CN110439491A - Packer expanding expandable casing patching tool - Google Patents
Packer expanding expandable casing patching tool Download PDFInfo
- Publication number
- CN110439491A CN110439491A CN201910782037.7A CN201910782037A CN110439491A CN 110439491 A CN110439491 A CN 110439491A CN 201910782037 A CN201910782037 A CN 201910782037A CN 110439491 A CN110439491 A CN 110439491A
- Authority
- CN
- China
- Prior art keywords
- tube
- packer
- expansion
- rubber
- expansion tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B29/00—Cutting or destroying pipes, packers, plugs or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
- E21B29/10—Reconditioning of well casings, e.g. straightening
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/126—Packers; Plugs with fluid-pressure-operated elastic cup or skirt
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Pipe Accessories (AREA)
Abstract
本发明公开了一种封隔器扩张式膨胀管补贴工具,包括内外套设的内膨胀装置和外膨胀管(7),所述内膨胀装置含有依次连接的封隔器和中心管(5),所述封隔器的长度小于外膨胀管(7)的长度,所述封隔器含有胶筒(3),当所述封隔器的胶筒(3)膨胀后能够使外膨胀管(7)膨胀。该封隔器扩张式膨胀管补贴工具使用膨胀封隔器将膨胀管从上至下进行膨胀坐封,通过封隔器膨胀补贴管达到修复破损漏失套管、封堵射孔段套管、侧钻井膨胀管完井、封堵钻井复杂层位等问题。该技术采用封隔器代替膨胀锥的方式由上至下膨胀补贴,对于补贴管内径可调,原套管变形,内壁腐蚀严重的均可进行补贴,同时也增加了施工时的安全性,并获取套管最大通径。
The invention discloses a packer-expandable expansion tube supplementary tool, which comprises an inner expansion device and an outer expansion tube (7) arranged inside and outside, and the inner expansion device contains a packer and a center pipe (5) connected in sequence , the length of the packer is less than the length of the outer expansion tube (7), the packer contains a rubber tube (3), when the rubber tube (3) of the packer expands, the outer expansion tube ( 7) Swelling. The packer-expandable expansion pipe subsidy tool uses an expansion packer to expand and set the expansion pipe from top to bottom. Through the packer expansion subsidy pipe, it can repair the damaged leakage casing, seal the casing of the perforation section, side Completion of drilling expansion pipes, plugging of complex formations in drilling, etc. This technology uses a packer instead of an expansion cone to expand subsidy from top to bottom. The subsidy pipe can be subsidized if the inner diameter is adjustable, the original casing is deformed, and the inner wall is severely corroded. It also increases the safety during construction and Get the maximum diameter of the casing.
Description
技术领域technical field
本发明涉及石油开采设备领域,具体的是一种封隔器扩张式膨胀管补贴工具。The invention relates to the field of oil exploitation equipment, in particular to a packer-expandable expansion pipe subsidy tool.
背景技术Background technique
目前,国内油田老井修复普遍采用的膨胀管补贴技术,该技术是由膨胀锥在发射腔内,经过打压由下至上膨胀补贴管对原套管进行补贴,虽然该技术在国内越来越成熟,但是少数老井结构比较复杂,膨胀锥在从下往上膨胀过程中可能出现卡死现象。同时在由于膨胀锥不可变径,对补贴段套管内径要求高,修井打通道周期长、成功率不高,特别是套管状况很差的一些老油田,修井打通道成功率更低,修井周期更长,投资不断增大,往往超出预算,迫使终止施工。膨胀管补贴井套管通道处理难的问题一直困扰着油田,大大的限制了膨胀管补贴技术在油田的推广应用。另外,膨胀管补贴后一旦在补贴段以下再出现套损时几乎没有办法修复或者修井成本过度增加。加之长庆油田、大庆油田、辽河油田老井套管长期处于腐蚀环境中,套管腐蚀程度日益增大,急需一种耐腐蚀膨胀管进行修复作业。At present, the expansion tube subsidy technology is commonly used in the repair of old wells in domestic oilfields. This technology is to subsidize the original casing by expanding the expansion cone in the firing chamber through pressure from bottom to top. Although this technology is becoming more and more mature in China , but a few old wells have complex structures, and the expansion cone may be stuck during the expansion process from bottom to top. At the same time, due to the non-variable diameter of the expansion cone, the requirement for the inner diameter of the casing in the subsidy section is high, the workover and drilling period is long, and the success rate is not high, especially in some old oil fields with poor casing conditions, the success rate of the workover and drilling is even lower , the workover period is longer, and the investment is constantly increasing, which often exceeds the budget, forcing the termination of construction. The problem of difficult handling of the casing channel of expansion tube subsidized wells has been plagued by oilfields, which greatly limits the popularization and application of expansion tube subsidy technology in oil fields. In addition, once the casing damage occurs below the subsidized section after the expansion pipe is subsidized, there is almost no way to repair it or the workover cost will increase excessively. In addition, the old well casings in Changqing Oilfield, Daqing Oilfield, and Liaohe Oilfield have been in a corrosive environment for a long time, and the corrosion degree of the casing is increasing day by day. There is an urgent need for a corrosion-resistant expansion pipe for repair work.
发明内容Contents of the invention
为了解决现有采用膨胀锥实现膨胀管补贴技术成功率低的问题,本发明提供了一种封隔器扩张式膨胀管补贴工具,该封隔器扩张式膨胀管补贴工具使用膨胀封隔器将膨胀管从上至下进行膨胀坐封,通过封隔器膨胀补贴管达到修复破损漏失套管、封堵射孔段套管、侧钻井膨胀管完井、封堵钻井复杂层位等问题。该技术采用封隔器代替膨胀锥的方式由上至下膨胀补贴,对于补贴管内径可调,原套管变形,内壁腐蚀严重的均可进行补贴,同时也增加了施工时的安全性,并获取套管最大通径。In order to solve the problem of the low success rate of the existing technology of using expansion cones to achieve expansion pipe subsidy, the present invention provides a packer-expandable expansion pipe subsidy tool, which uses an expansion packer to The expansion tube is expanded and set from top to bottom, and through the packer expansion subsidy tube, problems such as repairing the damaged leakage casing, sealing the casing of the perforation section, completion of the sidetracking expansion tube, and plugging the complex formation of the well are achieved. This technology uses a packer instead of an expansion cone to expand subsidy from top to bottom. The inner diameter of the subsidized pipe can be adjusted, the original casing is deformed, and the inner wall is severely corroded. It can also be subsidized, and it also increases the safety during construction, and Get the maximum diameter of the casing.
本发明解决其技术问题所采用的技术方案是:一种封隔器扩张式膨胀管补贴工具,包括内外套设的内膨胀装置和外膨胀管,所述内膨胀装置含有依次连接的封隔器和中心管,所述封隔器的长度小于外膨胀管的长度,所述封隔器含有胶筒,当所述封隔器的胶筒膨胀后能够使外膨胀管膨胀。The technical solution adopted by the present invention to solve the technical problem is: a packer expansion expansion tube subsidy tool, including an inner expansion device and an outer expansion tube arranged inside and outside, and the internal expansion device contains packers connected in sequence and the central pipe, the length of the packer is less than the length of the outer expansion pipe, and the packer contains a rubber sleeve, which can expand the outer expansion pipe when the rubber sleeve of the packer expands.
所述封隔器还含有依次连接的上接头、内管和下接头,胶筒套设于所述内管外,当向该封隔器内打压时,所述封隔器的胶筒能够膨胀。The packer also includes an upper joint, an inner pipe, and a lower joint connected in sequence. The rubber sleeve is sleeved outside the inner pipe. When the packer is pressed, the rubber sleeve of the packer can expand .
所述封隔器呈直立状态,胶筒的上端套设于上接头的下端外,胶筒的下端套设于下接头的上端外,所述内管或下接头的侧壁设有打压通孔。The packer is in an upright state, the upper end of the rubber tube is sleeved outside the lower end of the upper joint, the lower end of the rubber tube is sleeved outside the upper end of the lower joint, and the side wall of the inner pipe or the lower joint is provided with a pressure through hole .
所述内膨胀装置还含有定位通井规和限位接头,定位通井规、所述封隔器、中心管和限位接头依次连接。The internal expansion device also includes a positioning well gauge and a limit joint, and the positioning well gauge, the packer, the center pipe and the limit joint are connected in sequence.
外膨胀管呈直立状态,定位通井规位于外膨胀管的上端外,限位接头位于外膨胀管的下端内,限位接头与外膨胀管之间通过剪切销钉连接。The outer expansion tube is in an upright state, the positioning well gauge is located outside the upper end of the outer expansion tube, the limit joint is located in the lower end of the outer expansion tube, and the limit joint and the outer expansion tube are connected by shear pins.
所述封隔器的长度小于中心管的长度,外膨胀管的下端与限位接头的下端平齐,外膨胀管的上端与胶筒的上端平齐。The length of the packer is less than the length of the central pipe, the lower end of the outer expansion pipe is flush with the lower end of the stop joint, and the upper end of the outer expansion pipe is flush with the upper end of the rubber cylinder.
外膨胀管外从上向下依次套设有第一悬挂橡胶筒、第一密封挂橡胶筒、第二密封挂橡胶筒和第二悬挂橡胶筒。A first hanging rubber tube, a first sealing hanging rubber tube, a second sealing hanging rubber tube and a second hanging rubber tube are sheathed on the outside of the outer expansion tube from top to bottom.
第一悬挂橡胶筒与第二悬挂橡胶筒上下对称设置,第一密封挂橡胶筒与第二密封挂橡胶筒上下对称设置,第一悬挂橡胶筒的长度等于第一密封挂橡胶筒的长度。The first suspension rubber cylinder and the second suspension rubber cylinder are symmetrically arranged up and down, the first sealing hanging rubber cylinder and the second sealing hanging rubber cylinder are vertically symmetrically arranged, and the length of the first hanging rubber cylinder is equal to the length of the first sealing hanging rubber cylinder.
第一悬挂橡胶筒与第二悬挂橡胶筒完全相同,第一密封挂橡胶筒与第二密封挂橡胶筒完全相同,第一悬挂橡胶筒的外表面设有排水槽,胶筒的长度为第一悬挂橡胶筒长度的1倍至2倍。The first hanging rubber cylinder is exactly the same as the second hanging rubber cylinder, the first sealing hanging rubber cylinder is exactly the same as the second sealing hanging rubber cylinder, the outer surface of the first hanging rubber cylinder is provided with a drainage groove, and the length of the rubber cylinder is the first 1 to 2 times the length of the hanging rubber tube.
所述封隔器的胶筒与外膨胀管间隙配合,所述内膨胀装置能够相对于外膨胀管沿轴向移动,所述封隔器的胶筒能够使外膨胀管分段依次膨胀直至全部膨胀。The rubber sleeve of the packer is in clearance fit with the outer expansion tube, the inner expansion device can move axially relative to the outer expansion tube, and the rubber sleeve of the packer can expand the outer expansion tube in sections until all swell.
本发明的有益效果是:The beneficial effects of the present invention are:
1.可以用于5 1/2″套管井内补贴用的封隔器扩张式膨胀管补贴技术,利用膨胀封隔器代替膨胀锥膨胀补贴管对原套管进行补贴。主要原理就是到达预定补贴深度后,通过操作膨胀封隔器由上至下进行坐封,膨胀封隔器挤压膨胀管进行补贴,完成该段补贴后收缩封隔器,继续重复上述操作完成所有补贴施工。此技术对井筒尺寸要求较低,大大降低了处理通道的难度及时间,提高了施工安全性,同时补贴完成后可通过补贴位置对下部套管继续进行补贴,膨胀管具有防腐蚀性能。1. Packer-expandable expansion tube subsidy technology that can be used for subsidy in 5 1/2″ cased wells, using expansion packer instead of expansion cone expansion subsidy tube to subsidize the original casing. The main principle is to reach the scheduled subsidy After the depth is reached, the expansion packer is set from top to bottom, and the expansion packer extrudes the expansion tube for subsidy. After completing the subsidy, the packer is shrunk, and the above operation is continued to complete all subsidy construction. The wellbore size requirement is relatively low, which greatly reduces the difficulty and time of processing channels, and improves construction safety. At the same time, after the subsidy is completed, the subsidy can be continued to the lower casing through the subsidy position, and the expansion tube has anti-corrosion performance.
2.本发明可适用于工厂、加油站微小型储罐检测,可延伸到高校、研究所等机构进行实验类储罐底板的检测,具有一定实际性意义。2. The present invention is applicable to the detection of miniature storage tanks in factories and gas stations, and can be extended to universities, research institutes and other institutions for the detection of experimental storage tank bottom plates, which has certain practical significance.
附图说明Description of drawings
构成本申请的一部分的说明书附图用来提供对本发明的进一步理解,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。The accompanying drawings constituting a part of the present application are used to provide a further understanding of the present invention, and the schematic embodiments and descriptions of the present invention are used to explain the present invention, and do not constitute an improper limitation of the present invention.
图1是本发明所述封隔器扩张式膨胀管补贴工具的示意图。Fig. 1 is a schematic diagram of a packer-expandable expansion pipe patching tool according to the present invention.
图2是内膨胀装置的示意图。Figure 2 is a schematic diagram of the internal expansion device.
图3是外膨胀管的示意图。Fig. 3 is a schematic diagram of an external expansion tube.
图4是本发明所述封隔器扩张式膨胀管补贴工具的上部示意图。Fig. 4 is a schematic diagram of the upper part of the packer-expandable expansion pipe patching tool according to the present invention.
图5是本发明所述封隔器扩张式膨胀管补贴工具的上部示意图。Fig. 5 is a schematic diagram of the upper part of the packer-expandable expansion pipe patching tool according to the present invention.
图6是本发明所述封隔器扩张式膨胀管补贴工具的下部示意图。Fig. 6 is a schematic view of the lower part of the packer-expandable expansion pipe patching tool of the present invention.
1、定位通井规;2、上接头;3、胶筒;4、下接头;5、中心管;6、限位接头;7、外膨胀管;8、第一悬挂橡胶筒;9、第一密封挂橡胶筒;10、剪切销钉;11、第二密封挂橡胶筒;12、第二悬挂橡胶筒;13、打压通孔。1. Positioning well gauge; 2. Upper joint; 3. Rubber tube; 4. Lower joint; 5. Center tube; 6. Limit joint; 7. Outer expansion tube; 8. First suspension rubber tube; 9. 1. Seal hanging rubber tube; 10. Shearing pin; 11. Second sealing hanging rubber tube; 12. Second hanging rubber tube; 13. Pressure through hole.
具体实施方式Detailed ways
需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本发明。It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and examples.
一种封隔器扩张式膨胀管补贴工具,包括内外套设的内膨胀装置和外膨胀管7,所述内膨胀装置含有依次连接的封隔器和中心管5,所述封隔器的长度小于外膨胀管7的长度,所述封隔器含有胶筒3,当所述封隔器的胶筒3膨胀后能够使外膨胀管7膨胀,如图1至图6所示。A packer-expandable expansion tube supplementary tool, comprising an inner expansion device and an outer expansion tube 7 arranged inside and outside, the internal expansion device contains a packer and a center pipe 5 connected in sequence, and the length of the packer is Less than the length of the outer expansion tube 7, the packer contains a rubber sleeve 3, which can expand the outer expansion tube 7 when the rubber sleeve 3 of the packer expands, as shown in Fig. 1 to Fig. 6 .
在本实施例中,所述封隔器为K344封隔器,所述封隔器还含有依次连接的上接头2、内管和下接头4,胶筒3套设于所述内管外,当向该封隔器内打压时,所述封隔器的胶筒3能够膨胀。In this embodiment, the packer is a K344 packer, and the packer also includes an upper joint 2, an inner pipe and a lower joint 4 connected in sequence, and the rubber sleeve 3 is sleeved outside the inner pipe. When pressing into the packer, the rubber barrel 3 of the packer can expand.
在本实施例中,上接头2的轴线、所述内管的轴线、下接头4的轴线、胶筒3的轴线和中心管5的轴线重合,所述封隔器呈直立状态,上接头2的下端与所述内管的上端螺纹连接,下接头4的上端与所述内管的下端螺纹连接,下接头4的下端与中心管5的上端螺纹连接。In this embodiment, the axis of the upper joint 2, the axis of the inner pipe, the axis of the lower joint 4, the axis of the rubber tube 3 and the axis of the central pipe 5 coincide, the packer is in an upright state, and the upper joint 2 The lower end of the lower joint is threaded with the upper end of the inner pipe, the upper end of the lower joint 4 is threaded with the lower end of the inner pipe, and the lower end of the lower joint 4 is threaded with the upper end of the center pipe 5.
在本实施例中,胶筒3的上端套设于上接头2的下端外,胶筒3的下端套设于下接头4的上端外,所述内管或下接头4的侧壁设有打压通孔13。当向该封隔器的内管中打入压力液时,该压力液能够通过打压通孔13进入胶筒3与所述内管之间,从而使胶筒3径向膨胀,即胶筒3的直径变大。In this embodiment, the upper end of the rubber tube 3 is sleeved outside the lower end of the upper joint 2, the lower end of the rubber tube 3 is sleeved outside the upper end of the lower joint 4, and the inner tube or the side wall of the lower joint 4 is provided with a pressing Through hole 13. When the pressure fluid is injected into the inner tube of the packer, the pressure fluid can enter between the rubber tube 3 and the inner tube through the pressure through hole 13, so that the rubber tube 3 expands radially, that is, the rubber tube 3 diameter becomes larger.
在本实施例中,所述内膨胀装置还含有定位通井规1和限位接头6,定位通井规1、所述封隔器、中心管5和限位接头6从上向下依次连接。定位通井规1的轴线、限位接头6的轴线和中心管5的轴线重合。中心管5的外径小于胶筒3的外径。In this embodiment, the internal expansion device also includes a positioning well gauge 1 and a limit joint 6, and the positioning well gauge 1, the packer, the center pipe 5 and the limit joint 6 are sequentially connected from top to bottom . The axis of positioning well gauge 1, the axis of limit joint 6 and the axis of center pipe 5 coincide. The outer diameter of the central tube 5 is smaller than the outer diameter of the rubber cartridge 3 .
定位通井规1呈圆筒形结构,定位通井规1的外表面设有扩颈段,该扩颈段的外径等于外膨胀管7膨胀后的内径。定位通井规1的下端与上接头2的上端螺纹连接,中心管5的下端与限位接头6的上端可以采用螺纹、销钉或焊接的方式连接固定。The positioning well gauge 1 has a cylindrical structure, and the outer surface of the positioning well gauge 1 is provided with a neck expansion section, and the outer diameter of the neck expansion section is equal to the inner diameter of the outer expansion tube 7 after expansion. The lower end of the positioning well gauge 1 is threadedly connected with the upper end of the upper joint 2, and the lower end of the center pipe 5 and the upper end of the limit joint 6 can be connected and fixed by threads, pins or welding.
在本实施例中,定位通井规1位于外膨胀管7的上端外,限位接头6位于外膨胀管7的下端内,限位接头6为圆筒形结构,限位接头6与外膨胀管7之间通过剪切销钉10连接。限位接头6的外径大于中心管5的外径,限位接头6的外径等于外膨胀管7的内径。In this embodiment, the positioning gauge 1 is located outside the upper end of the outer expansion tube 7, and the limit joint 6 is located in the lower end of the outer expansion tube 7. The limit joint 6 is a cylindrical structure, and the limit joint 6 is connected to the outer expansion tube. The tubes 7 are connected by shear pins 10 . The outer diameter of the limit joint 6 is larger than the outer diameter of the central pipe 5 , and the outer diameter of the limit joint 6 is equal to the inner diameter of the outer expansion tube 7 .
在本实施例中,所述封隔器的长度小于中心管5的长度,优选外膨胀管7的下端与限位接头6的下端平齐,外膨胀管7的上端与胶筒3的上端平齐,外膨胀管7的材质为不锈钢。定位通井规1具备封隔器单行程定位功能和膨胀管膨胀后直径测试功能。In this embodiment, the length of the packer is less than the length of the central pipe 5, preferably the lower end of the outer expansion tube 7 is flush with the lower end of the limit joint 6, and the upper end of the outer expansion tube 7 is flush with the upper end of the rubber tube 3 Qi, the material of the outer expansion tube 7 is stainless steel. The positioning gauge 1 has the function of single-stroke positioning of the packer and the function of testing the diameter of the expansion pipe after expansion.
在本实施例中,外膨胀管7外从上向下依次套设有第一悬挂橡胶筒8、第一密封挂橡胶筒9、第二密封挂橡胶筒11和第二悬挂橡胶筒12。第一悬挂橡胶筒8和第二悬挂橡胶筒12的作用是提供外膨胀管7膨胀后与套管之间的悬挂力,第一密封挂橡胶筒9和第二密封挂橡胶筒11的作用是提供外膨胀管7膨胀后与套管之间的密封力。In this embodiment, the outer expansion tube 7 is sheathed with a first hanging rubber tube 8 , a first sealing hanging rubber tube 9 , a second sealing hanging rubber tube 11 and a second hanging rubber tube 12 from top to bottom. The function of the first suspension rubber cylinder 8 and the second suspension rubber cylinder 12 is to provide the suspension force between the outer expansion tube 7 and the casing after expansion, and the function of the first seal suspension rubber cylinder 9 and the second seal suspension rubber cylinder 11 is Provide the sealing force between the expanded outer expansion tube 7 and the casing.
在本实施例中,第一悬挂橡胶筒8位于外膨胀管7的上端,第二悬挂橡胶筒12位于外膨胀管7的下端。第一悬挂橡胶筒8与第二悬挂橡胶筒12上下对称设置且互为镜像,第一密封挂橡胶筒9与第二密封挂橡胶筒11上下对称设置且互为镜像,第一悬挂橡胶筒8的长度等于第一密封挂橡胶筒9的长度。第一悬挂橡胶筒8的上端与外膨胀管7的上端之间的距离为0cm-5cm,第一悬挂橡胶筒8与第一密封挂橡胶筒9之间的距离为0cm-5cm。In this embodiment, the first suspension rubber tube 8 is located at the upper end of the outer expansion tube 7 , and the second suspension rubber tube 12 is located at the lower end of the outer expansion tube 7 . The first suspension rubber cylinder 8 and the second suspension rubber cylinder 12 are symmetrically arranged up and down and are mirror images of each other. The first sealing rubber cylinder 9 and the second sealing rubber cylinder 11 are symmetrically arranged up and down and are mirror images of each other. The length equals the length of the first seal hanging rubber cylinder 9. The distance between the upper end of the first hanging rubber tube 8 and the upper end of the outer expansion tube 7 is 0cm-5cm, and the distance between the first hanging rubber tube 8 and the first sealing hanging rubber tube 9 is 0cm-5cm.
第一悬挂橡胶筒8、第一密封挂橡胶筒9、第二密封挂橡胶筒11和第二悬挂橡胶筒12均通过硫化的方式固定于外膨胀管7外,第一悬挂橡胶筒8、第一密封挂橡胶筒9、第二密封挂橡胶筒11和第二悬挂橡胶筒12的内径均等于外膨胀管7的外径。第一悬挂橡胶筒8的长度为外膨胀管7长度的10%-20%,所述长度为图1中上下方向上的尺寸,例如,第一悬挂橡胶筒8的长度约为1.5m,外膨胀管7长度约为9m。第一悬挂橡胶筒8的厚度和第一密封挂橡胶筒9的厚度约为1.5mm-3mm。The first suspension rubber cylinder 8, the first seal suspension rubber cylinder 9, the second seal suspension rubber cylinder 11 and the second suspension rubber cylinder 12 are all fixed outside the outer expansion tube 7 by vulcanization. The first suspension rubber cylinder 8, the second suspension rubber cylinder The inner diameters of the first sealing hanging rubber cylinder 9 , the second sealing hanging rubber cylinder 11 and the second hanging rubber cylinder 12 are equal to the outer diameter of the outer expansion tube 7 . The length of the first suspension rubber tube 8 is 10%-20% of the length of the outer expansion tube 7, and the length is the dimension on the up and down direction in Fig. 1, for example, the length of the first suspension rubber tube 8 is about 1.5m, and the outer The expansion pipe 7 has a length of about 9m. The thickness of the first suspension rubber cylinder 8 and the thickness of the first sealing suspension rubber cylinder 9 are about 1.5mm-3mm.
在本实施例中,第一悬挂橡胶筒8与第二悬挂橡胶筒12完全相同,第一密封挂橡胶筒9与第二密封挂橡胶筒11完全相同,第一悬挂橡胶筒8的外表面设有至少一个排水槽,所述排水槽沿第一悬挂橡胶筒8的轴线方向开设,胶筒3的长度为第一悬挂橡胶筒8长度的1倍至2倍。例如,胶筒3的长度为第一悬挂橡胶筒8长度的1倍,即胶筒3的长度等于第一悬挂橡胶筒8的长度。In this embodiment, the first suspension rubber cylinder 8 is identical to the second suspension rubber cylinder 12, the first seal suspension rubber cylinder 9 is identical to the second seal suspension rubber cylinder 11, and the outer surface of the first suspension rubber cylinder 8 is provided with There is at least one drainage groove, and the drainage groove is opened along the axial direction of the first suspension rubber cylinder 8, and the length of the rubber cylinder 3 is 1 to 2 times the length of the first suspension rubber cylinder 8. For example, the length of the rubber cylinder 3 is twice the length of the first suspension rubber cylinder 8 , that is, the length of the rubber cylinder 3 is equal to the length of the first suspension rubber cylinder 8 .
在本实施例中,当所述封隔器和外膨胀管7均处于初始状态时,即所述封隔器的胶筒3与外膨胀管7均未膨胀时,所述封隔器的胶筒3与外膨胀管7可以间隙配合。当剪切销钉10被破坏后,所述内膨胀装置能够相对于外膨胀管7沿轴向移动,该封隔器的胶筒3能够使外膨胀管7从上向下分段依次膨胀直至全部膨胀。In this embodiment, when both the packer and the outer expansion tube 7 are in the initial state, that is, when the rubber sleeve 3 of the packer and the outer expansion tube 7 are not expanded, the glue of the packer The cylinder 3 and the outer expansion tube 7 can be clearance fit. When the shear pin 10 is destroyed, the internal expansion device can move axially relative to the outer expansion tube 7, and the rubber sleeve 3 of the packer can expand the outer expansion tube 7 sequentially from top to bottom until the entire swell.
其中,外膨胀管7分段依次膨胀直至全部膨胀的含义为,例如,外膨胀管7的长度为9m,胶筒3的长度为1.5m。首先,胶筒3的上端与外膨胀管7的上端平齐,即胶筒3与外膨胀管7上端下方0-1.5m的一段相对应,第一次胶筒3膨胀可以使外膨胀管7上端下方0-1.5m的一段膨胀;然后,胶筒3向下移动,胶筒3与外膨胀管7上端下方1.5-3m的一段相对应,第二次胶筒3膨胀可以使外膨胀管7上端下方1.5-3m的一段膨胀;然后,胶筒3向下移动,胶筒3与外膨胀管7上端下方3m-4.5m的一段相对应,第三次胶筒3膨胀可以使外膨胀管7上端下方3m-4.5m的一段膨胀;然后,胶筒3向下移动,胶筒3与外膨胀管7上端下方4.5m-6m的一段相对应,第四次胶筒3膨胀可以使外膨胀管7上端下方4.5m-6m的一段膨胀;然后,胶筒3向下移动,胶筒3与外膨胀管7上端下方6m-7.5m的一段相对应,第五次胶筒3膨胀可以使外膨胀管7上端下方6m-7.5m的一段膨胀;然后,胶筒3向下移动,胶筒3与外膨胀管7上端下方7.5m-9m的一段相对应,第六次胶筒3膨胀可以使外膨胀管7上端下方7.5m-9m的一段膨胀,此时完成外膨胀管7全部膨胀。Wherein, the expansion of the outer expansion tube 7 in sections until fully expanded means that, for example, the length of the outer expansion tube 7 is 9 m, and the length of the rubber tube 3 is 1.5 m. First, the upper end of the rubber tube 3 is flush with the upper end of the outer expansion tube 7, that is, the rubber tube 3 corresponds to a section 0-1.5m below the upper end of the outer expansion tube 7, and the first expansion of the rubber tube 3 can make the outer expansion tube 7 A section of 0-1.5m below the upper end expands; then, the rubber tube 3 moves downward, and the rubber tube 3 corresponds to a section of 1.5-3m below the upper end of the outer expansion tube 7, and the second expansion of the rubber tube 3 can make the outer expansion tube 7 A section 1.5-3m below the upper end expands; then, the rubber tube 3 moves downward, and the rubber tube 3 corresponds to a section 3m-4.5m below the upper end of the outer expansion tube 7, and the third expansion of the rubber tube 3 can make the outer expansion tube 7 A section of 3m-4.5m below the upper end expands; then, the rubber tube 3 moves downward, and the rubber tube 3 corresponds to a section of 4.5m-6m below the upper end of the outer expansion tube 7, and the fourth expansion of the rubber tube 3 can make the outer expansion tube 7. A section of 4.5m-6m below the upper end expands; then, the rubber tube 3 moves downward, and the rubber tube 3 corresponds to a section of 6m-7.5m below the upper end of the outer expansion tube 7. The fifth expansion of the rubber tube 3 can make the outer expansion A section of 6m-7.5m below the upper end of the tube 7 expands; then, the rubber tube 3 moves downward, and the rubber tube 3 corresponds to a section of 7.5m-9m below the upper end of the outer expansion tube 7, and the sixth expansion of the rubber tube 3 can make the outer A section of 7.5m-9m below the upper end of the expansion tube 7 expands, and now the outer expansion tube 7 is fully expanded.
下面介绍该封隔器扩张式膨胀管补贴工具的工作过程。The following describes the working process of the packer expandable expansion pipe subsidy tool.
例如,某井套管腐蚀严重后套管漏失,将所述内膨胀装置套设于外膨胀管7内,所述内膨胀装置的下端与外膨胀管7通过剪切销钉10连接固定,所述内膨胀装置的封隔器和外膨胀管7均处于初始状态,如图1所示。胶筒3的长度略大于第一悬挂橡胶筒8和第一密封挂橡胶筒9的长度,胶筒3的位置与第一悬挂橡胶筒8的位置相对应,即胶筒3正位于第一悬挂橡胶筒8的内侧。For example, if the casing of a certain well corrodes seriously and the casing leaks, the inner expansion device is sleeved in the outer expansion pipe 7, and the lower end of the inner expansion device is connected and fixed to the outer expansion pipe 7 by a shear pin 10. The packer of the internal expansion device and the external expansion tube 7 are both in the initial state, as shown in FIG. 1 . The length of the rubber cylinder 3 is slightly longer than the length of the first suspension rubber cylinder 8 and the first seal suspension rubber cylinder 9, and the position of the rubber cylinder 3 corresponds to the position of the first suspension rubber The inner side of the rubber cylinder 8.
将定位通井规1的上部连接地面油管,将该封隔器扩张式膨胀管补贴工具下入至套管漏失部位,井口油管连接地面打压装置,启动地面打压装置压力液传至该封隔器的胶筒3,胶筒3膨胀后迫使外膨胀管7上第一悬挂橡胶筒8所在的一段膨胀,第一悬挂橡胶筒8在膨胀力的作用下在套管壁上压缩提供悬挂力。压力升高至膨胀管膨胀压力后泄压完成第一段膨胀,此时外膨胀管7已经悬挂在套管壁上。Connect the upper part of the positioning well gauge 1 to the surface tubing, lower the packer expansion expansion tube subsidy tool to the leaking part of the casing, connect the wellhead tubing to the ground pressing device, and start the ground pressing device to transmit the pressure fluid to the packer The rubber sleeve 3, after the expansion of the rubber sleeve 3, forces the first suspension rubber sleeve 8 on the outer expansion tube 7 to expand, and the first suspension rubber sleeve 8 is compressed on the casing wall under the action of the expansion force to provide suspension force. After the pressure rises to the expansion pressure of the expansion tube, the first stage of expansion is completed by releasing the pressure, and now the outer expansion tube 7 has been suspended on the casing wall.
上提或反转管柱(即所述内膨胀装置),破坏剪切销钉10,然后下放管柱,当悬重明显降低时说明定位通井规1已经到达膨胀后的第一行程下部,即膨胀后第一悬挂橡胶筒8的下端,上提固定尺寸调整封隔器位置后,使胶筒3的位置与第一密封挂橡胶筒9的位置相对应,进行第二次封隔器的胶筒3打压膨胀,此时,胶筒3膨胀后迫使外膨胀管7上第一密封挂橡胶筒9所在的一段膨胀,第一密封挂橡胶筒9在膨胀力的作用下在套管壁上压缩提供密封能力,压力升高至膨胀管膨胀压力后泄压完成第二段膨胀,反复以上操作,完成所有打压行程,直到下放管柱无悬重变化为止,说明膨胀管完全膨胀座封在套管上,起出管柱,完成套管补贴作业。上述过程实现了外膨胀管7依次分段膨胀直至全部膨胀。Lift or reverse the pipe string (that is, the internal expansion device), destroy the shear pin 10, and then lower the pipe string. When the hanging weight is significantly reduced, it means that the positioning well gauge 1 has reached the lower part of the first stroke after expansion, that is, After the expansion, the lower end of the first hanging rubber cylinder 8 is lifted up to adjust the position of the packer to a fixed size, so that the position of the rubber cylinder 3 corresponds to the position of the first sealing hanging rubber cylinder 9, and the second packer glue is carried out. The cylinder 3 is pressurized and expanded. At this time, after the expansion of the rubber cylinder 3, the section of the first sealing hanging rubber cylinder 9 on the outer expansion pipe 7 is forced to expand, and the first sealing hanging rubber cylinder 9 is compressed on the casing wall under the action of the expansion force. Provide sealing ability. After the pressure rises to the expansion pressure of the expansion tube, the pressure is released to complete the second stage of expansion. Repeat the above operations to complete all the pressing strokes until there is no change in the suspended weight of the lowering string, indicating that the expansion tube is completely expanded and seated on the casing. , pull out the pipe string, and complete the casing subsidy operation. The above-mentioned process realizes that the outer expansion tube 7 expands sequentially in sections until fully expanded.
以上所述,仅为本发明的具体实施例,不能以其限定发明实施的范围,所以其等同组件的置换,或依本发明专利保护范围所作的等同变化与修饰,都应仍属于本专利涵盖的范畴。另外,本发明中的技术特征与技术特征之间、技术特征与技术方案、技术方案与技术方案之间均可以自由组合使用。The above is only a specific embodiment of the present invention, and cannot limit the scope of the invention, so the replacement of its equivalent components, or the equivalent changes and modifications made according to the patent protection scope of the present invention, should still fall within the scope of this patent. category. In addition, the technical features and technical features, technical features and technical solutions, and technical solutions and technical solutions in the present invention can be used in free combination.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910782037.7A CN110439491B (en) | 2019-08-23 | 2019-08-23 | Packer expansion tube patching tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910782037.7A CN110439491B (en) | 2019-08-23 | 2019-08-23 | Packer expansion tube patching tool |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110439491A true CN110439491A (en) | 2019-11-12 |
CN110439491B CN110439491B (en) | 2025-01-07 |
Family
ID=68437296
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910782037.7A Active CN110439491B (en) | 2019-08-23 | 2019-08-23 | Packer expansion tube patching tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110439491B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110939403A (en) * | 2019-12-13 | 2020-03-31 | 孙肖 | Double hydraulic bidirectional anchoring packer |
CN113202442A (en) * | 2021-06-11 | 2021-08-03 | 东营普洛孚能源技术有限公司 | Underseal large expansion pipe tool and construction method thereof |
CN113982517A (en) * | 2021-11-11 | 2022-01-28 | 华鼎鸿基石油工程技术(北京)有限公司 | Expansion tube subsidy tool and elastic tube expander |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030196795A1 (en) * | 2002-04-17 | 2003-10-23 | Andrew Kutac | Inflatable packer with prestressed bladder |
US20110011578A1 (en) * | 2009-07-15 | 2011-01-20 | Enventure Global Technology, Llc | Expansion System for Expandable Tubulars |
CN202348193U (en) * | 2011-12-15 | 2012-07-25 | 浙江金洲管道工业有限公司 | Radius-variable expansion tool for sleeve damage of oil-gas well |
CN102777123A (en) * | 2012-05-02 | 2012-11-14 | 西南石油大学 | High-expansibility naked eye suspension adhering system and method |
CN103867155A (en) * | 2014-04-04 | 2014-06-18 | 华鼎鸿基石油工程技术(北京)有限公司 | Expansion pipe |
CN109267963A (en) * | 2018-08-22 | 2019-01-25 | 中国石油集团长城钻探工程有限公司 | Method for plugging leakage of equal diameter expansion sleeve |
CN210598888U (en) * | 2019-08-23 | 2020-05-22 | 华鼎鸿基石油工程技术(北京)有限公司 | Expansion type expansion pipe patching tool for packer |
-
2019
- 2019-08-23 CN CN201910782037.7A patent/CN110439491B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030196795A1 (en) * | 2002-04-17 | 2003-10-23 | Andrew Kutac | Inflatable packer with prestressed bladder |
US20110011578A1 (en) * | 2009-07-15 | 2011-01-20 | Enventure Global Technology, Llc | Expansion System for Expandable Tubulars |
CN202348193U (en) * | 2011-12-15 | 2012-07-25 | 浙江金洲管道工业有限公司 | Radius-variable expansion tool for sleeve damage of oil-gas well |
CN102777123A (en) * | 2012-05-02 | 2012-11-14 | 西南石油大学 | High-expansibility naked eye suspension adhering system and method |
CN103867155A (en) * | 2014-04-04 | 2014-06-18 | 华鼎鸿基石油工程技术(北京)有限公司 | Expansion pipe |
CN109267963A (en) * | 2018-08-22 | 2019-01-25 | 中国石油集团长城钻探工程有限公司 | Method for plugging leakage of equal diameter expansion sleeve |
CN210598888U (en) * | 2019-08-23 | 2020-05-22 | 华鼎鸿基石油工程技术(北京)有限公司 | Expansion type expansion pipe patching tool for packer |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110939403A (en) * | 2019-12-13 | 2020-03-31 | 孙肖 | Double hydraulic bidirectional anchoring packer |
CN113202442A (en) * | 2021-06-11 | 2021-08-03 | 东营普洛孚能源技术有限公司 | Underseal large expansion pipe tool and construction method thereof |
CN113982517A (en) * | 2021-11-11 | 2022-01-28 | 华鼎鸿基石油工程技术(北京)有限公司 | Expansion tube subsidy tool and elastic tube expander |
Also Published As
Publication number | Publication date |
---|---|
CN110439491B (en) | 2025-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017114149A1 (en) | Mechanical and hydraulic dual-effect expansion device for well drilling with expandable tubular technology | |
CN105443064B (en) | Underground controllable self-expansion casing patching pipe | |
CN110439491A (en) | Packer expanding expandable casing patching tool | |
CN110295869B (en) | Expansion liner tube for repeated fracturing and repeated fracturing method | |
CN107882515A (en) | A kind of sleeve pipe suspending apparatus | |
CN205445522U (en) | Underground controllable self-expansion casing patching pipe | |
CN215292438U (en) | Recyclable oil pipe bridge plug | |
CN108086936A (en) | A kind of odd-shaped cross section sheath repairing tool | |
CN206439026U (en) | One-way removable bridge plug | |
CN205243462U (en) | Shallow layer cover leaks big latus rectum metal inflation reinforcing apparatus | |
CN107542418A (en) | High-pressure oil-gas well hydraulic oil pipe anchoring device and its method of work | |
CN203808896U (en) | Double-clamp sleeve layered packing and repairing device for expansion pipe of long-section casing damage well | |
CN103089183A (en) | Double bellmouth type expansion sleeve packing tool and operating method thereof | |
CN205036341U (en) | But recovery type hydraulic pressure packer | |
CN103696718A (en) | Double-clamp sleeve layered packing repair device and method for long-section casing damage well expansion pipe | |
CN216406749U (en) | Hanger fracturing tieback instrument | |
CN201650207U (en) | High temperature resistant packer with automatic return capability | |
CN210598888U (en) | Expansion type expansion pipe patching tool for packer | |
CN200985759Y (en) | Expansion casing tube device having cushioning capacity | |
CN201241646Y (en) | Well wall repairing pipe column combining solid expansion casing pipe and corrugated pipe | |
CN113107415A (en) | Downhole packer system capable of being effectively sealed | |
CN211666680U (en) | Blowout preventer for rod-drive screw pump oil production system | |
CN206205842U (en) | It is a kind of to repair the expandable casing patching instrument for damaging sleeve pipe | |
CN219638794U (en) | Repair construction equipment for patch pipe type casing damage well | |
CN111749640A (en) | A packer, a method for processing a packer, and a method for setting a packer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20240730 Address after: 247099 Plot A, Zhanqian District, Chizhou City, Anhui Province, China. The 5th, 130th, 2nd, and 130th floors of the International Trade City Phase I Professional Market Complex Building Applicant after: Chizhou Guiqian Information Technology Co.,Ltd. Country or region after: China Address before: 100085 Room 303, block B, Huizhi building, No.9 Xueqing Road, Haidian District, Beijing Applicant before: HOLDING ENERGY PETROLEUM ENGINEERING (BEIJING) Co.,Ltd. Country or region before: China |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20241202 Address after: 257000 No. 120, Xierlu, Dongying District, Dongying City, Shandong Province Applicant after: SHENGLI OIL FIELD WUHUA INDUSTRIAL DEVELOPMENT Co.,Ltd. Country or region after: China Address before: 247099 Plot A, Zhanqian District, Chizhou City, Anhui Province, China. The 5th, 130th, 2nd, and 130th floors of the International Trade City Phase I Professional Market Complex Building Applicant before: Chizhou Guiqian Information Technology Co.,Ltd. Country or region before: China |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |