CN110492600B - Novel intelligent direct-current power supply system of transformer substation and maintenance method - Google Patents
Novel intelligent direct-current power supply system of transformer substation and maintenance method Download PDFInfo
- Publication number
- CN110492600B CN110492600B CN201910843008.7A CN201910843008A CN110492600B CN 110492600 B CN110492600 B CN 110492600B CN 201910843008 A CN201910843008 A CN 201910843008A CN 110492600 B CN110492600 B CN 110492600B
- Authority
- CN
- China
- Prior art keywords
- battery pack
- mth
- switch
- storage battery
- intelligent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/0013—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J11/00—Circuit arrangements for providing service supply to auxiliaries of stations in which electric power is generated, distributed or converted
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J9/00—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
- H02J9/04—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
- H02J9/06—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
- H02J9/061—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for DC powered loads
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
本发明涉及一种变电站新型智能直流电源系统及维护方法,属于变电站直流电源系统技术领域;所述系统,包括直流母线及馈线、第一至第N蓄电池组、第一至第N蓄电池组开关、智能放电维护模块、补充充电模块、蓄电池巡检模块,第一至第N蓄电池组并联,第M蓄电池组通过第M蓄电池组开关挂在直流母线上;交流正常供电时通过直流母线给第一至第N蓄电池组充电,交流失电时第一至第N蓄电池组可同时给直流母线及馈线供电;第一至第N蓄电池组共用一个补充充电电源和智能放电负载,维护时,第M蓄电池组处于浮充状态断开第M蓄电池组开关,闭合第M放电开关、启动智能放电负载工作,第M蓄电池组放电,实现第M蓄电池组免维护放电。
The invention relates to a new type of intelligent DC power supply system and maintenance method for substations, belonging to the technical field of DC power supply systems in substations; the system includes DC busbars and feeders, first to Nth battery packs, first to Nth battery pack switches, Intelligent discharge maintenance module, supplementary charging module, and battery inspection module, the first to Nth battery packs are connected in parallel, and the Mth battery pack is hung on the DC bus through the switch of the Mth battery pack; The Nth storage battery pack is charged, and the first to Nth storage battery packs can supply power to the DC bus and feeder at the same time when the AC power is lost; the first to Nth storage battery packs share a supplementary charging power supply and intelligent discharge load. During maintenance, the Mth storage battery pack In the state of floating charging, disconnect the switch of the Mth battery pack, close the Mth discharge switch, start the intelligent discharge load, discharge the Mth battery pack, and realize the maintenance-free discharge of the Mth battery pack.
Description
技术领域technical field
本发明涉及一种变电站新型智能直流电源系统及维护方法,属于变电站直流电源系统技术领域。The invention relates to a novel intelligent DC power supply system of a substation and a maintenance method, and belongs to the technical field of the DC power supply system of a substation.
背景技术Background technique
直流电源系统是整个变电站站用电源系统的核心,是变电站安全运行的基础。多年电力系统运行经验证明,在变电站设备发生故障的关键时刻,直流电源系统如果出现异常或故障,必将造成主设备严重损坏或火灾、设备爆炸、电网大面积停电,甚至区域电网解列的严重后果。The DC power system is the core of the entire substation power system and the basis for the safe operation of the substation. Years of power system operation experience has proved that at the critical moment when substation equipment fails, if the DC power supply system is abnormal or malfunctions, it will inevitably cause serious damage to the main equipment or fire, equipment explosion, large-scale power outage of the power grid, and even severe regional power grid disconnection. as a result of.
当前直流电源系统时常会出现因为蓄电池组开路导致整个直流电源失电的的事故发生,并且当前直流电源系统存在的最大问题为按照国网运检要求完成蓄电池核对性放电维护困难。The current DC power supply system often has accidents that cause the entire DC power supply to lose power due to the open circuit of the battery pack, and the biggest problem existing in the current DC power supply system is the difficulty in completing the check discharge maintenance of the battery in accordance with the requirements of the State Grid.
目前变电站直流电源系统蓄电池组连接方式为蓄电池单组串联的方式,具体系统原理图如图1所示。采用蓄电池单组串联方式的直流电源系统因为单组串联蓄电池的连接方式,蓄电池组只能进行50%核对性放电维护,无法进行100%核对性放电维护。一旦蓄电池质量或运行状况出现问题必将造成系统事故发生,且单串联蓄电池组必须携带备用蓄电池到现场才可以进行放电维护,因此现有直流电源系统存在运行安全可靠性低,维护工作量大、维护困难的问题。At present, the battery pack connection mode of the DC power system of the substation is the way of connecting a single battery pack in series. The specific system schematic diagram is shown in Figure 1. The DC power supply system adopting the single-group series connection mode of batteries can only perform 50% check discharge maintenance for the battery packs due to the connection method of single-set series-connected batteries, and cannot perform 100% check discharge maintenance. Once there is a problem with the quality or operation of the battery, a system accident will inevitably occur, and the single-series battery pack must carry a spare battery to the site before it can be discharged and maintained. Therefore, the existing DC power supply system has low operational safety and reliability, and the maintenance workload is large. Difficult maintenance issues.
中国专利201320884169.9,公开了一种具有紧急备用电源的变电站直流电源系统,一种具有紧急备用电源的变电站直流电源系统,设有交流母线和直流母线;所述交流母线通过一个交流电源转换开关与交流进线电源相连接;所述交流母线和直流母线通过若干条并联的充电模块线路相连接,每一条充电模块线路均依次串联着充电模块和直流接触器;所述的直流母线还连接有蓄电池组;其特征在于:所述的直流母线与蓄电池组之间的连接线路上串联有一个直流电源转换开关,且所述的蓄电池组并联设置两组,分别为常用蓄电池组和紧急备用蓄电池组;在蓄电池组与直流电源转换开关的连接线路上还设有一个直流电源检测装置,所述的直流电源检测装置的两个检测线端分别连接在常用蓄电池组、紧急备用蓄电池组与直流电源转换开关之间的连接线路上,所述的直流电源检测装置的控制线端与直流电源转换开关相连。Chinese patent 201320884169.9 discloses a substation DC power supply system with an emergency backup power supply. A substation DC power supply system with an emergency backup power supply is provided with an AC bus bar and a DC bus bar; The incoming power supply is connected; the AC bus and the DC bus are connected through several parallel charging module lines, and each charging module line is connected in series with the charging module and the DC contactor; the DC bus is also connected to the battery pack ; It is characterized in that: a DC power conversion switch is connected in series on the connection line between the DC bus and the storage battery, and the storage battery is provided in parallel with two groups, which are the normal storage battery and the emergency backup storage battery; A DC power detection device is also provided on the connection line between the storage battery pack and the DC power conversion switch, and the two detection wire ends of the DC power detection device are respectively connected between the normal storage battery pack, the emergency backup battery pack and the DC power conversion switch. On the connecting line between them, the control line end of the DC power detection device is connected with the DC power conversion switch.
蓄电池组共2组,分别为第1组蓄电池和第2组蓄电池,接入直流电源检测装置和直流电源转换开关。正常情况下,只有一组蓄电池经过直流电源转换开关接入直流电源母线。直流电源检测装置检测直流母线和两组蓄电池组的电压情况,并将相应信号送至直流电源转换开关。若直流电源母线电压正常且两组蓄电池组均正常,则直流电源转换开关自动选择蓄电池组1;若直流电源母线电压正常而有1蓄电池组不正常,则直流电源转换开关自动选择正常的那组蓄电池组;若直流电源母线的电压出现过压、欠压、失电而两组蓄电池组均正常,则直流电源转换开关自动选择蓄电池组1;若直流电源母线电源电压出现过压、欠压、失电而两组蓄电池组中只有1组正常,则直流转换开关自动选择正常的那组蓄电池组。若直流电源母线电压正常,两组蓄电池组中任一蓄电池组出现电池欠压,则切换至该组进行充电,充电完毕自动在接入该组蓄电池。这样直流电源母线上的两组蓄电池组总有一组退出运行,不接入直流电源系统,而作为特殊情况下的紧急备用电源,实现了两组蓄电池组互为备用。直流电源检测装置检测到直流母线电压消失,则说明2回交流电源和1组直流蓄电池出现故障,直流电源转换开关投入紧急备用蓄电池组,保证直流母线电压恢复。由于紧急备用蓄电池组在直流电源系统正常运行时不接入直流母线,不受电网系统运行的任何影响,保证了紧急备用蓄电池组的安全性,大大提高直流电源系统的可靠性。There are 2 sets of battery packs in total, which are the first set of batteries and the second set of batteries, which are connected to the DC power detection device and the DC power conversion switch. Normally, only one set of storage batteries is connected to the DC power bus through the DC power conversion switch. The DC power detection device detects the voltage of the DC bus and the two battery packs, and sends corresponding signals to the DC power conversion switch. If the DC power bus voltage is normal and both battery groups are normal, the DC power transfer switch automatically selects battery group 1; if the DC power bus voltage is normal but one battery group is abnormal, the DC power transfer switch automatically selects the normal group battery pack; if the voltage of the DC power bus is overvoltage, undervoltage, or power-off and the two battery packs are normal, the DC power switch will automatically select battery pack 1; if the voltage of the DC power bus is overvoltage, undervoltage, In case of power failure and only one of the two battery groups is normal, the DC transfer switch automatically selects the normal battery group. If the voltage of the DC power bus is normal and any of the two sets of battery packs is undervoltage, it will switch to this set for charging, and automatically connect to this set of batteries after charging. In this way, one of the two sets of battery packs on the DC power supply bus is always out of operation and is not connected to the DC power supply system. Instead, it is used as an emergency backup power supply under special circumstances, so that the two sets of battery packs can be used as backup for each other. If the DC power supply detection device detects that the DC bus voltage disappears, it means that the two AC power sources and one set of DC batteries are faulty, and the DC power conversion switch is put into the emergency backup battery group to ensure the recovery of the DC bus voltage. Since the emergency backup battery pack is not connected to the DC bus when the DC power system is in normal operation, it will not be affected by the operation of the grid system, which ensures the safety of the emergency backup battery pack and greatly improves the reliability of the DC power system.
但是,仅仅实现在变电站直流电源故障时能提供可靠的紧急备用电源,依然存在维护工作量大、维护困难的问题。However, only to provide a reliable emergency backup power supply when the DC power supply of the substation fails, there are still problems of heavy maintenance workload and difficult maintenance.
发明内容Contents of the invention
本发明要解决的技术问题是:克服现有技术的不足,提供一种变电站新型智能直流电源系统及维护方法,解决现有单串联蓄电池组可靠性低、维护困难的问题。The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art, provide a new type of intelligent DC power supply system and maintenance method for substations, and solve the problems of low reliability and difficult maintenance of existing single-series battery packs.
本发明所述变电站新型智能直流电源系统,包括直流母线及馈线,还包括第一至第N蓄电池组、第一至第N蓄电池组开关、智能放电维护模块、补充充电模块、蓄电池巡检模块,第一至第N蓄电池组并联,第M蓄电池组通过第M蓄电池组开关挂在直流母线上;智能放电维护模块包括智能放电负载和第一至第N放电开关,智能放电负载通过第M放电开关连接至第M蓄电池组;补充充电模块包括补充充电电源和第一至第N充电开关,补充充电电源通过第M充电开关连接至第M蓄电池组;蓄电池巡检模块包括电压采集单元、开关控制单元和智能监控主机,电压采集单元用于采集第一至第N蓄电池组单节电池的电压,开关控制单元用于第一至第N蓄电池组开关、第一至第N放电开关、第一至第N充电开关的开关量采集和开闭执行,智能监控主机用于电压采集单元、开关控制单元的数据监测和指令下达,智能监控主机还用于启动、停止智能放电负载工作;其中N为正偶数,1≤M≤N。The novel intelligent DC power supply system of the substation according to the present invention includes a DC bus and a feeder, and also includes the first to Nth storage battery packs, the first to Nth storage battery pack switches, an intelligent discharge maintenance module, a supplementary charging module, and a battery inspection module, The first to Nth battery groups are connected in parallel, and the Mth battery group is hung on the DC bus through the Mth battery group switch; the intelligent discharge maintenance module includes intelligent discharge loads and the first to Nth discharge switches, and the intelligent discharge load passes through the Mth discharge switch Connected to the Mth battery pack; the supplementary charging module includes a supplementary charging power supply and the first to Nth charging switches, and the supplementary charging power supply is connected to the Mth battery pack through the Mth charging switch; the battery inspection module includes a voltage acquisition unit and a switch control unit and an intelligent monitoring host, the voltage acquisition unit is used to collect the voltage of the first to Nth battery pack single battery, the switch control unit is used for the first to Nth battery pack switch, the first to Nth discharge switch, the first to Nth battery pack switch, the first to Nth discharge switch, The switching value acquisition and switching execution of the N charging switch, the intelligent monitoring host is used for data monitoring and command issuance of the voltage acquisition unit and the switch control unit, and the intelligent monitoring host is also used for starting and stopping the work of the intelligent discharge load; where N is a positive even number , 1≤M≤N.
交流正常供电时通过直流母线给第一至第N蓄电池组充电,交流失电时第一至第N蓄电池组可同时给直流母线及馈线供电。第一至第N蓄电池组共用一个补充充电电源和智能放电负载,维护时,第M蓄电池组处于浮充状态断开第M蓄电池组开关,闭合第M放电开关、启动智能放电负载工作,第M蓄电池组放电,实现第M蓄电池组免维护放电;第M蓄电池组放电结束闭合第M充电开关,补充充电电源给第M蓄电池组充电,实现第M蓄电池组的补充充电。通过蓄电池巡检模块自动控制第M蓄电池组充、放电,实现直流电源系统蓄电池组的100%免维护核对性充放电。When the AC power supply is normal, the first to Nth battery packs are charged through the DC bus, and the first to Nth battery packs can supply power to the DC bus and the feeder at the same time when the AC power is lost. The first to Nth battery packs share a supplementary charging power source and intelligent discharge load. During maintenance, the Mth battery pack is in a floating charge state, disconnect the switch of the Mth battery pack, close the Mth discharge switch, and start the smart discharge load. The battery pack is discharged to realize maintenance-free discharge of the Mth battery pack; the Mth charging switch is closed after the Mth battery pack is discharged, and the supplementary charging power is charged to the Mth battery pack to realize supplementary charging of the Mth battery pack. The charging and discharging of the Mth battery group is automatically controlled by the battery inspection module, and the 100% maintenance-free checking charging and discharging of the battery group of the DC power supply system is realized.
优选的,第一至第N放电开关互锁,第一至第N充电开关互锁。Preferably, the first to Nth discharge switches are interlocked, and the first to Nth charging switches are interlocked.
同时只能有一个放电开关闭合,也同时只能有一个充电开关闭合,同时只能对一个蓄电池组进行维护,在交流失电时非维护蓄电池组可同时给直流母线及馈线供电。Only one discharge switch can be closed at the same time, and only one charging switch can be closed at the same time. At the same time, only one battery pack can be maintained. When the AC power is lost, the non-maintenance battery pack can supply power to the DC bus and feeder at the same time.
优选的,还包括第一至第N二极管,第M二极管和第M蓄电池组开关并联。Preferably, it also includes first to Nth diodes, and the Mth diode is connected in parallel with the switch of the Mth battery pack.
第M二极管和第M蓄电池组开关组成第M不间断供电模块,系统正常运行时第一至第N蓄电池组开关闭合,此时直流母线通过第M蓄电池组开关给蓄电池组充电,交流失电时第M蓄电池组通过第M蓄电池组开关给直流母线及馈线供电;进行放电维护时断开第M蓄电池组开关,直流母线不再给第M蓄电池组充电,交流失电时第M蓄电池组可以通过第M二极管给直流母线及馈线供电,实现不间断供电。The Mth diode and the Mth battery pack switch form the Mth uninterruptible power supply module. When the system is running normally, the first to Nth battery pack switches are closed. At this time, the DC bus charges the battery pack through the Mth battery pack switch. The Mth battery pack supplies power to the DC bus and feeder through the Mth battery pack switch; disconnect the Mth battery pack switch during discharge maintenance, the DC bus will no longer charge the Mth battery pack, and the Mth battery pack can pass through when the AC power fails. The Mth diode supplies power to the DC bus and the feeder to realize uninterrupted power supply.
优选的,N=2,M=1或2。Preferably, N=2, M=1 or 2.
本发明所述变电站新型智能直流电源维护方法,应用于上述变电站新型智能直流电源系统,第M蓄电池组维护方法包括以下步骤:The new intelligent DC power supply maintenance method of the substation described in the present invention is applied to the above-mentioned new intelligent DC power supply system of the substation, and the maintenance method of the Mth battery pack includes the following steps:
步骤S1,智能监控主机监测第M蓄电池组是否浮充,若是进入步骤S2;Step S1, the intelligent monitoring host monitors whether the Mth battery pack is floating-charged, and if so, enters step S2;
步骤S2,智能监控主机给开关控制单元下发指令控制第M蓄电池组开关断开;Step S2, the intelligent monitoring host sends an instruction to the switch control unit to control the switch of the Mth battery pack to be disconnected;
步骤S3,智能监控主机监测到第M蓄电池组开关断开后,给开关控制单元下发指令控制第M放电开关闭合;Step S3, after the intelligent monitoring host monitors that the switch of the Mth battery pack is disconnected, it sends an instruction to the switch control unit to control the closing of the Mth discharge switch;
步骤S4,智能监控主机监测到第M放电开关闭合后,启动智能放电负载工作、实现第M蓄电池组的放电功能;Step S4, after the intelligent monitoring host detects that the Mth discharge switch is closed, it starts the intelligent discharge load to realize the discharge function of the Mth battery pack;
步骤S5,智能监控主机监测第M蓄电池组是否达到放电截止条件,若是停止智能放电负载工作、完成第M蓄电池组的放电功能,给开关控制单元下发指令控制第M放电开关断开;Step S5, the intelligent monitoring host monitors whether the Mth battery pack reaches the discharge cut-off condition, and if the smart discharge load is stopped and the discharge function of the Mth battery pack is completed, an instruction is issued to the switch control unit to control the Mth discharge switch to be disconnected;
步骤S6,智能监控主机监测到第M放电开关断开后,给开关控制单元下发指令控制第M充电开关闭合、实现第M蓄电池组的充电功能;Step S6, after the intelligent monitoring host monitors that the Mth discharge switch is disconnected, it sends an instruction to the switch control unit to control the Mth charging switch to be closed, so as to realize the charging function of the Mth battery pack;
步骤S7,智能监控主机监测第M蓄电池组是否充满电,若是给开关控制单元下发指令控制第M充电开关断开、完成第M蓄电池组的充电功能;Step S7, the intelligent monitoring host monitors whether the Mth battery pack is fully charged, and if so, sends an instruction to the switch control unit to control the Mth charging switch to be disconnected, and completes the charging function of the Mth battery pack;
步骤S8,智能监控主机监测到第M充电开关断开后,给开关控制单元下发指令控制第M蓄电池组开关闭合、恢复系统正常。Step S8, after the intelligent monitoring host monitors that the Mth charging switch is disconnected, it sends an instruction to the switch control unit to control the switch of the Mth battery pack to be closed, and restore the system to normal.
与现有技术相比,本发明具有以下有益效果:Compared with the prior art, the present invention has the following beneficial effects:
本发明所述变电站新型智能直流电源系统,可实现单电单充蓄电池组的100%免维护充放电功能,系统可定期自动进行100%核容充放电维护,无需运维人员到现场进行核容工作,只需到现场查看自动维护结果即可,有通道的情况可以在主站查看自动维护结果。The new intelligent DC power supply system of the substation described in the present invention can realize the 100% maintenance-free charging and discharging function of the single-electric single-charge battery pack, and the system can automatically perform 100% nuclear capacity charging and discharging maintenance on a regular basis, without the need for operation and maintenance personnel to go to the site for nuclear capacity To work, you only need to go to the site to check the automatic maintenance results. If there is a channel, you can check the automatic maintenance results at the master station.
本发明所述变电站新型智能直流电源系统,放电前自动判断蓄电池组是否处于浮充状态,只有浮充状态下才能进行自动放电进行维护,交流失电后立即停止放电,蓄电池组可以通过二极管向负载供电,保证交流失电时直流不间断供电。非维护蓄电池组可以正常供电,提高系统安全性与可靠性。The new intelligent DC power supply system of the substation described in the present invention can automatically judge whether the storage battery pack is in the floating charging state before discharging, and only in the floating charging state can automatic discharge be performed for maintenance, and the discharge will be stopped immediately after the AC power failure, and the storage battery pack can be charged to the load through the diode. Power supply to ensure uninterrupted DC power supply when AC power is lost. Non-maintenance battery packs can supply power normally, improving system safety and reliability.
本发明所述变电站新型智能直流电源维护方法,可实现单电单充蓄电池组的100%免维护充放电功能,可定期自动进行100%核容充放电维护,无需运维人员到现场进行核容工作,只需到现场查看自动维护结果即可,有通道的情况可以在主站查看自动维护结果。The novel intelligent DC power supply maintenance method for substations described in the present invention can realize the 100% maintenance-free charging and discharging function of the single-power single-charge battery pack, and can automatically perform 100% nuclear capacity charging and discharging maintenance on a regular basis, without the need for operation and maintenance personnel to go to the site for nuclear capacity To work, you only need to go to the site to check the automatic maintenance results. If there is a channel, you can check the automatic maintenance results at the master station.
本发明所述变电站新型智能直流电源维护方法,放电前自动判断蓄电池组是否处于浮充状态,只有浮充状态下才能进行自动放电进行维护,交流失电后立即停止放电,蓄电池组可以通过二极管向负载供电,保证交流失电时直流不间断供电。非维护蓄电池组可以正常供电,提高系统安全性与可靠性。The new intelligent DC power supply maintenance method for substations described in the present invention automatically judges whether the battery pack is in a floating charge state before discharging, and only in the floating charge state can automatic discharge be performed for maintenance, and the discharge is stopped immediately after the AC power failure, and the battery pack can be charged to the battery through a diode. Load power supply to ensure DC uninterrupted power supply in case of AC power failure. Non-maintenance battery packs can supply power normally, improving system safety and reliability.
附图说明Description of drawings
图1为本发明所述单串联蓄电池组直流电源系统原理图;Fig. 1 is a schematic diagram of a DC power supply system of a single series battery pack according to the present invention;
图2为本发明实施例2所述变电站新型智能直流电源系统的结构框图;Fig. 2 is a structural block diagram of a novel intelligent DC power supply system in a substation according to Embodiment 2 of the present invention;
图3为本发明实施例4所述变电站新型智能直流电源第一蓄电池组维护方法的流程图;Fig. 3 is a flow chart of the method for maintaining the first battery pack of the new intelligent DC power supply in the substation according to
图4为本发明实施例4所述变电站新型智能直流电源第二蓄电池组维护方法的流程图。Fig. 4 is a flow chart of the method for maintaining the second battery pack of the new intelligent DC power supply in the substation according to
其中,1、第一蓄电池组;101、第一蓄电池组开关;102、第一放电开关;103、第一充电开关;104、第一二极管;2、第二蓄电池组;201、第二蓄电池组开关;202、第二放电开关;203、第二充电开关;204、第二二极管;3、智能放电负载;4、补充充电电源;401、补充开关;5、蓄电池巡检模块。Among them, 1, the first battery pack; 101, the first battery pack switch; 102, the first discharge switch; 103, the first charging switch; 104, the first diode; 2, the second battery pack; 201, the second Battery pack switch; 202, second discharge switch; 203, second charging switch; 204, second diode; 3, intelligent discharge load; 4, supplementary charging power supply; 401, supplementary switch; 5, battery inspection module.
具体实施方式Detailed ways
为使本发明的目的、技术方案和优点更加清楚,下面将结合附图对本发明实施方式作进一步地详细描述。In order to make the object, technical solution and advantages of the present invention clearer, the implementation manner of the present invention will be further described in detail below in conjunction with the accompanying drawings.
实施例1Example 1
本发明所述一种变电站新型智能直流电源系统,包括直流母线及馈线,还包括第一至第N蓄电池组、第一至第N蓄电池组开关、智能放电维护模块、补充充电模块、蓄电池巡检模块5,第一至第N蓄电池组并联,第M蓄电池组通过第M蓄电池组开关挂在直流母线上;智能放电维护模块包括智能放电负载3和第一至第N放电开关,智能放电负载3通过第M放电开关连接至第M蓄电池组;补充充电模块包括补充充电电源4和第一至第N充电开关,补充充电电源4通过第M充电开关连接至第M蓄电池组;蓄电池巡检模块5包括电压采集单元、开关控制单元和智能监控主机,电压采集单元用于采集第一至第N蓄电池组单节电池的电压,开关控制单元用于第一至第N蓄电池组开关、第一至第N放电开关、第一至第N充电开关的开关量采集和开闭执行,智能监控主机用于电压采集单元、开关控制单元的数据监测和指令下达,智能监控主机还用于启动、停止智能放电负载3工作;其中N为正偶数,1≤M≤N。A novel intelligent DC power supply system for a substation according to the present invention includes a DC busbar and a feeder, and also includes first to Nth battery packs, switches for the first to Nth battery packs, an intelligent discharge maintenance module, a supplementary charging module, and
第一至第N放电开关互锁,第一至第N充电开关互锁。同时只能有一个放电开关闭合,也同时只能有一个充电开关闭合,同时只能对一个蓄电池组进行维护,在交流失电时非维护蓄电池组可同时给直流母线及馈线供电。The first to Nth discharge switches are interlocked, and the first to Nth charging switches are interlocked. Only one discharge switch can be closed at the same time, and only one charging switch can be closed at the same time. At the same time, only one battery pack can be maintained. When the AC power is lost, the non-maintenance battery pack can supply power to the DC bus and feeder at the same time.
还包括第一至第N二极管,第M二极管和第M蓄电池组开关并联。第M二极管和第M蓄电池组开关组成第M不间断供电模块,系统正常运行时第一至第N蓄电池组开关闭合,此时直流母线通过第M蓄电池组开关给蓄电池组充电,交流失电时第M蓄电池组通过第M蓄电池组开关给直流母线及馈线供电;进行放电维护时断开第M蓄电池组开关,直流母线不再给第M蓄电池组充电,交流失电时第M蓄电池组可以通过第M二极管给直流母线及馈线供电,实现不间断供电。It also includes first to Nth diodes, and the Mth diode is connected in parallel with the switch of the Mth battery pack. The Mth diode and the Mth battery pack switch form the Mth uninterruptible power supply module. When the system is running normally, the first to Nth battery pack switches are closed. At this time, the DC bus charges the battery pack through the Mth battery pack switch. The Mth battery pack supplies power to the DC bus and feeder through the Mth battery pack switch; disconnect the Mth battery pack switch during discharge maintenance, the DC bus will no longer charge the Mth battery pack, and the Mth battery pack can pass through when the AC power fails. The Mth diode supplies power to the DC bus and the feeder to realize uninterrupted power supply.
交流正常供电时通过直流母线给第一至第N蓄电池组充电,交流失电时第一至第N蓄电池组可同时给直流母线及馈线供电。第一至第N蓄电池组共用一个补充充电电源4和智能放电负载3,维护时,第M蓄电池组处于浮充状态断开第M蓄电池组开关,闭合第M放电开关、启动智能放电负载3工作,第M蓄电池组放电,实现第M蓄电池组免维护放电;第M蓄电池组放电结束闭合第M充电开关,补充充电电源4给第M蓄电池组充电,实现第M蓄电池组的补充充电。通过蓄电池巡检模块5自动控制第M蓄电池组充、放电,实现直流电源系统蓄电池组的100%免维护核对性充放电。智能监控主机监测电压采集单元采集的第M蓄电池组单节电池的电压判断第M蓄电池组是否浮充,是否达到放电截止条件,是否充满电。When the AC power supply is normal, the first to Nth battery packs are charged through the DC bus, and the first to Nth battery packs can supply power to the DC bus and the feeder at the same time when the AC power is lost. The first to Nth battery packs share a supplementary
补充充电电源4还可通过补充开关401挂在直流母线上,交流正常供电时直流母线通过补充开关401给补充充电电源4充电。The supplementary
N组小容量蓄电池组并联替代现有的N/2组蓄电池组串联,每组蓄电池通过不间断供电模块接至直流母线,系统总的蓄电池容量不变,但是并联蓄电池组解决了系统因为一组或几组蓄电池开路导致系统失电的问题。N groups of small-capacity battery groups are connected in parallel to replace the existing N/2 groups of battery groups in series. Each group of batteries is connected to the DC bus through an uninterrupted power supply module. Or the problem that several groups of batteries are open and cause the system to lose power.
可定期半年或一年进行一次放电维护,实现免人工维护。Discharge maintenance can be carried out on a regular basis every six months or a year to achieve manual maintenance-free.
实施例2Example 2
如图2所示,本发明所述一种变电站新型智能直流电源系统,包括直流母线及馈线,还包括第一蓄电池组1和第二蓄电池组2、第一蓄电池组开关101和第二蓄电池组开关201、智能放电维护模块、补充充电模块、蓄电池巡检模块5,第一蓄电池组1和第二蓄电池组2并联,第一蓄电池组1或第二蓄电池组2通过第一蓄电池组开关101或第二蓄电池组开关201挂在直流母线上;智能放电维护模块包括智能放电负载3和第一放电开关102和第二放电开关202,智能放电负载3通过第一放电开关102或第二放电开关202连接至第一或第二蓄电池组2;补充充电模块包括补充充电电源4和第一充电开关103和第二充电开关203,补充充电电源4通过第一充电开关103或第二充电开关203连接至第一蓄电池组1或第二蓄电池组2;蓄电池巡检模块5包括电压采集单元、开关控制单元和智能监控主机,电压采集单元用于采集第一和第二蓄电池组2单节电池的电压,开关控制单元用于第一蓄电池组开关101和第二蓄电池组开关201、第一放电开关102和第二放电开关202、第一充电开关103和第二充电开关203的开关量采集和开闭执行,智能监控主机用于电压采集单元、开关控制单元的数据监测和指令下达,智能监控主机还用于启动、停止智能放电负载3工作。As shown in Figure 2, a novel intelligent DC power supply system for a substation according to the present invention includes a DC busbar and a feeder, and also includes a first battery pack 1 and a second battery pack 2, a first battery pack switch 101 and a second battery pack Switch 201, intelligent discharge maintenance module, supplementary charging module, battery inspection module 5, the first battery pack 1 and the second battery pack 2 are connected in parallel, and the first battery pack 1 or the second battery pack 2 is connected through the first battery pack switch 101 or The second battery pack switch 201 is hung on the DC bus; the intelligent discharge maintenance module includes an intelligent discharge load 3 and a first discharge switch 102 and a second discharge switch 202, and the intelligent discharge load 3 passes through the first discharge switch 102 or the second discharge switch 202 Connected to the first or second storage battery pack 2; the supplementary charging module includes a supplementary charging power supply 4 and a first charging switch 103 and a second charging switch 203, and the supplementary charging power supply 4 is connected to the first charging switch 103 or the second charging switch 203 The first battery pack 1 or the second battery pack 2; the battery inspection module 5 includes a voltage acquisition unit, a switch control unit and an intelligent monitoring host, the voltage acquisition unit is used to collect the voltage of the first and second battery pack 2 single cells, The switch control unit is used for switching value acquisition and switching execution of the first battery pack switch 101 and the second battery pack switch 201, the first discharge switch 102 and the second discharge switch 202, the first charging switch 103 and the second charging switch 203 , the intelligent monitoring host is used for data monitoring and instruction issuance of the voltage acquisition unit and the switch control unit, and the intelligent monitoring host is also used for starting and stopping the intelligent discharge load 3 .
第一放电开关102和第二放电开关202互锁,第一充电开关103和第二充电开关203互锁。同时只能有一个放电开关闭合,也同时只能有一个充电开关闭合,同时只能对第一蓄电池组1或第二蓄电池组2进行维护,在交流失电时第二蓄电池组2或第一蓄电池组1可给直流母线及馈线供电。The
还包括第一二极管104和第二二极管204,第一二极管104或第二二极管204和第一蓄电池组开关101或第二蓄电池组开关201并联。第一二极管104或第二二极管204和第一蓄电池组开关101或第二蓄电池组开关201组成第一不间断供电模块或第二不间断供电模块,系统正常运行时第一蓄电池组开关101和第二蓄电池组开关201闭合,此时直流母线通过第一蓄电池组开关101或第二蓄电池组开关201给蓄电池组充电,交流失电时第一蓄电池组1或第二蓄电池组2通过第一蓄电池组开关101或第二蓄电池组开关201给直流母线及馈线供电;进行放电维护时断开第一蓄电池组开关101或第二蓄电池组开关201,直流母线不再给第一蓄电池组1或第二蓄电池组2充电,交流失电时第一蓄电池组1或第二蓄电池组2可以通过第一二极管104或第二二极管204给直流母线及馈线供电,实现不间断供电。It also includes a
交流正常供电时通过直流母线给第一蓄电池组1和第二蓄电池组2充电,交流失电时第一蓄电池组1和第二蓄电池组2可同时给直流母线及馈线供电。第一蓄电池组1和第二蓄电池组2共用一个补充充电电源4和智能放电负载3,维护时,第一蓄电池组1或第二蓄电池组2处于浮充状态断开第一蓄电池组开关101或第二蓄电池组开关201,闭合第一放电开关102或第二放电开关202、启动智能放电负载3工作,第一蓄电池组1或第二蓄电池组2放电,实现第一蓄电池组1或第二蓄电池组2免维护放电;第一蓄电池组1或第二蓄电池组2放电结束闭合第一充电开关103或第二充电开关203,补充充电电源4给第一蓄电池组1或第二蓄电池组2充电,实现第一蓄电池组1或第二蓄电池组2的补充充电。通过蓄电池巡检模块5自动控制第一蓄电池组1或第二蓄电池组2充、放电,完成维护。智能监控主机监测电压采集单元采集的第一蓄电池组1或第二蓄电池组2单节电池的电压判断第一或第二蓄电池组2是否浮充,是否达到放电截止条件,是否充满电。When the AC power supply is normal, the first battery pack 1 and the second battery pack 2 are charged through the DC bus, and the first battery pack 1 and the second battery pack 2 can simultaneously supply power to the DC bus and the feeder when the AC power fails. The first storage battery group 1 and the second storage battery group 2 share a supplementary
补充充电电源4还可通过补充开关401挂在直流母线上,交流正常供电时直流母线通过补充开关401给补充充电电源4充电。The supplementary
两组小容量蓄电池组并联替代现有的单组蓄电池组串联,每组蓄电池通过不间断供电模块接至直流母线,系统总的蓄电池容量不变,但是并联蓄电池组解决了系统因为一组蓄电池开路导致系统失电的问题。Two groups of small-capacity battery groups are connected in parallel to replace the existing single group of battery groups in series. Each group of batteries is connected to the DC bus through an uninterrupted power supply module. A problem that causes the system to lose power.
可定期半年或一年进行一次放电维护,实现免人工维护。Discharge maintenance can be carried out on a regular basis every six months or a year to achieve manual maintenance-free.
实施例3Example 3
本发明变电站新型智能直流电源维护方法,应用于实施例1所述变电站新型智能直流电源系统,第M蓄电池组维护方法包括以下步骤:The new intelligent DC power supply maintenance method of the substation of the present invention is applied to the new intelligent DC power supply system of the substation described in Embodiment 1, and the maintenance method of the Mth battery pack includes the following steps:
步骤S1,智能监控主机监测第M蓄电池组是否浮充,若是进入步骤S2;Step S1, the intelligent monitoring host monitors whether the Mth battery pack is floating-charged, and if so, enters step S2;
步骤S2,智能监控主机给开关控制单元下发指令控制第M蓄电池组开关断开;Step S2, the intelligent monitoring host sends an instruction to the switch control unit to control the switch of the Mth battery pack to be disconnected;
步骤S3,智能监控主机监测到第M蓄电池组开关断开后,给开关控制单元下发指令控制第M放电开关闭合;Step S3, after the intelligent monitoring host monitors that the switch of the Mth battery pack is disconnected, it sends an instruction to the switch control unit to control the closing of the Mth discharge switch;
步骤S4,智能监控主机监测到第M放电开关闭合后,启动智能放电负载3工作、实现第M蓄电池组的放电功能;Step S4, after the intelligent monitoring host monitors that the Mth discharge switch is closed, it starts the
步骤S5,智能监控主机监测第M蓄电池组是否达到放电截止条件,若是停止智能放电负载3工作、完成第M蓄电池组的放电功能,给开关控制单元下发指令控制第M放电开关断开;Step S5, the intelligent monitoring host monitors whether the Mth battery pack reaches the discharge cut-off condition, and if the
步骤S6,智能监控主机监测到第M放电开关断开后,给开关控制单元下发指令控制第M充电开关闭合、实现第M蓄电池组的充电功能;Step S6, after the intelligent monitoring host monitors that the Mth discharge switch is disconnected, it sends an instruction to the switch control unit to control the Mth charging switch to be closed, so as to realize the charging function of the Mth battery pack;
步骤S7,智能监控主机监测第M蓄电池组是否充满电,若是给开关控制单元下发指令控制第M充电开关断开、完成第M蓄电池组的充电功能;Step S7, the intelligent monitoring host monitors whether the Mth battery pack is fully charged, and if so, sends an instruction to the switch control unit to control the Mth charging switch to be disconnected, and completes the charging function of the Mth battery pack;
步骤S8,智能监控主机监测到第M充电开关断开后,给开关控制单元下发指令控制第M蓄电池组开关闭合、恢复系统正常。Step S8, after the intelligent monitoring host monitors that the Mth charging switch is disconnected, it sends an instruction to the switch control unit to control the switch of the Mth battery pack to be closed, and restore the system to normal.
步骤S5中智能监控主机监测第M蓄电池组是否达到放电截止条件时,分两种情况:一种是第M蓄电池组完成放电,另一种是交流失电第M蓄电池组通过二极管向负载供电。无论何种情况均可达到放电截止条件。In step S5, when the intelligent monitoring host monitors whether the Mth storage battery reaches the discharge cut-off condition, there are two situations: one is that the Mth storage battery completes discharging, and the other is that the Mth storage battery supplies power to the load through a diode due to AC failure. In any case, the discharge cut-off condition can be reached.
实施例4Example 4
本发明变电站新型智能直流电源维护方法,应用于实施例2所述变电站新型智能直流电源系统。如图3所示,第一蓄电池组1维护方法包括以下步骤:The maintenance method of the novel intelligent DC power supply of the substation of the present invention is applied to the novel intelligent DC power supply system of the substation described in Embodiment 2. As shown in Figure 3, the maintenance method for the first battery pack 1 includes the following steps:
步骤S1,智能监控主机监测第一蓄电池组1是否浮充,若是进入步骤S2;Step S1, the intelligent monitoring host monitors whether the first battery pack 1 is floating-charged, and if so, enters step S2;
步骤S2,智能监控主机给开关控制单元下发指令控制第一蓄电池组开关101断开;Step S2, the intelligent monitoring host sends an instruction to the switch control unit to control the first
步骤S3,智能监控主机监测到第一蓄电池组开关101断开后,给开关控制单元下发指令控制第一放电开关102闭合;Step S3, after the intelligent monitoring host monitors that the first
步骤S4,智能监控主机监测到第一放电开关102闭合后,启动智能放电负载3工作、实现第一蓄电池组1的放电功能;Step S4, after the intelligent monitoring host detects that the
步骤S5,智能监控主机监测第一蓄电池组1是否达到放电截止条件,若是停止智能放电负载3工作、完成第一蓄电池组1的放电功能,给开关控制单元下发指令控制第一放电开关102断开;Step S5, the intelligent monitoring host monitors whether the first storage battery pack 1 reaches the discharge cut-off condition, and if the
步骤S6,智能监控主机监测到第一放电开关102断开后,给开关控制单元下发指令控制第一充电开关103闭合、实现第一蓄电池组1的充电功能;Step S6, after the intelligent monitoring host monitors that the
步骤S7,智能监控主机监测第一蓄电池组1是否充满电,若是给开关控制单元下发指令控制第一充电开关103断开、完成第一蓄电池组1的充电功能;Step S7, the intelligent monitoring host monitors whether the first battery pack 1 is fully charged, and if it sends an instruction to the switch control unit to control the
步骤S8,智能监控主机监测到第一充电开关103断开后,给开关控制单元下发指令控制第一蓄电池组开关101闭合、恢复系统正常。Step S8 , after the intelligent monitoring host monitors that the
如图4所示,第二蓄电池组2维护方法包括以下步骤:As shown in Figure 4, the maintenance method for the second battery pack 2 includes the following steps:
步骤S1,智能监控主机监测第二蓄电池组2是否浮充,若是进入步骤S2;Step S1, the intelligent monitoring host monitors whether the second battery pack 2 is floating-charged, and if so, enters step S2;
步骤S2,智能监控主机给开关控制单元下发指令控制第二蓄电池组开关201断开;Step S2, the intelligent monitoring host issues an instruction to the switch control unit to control the second
步骤S3,智能监控主机监测到第二蓄电池组开关201断开后,给开关控制单元下发指令控制第二放电开关202闭合;Step S3, after the intelligent monitoring host monitors that the second
步骤S4,智能监控主机监测到第二放电开关202闭合后,启动智能放电负载3工作、实现第二蓄电池组2的放电功能;Step S4, after the intelligent monitoring host detects that the
步骤S5,智能监控主机监测第二蓄电池组2是否达到放电截止条件,若是停止智能放电负载3工作、完成第二蓄电池组2的放电功能,给开关控制单元下发指令控制第二放电开关202断开;Step S5, the intelligent monitoring host monitors whether the second battery pack 2 reaches the discharge cut-off condition, and if the
步骤S6,智能监控主机监测到第二放电开关202断开后,给开关控制单元下发指令控制第二充电开关203闭合、实现第二蓄电池组2的充电功能;Step S6, after the intelligent monitoring host monitors that the second discharging
步骤S7,智能监控主机监测第二蓄电池组2是否充满电,若是给开关控制单元下发指令控制第二充电开关203断开、完成第二蓄电池组2的充电功能;Step S7, the intelligent monitoring host monitors whether the second storage battery pack 2 is fully charged, and if it sends an instruction to the switch control unit to control the
步骤S8,智能监控主机监测到第二充电开关203断开后,给开关控制单元下发指令控制第二蓄电池组开关201闭合、恢复系统正常。Step S8 , after the intelligent monitoring host monitors that the
以上所述仅为本发明的较佳实施例而己,并不以本发明为限制,凡在本发明的精神和原则之内所作的均等修改、等同替换和改进等,均应包含在本发明的专利涵盖范围内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. All equal modifications, equivalent replacements and improvements made within the spirit and principles of the present invention should be included in the present invention. covered by the patent.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910843008.7A CN110492600B (en) | 2019-09-06 | 2019-09-06 | Novel intelligent direct-current power supply system of transformer substation and maintenance method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910843008.7A CN110492600B (en) | 2019-09-06 | 2019-09-06 | Novel intelligent direct-current power supply system of transformer substation and maintenance method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110492600A CN110492600A (en) | 2019-11-22 |
| CN110492600B true CN110492600B (en) | 2023-04-07 |
Family
ID=68555607
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910843008.7A Expired - Fee Related CN110492600B (en) | 2019-09-06 | 2019-09-06 | Novel intelligent direct-current power supply system of transformer substation and maintenance method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110492600B (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110932350A (en) * | 2019-12-03 | 2020-03-27 | 广西电网有限责任公司防城港供电局 | Storage battery pack online discharging system and control method |
| CN112086955A (en) * | 2020-07-27 | 2020-12-15 | 国网综合能源服务集团有限公司 | Multi-battery mutual backup direct current system for transformer substation and automatic control method thereof |
| CN113328501B (en) * | 2021-06-30 | 2023-09-19 | 港华能源投资有限公司 | Flexible connection device and framework of energy station direct current screen battery module |
| CN113890128B (en) * | 2021-08-30 | 2025-03-18 | 航天长屏科技有限公司 | A battery online maintenance method |
| CN113777504A (en) * | 2021-08-31 | 2021-12-10 | 云南电网有限责任公司保山供电局 | Storage battery pack capacity checking system |
| CN113708462A (en) * | 2021-09-23 | 2021-11-26 | 北京国电光宇机电设备有限公司 | Alternating current-direct current integrated power supply system based on storage battery online management |
| CN114629154B (en) * | 2022-05-07 | 2025-08-29 | 西安光谷电气有限公司 | A maintenance device and control method for an energy storage system based on a microgrid |
| CN115378068A (en) * | 2022-07-13 | 2022-11-22 | 广东电网有限责任公司 | Remote capacity checking method and device, electronic equipment and storage medium |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AU2012203475A1 (en) * | 2007-05-17 | 2012-07-05 | Enphase Energy, Inc. | Photovoltaic module-mounted AC inverter |
Family Cites Families (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102007030577A1 (en) * | 2007-06-29 | 2009-01-02 | Sma Solar Technology Ag | Inverter for feeding electrical energy into a power supply network |
| CN101572426A (en) * | 2009-03-13 | 2009-11-04 | 温州市创力电子有限公司 | Charge-discharge control system of storage battery |
| CN202260610U (en) * | 2011-08-31 | 2012-05-30 | 云南电网公司曲靖供电局 | A DC system dual power automatic switching device |
| DE102012101799A1 (en) * | 2012-03-02 | 2013-09-05 | ropa development GmbH | Network infrastructure component, interconnected system with a plurality of network infrastructure components and use of the interconnected system |
| CN103227583B (en) * | 2013-04-26 | 2015-09-02 | 中国能源建设集团江苏省电力设计院有限公司 | A kind of hot swap type converter system for new forms of energy and energy-storage system |
| CN203377677U (en) * | 2013-06-07 | 2014-01-01 | 苍南电力有限责任公司 | Lithium battery direct-current power device applied to transformer station |
| CN104578364A (en) * | 2014-12-26 | 2015-04-29 | 江苏省电力设计院 | DC (direct current) backup power supply for power distribution station |
| CN106532889A (en) * | 2016-12-13 | 2017-03-22 | 山东鲁能智能技术有限公司 | Direct-current power system having parallel battery modules and method |
| CN106972588B (en) * | 2017-05-12 | 2021-05-28 | 中国电力科学研究院 | Method and system for floating charge operation control of lithium ion battery DC power supply system |
| CN207265682U (en) * | 2017-06-07 | 2018-04-20 | 深圳奥特迅电力设备股份有限公司 | A kind of accumulator on-line maintenance system based on three port charge-discharge machines |
| CN107846075A (en) * | 2017-12-13 | 2018-03-27 | 国网上海市电力公司 | A kind of modularized distribution type batteries in parallel connection straight-flow system |
| CN208028641U (en) * | 2018-02-07 | 2018-10-30 | 深圳奥特迅电力设备股份有限公司 | Power-supply system with DC bus defencive function |
| CN108879879A (en) * | 2018-08-10 | 2018-11-23 | 广东电网有限责任公司 | On-line discharge maintenance device and method for battery pack |
| CN109274182A (en) * | 2018-12-03 | 2019-01-25 | 国网新疆电力有限公司乌鲁木齐供电公司 | DC power remote integrated monitoring platform |
-
2019
- 2019-09-06 CN CN201910843008.7A patent/CN110492600B/en not_active Expired - Fee Related
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AU2012203475A1 (en) * | 2007-05-17 | 2012-07-05 | Enphase Energy, Inc. | Photovoltaic module-mounted AC inverter |
Also Published As
| Publication number | Publication date |
|---|---|
| CN110492600A (en) | 2019-11-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110492600B (en) | Novel intelligent direct-current power supply system of transformer substation and maintenance method | |
| CN110794293A (en) | Method for detecting automatic nuclear capacity switch state of storage battery | |
| CN108879879A (en) | On-line discharge maintenance device and method for battery pack | |
| CN101860051A (en) | Charge/discharge test device for distributed full online storage battery pack | |
| CN103117595B (en) | Distributed direct current independent power supply system | |
| CN210534292U (en) | Checking discharge test device for storage battery pack of transformer substation of 110kV or below | |
| CN115421064A (en) | System and method for on-line inverter nuclear capacity of storage battery | |
| CN109917302B (en) | New battery pack nuclear capacity testing equipment and testing method | |
| CN107612138A (en) | A kind of low-voltage direct-current system | |
| CN203660548U (en) | Transformer substation direct-current power supply system provided with emergency stand-by power supply | |
| CN111864889B (en) | Uninterrupted emergency power supply system and power supply method for open-circuit protection of lead-acid storage battery pack | |
| CN114204658A (en) | Storage battery pack online capacity checking system | |
| CN203377670U (en) | Distributed intelligent direct current power supply | |
| CN106602689B (en) | A system for preventing DC power bus from losing voltage and its operation method | |
| CN110943525A (en) | DC power supply system with optimal topology and intrinsic safety | |
| CN113644704A (en) | Device, power supply and method for constant current control and circulating current suppression of dual-channel battery charge and discharge | |
| CN115940112A (en) | A Method of Utilizing Natural Load Capacitance to Prevent Bus Loss of Voltage | |
| CN213661215U (en) | Direct current power supply parallel system | |
| CN204118757U (en) | A kind of communication power supply peak load shifting system of online quick charge | |
| CN207689521U (en) | The uninterrupted switching device of accumulator cell charging and discharging | |
| CN202616809U (en) | Battery module, battery system and direct current screen power supply system | |
| CN201639336U (en) | Distributed full-line battery charge and discharge test equipment | |
| CN111948548A (en) | System for detecting storage battery pack without power interruption | |
| CN217427761U (en) | Automatic access system of standby charger | |
| CN113471950B (en) | A fault self-healing system and method for battery packs used in power plants and stations |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230407 |