CN110445077A - A kind of high-tension cable power channel original position suspension protection method - Google Patents

A kind of high-tension cable power channel original position suspension protection method Download PDF

Info

Publication number
CN110445077A
CN110445077A CN201810410593.7A CN201810410593A CN110445077A CN 110445077 A CN110445077 A CN 110445077A CN 201810410593 A CN201810410593 A CN 201810410593A CN 110445077 A CN110445077 A CN 110445077A
Authority
CN
China
Prior art keywords
power channel
tension cable
original position
suspension protection
protection method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810410593.7A
Other languages
Chinese (zh)
Other versions
CN110445077B (en
Inventor
陈朝晖
黄杰
谢维
林智雄
陈日坤
陈伟
郭建赟
王俊葳
严有祥
尤毅峰
林宇舟
洪志忠
林永忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Fujian Electric Power Co Ltd
Xiamen Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Fujian Electric Power Co Ltd
Xiamen Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Fujian Electric Power Co Ltd, Xiamen Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Fujian Electric Power Co Ltd
Priority to CN201810410593.7A priority Critical patent/CN110445077B/en
Publication of CN110445077A publication Critical patent/CN110445077A/en
Application granted granted Critical
Publication of CN110445077B publication Critical patent/CN110445077B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/30Installations of cables or lines on walls, floors or ceilings
    • H02G3/34Installations of cables or lines on walls, floors or ceilings using separate protective tubing
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The invention discloses a kind of high-tension cable power channel original position suspension protection methods; if the power channel is rested the head on including main pipe; the pipe pillow has location hole, and adjacent tubes rest the head on attaching composition rectangular array of working in coordination, and the location hole that high-tension cable passes through pipe pillow forms regular rectangular array arrangement;The pipe pillow removably fix mutually by installation;The original position suspension protection method includes being realized by the suspension in situ that pipe is rested the head on preparation of construction step, bearing bar setting steps and suspension step and being carried out suspension protection to high-tension cable in the state of resting the head on pipe.The present invention provides a kind of high-tension cable power channel original position suspension protection methods, greatly shorten the construction period of high tension power cable suspension protection, so that construction efficiency rises;The generation of construction waste is decreased simultaneously, saves construction cost.

Description

A kind of high-tension cable power channel original position suspension protection method
Technical field
The present invention relates to the realm of building construction, more particularly to a kind of high-tension cable power channel original position suspension protection side Method.
Background technique
City high-tension cable is more using the form of underground of being protected in is laid with, and ensure that safety and residential electricity consumption Stability, but whole laying higher cost.When need among city carry out heavy duty work construction, as megastore or When building of iron, buried cable need to carry out certain protection and evade.
There are two types of common paving modes for existing underground high voltage cable tool.The first paving mode is to be spaced a spacing From an electricity well is just arranged, which is formed by concrete casting, and high-tension cable is formed and determined by passing through in electricity well , well lid used for overhaul is reserved at the top of electricity well.Second of paving mode be spaced a distance by pipe pillow will be high Voltage cable carries out gathering fixation, then pipe pillow is closed by the power channel sealed, and constitute the positioning branch of high-tension cable Support.
In existing construction method, need to dismantle electricity well or power channel comprehensively, and to generated building Waste material carries out cleaning carrying.After completing forcible entry comprehensively, hanged after high-tension cable progress suitable protecting, then through Bailey bracket It hangs.After the completion of construction, electricity well or pipe pillow are reinstalled in situ, taken time and effort.
Summary of the invention
It is an object of the invention to overcome the deficiency of the prior art, provides a kind of high-tension cable power channel suspention in situ Guard method greatly shortens the construction period of high tension power cable suspension protection, so that construction efficiency rises;It decreases and builds simultaneously The generation for building waste material, saves construction cost.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of high-tension cable power channel original position suspension protection method, the power channel are embedded in underground, and along underground The setting of high-tension cable distribution lines interval, and high-tension cable is crossed and mistake by the power channel;Multiple groups are equipped in the power channel Pipe pillow, the cooperation attaching of each group of pipe pillow form rectangular array, and the high-tension cable in power channel sequentially passes through multi units tube pillow group At rectangular array positioned;The following steps are included:
The native stone of above power channel and side is removed, keeps the exterior wall of power channel completely sudden and violent by preparation of construction step Dew sets up the Bailey bracket for being across high-tension cable extending direction two sides in the top of power channel;
Exterior wall separating step uses rope if being drilled with longline saw hole respectively in the exterior wall top surface of power channel and side Saw equipment separates the exterior wall top surface of power channel and side cutting along the rope saw hole being drilled with, successively will be outer using lifting equipment The top surface of wall and side are carried far from scene;
The rectangular array that multi units tube is rested the head on is separately constituted rectangular array and reinforced by high-tension cable fixing step, and will be high Package protection is carried out on the outside of voltage cable, and the pipe pillow of bottom is finally both secured to multiple load bearing support bars or bearing plate;
Step is hung, locked mechanism is set on the multiple bearing bars or bearing plate fixed with pipe pillow, it will using steel strand wires Multiple bearing bars or bearing plate are hung by locked mechanism is fixed on the Bailey bracket.
As a preference, further include dregs cleanup step after the suspension step, the dregs that construction site is generated Uniformly cleared up.
As a preference, the side and top of the high-tension cable fixed are equipped with buffer layer, which uses resistance to punching Resistant to shearing material is hit to be made.
As a preference, the buffer layer includes the side buffer layer being made of sandbag pile and is made of the double-deck bamboo slab rubber Upper buffer layer.
As a preference, further including reconstitution steps in situ, is completed in all constructions, need again to bury power channel When underground, the exterior wall that cutting is removed is installed into go back to corresponding position in situ, and bonded by cement.
As a preference, diameter >=15.2mm of the steel strand wires, hitch point interval >=1.5m of adjacent steel strand wires.
As a preference, the locked mechanism is annular buckle, annular buckle is equipped with the clamping for being biased to wherein side Slot, the bearing bar two sides are equipped with location hole, and the state that the annular is snapped in clamping groove towards dip direction is installed on this Location hole.
The beneficial effects of the present invention are:
1, the construction period is greatly shortened.Realize the high tension power cable suspension that do not remove under pipe pillow state.When construction is completed Afterwards, it is only necessary to pipe be rested the head on into inserting reduction, can continue to realize the function that high-tension cable is fixedly mounted.Such construction method greatly contracts The construction period of short high tension power cable suspension protection, so that construction efficiency rises.The generation of construction waste is decreased simultaneously, is saved Construction cost is saved.
2, keep work progress more safe and reliable, be hardly damaged high-tension cable.Pipe pillow itself has protection high-tension cable Function, not to pipe pillow dismount, and directly to pipe pillow hang, can prevent dismount pipe pillow during to high-voltage electricity Cable damages.
3, after the completion of constructing, cementing is installed and passed through to the wall body in situ under cutting, greatly accelerates construction speed, And save construction material.
Invention is further described in detail with reference to the accompanying drawings and embodiments;But a kind of high-tension cable electricity of the invention Power channel original position suspension protection method is not limited to the embodiment.
Detailed description of the invention
Fig. 1 is the schematic cross-section of electricity well of the invention;
Fig. 2 is suspended structure schematic diagram of the invention;
Fig. 3 is step block diagram of the invention.
Specific embodiment
Embodiment:
Shown in Figure 3,2 electricity well original position suspension protection method implementation steps of a kind of high-tension cable of the invention are as follows:
Preparation of construction step removes the native stone of above power channel and side, and sets up and be across power channel two sides Bailey bracket 5.
3 setting steps of bearing bar separate pipe pillow 1 line by line, and load bearing support bar is arranged in the bottom of every a line pipe pillow 1.
Power channel outer layer seals to form separate chamber using concrete, before removing the concrete chamber, need to use slow Layer is rushed to protect high-tension cable 2.The side of the pipe pillow 1 is equipped with side buffer layer 61, and top is equipped with upper buffer layer 62.This reality It applies in example, the side buffer layer 61 is sandbag pile, and upper buffer layer 62 is the double-deck bamboo slab rubber.
Step is hung, locked mechanism 32 is set in the two sides of bearing bar 3, it is using steel strand wires 4 that the locked mechanism 32 is fixed Hang on the Bailey bracket 5.
Dregs cleanup step clears up the dregs generated in work progress.
The power channel that the present invention is applicable in is shown in Figure 1.High-tension cable 2 is embedded in after underground, is spaced one section The power channel for collecting high-tension cable 2 can be arranged in distance.If the power channel includes main pipe pillow 1, pipe pillow 1 has positioning Hole, and each pipe pillow 1 has the structure 11 that can mutually plug, and adjacent tubes pillow 1 is worked in coordination attaching composition rectangular array, The location hole that high-tension cable 2 passes through pipe pillow 1 forms regular rectangular array arrangement.
Suspended structure is shown in Figure 2, and the two sides of bearing bar 3 are equipped with the fixation of upward rounded triangle shape Portion 31, the fixed part 31 are equipped with hanging hole 31.31 latch closure of hanging hole is provided with fixed lock 32, and the borehole wall is solid by this Lock button 32 hangs on the Bailey bracket 5.Bearing bar 3 is set in 2 bottom of high-tension cable, and the both ends of bearing bar 3 are hung on The Bailey bracket 5.The hanging hole 31 is the through-hole of 4 φ 50.The diameter of the steel strand wires 4 is 15.2mm, adjacent steel strand wires 4 1.5m is divided between hitch point.
Above-described embodiment is only used to further illustrate a kind of high-tension cable power channel original position suspension protection side of the invention Method, but the invention is not limited to embodiment, according to the technical essence of the invention any letters to the above embodiments Single modification, equivalent variations and modification, fall within the scope of protection of technical solution of the present invention.

Claims (7)

1. a kind of high-tension cable power channel original position suspension protection method, the power channel are embedded in underground, and the height along underground The setting of voltage cable distribution lines interval, and high-tension cable is crossed and mistake by the power channel;Multi units tube is equipped in the power channel Pillow, the cooperation attaching of each group of pipe pillow form rectangular array, and the high-tension cable in power channel sequentially passes through multi units tube pillow composition Rectangular array positioned;Characterized by comprising the following steps:
The native stone of above power channel and side is removed, the exterior wall of power channel is completely exposed, In by preparation of construction step The top of power channel sets up the Bailey bracket for being across high-tension cable extending direction two sides;
Exterior wall separating step is set if being drilled with longline saw hole respectively in the exterior wall top surface of power channel and side using rope saw It is standby to separate the exterior wall top surface of power channel and side cutting along the rope being drilled with saw hole, using lifting equipment successively by exterior wall Top surface and side carry far from scene;
The rectangular array that multi units tube is rested the head on is separately constituted rectangular array and reinforced by high-tension cable fixing step, and by high-voltage electricity Package protection is carried out on the outside of cable, and the pipe pillow of bottom is finally both secured to multiple load bearing support bars or bearing plate;
Step is hung, locked mechanism is set on the multiple bearing bars or bearing plate fixed with pipe pillow, it will be multiple using steel strand wires Bearing bar or bearing plate are hung by locked mechanism is fixed on the Bailey bracket.
2. a kind of high-tension cable power channel original position according to claim 1 suspension protection method, it is characterised in that: in institute Further include dregs cleanup step after stating suspension step, the dregs that construction site generates uniformly is cleared up.
3. a kind of high-tension cable power channel original position according to claim 1 suspension protection method, it is characterised in that: consolidate The side and top of fixed high-tension cable are equipped with buffer layer, which is made of impact resistance resistant to shearing material.
4. a kind of high-tension cable power channel original position according to claim 3 suspension protection method, it is characterised in that: described Buffer layer includes the side buffer layer being made of sandbag pile and the upper buffer layer that is made of the double-deck bamboo slab rubber.
5. a kind of high-tension cable power channel original position according to claim 1 suspension protection method, it is characterised in that: also wrap Reconstitution steps in situ are included, are completed in all constructions, when needing that power channel is embedded in underground again, the exterior wall removed will be cut Body installs go back to corresponding position in situ, and is bonded by cement.
6. a kind of high-tension cable power channel original position according to claim 1 suspension protection method, it is characterised in that: described Diameter >=15.2mm of steel strand wires, hitch point interval >=1.5m of adjacent steel strand wires.
7. a kind of high-tension cable power channel original position according to claim 1 suspension protection method, it is characterised in that: described Locked mechanism is annular buckle, and annular buckle is equipped with the clamping groove for being biased to wherein side, and the bearing bar two sides are equipped with fixed Position hole, the state that the annular is snapped in clamping groove towards dip direction are installed on the location hole.
CN201810410593.7A 2018-05-02 2018-05-02 In-situ suspension protection method for power channel of high-voltage cable Active CN110445077B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810410593.7A CN110445077B (en) 2018-05-02 2018-05-02 In-situ suspension protection method for power channel of high-voltage cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810410593.7A CN110445077B (en) 2018-05-02 2018-05-02 In-situ suspension protection method for power channel of high-voltage cable

Publications (2)

Publication Number Publication Date
CN110445077A true CN110445077A (en) 2019-11-12
CN110445077B CN110445077B (en) 2021-03-16

Family

ID=68427983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810410593.7A Active CN110445077B (en) 2018-05-02 2018-05-02 In-situ suspension protection method for power channel of high-voltage cable

Country Status (1)

Country Link
CN (1) CN110445077B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021363A (en) * 2019-12-31 2020-04-17 广东顺德电力设计院有限公司 Method and system for protecting cable by using bailey truss

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201352698Y (en) * 2009-01-15 2009-11-25 刘�英 Assemble type calandria support
CN202034744U (en) * 2011-04-23 2011-11-09 广东三凌塑料管材有限公司 Pipe pillow
CN202099804U (en) * 2011-05-19 2012-01-04 长业建设集团有限公司 Bailey bracket hanging and underpining system for foundation-pit-spanning pipe lines
CN104676110A (en) * 2015-01-22 2015-06-03 中国地质大学(武汉) On-site overhanging protection method of high-voltage cable bailey truss under condition of excavation of foundation pit

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201352698Y (en) * 2009-01-15 2009-11-25 刘�英 Assemble type calandria support
CN202034744U (en) * 2011-04-23 2011-11-09 广东三凌塑料管材有限公司 Pipe pillow
CN202099804U (en) * 2011-05-19 2012-01-04 长业建设集团有限公司 Bailey bracket hanging and underpining system for foundation-pit-spanning pipe lines
CN104676110A (en) * 2015-01-22 2015-06-03 中国地质大学(武汉) On-site overhanging protection method of high-voltage cable bailey truss under condition of excavation of foundation pit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021363A (en) * 2019-12-31 2020-04-17 广东顺德电力设计院有限公司 Method and system for protecting cable by using bailey truss

Also Published As

Publication number Publication date
CN110445077B (en) 2021-03-16

Similar Documents

Publication Publication Date Title
KR101608624B1 (en) Method for lifting the height of tower
CN106498844A (en) A kind of high speed railway box beam bridge floor pre-fabricated electric cables groove
CN207498808U (en) A kind of steel suspension bridge for deep-foundation pit engineering earthwork outward transport
CN110445077A (en) A kind of high-tension cable power channel original position suspension protection method
CN108118689B (en) Prefabricated underground diaphragm wall capable of being partially recycled, lifting appliance and construction method
CN206859234U (en) A kind of protector for mountain area mud-rock flow
KR101065330B1 (en) Construction method for geothermal heat exchanger
CN108221955B (en) Prefabricated underground diaphragm wall capable of being recycled integrally, lifting appliance and construction method
CN108221954B (en) Easy-to-detach prefabricated underground diaphragm wall, lifting appliance and construction method
KR101297679B1 (en) Self-supporting Temporary Structure Using Steel Wire And Method Of The Same
CN104631474B (en) A kind of side slope protection greening structure
CN105587324B (en) Dig the construction method of tunnel portal section supporting steel grating section
CN102677680A (en) Dismantling method for concrete waist beam
CN210288409U (en) Soft soil stratum underground parking garage closes on shallow foundation building foundation pit deformation control structure
CN209011617U (en) Existing building elevator well structure additional construction structure
KR101192265B1 (en) Phc long pile construction machine and method thereof
CN217053415U (en) Temporary reinforcing system for shallow collapsed body of tunnel entrance section
CN109208936A (en) Existing building elevator shaft structure additional building structure and construction method thereof
CN218436442U (en) Precast concrete antiskid plate for ground hardening
CN214089981U (en) Span electric power piping lane of foundation ditch and suspend protective structure in midair
CN220266622U (en) Box transformer foundation structure
CN213775452U (en) Protection device for blasting operation underworkings pipeline facility
CN218347064U (en) Protective channel for deep foundation pit concrete support beam
CN109577667A (en) A kind of high-tension cable electricity well original position suspension protection method
CN211522822U (en) Trestle steel structure matched with tunnel shield construction

Legal Events

Date Code Title Description