CN110445077A - A kind of high-tension cable power channel original position suspension protection method - Google Patents
A kind of high-tension cable power channel original position suspension protection method Download PDFInfo
- Publication number
- CN110445077A CN110445077A CN201810410593.7A CN201810410593A CN110445077A CN 110445077 A CN110445077 A CN 110445077A CN 201810410593 A CN201810410593 A CN 201810410593A CN 110445077 A CN110445077 A CN 110445077A
- Authority
- CN
- China
- Prior art keywords
- power channel
- tension cable
- original position
- suspension protection
- protection method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/30—Installations of cables or lines on walls, floors or ceilings
- H02G3/34—Installations of cables or lines on walls, floors or ceilings using separate protective tubing
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/05—Suspension arrangements or devices for electric cables or lines
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The invention discloses a kind of high-tension cable power channel original position suspension protection methods; if the power channel is rested the head on including main pipe; the pipe pillow has location hole, and adjacent tubes rest the head on attaching composition rectangular array of working in coordination, and the location hole that high-tension cable passes through pipe pillow forms regular rectangular array arrangement;The pipe pillow removably fix mutually by installation;The original position suspension protection method includes being realized by the suspension in situ that pipe is rested the head on preparation of construction step, bearing bar setting steps and suspension step and being carried out suspension protection to high-tension cable in the state of resting the head on pipe.The present invention provides a kind of high-tension cable power channel original position suspension protection methods, greatly shorten the construction period of high tension power cable suspension protection, so that construction efficiency rises;The generation of construction waste is decreased simultaneously, saves construction cost.
Description
Technical field
The present invention relates to the realm of building construction, more particularly to a kind of high-tension cable power channel original position suspension protection side
Method.
Background technique
City high-tension cable is more using the form of underground of being protected in is laid with, and ensure that safety and residential electricity consumption
Stability, but whole laying higher cost.When need among city carry out heavy duty work construction, as megastore or
When building of iron, buried cable need to carry out certain protection and evade.
There are two types of common paving modes for existing underground high voltage cable tool.The first paving mode is to be spaced a spacing
From an electricity well is just arranged, which is formed by concrete casting, and high-tension cable is formed and determined by passing through in electricity well
, well lid used for overhaul is reserved at the top of electricity well.Second of paving mode be spaced a distance by pipe pillow will be high
Voltage cable carries out gathering fixation, then pipe pillow is closed by the power channel sealed, and constitute the positioning branch of high-tension cable
Support.
In existing construction method, need to dismantle electricity well or power channel comprehensively, and to generated building
Waste material carries out cleaning carrying.After completing forcible entry comprehensively, hanged after high-tension cable progress suitable protecting, then through Bailey bracket
It hangs.After the completion of construction, electricity well or pipe pillow are reinstalled in situ, taken time and effort.
Summary of the invention
It is an object of the invention to overcome the deficiency of the prior art, provides a kind of high-tension cable power channel suspention in situ
Guard method greatly shortens the construction period of high tension power cable suspension protection, so that construction efficiency rises;It decreases and builds simultaneously
The generation for building waste material, saves construction cost.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of high-tension cable power channel original position suspension protection method, the power channel are embedded in underground, and along underground
The setting of high-tension cable distribution lines interval, and high-tension cable is crossed and mistake by the power channel;Multiple groups are equipped in the power channel
Pipe pillow, the cooperation attaching of each group of pipe pillow form rectangular array, and the high-tension cable in power channel sequentially passes through multi units tube pillow group
At rectangular array positioned;The following steps are included:
The native stone of above power channel and side is removed, keeps the exterior wall of power channel completely sudden and violent by preparation of construction step
Dew sets up the Bailey bracket for being across high-tension cable extending direction two sides in the top of power channel;
Exterior wall separating step uses rope if being drilled with longline saw hole respectively in the exterior wall top surface of power channel and side
Saw equipment separates the exterior wall top surface of power channel and side cutting along the rope saw hole being drilled with, successively will be outer using lifting equipment
The top surface of wall and side are carried far from scene;
The rectangular array that multi units tube is rested the head on is separately constituted rectangular array and reinforced by high-tension cable fixing step, and will be high
Package protection is carried out on the outside of voltage cable, and the pipe pillow of bottom is finally both secured to multiple load bearing support bars or bearing plate;
Step is hung, locked mechanism is set on the multiple bearing bars or bearing plate fixed with pipe pillow, it will using steel strand wires
Multiple bearing bars or bearing plate are hung by locked mechanism is fixed on the Bailey bracket.
As a preference, further include dregs cleanup step after the suspension step, the dregs that construction site is generated
Uniformly cleared up.
As a preference, the side and top of the high-tension cable fixed are equipped with buffer layer, which uses resistance to punching
Resistant to shearing material is hit to be made.
As a preference, the buffer layer includes the side buffer layer being made of sandbag pile and is made of the double-deck bamboo slab rubber
Upper buffer layer.
As a preference, further including reconstitution steps in situ, is completed in all constructions, need again to bury power channel
When underground, the exterior wall that cutting is removed is installed into go back to corresponding position in situ, and bonded by cement.
As a preference, diameter >=15.2mm of the steel strand wires, hitch point interval >=1.5m of adjacent steel strand wires.
As a preference, the locked mechanism is annular buckle, annular buckle is equipped with the clamping for being biased to wherein side
Slot, the bearing bar two sides are equipped with location hole, and the state that the annular is snapped in clamping groove towards dip direction is installed on this
Location hole.
The beneficial effects of the present invention are:
1, the construction period is greatly shortened.Realize the high tension power cable suspension that do not remove under pipe pillow state.When construction is completed
Afterwards, it is only necessary to pipe be rested the head on into inserting reduction, can continue to realize the function that high-tension cable is fixedly mounted.Such construction method greatly contracts
The construction period of short high tension power cable suspension protection, so that construction efficiency rises.The generation of construction waste is decreased simultaneously, is saved
Construction cost is saved.
2, keep work progress more safe and reliable, be hardly damaged high-tension cable.Pipe pillow itself has protection high-tension cable
Function, not to pipe pillow dismount, and directly to pipe pillow hang, can prevent dismount pipe pillow during to high-voltage electricity
Cable damages.
3, after the completion of constructing, cementing is installed and passed through to the wall body in situ under cutting, greatly accelerates construction speed,
And save construction material.
Invention is further described in detail with reference to the accompanying drawings and embodiments;But a kind of high-tension cable electricity of the invention
Power channel original position suspension protection method is not limited to the embodiment.
Detailed description of the invention
Fig. 1 is the schematic cross-section of electricity well of the invention;
Fig. 2 is suspended structure schematic diagram of the invention;
Fig. 3 is step block diagram of the invention.
Specific embodiment
Embodiment:
Shown in Figure 3,2 electricity well original position suspension protection method implementation steps of a kind of high-tension cable of the invention are as follows:
Preparation of construction step removes the native stone of above power channel and side, and sets up and be across power channel two sides
Bailey bracket 5.
3 setting steps of bearing bar separate pipe pillow 1 line by line, and load bearing support bar is arranged in the bottom of every a line pipe pillow 1.
Power channel outer layer seals to form separate chamber using concrete, before removing the concrete chamber, need to use slow
Layer is rushed to protect high-tension cable 2.The side of the pipe pillow 1 is equipped with side buffer layer 61, and top is equipped with upper buffer layer 62.This reality
It applies in example, the side buffer layer 61 is sandbag pile, and upper buffer layer 62 is the double-deck bamboo slab rubber.
Step is hung, locked mechanism 32 is set in the two sides of bearing bar 3, it is using steel strand wires 4 that the locked mechanism 32 is fixed
Hang on the Bailey bracket 5.
Dregs cleanup step clears up the dregs generated in work progress.
The power channel that the present invention is applicable in is shown in Figure 1.High-tension cable 2 is embedded in after underground, is spaced one section
The power channel for collecting high-tension cable 2 can be arranged in distance.If the power channel includes main pipe pillow 1, pipe pillow 1 has positioning
Hole, and each pipe pillow 1 has the structure 11 that can mutually plug, and adjacent tubes pillow 1 is worked in coordination attaching composition rectangular array,
The location hole that high-tension cable 2 passes through pipe pillow 1 forms regular rectangular array arrangement.
Suspended structure is shown in Figure 2, and the two sides of bearing bar 3 are equipped with the fixation of upward rounded triangle shape
Portion 31, the fixed part 31 are equipped with hanging hole 31.31 latch closure of hanging hole is provided with fixed lock 32, and the borehole wall is solid by this
Lock button 32 hangs on the Bailey bracket 5.Bearing bar 3 is set in 2 bottom of high-tension cable, and the both ends of bearing bar 3 are hung on
The Bailey bracket 5.The hanging hole 31 is the through-hole of 4 φ 50.The diameter of the steel strand wires 4 is 15.2mm, adjacent steel strand wires 4
1.5m is divided between hitch point.
Above-described embodiment is only used to further illustrate a kind of high-tension cable power channel original position suspension protection side of the invention
Method, but the invention is not limited to embodiment, according to the technical essence of the invention any letters to the above embodiments
Single modification, equivalent variations and modification, fall within the scope of protection of technical solution of the present invention.
Claims (7)
1. a kind of high-tension cable power channel original position suspension protection method, the power channel are embedded in underground, and the height along underground
The setting of voltage cable distribution lines interval, and high-tension cable is crossed and mistake by the power channel;Multi units tube is equipped in the power channel
Pillow, the cooperation attaching of each group of pipe pillow form rectangular array, and the high-tension cable in power channel sequentially passes through multi units tube pillow composition
Rectangular array positioned;Characterized by comprising the following steps:
The native stone of above power channel and side is removed, the exterior wall of power channel is completely exposed, In by preparation of construction step
The top of power channel sets up the Bailey bracket for being across high-tension cable extending direction two sides;
Exterior wall separating step is set if being drilled with longline saw hole respectively in the exterior wall top surface of power channel and side using rope saw
It is standby to separate the exterior wall top surface of power channel and side cutting along the rope being drilled with saw hole, using lifting equipment successively by exterior wall
Top surface and side carry far from scene;
The rectangular array that multi units tube is rested the head on is separately constituted rectangular array and reinforced by high-tension cable fixing step, and by high-voltage electricity
Package protection is carried out on the outside of cable, and the pipe pillow of bottom is finally both secured to multiple load bearing support bars or bearing plate;
Step is hung, locked mechanism is set on the multiple bearing bars or bearing plate fixed with pipe pillow, it will be multiple using steel strand wires
Bearing bar or bearing plate are hung by locked mechanism is fixed on the Bailey bracket.
2. a kind of high-tension cable power channel original position according to claim 1 suspension protection method, it is characterised in that: in institute
Further include dregs cleanup step after stating suspension step, the dregs that construction site generates uniformly is cleared up.
3. a kind of high-tension cable power channel original position according to claim 1 suspension protection method, it is characterised in that: consolidate
The side and top of fixed high-tension cable are equipped with buffer layer, which is made of impact resistance resistant to shearing material.
4. a kind of high-tension cable power channel original position according to claim 3 suspension protection method, it is characterised in that: described
Buffer layer includes the side buffer layer being made of sandbag pile and the upper buffer layer that is made of the double-deck bamboo slab rubber.
5. a kind of high-tension cable power channel original position according to claim 1 suspension protection method, it is characterised in that: also wrap
Reconstitution steps in situ are included, are completed in all constructions, when needing that power channel is embedded in underground again, the exterior wall removed will be cut
Body installs go back to corresponding position in situ, and is bonded by cement.
6. a kind of high-tension cable power channel original position according to claim 1 suspension protection method, it is characterised in that: described
Diameter >=15.2mm of steel strand wires, hitch point interval >=1.5m of adjacent steel strand wires.
7. a kind of high-tension cable power channel original position according to claim 1 suspension protection method, it is characterised in that: described
Locked mechanism is annular buckle, and annular buckle is equipped with the clamping groove for being biased to wherein side, and the bearing bar two sides are equipped with fixed
Position hole, the state that the annular is snapped in clamping groove towards dip direction are installed on the location hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810410593.7A CN110445077B (en) | 2018-05-02 | 2018-05-02 | In-situ suspension protection method for power channel of high-voltage cable |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810410593.7A CN110445077B (en) | 2018-05-02 | 2018-05-02 | In-situ suspension protection method for power channel of high-voltage cable |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110445077A true CN110445077A (en) | 2019-11-12 |
CN110445077B CN110445077B (en) | 2021-03-16 |
Family
ID=68427983
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810410593.7A Active CN110445077B (en) | 2018-05-02 | 2018-05-02 | In-situ suspension protection method for power channel of high-voltage cable |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110445077B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111021363A (en) * | 2019-12-31 | 2020-04-17 | 广东顺德电力设计院有限公司 | Method and system for protecting cable by using bailey truss |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201352698Y (en) * | 2009-01-15 | 2009-11-25 | 刘�英 | Assemble type calandria support |
CN202034744U (en) * | 2011-04-23 | 2011-11-09 | 广东三凌塑料管材有限公司 | Pipe pillow |
CN202099804U (en) * | 2011-05-19 | 2012-01-04 | 长业建设集团有限公司 | Bailey bracket hanging and underpining system for foundation-pit-spanning pipe lines |
CN104676110A (en) * | 2015-01-22 | 2015-06-03 | 中国地质大学(武汉) | On-site overhanging protection method of high-voltage cable bailey truss under condition of excavation of foundation pit |
-
2018
- 2018-05-02 CN CN201810410593.7A patent/CN110445077B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201352698Y (en) * | 2009-01-15 | 2009-11-25 | 刘�英 | Assemble type calandria support |
CN202034744U (en) * | 2011-04-23 | 2011-11-09 | 广东三凌塑料管材有限公司 | Pipe pillow |
CN202099804U (en) * | 2011-05-19 | 2012-01-04 | 长业建设集团有限公司 | Bailey bracket hanging and underpining system for foundation-pit-spanning pipe lines |
CN104676110A (en) * | 2015-01-22 | 2015-06-03 | 中国地质大学(武汉) | On-site overhanging protection method of high-voltage cable bailey truss under condition of excavation of foundation pit |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111021363A (en) * | 2019-12-31 | 2020-04-17 | 广东顺德电力设计院有限公司 | Method and system for protecting cable by using bailey truss |
Also Published As
Publication number | Publication date |
---|---|
CN110445077B (en) | 2021-03-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101608624B1 (en) | Method for lifting the height of tower | |
CN106498844A (en) | A kind of high speed railway box beam bridge floor pre-fabricated electric cables groove | |
CN207498808U (en) | A kind of steel suspension bridge for deep-foundation pit engineering earthwork outward transport | |
CN110445077A (en) | A kind of high-tension cable power channel original position suspension protection method | |
CN108118689B (en) | Prefabricated underground diaphragm wall capable of being partially recycled, lifting appliance and construction method | |
CN206859234U (en) | A kind of protector for mountain area mud-rock flow | |
KR101065330B1 (en) | Construction method for geothermal heat exchanger | |
CN108221955B (en) | Prefabricated underground diaphragm wall capable of being recycled integrally, lifting appliance and construction method | |
CN108221954B (en) | Easy-to-detach prefabricated underground diaphragm wall, lifting appliance and construction method | |
KR101297679B1 (en) | Self-supporting Temporary Structure Using Steel Wire And Method Of The Same | |
CN104631474B (en) | A kind of side slope protection greening structure | |
CN105587324B (en) | Dig the construction method of tunnel portal section supporting steel grating section | |
CN102677680A (en) | Dismantling method for concrete waist beam | |
CN210288409U (en) | Soft soil stratum underground parking garage closes on shallow foundation building foundation pit deformation control structure | |
CN209011617U (en) | Existing building elevator well structure additional construction structure | |
KR101192265B1 (en) | Phc long pile construction machine and method thereof | |
CN217053415U (en) | Temporary reinforcing system for shallow collapsed body of tunnel entrance section | |
CN109208936A (en) | Existing building elevator shaft structure additional building structure and construction method thereof | |
CN218436442U (en) | Precast concrete antiskid plate for ground hardening | |
CN214089981U (en) | Span electric power piping lane of foundation ditch and suspend protective structure in midair | |
CN220266622U (en) | Box transformer foundation structure | |
CN213775452U (en) | Protection device for blasting operation underworkings pipeline facility | |
CN218347064U (en) | Protective channel for deep foundation pit concrete support beam | |
CN109577667A (en) | A kind of high-tension cable electricity well original position suspension protection method | |
CN211522822U (en) | Trestle steel structure matched with tunnel shield construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |