CN110485234A - A kind of reinforcement subgrade and pavement of anti-ponding - Google Patents

A kind of reinforcement subgrade and pavement of anti-ponding Download PDF

Info

Publication number
CN110485234A
CN110485234A CN201910807381.7A CN201910807381A CN110485234A CN 110485234 A CN110485234 A CN 110485234A CN 201910807381 A CN201910807381 A CN 201910807381A CN 110485234 A CN110485234 A CN 110485234A
Authority
CN
China
Prior art keywords
water
pipe
permeable
supply
permeable pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910807381.7A
Other languages
Chinese (zh)
Inventor
钦振华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU TRAFFIC ENGINEERING GROUP Co Ltd
Original Assignee
SUZHOU TRAFFIC ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU TRAFFIC ENGINEERING GROUP Co Ltd filed Critical SUZHOU TRAFFIC ENGINEERING GROUP Co Ltd
Priority to CN201910807381.7A priority Critical patent/CN110485234A/en
Publication of CN110485234A publication Critical patent/CN110485234A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • E01C11/226Coherent pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F5/00Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to the technical field of highway construction, especially a kind of reinforcement subgrade and pavement of anti-ponding.It includes the permeable reinforcement base course of asphalt paving layer, volcanic ash, anti-seepage geotextile water barrier and the ground stone layer being from top to bottom sequentially arranged, the top spaced set of anti-seepage geotextile water barrier has water-permeable pipe, several permeable holes are offered on water-permeable pipe, the tube head of water-permeable pipe is connected with water-supply-pipe, one end that water-supply-pipe is not connect with water-permeable pipe is connected to underwater, and the water-supply-pipe positioned at permeable pipe end is higher than the water surface.It can reduce the ponding on road surface, and make the water of lower infiltration that roadbed be smoothly discharged, so that the safety on roadbed and road surface has been ensured, but also the service life on roadbed and road surface can be longer.

Description

A kind of reinforcement subgrade and pavement of anti-ponding
Technical field
The present invention relates to the technical field of highway construction, especially a kind of reinforcement subgrade and pavement of anti-ponding.
Background technique
Whether road surface and roadbed internal drainage are smooth, directly influence the integral strength of roadbed and pavement structure, thus shadow Ring the bearing capacity and service life of highway.Road surface draining drops on road shoulder surface and road surface primarily to draining Water, to reduce the harm of surface gathered water;Traditional subgrade and pavement is generally used and is drained to roadbed two sides gutter.So And low-lying place caused by being rolled as road vehicles can still accumulate ponding, for a long time, these ponding can corrode road surface, make At the damage on road surface and roadbed, many unfavorable factors are brought to highway tonnage capability and service life.
Summary of the invention
The object of the present invention is to provide a kind of reinforcement subgrade and pavements of anti-ponding, reduce the ponding on road surface, and make lower infiltration Water roadbed is smoothly discharged, so that the safety on roadbed and road surface has been ensured, but also the service life on roadbed and road surface can be more It is long.
In order to solve the above technical problems, the present invention adopts the following technical scheme that:
A kind of reinforcement subgrade and pavement of anti-ponding, including asphalt paving layer, the volcanic ash being from top to bottom sequentially arranged Permeable reinforcement base course, anti-seepage geotextile water barrier and ground stone layer, the top of the anti-seepage geotextile water barrier are equidistant It is provided with water-permeable pipe, several permeable holes are offered on the water-permeable pipe, the tube head of the water-permeable pipe is connected with water-supply-pipe, described One end that water-supply-pipe is not connect with water-permeable pipe is connected to underwater, and the water-supply-pipe positioned at permeable pipe end is higher than the water surface.
The reinforcement subgrade and pavement of anti-ponding above-mentioned, the water-supply-pipe are located at one end of water-permeable pipe relative to other end height It is gradually reduced.
The reinforcement subgrade and pavement of anti-ponding above-mentioned, the permeable hole of the water-permeable pipe are opened in water-permeable pipe along the vertical direction Top half.
The reinforcement subgrade and pavement of anti-ponding above-mentioned is coated with geotextiles on the water-permeable pipe.
The reinforcement subgrade and pavement of anti-ponding above-mentioned, the material of the water-permeable pipe are duroplasts.
The reinforcement subgrade and pavement of anti-ponding above-mentioned, the material of the water-supply-pipe are flexible plastic.
Compared with prior art, the invention has the beneficial effects that:
1) present invention reduces the ponding on road surface, and make the water of lower infiltration by providing a kind of reinforcement subgrade and pavement of anti-ponding Roadbed is smoothly discharged, so that the safety on roadbed and road surface has been ensured, but also the service life on roadbed and road surface can be longer;
2) by the way that anti-seepage geotextile water barrier is arranged by the permeable reinforcement base course of asphalt paving layer, the volcanic ash of top It is separated with the ground stone layer of lower section, so that the water on road surface can be from asphalt paving layer, the volcano for being easy to infiltration It seeps under the permeable reinforcement base course of ash, and is isolated by anti-seepage geotextile water barrier, to be efficiently entering in water-permeable pipe, and be convenient for It is discharged inside roadbed;
3) by the way that the tube head of water-permeable pipe is connected water-supply-pipe, one end that water-supply-pipe is not connect with water-permeable pipe is connected to the water surface Under, the water-supply-pipe positioned at permeable pipe end is higher than the water surface so that the water seeped under road surface enters water-permeable pipe and water-supply-pipe, to water-permeable pipe and After water in water-supply-pipe is filled, it will generate " siphonage ", the water in water-permeable pipe and water-supply-pipe can be continually output to Water-supply-pipe is located at one end of the water surface, wherein due to from the permeable pressure for reinforcing base course of asphalt paving layer, volcanic ash and From the permeable cladding for reinforcing base course, anti-seepage geotextile water barrier of volcanic ash, though approximation is remained to so that water-permeable pipe has gap Regard integral conduit as, meeting the pipeline integrity requirement that " siphonage " generates in addition to this can be whole by inbuilt water-permeable pipe It sees as at one by the water source formed that seeps water, is relatively close to and (is highly not much different) in atmospheric pressure, but roadbed internal pressure In the case where being apparently higher than outside, and according to pascal's principle (P=ρ gh), water-permeable pipe is located at the height at roadbed and is higher than separately The height of one end underwater, therefore " siphonage " will occur in the case where infiltration reaches water-permeable pipe connection;
4) it is arranged with respect to other end height by one end that water-supply-pipe is located at water-permeable pipe to be gradually reduced, so that instantly When the water shortage of infiltration is to fill water-permeable pipe and water-supply-pipe, the water in water-permeable pipe and water-supply-pipe can also be flowed naturally by gravity Out;
5) by the way that the permeable hole of water-permeable pipe to be provided with to the top half of vertical direction, water-permeable pipe lower half portion is maintained Pipeline integrity is conducive to the water delivery of water-permeable pipe;
6) by coating geotextiles in the external of water-permeable pipe, so that water-permeable pipe has preferably handling capacity for lower infiltration, But there is preferably insulating effect to other sundries such as soil, it ensure that the permanently effective of water-permeable pipe;
7) by setting hard material for water-permeable pipe, so that water-permeable pipe anti-pressure ability is stronger, be conducive to the length of water-permeable pipe It uses long, is also beneficial to improve the service life on road surface and roadbed;By setting hose for water-supply-pipe, and water-supply-pipe is almost Outside roadbed, the mainly relatively smaller earth pressure for needing to bear, therefore resistance to compression demand is smaller, so as to compared with Pliability well is realized from the height being gradually reduced with water-permeable pipe junction.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
The meaning of appended drawing reference: 1, asphalt paving layer;2, the permeable reinforcement base course of volcanic ash;3, anti-seepage geotextile every Water layer;4, ground stone layer;5, water-permeable pipe;6, permeable hole;7, water-supply-pipe.
The present invention is further illustrated with reference to the accompanying drawings and detailed description.
Specific embodiment
The embodiment of the present invention 1: a kind of reinforcement subgrade and pavement of anti-ponding is constituted as shown in Figure 1, including suitable from top to bottom The permeable reinforcement base course 2 of asphalt paving layer 1, the volcanic ash of secondary setting, anti-seepage geotextile water barrier 3 and ground stone layer 4, The top spaced set of the anti-seepage geotextile water barrier 3 has water-permeable pipe 5, and it is permeable to offer several on the water-permeable pipe 5 Hole 6, the tube head of the water-permeable pipe 5 are connected with water-supply-pipe 7, and one end that the water-supply-pipe 7 is not connect with water-permeable pipe 5 is connected to the water surface Under, the water surface, which can be, has gutter or rainwater impoundment dedicated of water etc. throughout the year, even usually dry gutter, when rainy, Ditch water level rises, and can also meet water level requirement herein, and the water-supply-pipe 7 positioned at 5 end of water-permeable pipe is higher than the water surface and passes through setting Anti-seepage geotextile water barrier 3 by asphalt paving layer 1, the volcanic ash of top it is permeable reinforce base course 2 and lower section ground foundation stone The bed of material 4 is separated, so that the water on road surface can be from asphalt paving floor 1, the permeable reinforcement road of volcanic ash for being easy to infiltration Base 2 is lower to seep, and is isolated by anti-seepage geotextile water barrier 3, to be efficiently entering in water-permeable pipe 5, and convenient for discharge roadbed It is internal.
By the way that the tube head of water-permeable pipe 5 is connected water-supply-pipe 7, one end that water-supply-pipe 7 is not connect with water-permeable pipe 5 is connected to the water surface Under, the water-supply-pipe 7 positioned at 5 end of water-permeable pipe is higher than the water surface, so that the water seeped under road surface enters water-permeable pipe 5 and water-supply-pipe 7, to permeable After water in pipe 5 and water-supply-pipe 7 is filled, it will generate " siphonage ", the water in water-permeable pipe 5 and water-supply-pipe 7 can in a steady stream not It is disconnected to be output to one end that water-supply-pipe 7 is located at the water surface, wherein due to coming from asphalt paving layer 1, the permeable reinforcement roadbed of volcanic ash Layer 2 pressure and from volcanic ash it is permeable reinforce base course 2, anti-seepage geotextile water barrier 3 cladding, though so that water-permeable pipe 5 has Gap, but remain to approximation and regard integral conduit as, meet the pipeline integrity requirement that " siphonage " generates;In addition to this, it can incite somebody to action Inbuilt every water-permeable pipe 5 is considered collectively as at one being relatively close to and (highly being differed not in atmospheric pressure by the water source formed that seeps water Greatly), but in the case that roadbed internal pressure is apparently higher than outside, and according to pascal's principle (P=ρ gh), water-permeable pipe 5 Height at roadbed is higher than the height of other end underwater, and therefore " siphonage " reaches the feelings of 5 connection of water-permeable pipe in infiltration It will occur under condition.
The permeable hole 6 of the water-permeable pipe 5 is opened in the top half of water-permeable pipe 5 along the vertical direction, by by water-permeable pipe 5 Permeable hole 6 is provided with the top half of vertical direction, maintains the pipeline integrity of 5 lower half portion of water-permeable pipe, is conducive to permeable The water delivery of pipe 5.
Geotextiles are coated on the water-permeable pipe 5, by coating geotextiles in the external of water-permeable pipe 5, so that water-permeable pipe 5 is right There is preferably handling capacity in lower infiltration, but there is preferably insulating effect to other sundries such as soil, ensure that water-permeable pipe 5 It is permanently effective.
The material of the water-permeable pipe 5 is duroplasts, and the material of the water-supply-pipe 7 is flexible plastic, by the way that water-permeable pipe 5 to be arranged Be conducive to being used for a long time for water-permeable pipe 5 so that 5 anti-pressure ability of water-permeable pipe is stronger for hard material, be also beneficial to improve road surface and The service life of roadbed;By setting hose for water-supply-pipe 7, and water-supply-pipe 7 is nearly seated at outside roadbed, needs to bear Mainly relatively smaller earth pressure, therefore resistance to compression demand is smaller, so as to preferably pliability, realize from it is permeable The height that 5 junction of pipe is gradually reduced.
Embodiment 2: a kind of reinforcement subgrade and pavement of anti-ponding is constituted as shown in Figure 1, including from top to bottom being sequentially arranged The permeable reinforcement base course 2 of asphalt paving layer 1, volcanic ash, anti-seepage geotextile water barrier 3 and ground stone layer 4, the antiseepage The top spaced set of geotextiles water barrier 3 has water-permeable pipe 5, several permeable holes 6 are offered on the water-permeable pipe 5, described The tube head of water-permeable pipe 5 is connected with water-supply-pipe 7, and one end that the water-supply-pipe 7 is not connect with water-permeable pipe 5 is connected to underwater, the water surface Can be has gutter or rainwater impoundment dedicated of water etc. throughout the year, even usually dry gutter, when rainy, and ditch water level Rise, water level requirement herein can also be met, the water-supply-pipe 7 positioned at 5 end of water-permeable pipe is higher than the water surface and passes through setting antiseepage geotechnique Cloth water barrier 3 carries out the permeable reinforcement base course 2 of asphalt paving layer 1, the volcanic ash of top and the ground stone layer 4 of lower section Separation, so that the water on road surface can be seeped from the asphalt paving layer 1, the permeable reinforcement base course 2 of volcanic ash for being easy to seep water are lower, And be isolated by anti-seepage geotextile water barrier 3, to be efficiently entering in water-permeable pipe 5, and convenient for being discharged inside roadbed.
By the way that the tube head of water-permeable pipe 5 is connected water-supply-pipe 7, one end that water-supply-pipe 7 is not connect with water-permeable pipe 5 is connected to the water surface Under, the water-supply-pipe 7 positioned at 5 end of water-permeable pipe is higher than the water surface, so that the water seeped under road surface enters water-permeable pipe 5 and water-supply-pipe 7, to permeable After water in pipe 5 and water-supply-pipe 7 is filled, it will generate " siphonage ", the water in water-permeable pipe 5 and water-supply-pipe 7 can in a steady stream not It is disconnected to be output to one end that water-supply-pipe 7 is located at the water surface, wherein due to coming from asphalt paving layer 1, the permeable reinforcement roadbed of volcanic ash Layer 2 pressure and from volcanic ash it is permeable reinforce base course 2, anti-seepage geotextile water barrier 3 cladding, though so that water-permeable pipe 5 has Gap, but remain to approximation and regard integral conduit as, meet the pipeline integrity requirement that " siphonage " generates;In addition to this, it can incite somebody to action Inbuilt every water-permeable pipe 5 is considered collectively as at one being relatively close to and (highly being differed not in atmospheric pressure by the water source formed that seeps water Greatly), but in the case that roadbed internal pressure is apparently higher than outside, and according to pascal's principle (P=ρ gh), water-permeable pipe 5 Height at roadbed is higher than the height of other end underwater, and therefore " siphonage " reaches the feelings of 5 connection of water-permeable pipe in infiltration It will occur under condition.
One end that the water-supply-pipe 7 is located at water-permeable pipe 5 is gradually reduced relative to other end height, by by water-supply-pipe 7 It is arranged with respect to other end height in one end of water-permeable pipe 5 to be gradually reduced, so that the water shortage seeped instantly is permeable to fill When pipe 5 and water-supply-pipe 7, the water in water-permeable pipe 5 and water-supply-pipe 7 can also be flowed out naturally by gravity.
The permeable hole 6 of the water-permeable pipe 5 is opened in the top half of water-permeable pipe 5 along the vertical direction, by by water-permeable pipe 5 Permeable hole 6 is provided with the top half of vertical direction, maintains the pipeline integrity of 5 lower half portion of water-permeable pipe, is conducive to permeable The water delivery of pipe 5.
Geotextiles are coated on the water-permeable pipe 5, by coating geotextiles in the external of water-permeable pipe 5, so that water-permeable pipe 5 is right There is preferably handling capacity in lower infiltration, but there is preferably insulating effect to other sundries such as soil, ensure that water-permeable pipe 5 It is permanently effective.
The material of the water-permeable pipe 5 is duroplasts, and the material of the water-supply-pipe 7 is flexible plastic, by the way that water-permeable pipe 5 to be arranged Be conducive to being used for a long time for water-permeable pipe 5 so that 5 anti-pressure ability of water-permeable pipe is stronger for hard material, be also beneficial to improve road surface and The service life of roadbed;By setting hose for water-supply-pipe 7, and water-supply-pipe 7 is nearly seated at outside roadbed, needs to bear Mainly relatively smaller earth pressure, therefore resistance to compression demand is smaller, so as to preferably pliability, realize from it is permeable The height that 5 junction of pipe is gradually reduced.
The working principle of the invention:
The present invention is by by asphalt paving layer 1, the permeable reinforcement base course 2 of volcanic ash, anti-seepage geotextile water barrier 3 It is from top to bottom sequentially arranged with ground stone layer 4, and in the top spaced set water-permeable pipe 5 of anti-seepage geotextile water barrier 3, institute State and offer several permeable holes 6 on water-permeable pipe 5, the tube head of the water-permeable pipe 5 is connected with water-supply-pipe 7, the water-supply-pipe 7 not with One end that water-permeable pipe 5 connects is connected to underwater, and the water-supply-pipe 7 positioned at 5 end of water-permeable pipe is higher than the water surface, to reduce road surface Ponding, and make the water of lower infiltration that roadbed be smoothly discharged, to ensure the safety on roadbed and road surface, but also roadbed and road surface Service life can be longer.By the way that anti-seepage geotextile water barrier 3 is arranged by the asphalt paving layer 1 of top, fire in the present invention Mountain permeable the reinforcements base course 2 of ash is separated with the ground stone layer 4 of lower section, so that the water on road surface can be from being easy to infiltration The permeable reinforcement base course 2 of asphalt paving layer 1, volcanic ash is lower to be seeped, and is isolated by anti-seepage geotextile water barrier 3, thus It is efficiently entering in water-permeable pipe 5, and convenient for being discharged inside roadbed;By the way that the tube head of water-permeable pipe 5 is connected water-supply-pipe 7, water-supply-pipe 7 is not The one end connecting with water-permeable pipe 5 is connected to underwater, and the water-supply-pipe 7 positioned at 5 end of water-permeable pipe is higher than the water surface, so that seeped under road surface Water enters water-permeable pipe 5 and water-supply-pipe 7, after filling to the water in water-permeable pipe 5 and water-supply-pipe 7, it will generates " siphonage ", thoroughly Water in water pipe 5 and water-supply-pipe 7 can continually be output to one end that water-supply-pipe 7 is located at the water surface, wherein due to coming from permeable drip Green supercrust 1, volcanic ash it is permeable reinforce base course 2 pressure and from the permeable reinforcement base course 2 of volcanic ash, anti-seepage geotextile every The cladding of water layer 3 meets the pipe that " siphonage " generates though remaining to approximation and regarding integral conduit as so that water-permeable pipe 5 has gap In addition to this inbuilt every water-permeable pipe 5 can be considered collectively as at one by the water source formed that seeps water, In by road integrity demands Atmospheric pressure is relatively close to and (is highly not much different), but in the case that roadbed internal pressure is apparently higher than outside, and according to Pascal's principle (P=ρ gh), water-permeable pipe 5 are located at the height that the height at roadbed is higher than other end underwater, and therefore " siphon is existing As " will occur in the case where infiltration reaches 5 connection of water-permeable pipe;It is set as by one end that water-supply-pipe 7 is located at water-permeable pipe 5 It is gradually reduced relative to other end height, when so that the water shortage seeped instantly is filling water-permeable pipe 5 and water-supply-pipe 7, water-permeable pipe 5 It can also be flowed out naturally by gravity with the water in water-supply-pipe 7;By the way that the permeable hole 6 of water-permeable pipe 5 is provided with vertical direction Top half maintains the pipeline integrity of 5 lower half portion of water-permeable pipe, is conducive to the water delivery of water-permeable pipe 5;By in water-permeable pipe 5 It is external coat geotextiles so that water-permeable pipe 5 has preferably handling capacity for lower infiltration, but have to other sundries such as soil There is preferably insulating effect, ensure that the permanently effective of water-permeable pipe 5;By setting hard material for water-permeable pipe 5, so that permeable 5 anti-pressure ability of pipe is stronger, is conducive to being used for a long time for water-permeable pipe 5, is also beneficial to improve the service life on road surface and roadbed;Pass through Hose is set by water-supply-pipe 7, and water-supply-pipe 7 is nearly seated at outside roadbed, the mainly relatively smaller soil for needing to bear Stressor layer, therefore resistance to compression demand is smaller, so as to realize and be gradually reduced certainly with 5 junction of water-permeable pipe with preferably pliability Height.

Claims (6)

1. a kind of reinforcement subgrade and pavement of anti-ponding, which is characterized in that including the asphalt paving being from top to bottom sequentially arranged Layer (1), the permeable reinforcement base course (2) of volcanic ash, anti-seepage geotextile water barrier (3) and ground stone layer (4), the antiseepage geotechnique The top spaced set of cloth water barrier (3) has water-permeable pipe (5), several permeable holes (6) are offered on the water-permeable pipe (5), The tube head of the water-permeable pipe (5) is connected with water-supply-pipe (7), and one end that the water-supply-pipe (7) does not connect with water-permeable pipe (5) is connected to Underwater, the water-supply-pipe (7) positioned at water-permeable pipe (5) end are higher than the water surface.
2. the reinforcement subgrade and pavement of anti-ponding according to claim 1, which is characterized in that the water-supply-pipe (7) is located at saturating One end of water pipe (5) is gradually reduced relative to other end height.
3. the reinforcement subgrade and pavement of anti-ponding according to claim 1 or 2, which is characterized in that the water-permeable pipe (5) it is saturating Water hole (6) is opened in the top half of water-permeable pipe (5) along the vertical direction.
4. the reinforcement subgrade and pavement of anti-ponding according to claim 3, which is characterized in that coated on the water-permeable pipe (5) There are geotextiles.
5. the reinforcement subgrade and pavement of anti-ponding according to claim 4, which is characterized in that the material of the water-permeable pipe (5) For duroplasts.
6. the reinforcement subgrade and pavement of anti-ponding according to claim 5, which is characterized in that the material of the water-supply-pipe (7) For flexible plastic.
CN201910807381.7A 2019-08-29 2019-08-29 A kind of reinforcement subgrade and pavement of anti-ponding Pending CN110485234A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910807381.7A CN110485234A (en) 2019-08-29 2019-08-29 A kind of reinforcement subgrade and pavement of anti-ponding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910807381.7A CN110485234A (en) 2019-08-29 2019-08-29 A kind of reinforcement subgrade and pavement of anti-ponding

Publications (1)

Publication Number Publication Date
CN110485234A true CN110485234A (en) 2019-11-22

Family

ID=68555035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910807381.7A Pending CN110485234A (en) 2019-08-29 2019-08-29 A kind of reinforcement subgrade and pavement of anti-ponding

Country Status (1)

Country Link
CN (1) CN110485234A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924257A (en) * 2019-12-05 2020-03-27 东莞嘉誉诚建设基础工程有限公司 Municipal road, pouring template for construction of municipal road and construction method of pouring template
CN111379202A (en) * 2020-03-24 2020-07-07 王文超 Prevent enhancement road bed road surface of ponding

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100642330B1 (en) * 2006-07-29 2006-11-10 주식회사 도화종합기술공사 Sidewalk block unit with drainage function
CN206289479U (en) * 2016-12-14 2017-06-30 东华理工大学 One kind improvement highway subgrade structure
CN108867241A (en) * 2018-07-16 2018-11-23 河南城建学院 A kind of road structure for receiving water function with face formula
CN209039905U (en) * 2018-09-25 2019-06-28 山东省公路建设(集团)有限公司 A kind of asphalt paving convenient for construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100642330B1 (en) * 2006-07-29 2006-11-10 주식회사 도화종합기술공사 Sidewalk block unit with drainage function
CN206289479U (en) * 2016-12-14 2017-06-30 东华理工大学 One kind improvement highway subgrade structure
CN108867241A (en) * 2018-07-16 2018-11-23 河南城建学院 A kind of road structure for receiving water function with face formula
CN209039905U (en) * 2018-09-25 2019-06-28 山东省公路建设(集团)有限公司 A kind of asphalt paving convenient for construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924257A (en) * 2019-12-05 2020-03-27 东莞嘉誉诚建设基础工程有限公司 Municipal road, pouring template for construction of municipal road and construction method of pouring template
CN110924257B (en) * 2019-12-05 2021-08-03 东莞嘉誉诚建设基础工程有限公司 A municipal road, a pouring formwork for its construction and its construction method
CN111379202A (en) * 2020-03-24 2020-07-07 王文超 Prevent enhancement road bed road surface of ponding

Similar Documents

Publication Publication Date Title
CN106759825B (en) Construction method of sponge urban green land water storage system
CN202170502U (en) Soil cut slope drainage system
CN104179189A (en) Dewatering and drainage structure of foundation pit deep drop area and construction method thereof
CN110485234A (en) A kind of reinforcement subgrade and pavement of anti-ponding
CN214574037U (en) Comprehensive treatment system for up-down landslides of highway
CN203049757U (en) Rainwater draining and collecting system for residential quarter
CN204174631U (en) A kind of foundation ditch falls the water drainage structure in dark region
CN203924082U (en) Anti-floating of underground building structure
CN209652669U (en) A kind of subgrade drainage structure
CN112832288A (en) Anti-floating structure of sloping field building basement and construction method thereof
CN105755919A (en) Widen old embankment side slope infiltration punishment structure of highway
CN214737362U (en) Bridge floor drainage collecting system through expansion joint
CN212865470U (en) Composite foundation structure
US8182174B2 (en) Drainage system for directing surface water to underground strata
CN112281806A (en) Spring soil roadbed unsaturated horizontal drainage device and construction method thereof
CN208266612U (en) A kind of town road structure
CN110644533A (en) An underground pipe gallery structure with underground rainwater collection function
CN216074555U (en) Structure for preventing settlement of soft soil foundation
CN213896619U (en) Curb, drainage system who contains it
CN210529482U (en) Bridge expansion joint drainage structures
CN114108689A (en) Ecological retaining wall system
CN208899423U (en) A kind of hilly pond reservoir dam with water storage for preventing flood function
CN217678428U (en) Sponge urban road system
CN212560983U (en) Membrane cloth road convenient to anticorrosion
CN206888133U (en) One kind oozes draining blind pipe structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191122

RJ01 Rejection of invention patent application after publication