构成一组高压+,一组高压-,一组能通过DCD I/O检测开关抽屉盒位置状态的第五开关;The six inner conductors in the first six-core plug are connected in pairs through the first high-voltage cable, forming a set of high-voltage +, a set of high-voltage-, and a set of second conductors that can detect the position status of the switch drawer box through DCD I/O. five switches;
所述第二六芯插头中的两个内导体分别通过第二高压电缆分别与高压连接座上的两个高压插座连接,另外两个内导体通过第三高压电缆互连,构成能通过DCD I/O检测测试抽屉盒位置状态的第六开关;The two inner conductors in the second six-pin plug are respectively connected to the two high-voltage sockets on the high-voltage connection seat through the second high-voltage cable, and the other two inner conductors are interconnected through the third high-voltage cable, forming a structure that can pass through the DCD I /O detects the sixth switch that tests the position status of the drawer box;
所述第一弹簧短路器通过第一顶杆与测试抽屉盒接触,以在测试抽屉盒拉出第一顶杆阻力消除时,弹簧释放后第一弹簧短路器的所有电极全部与金属簧片接触而短路;并在测试抽屉盒推入第一顶杆顶起时,带动第一弹簧短路器的电极全部与金属簧片脱离就结束短路;The first spring short circuit is in contact with the test drawer box through the first push rod, so that when the resistance of the test drawer box is pulled out of the first push rod, all electrodes of the first spring short circuit contact with the metal reed after the spring is released. and short circuit; and when the test drawer box is pushed into the first ejector rod and jacked up, the electrodes of the first spring short circuit are all separated from the metal reed and the short circuit is ended;
所述开关抽屉盒上第一前板在与测试抽屉盒上第二前板相接触的一端具有延伸的止挡部,所述第二前板在与止挡部相配合的位置上设置有延伸的卡止部,以使二者在空间上构成阻挡式结构,所述开关抽屉盒、测试抽屉盒分别通过设置在第二箱体上的第三机械锁、第一压缩把手进而固定。The first front plate on the switch drawer box has an extended stopper at one end in contact with the second front plate on the test drawer box, and the second front plate is provided with an extended stopper at a position matched with the stopper. The latching part of the box is used to make the two form a blocking structure in space. The switch drawer box and the test drawer box are respectively fixed by the third mechanical lock and the first compression handle arranged on the second box body.
优选的是,其中,所述底层空盒与高压输出段、电缆终端盒分别通过相配合的第一矩形连接器、第二矩形连接器实现三者的盲插连接导通;Preferably, wherein, the bottom empty box, the high-voltage output section, and the cable terminal box respectively realize the blind-mating connection conduction of the three through the matched first rectangular connector and the second rectangular connector;
所述电子负载、电源变换器上的高压插头和电源信号插座,分别通过背板上相配合的高压插座和电源信号插头,进而实现电子负载、电源变换器的带电盲插,所述机柜在与电源变换器、电源负载相配合的安装位上方设置有活动的铰链门;The high-voltage plugs and power signal sockets on the electronic load and the power converter pass through the matching high-voltage sockets and power signal plugs on the backboard respectively, so as to realize the live blind insertion of the electronic load and the power converter. There is a movable hinged door above the matching installation position of the power converter and power load;
其中,所述第一矩形连接器被配置为包括设置在高压输出端的插座安装座,以及设置在底层空盒上插头安装座;Wherein, the first rectangular connector is configured to include a socket mounting seat provided at the high-voltage output end, and a plug mounting seat provided on the bottom empty box;
所述底层空盒上设置有与插头安装座相配合的安装槽,以使底层空盒与高压输出段的连接配合在空间上构成阻挡式结构;The bottom empty box is provided with a mounting groove matching with the plug mounting seat, so that the connection between the bottom empty box and the high-voltage output section forms a blocking structure in space;
所述铰链门被配置为包括:与机架相配合的安装架,设置在安装架上的转轴以及设置在转轴上的门体;The hinged door is configured to include: a mounting frame matched with the frame, a rotating shaft disposed on the mounting frame, and a door body disposed on the rotating shaft;
所述转轴上设置有与DCD I/O组件盒通信连接的旋转开关。A rotary switch communicatively connected with the DCD I/O component box is arranged on the rotating shaft.
优选的是,其中,所述电缆终端盒被配置为包括:Preferably, wherein, the cable terminal box is configured to include:
第三箱体,其一侧设置有门体,另一侧设置有电流检测组件;The third box body is provided with a door body on one side and a current detection component on the other side;
通过安装架分别设置在第三箱体内,并与门体、底层空盒位置相对应的第二弹簧短路器;The second spring circuit breaker is respectively arranged in the third box through the installation frame and corresponds to the position of the door body and the bottom empty box;
其中,所述门体通过相配合的第二压缩把手进而固定在第三箱体上;Wherein, the door body is further fixed on the third box body through the matched second compression handle;
所述第二弹簧短路器分别通过相配合的第二顶杆进而与门体、底层空盒相接触,以在拉出底层空盒、拔出门体时使弹簧短路器上的电缆+、电缆-、电缆保护地、站点地全部短路,实现接地保护。The second spring short-circuiter contacts the door body and the bottom empty box respectively through the matching second ejector rod, so that the cables + and cables on the spring short-circuiter -, the cable protection ground and the site ground are all short-circuited to achieve ground protection.
优选的是,其中,还包括套一、套二、套三共三套不同型号的机械锁;Preferably, among them, it also includes three sets of mechanical locks of different types: set 1, set 2, and set 3;
其中,所述套一被配置为包括:三把分别设置在电源配电盒封装面板上,高压输出段下段,以及测试抽屉盒内的第一机械锁,第三机械锁,第四机械锁;Wherein, the set one is configured to include: three mechanical locks respectively arranged on the packaging panel of the power distribution box, the lower part of the high-voltage output section, and the first mechanical lock, the third mechanical lock, and the fourth mechanical lock in the test drawer box;
所述套二被配置为包括:三把分别设置在输出段上段的铰链翻盖,机柜后门、输出段下段开关抽屉盒内的第二机械锁,第五机械锁,第六机械锁;The second set is configured to include: three hinged flip covers respectively arranged on the upper section of the output section, the second mechanical lock, the fifth mechanical lock, and the sixth mechanical lock in the cabinet rear door and the switch drawer box at the lower section of the output section;
所述套三被配置为包括一把位于输出段下段的测试抽屉盒内的第七机械锁;said set three is configured to include a seventh mechanical lock located in the test drawer box in the lower section of the output section;
所述套一、套二、套三分别通过相配合的第一钥匙、第二钥匙、第三钥匙完成解锁操作,在设备处于运行状态中,第一钥匙被配置在第三机械锁上,第二钥匙被配置在输出段下段的开关抽屉盒内,第三钥匙放置在预定位置。The set 1, set 2, and set 3 are respectively unlocked by the matching first key, second key, and third key. When the device is in operation, the first key is configured on the third mechanical lock, and the second key is configured on the third mechanical lock. The second key is arranged in the switch drawer box of the lower part of the output section, and the third key is placed in a predetermined position.
一种应用高压远供电源设备进行互锁防护的方法,在高压远供电源设备检修时,互锁防护方法被配置为包括:A method for interlock protection using high-voltage remote power supply equipment. When the high-voltage remote power supply equipment is overhauled, the interlock protection method is configured to include:
S10,电源配电盒上主断路器上的所有手柄均被配置为下扳关断状态,转动封装面板上第一机械锁中的第一钥匙,以通过锁芯的转动带动曲柄作上下伸缩,进一步带动滑板向下运动,进而在第一机械锁的锁定位置,使得滑板刚好卡住主断路器的各手柄,使各主断路器手柄在滑板的作用下处于锁死状态,而不能向上扳动;S10, all the handles on the main circuit breaker on the power distribution box are configured to be turned down and turned off. Turn the first key in the first mechanical lock on the package panel to drive the crank to expand and contract up and down through the rotation of the lock cylinder. Further drive the sliding plate to move downward, and then at the locked position of the first mechanical lock, the sliding plate just blocks the handles of the main circuit breaker, so that the handles of the main circuit breaker are in a locked state under the action of the sliding plate and cannot be pulled upward. ;
S11,拔出第一机械锁上的第一钥匙,用第一钥匙解锁高压输出段下段上的第三机械锁,配合扳动第一压缩把手,将开关抽屉盒和测试抽屉盒全部拉出,并在二者拉出到位后使得其上分别对应的第一六芯高压插头,第二六芯高压插头,与支架上的六芯高压插座处于断开状态,转动第三机械锁上的第一钥匙将开关抽屉锁住,进而使设备处于检修状态。S11, pull out the first key on the first mechanical lock, use the first key to unlock the third mechanical lock on the lower part of the high-voltage output section, cooperate with the first compression handle to pull out the switch drawer box and the test drawer box, And after the two are pulled out in place, the corresponding first six-core high-voltage plug and the second six-core high-voltage plug are disconnected from the six-core high-voltage socket on the bracket, and the first one on the third mechanical lock is rotated. The key locks the switch drawer, thereby keeping the unit in service.
优选的是,其中,用于电缆高压测试时的互锁防护方法被配置为包括:Preferably, wherein, the interlock protection method used for cable high-voltage testing is configured to include:
S20,拔出高压输出段下段第三机械锁上的第一钥匙,以解锁测试抽屉盒内高压连接器座上的第四机械锁,进而通过第四机械锁上锁撇的转动,使高压连接器座和开关抽屉盒分离;S20, pull out the first key on the third mechanical lock in the lower section of the high-voltage output section to unlock the fourth mechanical lock on the high-voltage connector seat in the test drawer box, and then turn the lock on the fourth mechanical lock to make the high-voltage connection The device seat is separated from the switch drawer box;
S20,从预定位置上拿到第三锁匙,以解锁测试抽屉盒内的第七机械锁,以使高压连接器座在压簧的作用下滑动到测试抽屉盒的最右边,进而使高压连接器座上的插座孔与测试抽屉盒面板的测试孔对齐;S20, get the third lock key from the predetermined position to unlock the seventh mechanical lock in the test drawer box, so that the high-voltage connector seat slides to the far right of the test drawer box under the action of the pressure spring, so that the high-voltage connector The socket hole on the seat is aligned with the test hole on the test drawer panel;
S21,推进并用第一压缩把手关闭测试抽屉盒进行电缆高压测试,并在测试后扳动第一压缩把手,使得测试抽屉盒在弹簧短路器上顶杆的作用下滑出,弹簧短路器处于短路保护状态,重新锁定第四机械锁、第七机械锁,使得设备重新处于检修状态;S21, advance and use the first compression handle to close the test drawer box for cable high-voltage test, and pull the first compression handle after the test, so that the test drawer box will slide out under the action of the spring short-circuiter upper rod, and the spring short-circuiter is under short-circuit protection state, re-lock the fourth mechanical lock and the seventh mechanical lock, so that the equipment is in the maintenance state again;
在打开机柜后门和输出段上段的铰链翻盖进行其他操作时,其互锁防护方法被配置为包括:When opening the cabinet rear door and the hinged flap of the upper section of the output section for other operations, its interlocking protection method is configured to include:
S30,设备在处于检修状态时,拿出开关抽屉盒中的第二钥匙,转动第二钥匙使第六机械锁处于锁定状态,并将第二钥匙拔出以使开关抽屉盒不能被推回去;S30, when the equipment is in the maintenance state, take out the second key in the switch drawer box, turn the second key to make the sixth mechanical lock in the locked state, and pull out the second key so that the switch drawer box cannot be pushed back;
S31,采用第二钥匙打开铰链翻盖上的第二机械锁,进行极性开关的相关操作,或打开后门上的第五机械锁进行其他操作。S31, using the second key to unlock the second mechanical lock on the hinged cover to perform related operations on the polarity switch, or unlock the fifth mechanical lock on the rear door to perform other operations.
本发明至少包括以下有益效果:其一,本发明通过设置高压远供电源设备的各部件,使得其能将低压直流(如±48V)或交流(如~220V或~380V)变换成数千伏或者数万伏的直流高压输出,向上对电子负载供电,向下通过输出段对电缆供电,实现远端供电的需要。The present invention at least includes the following beneficial effects: First, the present invention enables it to convert low-voltage direct current (such as ±48V) or alternating current (such as ~220V or ~380V) into thousands of volts by arranging the components of the high-voltage remote power supply equipment Or tens of thousands of volts of DC high-voltage output, supplying power to the electronic load upwards, and supplying power to the cable through the output section downwards, so as to realize the need of remote power supply.
其二,本发明通过电源配电盒的结构设计,通过第一机械锁与滑板的结构设计,使得第一机械锁中的钥匙拔出后,第一机械锁的锁芯则不能转动,导致滑板不能再向上滑动,这样就卡住断路器的手柄不能上扳,这样互锁曲柄滑板机构就保证了检修设备必须关闭电源配电盒的主断路器,变被动防护为主动防护,以具有更高的安全性能。Its two, the present invention through the structural design of power distribution box, through the structural design of first mechanical lock and slide plate, after the key in the first mechanical lock is pulled out, the lock cylinder of the first mechanical lock then can not rotate, causes slide plate Can no longer slide upwards, so that the handle of the circuit breaker is stuck and cannot be pulled up, so that the interlocking crank slide mechanism ensures that the maintenance equipment must turn off the main circuit breaker of the power distribution box, changing passive protection into active protection, so as to have higher safety performance.
其三,本发明通过在机柜各部件的安装螺钉,电子负载、电源变换器面板上的安装螺钉上分别设置对就的状态监测用开关,对设备的位置信息进行主动监测,以在其脱离预定位置时,对其部件的工作状态进行切换,以使其实现主动的安全防护。Third, the present invention actively monitors the position information of the equipment by setting the corresponding state monitoring switches on the mounting screws of the components of the cabinet, the mounting screws of the electronic load, and the power converter panel respectively, so as to prevent the position information of the equipment from being scheduled. When it is in the position, switch the working state of its components so that it can realize active safety protection.
其四,本发明通过在高压输出段下段、电缆终端盒上分别设置对应的弹簧短路器,以在设备部件位置发生变换时,对其连接状态、接地状态进行转化,以保证其处于安全的工作环境下,实现主动防护的功能。Fourth, the present invention sets corresponding spring circuit breakers respectively on the lower part of the high-voltage output section and the cable terminal box, so that when the position of the equipment components is changed, the connection state and the grounding state are transformed to ensure that they are in a safe working state. Under the environment, realize the function of active protection.
其五,本发明通过部件上多套锁的结构设计,配合相应的部件,使得其结构之间的工作流程之间具有一定的干涉,进而实现设备之间的互锁防护,变原有的无防护功能为互锁主动防护,具有更好的安全系数,Fifth, the present invention cooperates with the corresponding components through the structural design of multiple sets of locks on the components, so that there is a certain interference between the work processes between the structures, and then realizes the interlock protection between the equipment, and changes the original non-functional The protection function is interlocking active protection, which has a better safety factor,
总之,本发明是通过各种状态监测开关、互锁和弹簧短路器、DCD I/O组件盒、本地控制单元,以及电源负载、电源变换器背板盲插、活动铰链门的遮蔽等装置的共同作用,赋予高压远供电源设备一套简洁、可靠的安全保护装置,从而保证了高压远供电源设备运行、检修时主动安全,杜绝触电危险的发生。In a word, the present invention is achieved through various state monitoring switches, interlocks and spring shorts, DCD I/O component boxes, local control units, and power loads, power converter backplane blind insertion, and the shelter of movable hinged doors. Working together, the high-voltage remote power supply equipment is endowed with a set of simple and reliable safety protection devices, thereby ensuring the active safety of the high-voltage remote power supply equipment during operation and maintenance, and preventing the occurrence of electric shock hazards.
本发明的其它优点、目标和特征将部分通过下面的说明体现,部分还将通过对本发明的研究和实践而为本领域的技术人员所理解。Other advantages, objectives and features of the present invention will partly be embodied through the following descriptions, and partly will be understood by those skilled in the art through the study and practice of the present invention.
附图说明Description of drawings
图1为本发明的一个实施例中具有主动安保功能的高压远供电源设备的正面结构示意图;FIG. 1 is a schematic diagram of the front structure of a high-voltage remote power supply device with an active security function in an embodiment of the present invention;
图2为本发明的一个实施例中具有主动安保功能的高压远供电源设备的背面结构示意图;Fig. 2 is a schematic diagram of the rear structure of a high-voltage remote power supply device with an active security function in an embodiment of the present invention;
图3为本发明的一个实施例中具有主动安保功能的高压远供电源设备去掉机柜后门的结构示意图;Fig. 3 is a schematic diagram of the structure of the high-voltage remote power supply device with active security function in an embodiment of the present invention without the back door of the cabinet;
图4为本发明的一个实施例中电源配电盒的结构示意图;Fig. 4 is a schematic structural diagram of a power distribution box in an embodiment of the present invention;
图5为图4中封装面板与第一机械锁配合的透视结构示意图;Fig. 5 is a perspective structural schematic diagram of the cooperation between the packaging panel and the first mechanical lock in Fig. 4;
图6为本发明的一个实施例中电源变换器的结构示意图;FIG. 6 is a schematic structural diagram of a power converter in an embodiment of the present invention;
图7为本发明的一个实施例中机柜的爆炸结构示意图;Fig. 7 is a schematic diagram of the exploded structure of the cabinet in an embodiment of the present invention;
图8为本发明的一个实施例中高压输出段的结构示意图;Fig. 8 is a structural schematic diagram of a high voltage output section in an embodiment of the present invention;
图9为本发明的一个实施例高压输出段中上段铰链翻盖下翻时的结构示意图;Fig. 9 is a structural schematic view of the upper hinge flip cover in the high-voltage output section of an embodiment of the present invention when it is flipped down;
图10为本发明的一个实施例高压输出段中下段去掉盖板后的结构示意图;Fig. 10 is a schematic structural view of the middle and lower section of the high-voltage output section of an embodiment of the present invention after the cover plate is removed;
图11为本发明的一个实施例高压输出段下段处于运行状态时,其内部结构及连线关系示意图;Fig. 11 is a schematic diagram of the internal structure and connection relationship of the lower section of the high-voltage output section of an embodiment of the present invention when the lower section is in operation;
图12为本发明的一个实施例中高压输出段下段处于检修状态时,其内部结构及连线关系示意图;Fig. 12 is a schematic diagram of the internal structure and connection relationship of the lower section of the high-voltage output section in an embodiment of the present invention when it is in an overhaul state;
图13为图12中I部的局部放大示意图;Fig. 13 is a partially enlarged schematic diagram of part I in Fig. 12;
图14为本发明的一个实施例中高压输出段下段测量状态时,其内部结构及连线关系示意图;Fig. 14 is a schematic diagram of the internal structure and wiring relationship of the lower section of the high-voltage output section in the measurement state in one embodiment of the present invention;
图15为本发明的一个实施例中底层空盒的结构示意图;Fig. 15 is a schematic structural view of a bottom empty box in an embodiment of the present invention;
图16为本发明的一个实施例中底层空盒、高压输出段与电缆终端盒的配合关系结构示意图;Fig. 16 is a schematic structural diagram of the coordination relationship between the bottom empty box, the high-voltage output section and the cable terminal box in an embodiment of the present invention;
图17为本发明的一个实施例中电源变换器拉出机柜后,活动铰链门落下的结构示意图;Fig. 17 is a structural schematic diagram of the movable hinged door falling after the power converter is pulled out of the cabinet in one embodiment of the present invention;
图18为本发明的一个实施例中活动铰链门落下时的结构示意图;Fig. 18 is a schematic diagram of the structure when the living hinge door falls in an embodiment of the present invention;
图19为本发明的一个实施例中电缆终端盒的外部结构示意图;Fig. 19 is a schematic diagram of the external structure of a cable terminal box in an embodiment of the present invention;
图20为本发明的一个实施例中电缆终端盒的透视结构示意图。Fig. 20 is a schematic perspective view of the cable terminal box in an embodiment of the present invention.
具体实施方式Detailed ways
下面结合附图对本发明做进一步的详细说明,以令本领域技术人员参照说明书文字能够据以实施。The present invention will be further described in detail below in conjunction with the accompanying drawings, so that those skilled in the art can implement it with reference to the description.
应当理解,本文所使用的诸如“具有”、“包含”以及“包括”术语并不配出一个或多个其它元件或其组合的存在或添加。It should be understood that terms such as "having", "comprising" and "including" as used herein do not entail the presence or addition of one or more other elements or combinations thereof.
图1-4示出了根据本发明的一种具有主动安保功能的高压远供电源设备的实现形式,其中包括:Figures 1-4 show an implementation form of a high-voltage remote power supply device with an active security function according to the present invention, including:
用于将低压的直流或交流变换成数千伏或者数万伏直流高压输出的多组电源变换器1,其可由多个电源变换器10,11、12组成,电源变换器是高压远供电源设备的核心模块,它将低压直流(如±48V)或交流(如~220V或~380V)变换成数千伏或者数万伏的直流高压输出。电源变换器的高压输出可通过一个双路高压真空继电器来进行输出方向控制,向上对电子负载供电,向下通过输出段对电缆供电;Multiple sets of power converters 1 for converting low-voltage DC or AC into thousands of volts or tens of thousands of volts of DC high-voltage output, which can be composed of multiple power converters 10, 11, 12, and the power converter is a high-voltage remote power supply The core module of the device, which converts low-voltage DC (such as ±48V) or AC (such as ~220V or ~380V) into a DC high-voltage output of thousands of volts or tens of thousands of volts. The high-voltage output of the power converter can control the output direction through a dual-channel high-voltage vacuum relay, supply power to the electronic load upward, and supply power to the cable through the output section downward;
通过背板进而与电源变换器电连接,以检测设备高压输出的电子负载2,于检测设备的高压输出,合格的高压输出才能下传到电缆;Through the backplane and then electrically connected to the power converter to detect the electronic load 2 of the high-voltage output of the equipment, and only the qualified high-voltage output can be transmitted to the cable after testing the high-voltage output of the equipment;
与电源变换器相配合实现向输出电缆(简称电缆)供电的高压输出段3,高压输出段在高压输出过程起到一个正负极性转换、与电缆汇接、测量和开关的作用;Cooperate with the power converter to realize the high-voltage output section 3 supplying power to the output cable (referred to as the cable). The high-voltage output section plays the role of positive and negative polarity conversion, connection with the cable, measurement and switching during the high-voltage output process;
用于将电缆正负极、电缆保护地、站点地接入的电缆终端盒4;A cable terminal box 4 for connecting the positive and negative poles of the cable, the cable protection ground, and the site ground;
为电子负载、电源变换器、本地控制单元8供电的电源配电盒5;A power distribution box 5 for supplying power to the electronic load, the power converter, and the local control unit 8;
用于对设备组件进行封装的机柜6,其底部设置有连接高压输出段和电缆终端盒,且在拉出后能将电缆和高压输出彻底断开的底层空盒7,具体的,在这种方案中高压远供电源设备由机柜、电源负载、电源变换器、活动铰链门、DCD I/O组件盒、本地控制单元、高压输出段、底层空盒、电源配电盒、电缆终端盒、高压汇接盒和电源输入/高压输出接线盒等装置组成,其各组成部件在机柜上的位置及结构布局图1-3,The cabinet 6 used for encapsulating equipment components is provided with a bottom empty box 7 that connects the high-voltage output section and the cable terminal box, and can completely disconnect the cable and the high-voltage output after being pulled out. Specifically, in this The high-voltage remote power supply equipment in the scheme consists of cabinets, power loads, power converters, movable hinge doors, DCD I/O component boxes, local control units, high-voltage output sections, bottom empty boxes, power distribution boxes, cable terminal boxes, high-voltage Combination box and power input/high voltage output junction box and other devices, the position and structural layout of each component on the cabinet are shown in Figure 1-3,
其中,所述电源配电盒被配置为包括至少一组输入电源,每组输入电源被被配置为采用多路电源输出,每路电源输出通过相配合的断路器实现输出状态的切换;Wherein, the power distribution box is configured to include at least one group of input power sources, each group of input power sources is configured to adopt multiple power outputs, and each power output can switch the output state through a matched circuit breaker;
各路电源输出根据其连接设备电流大小划分主断器组50、副断路器51The output of each power supply is divided into the main breaker group 50 and the auxiliary circuit breaker 51 according to the current size of the connected equipment
所述主断路器上设置有相配合的封装面板52述封装面板上设置有第一机械锁53;The main circuit breaker is provided with a matching packaging panel 52. The packaging panel is provided with a first mechanical lock 53;
所述第一机械锁的转杆下方通过枢接的曲柄54有滑板55封装面板上相对设置有可供滑板上下滑动的滑槽56第一机械锁转动时,通过滑板的上下运动,对主断路器的工作状态进行干涉,在这种方案中,电源配电盒是为电源负载、电源变换器、DCD I/O组件盒、本地控制单元等单元设备供电的装置,它由一组或两组输入电源,经设计分配成多路电源输出,每组电源输出就有断路器控制,如图4所示。电源配电盒中主断路器输出端子57控制电源负载、电源变换器等大电流设备,副断路器控制DCD I/O组件盒、本地控制单元等小电流设备。通常设备检修,设备必须断电,也就是必须关闭配电盒的主断路器。而为了保证配电盒的主断路器始终处于关闭状态,防止误操作,本设备设计了一套带锁的曲柄滑板机构,如图5所示。转动第一机械锁上的第一钥匙,滑板就会上下滑动。Below the rotating rod of the first mechanical lock, the pivoted crank 54 is provided with a slide plate 55 on the packaging panel, and a chute 56 for the slide plate to slide up and down is relatively arranged on the packaging panel. In this scheme, the power distribution box is a device that supplies power to power loads, power converters, DCD I/O component boxes, local control units and other unit equipment. It consists of one or two groups The input power is divided into multiple power outputs by design, and each group of power outputs is controlled by a circuit breaker, as shown in Figure 4. The main circuit breaker output terminal 57 in the power distribution box controls high-current equipment such as power loads and power converters, and the auxiliary circuit breaker controls low-current equipment such as DCD I/O component boxes and local control units. Usually, for equipment maintenance, the equipment must be powered off, that is, the main circuit breaker of the power distribution box must be turned off. In order to ensure that the main circuit breaker of the power distribution box is always in the closed state and prevent misoperation, a crank slider mechanism with a lock is designed for this equipment, as shown in Figure 5. Turn the first key on the first mechanical lock, and the slide plate will slide up and down.
当主断路器开,主断路器全部手柄上扳,转动第一机械锁上的第一钥匙到开锁位置,滑板滑到上面,这时第一机械锁上的钥匙不能从锁中拔出,锁中的钥匙不能拔出则不能进行后续的互锁动作。When the main circuit breaker is opened, all the handles of the main circuit breaker are turned up, and the first key on the first mechanical lock is turned to the unlocking position, and the slide plate slides to the top. At this time, the key on the first mechanical lock cannot be pulled out from the lock. If the key cannot be pulled out, subsequent interlocking actions cannot be performed.
当主断路器关,主断路器全部手柄下扳,转动第一机械锁上的第一钥匙到锁定位置,滑板滑到下面,如图4,这时第一机械锁上的第一钥匙才可以从锁中拔出,锁中的钥匙拔出后才可进行后续的互锁动作。而且,锁中的钥匙拔出后,第一机械锁的锁芯则不能转动,导致滑板不能再向上滑动,这样就卡住断路器的手柄不能上扳,这样互锁曲柄滑板机构就保证了检修设备必须关闭电源配电盒的主断路器,变被动防护为主动防护,以具有更高的安全性能。When the main circuit breaker is off, pull down all the handles of the main circuit breaker, turn the first key on the first mechanical lock to the locked position, and slide the slide plate down, as shown in Figure 4. At this time, the first key on the first mechanical lock can be released from the The subsequent interlocking action can only be performed after the key in the lock is pulled out. Moreover, after the key in the lock is pulled out, the lock cylinder of the first mechanical lock cannot rotate, causing the slide plate to no longer slide upwards, so that the handle of the circuit breaker is stuck and cannot be pulled up, so that the interlocking crank slide plate mechanism ensures maintenance The equipment must turn off the main circuit breaker of the power distribution box and change passive protection into active protection to have higher safety performance.
如图6,在另一种实施例中,各所述电源变换器通过相配合的双路高压真空继电器(未示出)来实现输出方向的控制,向上对电子负载供电,向下通过高压输出段对电缆供电;As shown in Figure 6, in another embodiment, each of the power converters realizes the control of the output direction through a matched dual-channel high-voltage vacuum relay (not shown), supplying power to the electronic load upward, and outputting power downward through the high voltage Segment-to-cable power supply;
各电源变换器、电子负载的面板上分别设置有对其电源通断状态进行切换的第一开关(未示出),电源变换器是高压远供电源设备的核心模块,为了保证高压远供电源设备在电源变换器故障时都不终断高压的输出,通常对电源变换器进行热备份,有故障的电源变换器也可以在带电情况下进行更换。为了更换时的安全,本设备设计了第一项安全保障措施:即在电源变换器面板上设置有紧急开关,按下紧急开关可以关机,停止本端电源变换器的高压输出;保证其检修状态下的安全。Each power converter and the panel of the electronic load are respectively provided with a first switch (not shown) for switching the on-off state of the power supply. The power converter is the core module of the high-voltage remote power supply device. The equipment does not interrupt the high-voltage output when the power converter fails, and usually performs hot backup for the power converter, and the faulty power converter can also be replaced while it is live. For the safety of the replacement, the equipment has designed the first safety guarantee measure: an emergency switch is set on the panel of the power converter, pressing the emergency switch can shut down and stop the high-voltage output of the power converter at the end; ensure its maintenance status next to the security.
如图1-3、7,在另一种实施例中,所述机柜包括机架60以及通过可拆卸方式设置于机架各侧面的侧板61,机柜是高压远供电源设备的安装架,也是安全保护装置的主体,它由焊接成整体的机架、左右侧门、后门、顶盖组成,其中左右侧门、后门、顶盖在检修时可拆卸;As shown in Figures 1-3 and 7, in another embodiment, the cabinet includes a rack 60 and side panels 61 detachably arranged on each side of the rack, and the cabinet is a mounting frame for high-voltage remote power supply equipment. It is also the main body of the safety protection device, which is composed of a frame welded as a whole, left and right side doors, rear doors, and top cover, of which the left and right side doors, back door, and top cover are detachable during maintenance;
所述电子负载2、电源变换器1、本地控制单元8、高压输出段3、底层空盒7分别通过相配合的第一滑轨62设置在机架正面,电子负载和电源变换器的上架安装均采用不锈钢滑轨,这样电子负载(和电源变换器在机柜内可以很方便的推入和拉出,其它装置也可以进行类似操作,本地控制单元有三个作用:The electronic load 2, the power converter 1, the local control unit 8, the high-voltage output section 3, and the bottom empty box 7 are respectively arranged on the front of the rack through the matched first slide rail 62, and the rack installation of the electronic load and the power converter Stainless steel slide rails are used, so that the electronic load (and the power converter can be easily pushed in and pulled out in the cabinet, and other devices can also perform similar operations. The local control unit has three functions:
第一,通过DCD I/O的开关信号控制电源变换器高压的输出,本地控制单元只要检测到任意一个开关没有处于通路状态,都会关闭电源变换器的高压输出;First, the high-voltage output of the power converter is controlled by the switching signal of the DCD I/O. As long as the local control unit detects that any switch is not in the on-circuit state, it will turn off the high-voltage output of the power converter;
第二,控制电子负载高压的接收;Second, control the reception of high voltage of the electronic load;
第三,与远程监控装置通信,可向远程控制装置传送本地设备的状态信息,也可接受远程监控装置发出的指令对本地设备进行控制;Third, communicate with the remote monitoring device, can transmit the status information of the local equipment to the remote control device, and can also accept the instructions issued by the remote monitoring device to control the local equipment;
所述电缆终端盒4通过第二滑轨40设置在机架背面,且机架背面还分别通过相配合的第三滑轨设置有高压汇接盒8、电源配电盒5、DCD I/O组件盒9,电源输入/高压输出接线盒90,同样地安装于机柜正面的电源负载、电源变换器、本地控制单元、高压输出段、底层空盒,以及安装于机柜背面底座上的电源输入/高压输出接线盒等装置在检修时也可拆卸,DCD I/O组件盒是收集高压远供电源设备内各个状态监测开关开关量的一个装置;The cable terminal box 4 is arranged on the back of the rack through the second slide rail 40, and the back of the rack is also provided with a high-voltage junction box 8, a power distribution box 5, and a DCD I/O through the matching third slide rail. Component box 9, power input/high voltage output junction box 90, power load, power converter, local control unit, high voltage output section, bottom empty box installed on the front of the cabinet, and power input/high voltage output junction box installed on the back of the cabinet The high-voltage output junction box and other devices can also be disassembled during maintenance, and the DCD I/O component box is a device that collects the switching values of each state monitoring switch in the high-voltage remote power supply equipment;
所述机架上的各部件通过相配合的安装螺钉(未示出)进而与机架实现可拆卸连接,所述机架在与各部件安装螺钉相配合的位置上,设置有与DCD I/O组件盒连接,以对安装螺钉状态位置进行监测的第二开关(未示出),其主要用于对部件脱离机架进行检测;Each component on the frame is detachably connected to the frame through matching mounting screws (not shown), and the frame is provided with DCD I/ O the component box is connected to a second switch (not shown) that monitors the state position of the mounting screw, which is mainly used to detect that the component is detached from the rack;
所述DCD I/O组件盒通信连接至本地控制单元,所述本地控制单元分别通信连接至各电源变换器的高压开关管以及高压真空继电器,在这种方案中,为了防止设备检修时带电操作,这些可拆卸部分均对应机架上的一个状态监测用第二开关(轻触开关),拆下这些可拆卸部分,状态监测开关就处于断路状态(轻触开关翘柄弹开),DCD I/O得到这个断路信息后通知本地控制单元控制电源变换器,关闭电源变换器的高压开关管,终断高压输出,同时向远程监控装置发出“某部件已拆卸,电源变换器已关闭”的信息。装上这些些可拆卸部分,状态监测开关就处于通路状态(轻触开关翘柄被压下),DCD I/O得到这个通路信息后通知本地控制单元解除对电源变换器高压开关管的关闭,同时向远程监控装置发出“某部件已安装,开启电源变换器”的信息;The DCD I/O component box is communicatively connected to the local control unit, and the local control unit is respectively communicatively connected to the high-voltage switch tube and high-voltage vacuum relay of each power converter. In this scheme, in order to prevent live operation during equipment maintenance , these detachable parts all correspond to a second switch (tact switch) for state monitoring on the rack. When these detachable parts are removed, the state monitoring switch will be in an open circuit state (tact switch handle pops off), DCD I /O notifies the local control unit to control the power converter after getting the circuit breaker information, turns off the high-voltage switching tube of the power converter, cuts off the high-voltage output, and sends a message to the remote monitoring device that "a certain component has been disassembled and the power converter is turned off" . After installing these detachable parts, the state monitoring switch is in the on state (the handle of the light touch switch is pressed down), and the DCD I/O notifies the local control unit to release the closing of the high voltage switch tube of the power converter after getting the information of this path. At the same time, send the message "a certain component has been installed, turn on the power converter" to the remote monitoring device;
电源变换器、电子负载面板的安装螺钉对应有一个状态监测用第三开关(未示出),只要松开安装螺钉,状态监测开关就处于断路状态,DCD I/O收集到这个断路信息后通知本地控制单元关闭该电源变换器的高压开关管,终止高压输出,同时向远程监控装置发出“某电源变换器已关闭”的信息。与其他状态监测开关一样,电源变换器面板的安装螺钉紧固好之后,状态监测开关就处于通路状态,DCD I/O收集到这个通路信息后通知本地控制单元解除对该电源变换器高压开关管的关闭,同时向远程监控装置发出“某电源变换器已开启”的信息,电子负载与电源变换器的采用一样的安全措施,即除本身上具有地通断控制开关外,面板的安装螺钉也对应有一个状态监测用第三开关,而且其上方也安装有活动铰链门,但这些状态检测开关通过DCD I/O和本地控制单元控制的对象,与电源变换器和其他可拆卸部分不一样,电源变换器和其他可拆卸部分的状态检测开关通过DCD I/O和本地控制单元控制的对象是电源变换器的高压开关管,控制结果是“关闭或开启”,而电子负载是控制电源变换器中对应的高压真空继电器,控制结果是“断开或接通”;其它结构也可采用类似的第三开关,对其面板或部件状态进行监测。The mounting screws of the power converter and the electronic load panel correspond to a third switch (not shown) for state monitoring. As long as the mounting screws are loosened, the state monitoring switch will be in an open circuit state, and the DCD I/O will notify The local control unit turns off the high-voltage switch tube of the power converter, terminates the high-voltage output, and at the same time sends a message to the remote monitoring device that a certain power converter is turned off. Like other status monitoring switches, after the mounting screws on the panel of the power converter are fastened, the status monitoring switch is in the access state. After collecting the access information, the DCD I/O notifies the local control unit to release the high voltage switch tube of the power converter. At the same time, it sends a message to the remote monitoring device that "a certain power converter has been turned on". The electronic load adopts the same safety measures as the power converter, that is, in addition to the ground on-off control switch itself, the mounting screws on the panel are also Correspondingly, there is a third switch for status monitoring, and a living hinge door is also installed above it, but the objects controlled by these status detection switches through DCD I/O and the local control unit are different from the power converter and other detachable parts, The state detection switch of the power converter and other detachable parts controls the high-voltage switch tube of the power converter through the DCD I/O and the local control unit. The control result of the corresponding high-voltage vacuum relay is "off or on"; other structures can also use a similar third switch to monitor the status of its panel or components.
如图8-11,在另一种实施例中,所述高压输出段被配置为包括:As shown in Figures 8-11, in another embodiment, the high-voltage output section is configured to include:
用于将多组电源变换器输出高压进行汇接形成一组高压输出,并对高压输出进行极性转换、整流滤波、测量的上段310,高压输出段的上段主要负责输出高压的极性转换、高压的整流滤波和测量,如图8所示;The upper section 310 is used to connect the high voltage output of multiple sets of power converters to form a set of high voltage output, and perform polarity conversion, rectification and filtering, and measurement of the high voltage output. The upper section of the high voltage output section is mainly responsible for the polarity conversion of the output high voltage, High voltage rectification, filtering and measurement, as shown in Figure 8;
用于将输出高压与电缆的汇接,将电缆保护地与站点地进行转换,以及对电缆电压进行测量的下段320,高压输出段的下段主要负责输出高压与电缆的汇接、电缆保护地与站点地的转换,以及电缆电压的测量,其结构形态如图10所示,其内部结构和连线关系如图11所示;The lower section 320 is used to connect the output high voltage with the cable, convert the cable protection ground and the site ground, and measure the cable voltage. The lower section of the high voltage output section is mainly responsible for the connection of the output high voltage and the cable, the cable protection ground and The structure of site-to-ground conversion and cable voltage measurement is shown in Figure 10, and its internal structure and connection relationship are shown in Figure 11;
其中,所述上段被配置为包括:Wherein, the above paragraph is configured to include:
第一箱体311,其上设置有对输出高压进行极性转换的极性开关312;The first box 311 is provided with a polarity switch 312 for switching the polarity of the output high voltage;
用于对极性开关的安装位置进行封装的铰链翻盖313,所述铰链翻盖内侧壁错开极性开关的一侧上设置有测量板314,以及对铰链翻盖的打开状态进行监测的第四开关315;A hinge flip cover 313 for encapsulating the installation position of the polarity switch, a measuring board 314 is arranged on the side of the inner wall of the hinge flip cover staggered from the polarity switch, and a fourth switch 315 for monitoring the opening state of the hinge flip cover ;
设置在铰链翻盖上的第二机械锁316,其通过上段上第四开关,以及第四机械锁的配合,实现对设备工作状态的主动安全防护。The second mechanical lock 316 provided on the hinged cover realizes the active safety protection of the working state of the equipment through the cooperation of the fourth switch on the upper section and the fourth mechanical lock.
如图10-14在另一种实施例中,所述下段被配置为包括:10-14 In another embodiment, the lower section is configured to include:
第二箱体321,其底座上通过第四滑轨328安装有开关抽屉盒322和测试抽屉盒323;The second box body 321 is equipped with a switch drawer box 322 and a test drawer box 323 through a fourth slide rail 328 on its base;
设置于第二箱体内部并与开关抽屉盒、测试抽屉盒相对应的支架324;A bracket 324 arranged inside the second box body and corresponding to the switch drawer box and the test drawer box;
安装在支架上,并与测试抽屉盒后端相配合的第一弹簧短路器325,在附图中为了显示其连线关系,将其横放;Be installed on the support, and the first spring circuit breaker 325 that cooperates with the test drawer box rear end, in order to show its wiring relationship in the accompanying drawing, it is placed horizontally;
设置在测试抽屉盒一侧的海洋极保护组件326,其通过相配合的极地转化开关326(a)对其工作状态进行切换,为了与开关抽屉测试抽屉盒上的六芯高压连接器322(a)相配合,所述第二箱体上设置有高压输入+321(a)、高压输入-321(b);为了与测试抽屉盒上的六芯高压连接器323(a)相配合,所述第二箱体上设置有相配合的高压输出+321(c)、高压输出-321(d);为了与极地转化开关相配合,所述第二箱体上设置有相配合的站点地321(e)、电缆保护地321(f),所述极地转化开关与站点地连接,并通过电缆保护地汇流条321(g)与电缆保护地相连接实现极地的转化,所述开关抽屉盒的高压输出,分别通过相配合的高压输出-汇流条321(h)、高压输出+汇流条321(i)与测试抽屉盒、第二箱体上分别设置的高压输出+、高压输出-实现连接,其各自端口的连接可通过高压电缆得以实现;The marine polar protection assembly 326 arranged on one side of the test drawer box switches its working state through the matching polar conversion switch 326 (a), in order to switch the six-core high-voltage connector 322 (a) on the test drawer box of the switch drawer ), the second box body is provided with high voltage input + 321 (a), high voltage input - 321 (b); in order to match the six-core high voltage connector 323 (a) on the test drawer box, the The second box is provided with matching high-voltage output +321(c) and high-voltage output-321(d); in order to cooperate with the polar conversion switch, the second box is provided with a matching station ground 321( e), cable protection ground 321(f), the polar conversion switch is connected to the station ground, and is connected to the cable protection ground through the cable protection ground bus bar 321(g) to realize polar conversion, the high voltage of the switch drawer box The output is respectively connected with the high voltage output + and the high voltage output - respectively provided on the test drawer box and the second box body through the matching high voltage output-bus bar 321(h), high voltage output + bus bar 321(i), and the The connection of the respective ports can be realized by high voltage cables;
其中,所述开关抽屉盒、测试抽屉盒在与支架相配合的一端上分别设置有第一六芯高压插头322(b),第二六芯高压插头323(b),所述支架上分别设置有与第一六芯高压插头、第二六芯插头相配合的六芯高压插座322(c),323(c);Wherein, the switch drawer box and the test drawer box are respectively provided with a first six-core high-voltage plug 322 (b) and a second six-core high-voltage plug 323 (b) on one end matched with the bracket, and the brackets are respectively provided with There are six-pin high-voltage sockets 322(c), 323(c) matched with the first six-pin high-voltage plug and the second six-pin plug;
所述第一六芯插头中的六个内导体通过第一高压电缆实现两两连接,构成一组高压+,一组高压-,一组能通过DCD I/O检测开关抽屉盒位置状态的第五开关;The six inner conductors in the first six-core plug are connected in pairs through the first high-voltage cable, forming a set of high-voltage +, a set of high-voltage-, and a set of second conductors that can detect the position status of the switch drawer box through DCD I/O. five switches;
所述第二六芯插头中的两个内导体分别通过第二高压电缆分别与高压连接座上的两个高压插座连接,另外两个内导体通过第三高压电缆互连,构成能通过DCD I/O检测测试抽屉盒位置状态的第六开关(未示出);The two inner conductors in the second six-pin plug are respectively connected to the two high-voltage sockets on the high-voltage connection seat through the second high-voltage cable, and the other two inner conductors are interconnected through the third high-voltage cable, forming a structure that can pass through the DCD I /O detects a sixth switch (not shown) that tests the position status of the drawer;
所述第一弹簧短路器通过第一顶杆327与测试抽屉盒接触,以在测试抽屉盒拉出第一顶杆阻力消除时,弹簧释放后第一弹簧短路器的所有电极全部与金属簧片(未示出)接触而短路;并在测试抽屉盒推入第一顶杆顶起时,带动第一弹簧短路器的电极全部与金属簧片脱离就结束短路;The first spring short circuit is in contact with the test drawer box through the first push rod 327, so that when the test drawer box is pulled out of the first push rod resistance and the resistance is eliminated, all the electrodes of the first spring short circuit device are all in contact with the metal reeds after the spring is released. (not shown) contact and short circuit; And when the test drawer box is pushed into the first push rod and jacked up, the electrodes that drive the first spring short circuit are all disengaged from the metal reed and just end the short circuit;
所述开关抽屉盒上第一前板在与测试抽屉盒上第二前板相接触的一端具有延伸的止挡部322(d),所述第二前板在与止挡部相配合的位置上设置有延伸的卡止部323(d),以使二者在空间上构成阻挡式结构,所述开关抽屉盒、测试抽屉盒分别通过设置在第二箱体上的第三机械锁321(j)、第一压缩把手321(k)进而固定,在这种方案中,高压输出段下段的核心是两个抽屉盒,即开关抽屉盒和测试抽屉盒。两个抽屉盒通过线性滑轨安装在底座上,两个抽屉盒的后部均安装6芯高压插头,其中开关抽屉盒的6芯高压插头的6个内导体通过高压电缆两两连接,形成三组,一组为高压+,一组为高压-,一组为开关,可使DCD I/O检测开关抽屉盒的状态;测试抽屉盒6芯高压插头中的两个内导体通过高压电缆分别与高压连接座上的两个高压插座连接,再用两个内导体通过高压电缆互连,构成开关,可使DCD I/O检测测试抽屉盒的状态。两个抽屉盒后部的6芯高压插头分别对应支架上的6芯高压插座,它们之间可容差浮动插合。测试抽屉盒的后部还对应一个安装在支架上的弹簧短路器顶杆。测试抽屉盒拉出,顶杆阻力消除,弹簧释放,弹簧短路器的所有电极就全部与一金属簧片接触而短路;测试抽屉盒推入,顶杆顶起,带动弹簧短路器的电极全部与金属簧片脱离就结束短路。开关抽屉盒和测试抽屉盒的面板采用阻挡式设计,即开关抽屉盒的面板在外,测试抽屉盒的面板在内,如图13中的局部放大的I视图。当两个抽屉盒全部推入,锁定输出段下段面板上的第二机械锁,即锁住开关抽屉盒,同时也锁住了测试抽屉盒;当解锁输出段下段面板上的第二机械锁,拉动测试抽屉盒的面板上的第一压缩把手,又可同时将开关抽屉盒拉出。The first front plate on the switch drawer box has an extended stop portion 322(d) at the end in contact with the second front plate on the test drawer box, and the second front plate is at a position matched with the stop portion An extended locking part 323(d) is provided on the top, so that the two form a blocking structure in space, and the switch drawer box and the test drawer box pass through the third mechanical lock 321 ( j), the first compression handle 321(k) is further fixed. In this solution, the core of the lower section of the high-voltage output section is two drawer boxes, that is, the switch drawer box and the test drawer box. The two drawer boxes are installed on the base through linear slide rails, and 6-core high-voltage plugs are installed at the rear of the two drawer boxes, and the 6 inner conductors of the 6-core high-voltage plugs of the switch drawer box are connected in pairs by high-voltage cables to form a three-core One group is high voltage +, one group is high voltage -, and one group is switch, which can make the DCD I/O detect the state of the switch drawer box; the two inner conductors in the 6-core high-voltage plug of the test drawer box are respectively connected to the high-voltage cable through the high-voltage cable The two high-voltage sockets on the high-voltage connection seat are connected, and then two inner conductors are interconnected by a high-voltage cable to form a switch, which allows the DCD I/O to detect and test the state of the drawer box. The 6-core high-voltage plugs at the rear of the two drawer boxes correspond to the 6-core high-voltage sockets on the bracket respectively, and they can be fitted with tolerance floating. The rear of the test drawer also corresponds to a spring short-circuiter ejector rod mounted on the bracket. The test drawer is pulled out, the resistance of the ejector rod is eliminated, and the spring is released, and all the electrodes of the spring short circuit are in contact with a metal reed to short circuit; the test drawer is pushed in, the ejector rod is lifted, and all the electrodes of the spring short circuit are connected to each other. The metal reed breaks away to end the short circuit. The panels of the switch drawer box and the test drawer box adopt a blocking design, that is, the panel of the switch drawer box is outside, and the panel of the test drawer box is inside, as shown in the partially enlarged I view in Figure 13. When the two drawer boxes are all pushed in, the second mechanical lock on the lower panel of the output section is locked, that is, the switch drawer box is locked, and the test drawer box is also locked at the same time; when the second mechanical lock on the lower panel of the output section is unlocked, Pull the first compression handle on the panel of the test drawer, and the switch drawer can be pulled out at the same time.
高压输出段下段中的开关抽屉盒和测试抽屉盒的三个状态代表了高压远供电源设备的三个状态,及运行、检修、测量。The three states of the switch drawer box and the test drawer box in the lower section of the high-voltage output section represent the three states of the high-voltage remote power supply equipment, as well as operation, maintenance, and measurement.
(1)运行:如图10-11所示,开关抽屉盒和测试抽屉盒均在关闭状态,这时6芯高压连接器插头插座连接,高压输入与高压输出贯通,设备处于运行状态。(1) Operation: As shown in Figure 10-11, the switch drawer box and the test drawer box are both in the closed state. At this time, the 6-pin high-voltage connector plug and socket are connected, the high-voltage input and high-voltage output are connected, and the equipment is in the running state.
(2)检修:如图12所示,开关抽屉盒和测试抽屉盒全部拉出,这时抽屉盒对应的高压插头、插座断开,则高压输入与输出相应断开;同时弹簧短路器弹簧释放,短路器上高压输出+(电缆+)、高压输出-(电缆-)与电缆保护地、站点地连接的电极与金属簧片接触而短路,起到接地保护的作用。(2) Overhaul: As shown in Figure 12, the switch drawer box and the test drawer box are all pulled out. At this time, the high-voltage plug and socket corresponding to the drawer box are disconnected, and the high-voltage input and output are disconnected accordingly; at the same time, the spring circuit breaker spring is released. , The high-voltage output + (cable +) and high-voltage output- (cable-) on the short circuit are connected to the cable protection ground and the electrode connected to the site ground and the metal reed is in contact with the metal reed to short circuit, which plays the role of grounding protection.
(3)测量:如图14所示,开关抽屉盒拉开,测试抽屉盒关闭,这时开关抽屉盒对应的6芯高压插头、插座断开,则高压输入与输出相互断开;但测试抽屉盒对应的6芯高压插头、插座连接,同时弹簧短路器顶杆被测试抽屉盒顶起,高压输出+(电缆+)、高压输出-(电缆-)与电缆保护地、站点地连接的电极与金属簧片脱开而结束短路,再通过对测试抽屉盒内的第四机械锁、第七机械锁进行解锁操作后,我们就可以通过测试抽屉盒的两个高压插座测量电缆的电压。(3) Measurement: As shown in Figure 14, the switch drawer box is opened and the test drawer box is closed. At this time, the corresponding 6-core high-voltage plug and socket of the switch drawer box are disconnected, and the high-voltage input and output are disconnected from each other; but the test drawer The 6-core high-voltage plug and socket corresponding to the box are connected, and the ejector rod of the spring short circuit is lifted by the test drawer box. The metal reed is disengaged to end the short circuit, and after unlocking the fourth and seventh mechanical locks in the test drawer box, we can measure the voltage of the cable through the two high-voltage sockets of the test drawer box.
如图7、15-18,在另一种实施例中,所述底层空盒与高压输出段、电缆终端盒分别通过相配合的第一矩形连接器70、第二矩形连接器(未示出)实现三者的盲插连接导通;As shown in Fig. 7, 15-18, in another embodiment, the bottom empty box and the high-voltage output section and the cable terminal box respectively pass through the matched first rectangular connector 70 and the second rectangular connector (not shown). ) to realize the conduction of the blind plug connection of the three;
所述电子负载、电源变换器上的高压插头(未示出)和电源信号插座(未示出),分别通过背板63上相配合的高压插座64和电源信号插头65,进而实现电子负载、电源变换器的带电盲插,为了安全,电子负载和电源变换器与机柜的连接采用了背板连接方式,即电子负载和电源变换器的高压插头和电源信号插座与背板上的高压插座和电源信号插头相互之间可以带电盲插,这样电子负载和电源变换器拉出机柜,其尾部就不会与机柜之间的有高压连线,杜绝因人工插拔高压连接器发生触电的危险,所述机柜在与电源变换器、电源负载相配合的安装位上方设置有活动的铰链门66,电子负载和电源变换器(CV)从机柜拉出后在机柜上就留下一个空窗,为了防止维修人员不小心把手伸进这个空窗触碰到高压插座,所以电子负载和电源变换器从机柜拉出后,安装在电子负载和电源变换器上方的活动铰链门的塑料门就自动落下,阻止工作人员把手伸进机柜;The electronic load, the high-voltage plug (not shown) and the power signal socket (not shown) on the power converter pass through the matched high-voltage socket 64 and power signal plug 65 on the backplane 63 respectively, and then realize the electronic load, For the live blind insertion of the power converter, for safety, the connection between the electronic load and the power converter and the cabinet adopts the backplane connection method, that is, the high-voltage plug and the power signal socket of the electronic load and the power converter are connected with the high-voltage socket and the high-voltage socket on the backplane The power signal plugs can be charged blindly with each other, so that when the electronic load and power converter are pulled out of the cabinet, there will be no high-voltage connection between the tail and the cabinet, and the risk of electric shock caused by manual plugging and unplugging of high-voltage connectors will be eliminated. The cabinet is provided with a movable hinged door 66 above the installation position matched with the power converter and the power load. After the electronic load and the power converter (CV) are pulled out from the cabinet, an empty window is left on the cabinet. To prevent the maintenance personnel from accidentally reaching into the empty window and touching the high-voltage socket, so after the electronic load and power converter are pulled out from the cabinet, the plastic door of the movable hinge door installed above the electronic load and power converter will automatically fall down, Prevent staff from reaching into the cabinet;
其中,所述第一矩形连接器被配置为包括设置在高压输出端的插座安装座(未示出),以及设置在底层空盒上插头安装座71;Wherein, the first rectangular connector is configured to include a socket mount (not shown) disposed on the high voltage output end, and a plug mount 71 disposed on the bottom empty box;
所述底层空盒上设置有与插头安装座相配合的安装槽72,以使底层空盒与高压输出段的连接配合在空间上构成阻挡式结构;如图15所示,底层空盒是连接高压输出段和电缆终端的一个装置,在高压远供电源设备上相当一个高压隔离开关,底层空盒从机柜中拉出,就可将电缆和高压输出彻底断开。为了方便底层空盒从机柜中拉出,它们相互之间的连接均采用矩形高压连接器盲插的方式。从检修安全性考虑,由于底层空盒是个高压隔离开关,所以它从机柜中拉出应有优先性,为了体现这种优先性,底层空盒与高压输出段的连接配合也采取了阻挡式设计,即底层空盒的插头安装座能挡住高压输出段下段的插座安装座,只有先拉出底层空盒后,高压输出段才可以从机柜中拉出,见图16底层空盒、高压输出段与电缆终端盒的配合关系。这样就就保证了在拆卸高压输出段时,电缆和高压输出已彻底断开,从而保障拆卸高压输出段时的安全,第二矩形连接器与第一矩形连接器的安装位置在不同的侧壁上,以使高压输出段位于底层空盒的上方,而底层空盒的后面板上设置有连接器座73,用以与电缆终端盒相配合,且连接器座73位置将安装槽位置让开,使得其相互之间在空间上相互干涉,以利于主动式的安全防护;The bottom empty box is provided with a mounting groove 72 that matches the plug mounting seat, so that the connection between the bottom empty box and the high-voltage output section forms a blocking structure in space; as shown in Figure 15, the bottom empty box is connected A device for the high-voltage output section and the cable terminal is equivalent to a high-voltage isolation switch on the high-voltage remote power supply equipment. The bottom empty box is pulled out from the cabinet to completely disconnect the cable and high-voltage output. In order to facilitate the pulling out of the bottom empty boxes from the cabinet, they are connected with each other by blind insertion of rectangular high-voltage connectors. From the perspective of maintenance safety, since the bottom empty box is a high-voltage isolation switch, it should be pulled out from the cabinet. In order to reflect this priority, the connection between the bottom empty box and the high-voltage output section also adopts a blocking design. , that is, the plug mounting seat of the bottom empty box can block the socket mounting seat of the lower part of the high-voltage output section. Coordination relationship with the cable terminal box. This ensures that when the high-voltage output section is disassembled, the cable and the high-voltage output have been completely disconnected, thereby ensuring safety when the high-voltage output section is disassembled. The installation positions of the second rectangular connector and the first rectangular connector are on different side walls so that the high-voltage output section is located above the empty box at the bottom, and a connector seat 73 is provided on the rear panel of the empty box at the bottom to match with the cable terminal box, and the position of the connector seat 73 leaves the position of the installation groove , so that they interfere with each other in space, so as to facilitate active security protection;
所述铰链门被配置为包括:与机架相配合的安装架66(a),设置在安装架上的转轴66(b)以及设置在转轴上的门体66(c);The hinged door is configured to include: a mounting frame 66(a) matched with the frame, a rotating shaft 66(b) disposed on the mounting frame, and a door body 66(c) disposed on the rotating shaft;
所述转轴上设置有与DCD I/O组件盒通信连接的旋转开关(未示出),活动铰链门的转轴上安装有一个旋转开关,活动铰链门的塑料门旋转落下和翻起分别使旋转开关处于断路和通路状态,DCD I/O收集到这个断路和通路信息后通知本地控制单元,本地控制单元就会向远程控制发出“某部件从机柜中移除”或者“某部件装入机柜”的信息。A rotary switch (not shown) communicating with the DCD I/O assembly box is provided on the rotating shaft, a rotary switch is installed on the rotating shaft of the living hinge door, and the plastic door of the living hinge door rotates and falls and turns up to make the rotation The switch is in the state of open circuit and open circuit, and the DCD I/O will notify the local control unit after collecting the open circuit and open circuit information, and the local control unit will send "a certain component is removed from the cabinet" or "a certain component is installed in the cabinet" to the remote control Information.
如图19-20,在另一种实施例中,所述电缆终端盒被配置为包括:As shown in Figures 19-20, in another embodiment, the cable termination box is configured to include:
第三箱体40,其一侧设置有门体41,另一侧设置有电流检测组件42;The third box body 40 is provided with a door body 41 on one side and a current detection assembly 42 on the other side;
通过安装架43、44分别设置在第三箱体内,并与门体、底层空盒位置相对应的第二弹簧短路器45、46;The second spring circuit breakers 45, 46 are respectively arranged in the third box through the mounting brackets 43, 44, and correspond to the positions of the door body and the bottom empty box;
其中,所述门体通过相配合的第二压缩把手47进而固定在第三箱体上;Wherein, the door body is further fixed on the third box body through the matched second compression handle 47;
所述第二弹簧短路器分别通过相配合的第二顶杆48、49进而与门体、底层空盒相接触,以在拉出底层空盒、拔出门体时使弹簧短路器上的电缆+、电缆-、电缆保护地、站点地全部短路,实现接地保护,电缆终端盒是将电缆+、电缆-、电缆保护地、站点地接入的装置,它内部有一套电流检测装置和两套弹簧短路器。两套弹簧短路器的顶杆分别对应底层空盒和面板上的快修活动门(由两个面板压缩把手固定),拉出底层空盒和拔出快修活动门都会使弹簧短路器上的电缆+、电缆-、电缆保护地、站点地全部短路,起到接地保护的作用。The second spring circuit breaker contacts the door body and the bottom empty box through the matched second push rods 48 and 49 respectively, so that the cables on the spring short circuit breaker will +, cable -, cable protection ground, and site ground are all short-circuited to achieve grounding protection. The cable terminal box is a device for connecting cable +, cable -, cable protection ground, and site ground. It has a set of current detection devices and two sets of Spring short circuit. The ejector pins of the two sets of spring circuit breakers correspond to the bottom empty box and the quick-repair movable door on the panel respectively (fixed by two panel compression handles), pulling out the bottom empty box and pulling out the quick-repair movable door will make the spring short-circuit device The cable +, cable -, cable protection ground, and site ground are all short-circuited to play the role of ground protection.
如图4、5、8、9、10、11,在另一种实施例中,还包括套一、套二、套三共三套不同型号的机械锁,高压远供电源设备共有三套不同型号的机械锁,型号相同的机械锁其锁芯相同,钥匙一致,一把钥匙可解多个锁;不同型号的机械锁则其锁芯不同,钥匙不一致,相互之间不能解锁。所有锁的钥匙均只可在锁定状态拔出,非锁定状态不能拔出;As shown in Figures 4, 5, 8, 9, 10, and 11, in another embodiment, it also includes three sets of mechanical locks of different types, including set one, set two, and set three. There are three sets of different types of high-voltage remote power supply equipment Mechanical locks of the same model have the same lock core and the same key, and one key can unlock multiple locks; different types of mechanical locks have different lock cores, inconsistent keys, and cannot unlock each other. The keys of all locks can only be pulled out in the locked state, and cannot be pulled out in the unlocked state;
其中,所述套一被配置为包括:三把分别设置在电源配电盒封装面板上,高压输出段下段,以及测试抽屉盒内的第一机械锁53,第三机械锁321(j),第四机械锁323(d);Wherein, the set one is configured to include: three sets respectively arranged on the packaging panel of the power distribution box, the lower part of the high-voltage output section, and the first mechanical lock 53 and the third mechanical lock 321(j) in the test drawer box, fourth mechanical lock 323(d);
所述套二被配置为包括:三把分别设置在输出段上段的铰链翻盖,机柜后门、输出段下段开关抽屉盒内的第二机械锁316,第五机械锁(未示出),第六机械锁322(e);The second set is configured to include: three hinged covers respectively arranged on the upper section of the output section, the second mechanical lock 316 in the cabinet rear door, the switch drawer box of the lower section of the output section, the fifth mechanical lock (not shown), and the sixth mechanical lock (not shown). mechanical lock 322(e);
所述套三被配置为包括一把位于输出段下段的测试抽屉盒内的第七机械锁323(e);Said set three is configured to include a seventh mechanical lock 323(e) located in the test drawer box in the lower section of the output section;
所述套一、套二、套三分别通过相配合的第一钥匙321(l)、第二钥匙317、第三钥匙(未示出)完成解锁操作,在设备处于运行状态中,第一钥匙被配置在第一机械锁上,第二钥匙被配置在输出段下段的开关抽屉盒内,第三钥匙放置在预定位置。在这种方案中,每套高压远供电源设备只有三把钥匙,其中第一钥匙和第二钥匙在设备上,第三钥匙可由设备管理员掌握。设备在运行状态下,第一钥匙始终在配电盒的第一机械锁里,第二钥匙始终隐藏在输出段下段的开关抽屉盒内第六机械锁里。Said sets 1, 2, and 3 are unlocked by matching first key 321(1), second key 317, and third key (not shown). When the device is in operation, the first key It is configured on the first mechanical lock, the second key is configured in the switch drawer box at the lower part of the output section, and the third key is placed in a predetermined position. In this scheme, each set of high-voltage remote power supply equipment has only three keys, of which the first key and the second key are on the equipment, and the third key can be mastered by the equipment administrator. When the equipment is running, the first key is always in the first mechanical lock of the power distribution box, and the second key is always hidden in the sixth mechanical lock in the switch drawer box at the lower part of the output section.
一种应用高压远供电源设备进行互锁防护的方法,在高压远供电源设备检修时,互锁防护方法被配置为包括:A method for interlock protection using high-voltage remote power supply equipment. When the high-voltage remote power supply equipment is overhauled, the interlock protection method is configured to include:
S10,电源配电盒上主断路器上的所有手柄均被配置为下扳关断状态,转动封装面板上第一机械锁中的第一钥匙,以通过锁芯的转动带动曲柄作上下伸缩,进一步带动滑板向下运动,进而在第一机械锁的锁定位置,使得滑板刚好卡住主断路器的各手柄,使各主断路器手柄在滑板的作用下处于锁死状态,而不能向上扳动,这样就保证设备在检修过程中主断路器不能误操作;S10, all the handles on the main circuit breaker on the power distribution box are configured to be turned down and turned off. Turn the first key in the first mechanical lock on the package panel to drive the crank to expand and contract up and down through the rotation of the lock cylinder. Further drive the sliding plate to move downward, and then at the locked position of the first mechanical lock, the sliding plate just blocks the handles of the main circuit breaker, so that the handles of the main circuit breaker are in a locked state under the action of the sliding plate and cannot be pulled upward. , so as to ensure that the main circuit breaker cannot be misoperated during the maintenance process of the equipment;
S11,拔出第一机械锁上的第一钥匙,用第一钥匙解锁高压输出段下段上的第三机械锁,配合扳动第一压缩把手,将开关抽屉盒和测试抽屉盒全部拉出,并在二者拉出到位后使得其上分别对应的第一六芯高压插头,第二六芯高压插头,与支架上的六芯高压插座处于断开状态,转动第三机械锁上的第一钥匙将开关抽屉锁住,进而使设备处于检修状态,检修状态的特征就是:S11, pull out the first key on the first mechanical lock, use the first key to unlock the third mechanical lock on the lower part of the high-voltage output section, cooperate with the first compression handle to pull out the switch drawer box and the test drawer box, And after the two are pulled out in place, the corresponding first six-core high-voltage plug and the second six-core high-voltage plug are disconnected from the six-core high-voltage socket on the bracket, and the first one on the third mechanical lock is rotated. The key locks the switch drawer, and then puts the equipment in the inspection state. The characteristics of the inspection state are:
(1)设备的电源配电盒上的主断路器处于断路状态;(1) The main circuit breaker on the power distribution box of the equipment is in an open circuit state;
(2)输出段下段的开关抽屉盒和测试抽屉盒全部拉出,使高压输入和高压输出自动断开,弹簧短路器上的电缆+、电缆-与电缆保护地、站点地全部接地短路,使设备自动接地保护的作用。(2) The switch drawer box and test drawer box in the lower section of the output section are all pulled out, so that the high-voltage input and high-voltage output are automatically disconnected, and the cable + and cable- on the spring circuit breaker are all grounded and short-circuited with the cable protection ground and the station ground, so that The function of automatic grounding protection of equipment.
在另一种实施例中,用于电缆高压测试时的互锁防护方法被配置为包括:In another embodiment, the interlock protection method for cable high voltage testing is configured to include:
S20,拔出高压输出段下段第三机械锁上的第一钥匙,以解锁测试抽屉盒内高压连接器座上的第四机械锁,进而通过第四机械锁上锁撇的转动,使高压连接器座和开关抽屉盒分离,其通过第四机械锁使高压连接器座和开关抽屉盒脱开,高压连接器座和开关抽屉盒是通过第四机械锁的锁撇连在一起的;S20, pull out the first key on the third mechanical lock in the lower section of the high-voltage output section to unlock the fourth mechanical lock on the high-voltage connector seat in the test drawer box, and then turn the lock on the fourth mechanical lock to make the high-voltage connection The device seat is separated from the switch drawer box, which disengages the high-voltage connector seat and the switch drawer box through the fourth mechanical lock, and the high-voltage connector seat and the switch drawer box are connected together by the lock of the fourth mechanical lock;
S20,从预定位置上拿到第三锁匙,以解锁测试抽屉盒内的第七机械锁,以使高压连接器座在压簧的作用下滑动到测试抽屉盒的最右边,进而使高压连接器座上的插座孔与测试抽屉盒面板的测试孔对齐;S20, get the third lock key from the predetermined position to unlock the seventh mechanical lock in the test drawer box, so that the high-voltage connector seat slides to the far right of the test drawer box under the action of the pressure spring, so that the high-voltage connector The socket hole on the seat is aligned with the test hole on the test drawer panel;
S21,推进并用第一压缩把手关闭测试抽屉盒进行电缆高压测试,并在测试后扳动第一压缩把手,结束电缆高压测试后,只需扳动面板第一压缩把手,使得测试抽屉盒在弹簧短路器上顶杆的作用下滑出,弹簧短路器处于短路保护状态,重新锁定第四机械锁、第七机械锁,使得设备重新处于检修状态;S21, push forward and close the test drawer box with the first compression handle for the cable high voltage test, and pull the first compression handle after the test. The push rod on the short circuit breaker slides out, the spring short circuit breaker is in the short circuit protection state, and the fourth mechanical lock and the seventh mechanical lock are locked again, so that the equipment is in the maintenance state again;
在打开机柜后门和输出段上段的铰链翻盖进行其他操作时,其互锁防护方法被配置为包括:When opening the cabinet rear door and the hinged flap of the upper section of the output section for other operations, its interlocking protection method is configured to include:
S30,设备在处于检修状态时,如果要打开机柜后门和输出段上段的铰链翻盖,则需要拿出开关抽屉盒中的第二钥匙,转动第二钥匙使第六机械锁处于锁定状态,并将第二钥匙拔出以使开关抽屉盒不能被推回去,第二钥匙则可从第六机械锁中拔出。第六机械锁处于锁定状态则高压开关抽屉盒就不能再推得回去,只有第二钥匙还回第六机械锁上,解除第六机械锁的锁定,同时再解除第六机械锁的锁定,高压开关抽屉才能推回去;S30, when the equipment is in the maintenance state, if you want to open the hinged cover of the rear door of the cabinet and the upper section of the output section, you need to take out the second key in the switch drawer box, turn the second key to make the sixth mechanical lock in the locked state, and set the The second key is extracted so that the switch drawer box cannot be pushed back, and the second key can be extracted from the sixth mechanical lock. When the sixth mechanical lock is in the locked state, the high-voltage switch drawer box cannot be pushed back. Only the second key is returned to the sixth mechanical lock to unlock the sixth mechanical lock, and at the same time unlock the sixth mechanical lock. Open and close the drawer to push it back;
S31,采用第二钥匙打开铰链翻盖上的第二机械锁,取下第二钥匙则就可以打开输出段上段的铰链翻盖,进行极性开关的相关操作,或打开后门上的第五机械锁进行其他操作。在本方案中,在打开机柜后门和输出段上段铰链翻盖进行其他操作之前,通过上述互锁操作,已经先使设备处于检修状态,具有更好的防护性能。S31, use the second key to open the second mechanical lock on the hinge cover, remove the second key to open the hinge cover on the upper section of the output section, and perform related operations on the polarity switch, or open the fifth mechanical lock on the rear door to perform other operations. In this solution, before opening the rear door of the cabinet and the upper hinge cover of the output section for other operations, through the above-mentioned interlocking operation, the equipment has been put in the maintenance state, which has better protection performance.
故本发明主要通过各种状态监测开关、互锁和弹簧短路器、DCD I/O组件盒、本地控制单元,以及电源负载、电源变换器背板盲插、活动铰链门的遮蔽等装置的共同作用,赋予高压远供电源设备一套简洁、可靠的安全保护装置,从而保证了高压远供电源设备运行、检修时主动安全,杜绝触电危险的发生。Therefore, the present invention is mainly through the cooperation of various state monitoring switches, interlocks and spring shorts, DCD I/O component boxes, local control units, and power loads, power converter backplane blind insertion, and movable hinge door shielding. Function, endow high-voltage remote power supply equipment with a simple and reliable safety protection device, thus ensuring active safety during operation and maintenance of high-voltage remote power supply equipment, and preventing the occurrence of electric shock hazards.
采用以上方案只是一种较佳实例的说明,但并不局限于此。在实施本发明时,可以根据使用者需求进行适当的替换和/或修改。The adoption of the above solution is only an illustration of a preferred example, but not limited thereto. When implementing the present invention, appropriate replacements and/or modifications can be made according to user requirements.
这里说明的设备数量和处理规模是用来简化本发明的说明的。对本发明的具有主动安保功能的高压远供电源设备及互锁防护方法的应用、修改和变化对本领域的技术人员来说是显而易见的。The number of devices and processing scales described here are used to simplify the description of the present invention. The application, modification and change of the high-voltage remote power supply device with active security function and the interlock protection method of the present invention will be obvious to those skilled in the art.
尽管本发明的实施方案已公开如上,但其并不仅仅限于说明书和实施方式中所列运用。它完全可以被适用于各种适合本发明的领域。对于熟悉本领域的人员而言,可容易地实现另外的修改。因此在不背离权利要求及等同范围所限定的一般概念下,本发明并不限于特定的细节和这里示出与描述的图例。Although embodiments of the present invention have been disclosed above, it is not limited to the applications set forth in the specification and examples. It can be fully applied to various fields suitable for the present invention. Additional modifications can readily be made by those skilled in the art. Therefore, the invention should not be limited to the specific details and examples shown and described herein, without departing from the general concept defined by the claims and their equivalents.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910884389.3A CN110504637B (en) | 2019-09-19 | 2019-09-19 | Interlocking protection method for high voltage remote power supply equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910884389.3A CN110504637B (en) | 2019-09-19 | 2019-09-19 | Interlocking protection method for high voltage remote power supply equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110504637A true CN110504637A (en) | 2019-11-26 |
| CN110504637B CN110504637B (en) | 2024-05-07 |
Family
ID=68592303
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910884389.3A Expired - Fee Related CN110504637B (en) | 2019-09-19 | 2019-09-19 | Interlocking protection method for high voltage remote power supply equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110504637B (en) |
Citations (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH11341174A (en) * | 1998-05-27 | 1999-12-10 | Nippon Telegr & Teleph Corp <Ntt> | Remote power supply activation device |
| JP2003235121A (en) * | 2002-02-05 | 2003-08-22 | Kyoritsu Keiki Co Ltd | Draw-out device equipped with bypass breaker comprising draw-out vacuum breaker |
| JP2006149043A (en) * | 2004-11-18 | 2006-06-08 | Terasaki Electric Co Ltd | Switchboard interlock device |
| CN201926549U (en) * | 2010-12-23 | 2011-08-10 | 上海泉润机电设备有限公司 | Aeronautical airborne illumination testing device |
| CN201956749U (en) * | 2010-12-16 | 2011-08-31 | 宁波三维技术有限公司 | Modular uninterruptable power supply for monitoring equipment |
| CN103023387A (en) * | 2012-12-31 | 2013-04-03 | 宋开泉 | Magnetic power system using natural energy as driving force |
| KR101251604B1 (en) * | 2013-02-12 | 2013-04-08 | (주)두연테크 | Motor control center |
| CN202930812U (en) * | 2012-09-26 | 2013-05-08 | 芜湖明远电力设备制造有限公司 | Drawer unit of power distribution cabinet |
| CN202978013U (en) * | 2012-12-11 | 2013-06-05 | 广东志成冠军集团有限公司 | High-voltage DC power supply integrated system cabinet |
| CN103384085A (en) * | 2012-05-03 | 2013-11-06 | 张立洁 | Remote power supply system of repeater |
| CN103414114A (en) * | 2013-07-04 | 2013-11-27 | 安徽电力芜湖县供电有限责任公司 | Drawer-type intelligent comprehensive low-voltage distribution JP cabinet |
| CN203423703U (en) * | 2013-08-19 | 2014-02-05 | 深圳市金霆科技有限公司 | Back wiring type DC remote power supply device with self-equipped PDU |
| CN203645147U (en) * | 2013-08-19 | 2014-06-11 | 深圳市金霆科技有限公司 | Front wired DC remote power supply apparatus with a PDU |
| CN206041628U (en) * | 2016-09-14 | 2017-03-22 | 常熟开关制造有限公司(原常熟开关厂) | Dual -power switching device |
| CN206180697U (en) * | 2016-08-30 | 2017-05-17 | 天津光电比特信息技术有限公司 | N+1 computer case power supply monitoring devices |
| CN207925351U (en) * | 2018-02-08 | 2018-09-28 | 常熟开关制造有限公司(原常熟开关厂) | A kind of mechanical interlocks of breaker |
| CN109061523A (en) * | 2018-09-05 | 2018-12-21 | 深圳市实益达工业有限公司 | A kind of power detecting system |
| CN210379992U (en) * | 2019-09-19 | 2020-04-21 | 四川灵通电讯有限公司 | High-voltage remote power supply equipment with interlocking function |
| CN210628920U (en) * | 2019-09-19 | 2020-05-26 | 四川灵通电讯有限公司 | High-voltage remote power supply equipment with active security function |
-
2019
- 2019-09-19 CN CN201910884389.3A patent/CN110504637B/en not_active Expired - Fee Related
Patent Citations (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH11341174A (en) * | 1998-05-27 | 1999-12-10 | Nippon Telegr & Teleph Corp <Ntt> | Remote power supply activation device |
| JP2003235121A (en) * | 2002-02-05 | 2003-08-22 | Kyoritsu Keiki Co Ltd | Draw-out device equipped with bypass breaker comprising draw-out vacuum breaker |
| JP2006149043A (en) * | 2004-11-18 | 2006-06-08 | Terasaki Electric Co Ltd | Switchboard interlock device |
| CN201956749U (en) * | 2010-12-16 | 2011-08-31 | 宁波三维技术有限公司 | Modular uninterruptable power supply for monitoring equipment |
| CN201926549U (en) * | 2010-12-23 | 2011-08-10 | 上海泉润机电设备有限公司 | Aeronautical airborne illumination testing device |
| CN103384085A (en) * | 2012-05-03 | 2013-11-06 | 张立洁 | Remote power supply system of repeater |
| CN202930812U (en) * | 2012-09-26 | 2013-05-08 | 芜湖明远电力设备制造有限公司 | Drawer unit of power distribution cabinet |
| CN202978013U (en) * | 2012-12-11 | 2013-06-05 | 广东志成冠军集团有限公司 | High-voltage DC power supply integrated system cabinet |
| CN103023387A (en) * | 2012-12-31 | 2013-04-03 | 宋开泉 | Magnetic power system using natural energy as driving force |
| KR101251604B1 (en) * | 2013-02-12 | 2013-04-08 | (주)두연테크 | Motor control center |
| CN103414114A (en) * | 2013-07-04 | 2013-11-27 | 安徽电力芜湖县供电有限责任公司 | Drawer-type intelligent comprehensive low-voltage distribution JP cabinet |
| CN203423703U (en) * | 2013-08-19 | 2014-02-05 | 深圳市金霆科技有限公司 | Back wiring type DC remote power supply device with self-equipped PDU |
| CN203645147U (en) * | 2013-08-19 | 2014-06-11 | 深圳市金霆科技有限公司 | Front wired DC remote power supply apparatus with a PDU |
| CN206180697U (en) * | 2016-08-30 | 2017-05-17 | 天津光电比特信息技术有限公司 | N+1 computer case power supply monitoring devices |
| CN206041628U (en) * | 2016-09-14 | 2017-03-22 | 常熟开关制造有限公司(原常熟开关厂) | Dual -power switching device |
| CN207925351U (en) * | 2018-02-08 | 2018-09-28 | 常熟开关制造有限公司(原常熟开关厂) | A kind of mechanical interlocks of breaker |
| CN109061523A (en) * | 2018-09-05 | 2018-12-21 | 深圳市实益达工业有限公司 | A kind of power detecting system |
| CN210379992U (en) * | 2019-09-19 | 2020-04-21 | 四川灵通电讯有限公司 | High-voltage remote power supply equipment with interlocking function |
| CN210628920U (en) * | 2019-09-19 | 2020-05-26 | 四川灵通电讯有限公司 | High-voltage remote power supply equipment with active security function |
Also Published As
| Publication number | Publication date |
|---|---|
| CN110504637B (en) | 2024-05-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201541058U (en) | Intelligent misoperation prevention system of substation primary equipment | |
| CN103904578B (en) | For high-tension switch cabinet nuclear phase, busbar grounding function solid type handcart | |
| WO2015161611A1 (en) | Inductive high-voltage live display apparatus for power line | |
| CN210379992U (en) | High-voltage remote power supply equipment with interlocking function | |
| CN202810416U (en) | Cable and cabin door interlocking device | |
| CN210628920U (en) | High-voltage remote power supply equipment with active security function | |
| CN104078254A (en) | Safety locking device of 10 kV ring main unit and locking control system | |
| CN110504637A (en) | High-voltage remote power supply equipment with active security function and interlock protection method | |
| CN209642160U (en) | Distribution Cabinet | |
| CN209860400U (en) | Movable observation window of switch cabinet door | |
| CN201478729U (en) | Indoor box-type metal enclosed ring main unit | |
| CN205828998U (en) | A locking device and switch cabinet for preventing misoperation of grounding trolley | |
| CN111463697A (en) | Power distribution cabinet | |
| CN202888695U (en) | Power distribution cabinet provided with monitoring devices | |
| CN204011153U (en) | Ring main unit operation interlocking device | |
| CN203787835U (en) | One-piece handcart used for phasing and bus grounding of high tension switchgear | |
| CN102760594B (en) | Transformer substation misoperation preventer and ground wire locking device thereof | |
| CN201717543U (en) | Improved switch cabinet | |
| CN206908116U (en) | A kind of high voltage power distributing cabinet error-proof device | |
| CN208257244U (en) | The protection exclusive circuit and low-voltage distribution cabinet of electrically operated institution | |
| CN206442007U (en) | The electric isolating switch cabinet of convenient operation | |
| CN207852566U (en) | A kind of electromagnetic lock and padlock double insurance interlock | |
| CN217115950U (en) | Multi-loop electromagnetic starter device | |
| CN216981337U (en) | Switch cabinet | |
| CN216720622U (en) | High-low voltage power distribution cabinet with protection component |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20240507 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |