CN110439284A - 一种钢结构支模 - Google Patents
一种钢结构支模 Download PDFInfo
- Publication number
- CN110439284A CN110439284A CN201910719107.4A CN201910719107A CN110439284A CN 110439284 A CN110439284 A CN 110439284A CN 201910719107 A CN201910719107 A CN 201910719107A CN 110439284 A CN110439284 A CN 110439284A
- Authority
- CN
- China
- Prior art keywords
- fixing bolt
- support
- steel construction
- crossbeam
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 20
- 239000010959 steel Substances 0.000 title claims abstract description 20
- 238000010276 construction Methods 0.000 title claims abstract description 16
- 238000009415 formwork Methods 0.000 title claims abstract description 10
- 238000009416 shuttering Methods 0.000 claims abstract description 11
- 239000000203 mixture Substances 0.000 claims abstract description 3
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 abstract description 2
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/04—Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/04—Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements
- E04G17/042—Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements being tensioned by threaded elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本发明涉及一种钢结构支模。支架的下端通过螺纹固定下固定螺栓,支架上端中部有支撑槽,用来支撑模板横梁,支撑槽的两侧分别通过螺纹固定左固定螺栓和右固定螺栓,用来顶住钢结构工字钢槽的内顶面,确保支撑模板横梁能够放入且不受支撑力;所述的下固定螺栓、左固定螺栓和右固定螺栓组成三角形稳固支撑。它结构简单,施工方便,可以连续施工,大大缩短了工期。
Description
技术领域
本发明涉及一种模板支架,特别涉及一种钢结构的支模。
背景技术
现有基本建设混凝土浇灌工程。板、梁、柱、基的施工广泛采用木模板和钢模板,间或采用砖砌模板,采用上述模板都要支模、拆模,木模板不仅消耗大量木材而且支模复杂。需要凝固干燥时间,所以工期长。
发明内容
为了克服现有技术的缺点,本发明提供一种钢结构支模,它结构简单,施工方便,可以连续施工,大大缩短了工期。
本发明解决其技术问题所采取的技术方案是:支架的下端通过螺纹固定下固定螺栓,支架上端中部有支撑槽,用来支撑模板横梁,支撑槽的两侧分别通过螺纹固定左固定螺栓和右固定螺栓,用来顶住钢结构工字钢槽的内顶面,确保支撑模板横梁能够放入且不受支撑力;所述的下固定螺栓、左固定螺栓和右固定螺栓组成三角形稳固支撑。
本发明钢具有下列优点:1、速度快,节省大量人工成本;2、成本低,取消了大量支撑杆;3、节省时间,由于取消了支撑杆,可以多层同时浇筑;4、节省人工,由于取消了支撑杆,不用再超平处理,取消了传统的两项作业;5、节省了大量人工,带来更多的经济效益。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1为本发明主视图;
图2为本发明左视图;
图3为本发明使用状态主视图;
图4为本发明使用状态俯视图。
具体实施方式
如图1、2所示,支架3的下端通过螺纹固定下固定螺栓1,支架3上端中部有支撑槽4,用来支撑模板横梁8,支撑槽4的两侧分别通过螺纹固定左固定螺栓5和右固定螺栓6,用来顶住钢结构工字钢7槽的内顶面,确保支撑模板横梁8能够放入且不受支撑力;所述的下固定螺栓1、左固定螺栓5和右固定螺栓6组成三角形稳固支撑。
所述的下固定螺栓1上有锁紧螺母2,防止支架3在调整固定好后松动。
如图3、4所示,使用时,通过下固定螺栓1、左固定螺栓5和右固定螺栓6将支架3固定在钢结构的工字钢7槽内,相邻工字钢7上对应固定的支架3的上支撑槽4内放置支撑模板横梁8,支撑模板横梁8上放置模板(图中未画出)即可浇筑。由于取消了传统混凝土现场浇注的满堂红支模架受力方式,改由结构钢梁受力方式来支模,所以每层的浇筑可以同时进行,大大缩短了工期。
Claims (2)
1.一种钢结构支模,其特征在于:支架(3)的下端通过螺纹固定下固定螺栓(1),支架(3)上端中部有支撑槽(4),用来支撑模板横梁(8),支撑槽(4)的两侧分别通过螺纹固定左固定螺栓(5)和右固定螺栓(6),用来顶住钢结构工字钢(7)槽的内顶面,确保支撑模板横梁(8)能够放入且不受支撑力;所述的下固定螺栓(1)、左固定螺栓(5)和右固定螺栓(6)组成三角形稳固支撑。
2.根据权利要求1所述的钢结构支模,其特征在于:所述的下固定螺栓(1)上有锁紧螺母(2)。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910719107.4A CN110439284A (zh) | 2019-07-23 | 2019-07-23 | 一种钢结构支模 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910719107.4A CN110439284A (zh) | 2019-07-23 | 2019-07-23 | 一种钢结构支模 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110439284A true CN110439284A (zh) | 2019-11-12 |
Family
ID=68433411
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910719107.4A Pending CN110439284A (zh) | 2019-07-23 | 2019-07-23 | 一种钢结构支模 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110439284A (zh) |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH10325173A (ja) * | 1997-05-27 | 1998-12-08 | Kobayashi Jun | 梁の構築方法及び梁型枠装置並びに側板用のキャップ |
| CN2649697Y (zh) * | 2003-04-30 | 2004-10-20 | 浙江杭萧钢构股份有限公司 | 可调式楼面模板钢支撑组合件 |
| CN101701494A (zh) * | 2009-10-23 | 2010-05-05 | 清华大学 | 钢结构建筑模板的可拆卸便捷支撑装置和使用方法 |
| CN101787796A (zh) * | 2010-01-25 | 2010-07-28 | 郑蓉军 | 钢结构混凝土楼板施工用悬挂模板支撑系统 |
| CN102418416A (zh) * | 2010-09-28 | 2012-04-18 | 杨峰 | 大板跨钢梁现浇楼板支模体系 |
| CN104179352A (zh) * | 2014-08-12 | 2014-12-03 | 金天德 | 可拆卸模板体系 |
| CN104947836A (zh) * | 2015-06-25 | 2015-09-30 | 大元建业集团股份有限公司 | 高层钢结构住宅现浇楼板无支撑的施工方法 |
-
2019
- 2019-07-23 CN CN201910719107.4A patent/CN110439284A/zh active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH10325173A (ja) * | 1997-05-27 | 1998-12-08 | Kobayashi Jun | 梁の構築方法及び梁型枠装置並びに側板用のキャップ |
| CN2649697Y (zh) * | 2003-04-30 | 2004-10-20 | 浙江杭萧钢构股份有限公司 | 可调式楼面模板钢支撑组合件 |
| CN101701494A (zh) * | 2009-10-23 | 2010-05-05 | 清华大学 | 钢结构建筑模板的可拆卸便捷支撑装置和使用方法 |
| CN101787796A (zh) * | 2010-01-25 | 2010-07-28 | 郑蓉军 | 钢结构混凝土楼板施工用悬挂模板支撑系统 |
| CN102418416A (zh) * | 2010-09-28 | 2012-04-18 | 杨峰 | 大板跨钢梁现浇楼板支模体系 |
| CN104179352A (zh) * | 2014-08-12 | 2014-12-03 | 金天德 | 可拆卸模板体系 |
| CN104947836A (zh) * | 2015-06-25 | 2015-09-30 | 大元建业集团股份有限公司 | 高层钢结构住宅现浇楼板无支撑的施工方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109667377A (zh) | 预应力混凝土叠合板的施工方法及预应力混凝土叠合板 | |
| CN101144328A (zh) | 后浇带梁板模板的施工方法 | |
| CN103306208A (zh) | 1.6次抛物线形新型四柱板式空心变截面高墩爬模方法 | |
| CN105649213B (zh) | 一种密集布筋区大型钢结构预埋件的施工方法 | |
| CN207747197U (zh) | 一种高精度预制风电塔架装备化模具 | |
| CN109826117A (zh) | 电动滑模无拉杆整体通涵墙身浇筑模板台车 | |
| CN106522282B (zh) | 一种可升降后浇带模板结构及体系及其施工方法 | |
| CN204983649U (zh) | 一种大倾角圆柱钢模板 | |
| CN101701494B (zh) | 钢结构建筑模板的可拆卸便捷支撑装置和使用方法 | |
| CN204875558U (zh) | 一种型钢贯穿内外复合支撑式悬挑托架体系 | |
| CN204781960U (zh) | 高层建筑剪力墙变形缝处模板支设及加固体系 | |
| CN209482709U (zh) | 一种现浇混凝土墙体沉降缝定型模板 | |
| CN103276894A (zh) | 空心楼盖大截面梁式转换层的支撑体系及施工工艺 | |
| CN104912333B (zh) | 墙体施工系统及施工方法 | |
| KR101908811B1 (ko) | 교량용 거푸집 | |
| CN105442737A (zh) | 一种新型复合保温楼面板及其施工方法 | |
| CN204212413U (zh) | 一种台模中横梁与底部支撑的专用连接件 | |
| CN204609265U (zh) | 用于造粒塔上部结构施工的钢平台 | |
| CN209976016U (zh) | 一种自带钢筋保护层支撑的组合钢模板龙骨支架 | |
| CN204662369U (zh) | 一种斜坡面悬臂大模板 | |
| CN210152313U (zh) | 一种土建工程框架梁加固装置 | |
| CN103437285A (zh) | 满堂支架现浇箱梁施工工艺 | |
| CN112627034A (zh) | 一种桥梁高墩翻模同步建造方法 | |
| CN206986732U (zh) | 一种桥墩混凝土浇筑装置 | |
| CN206512744U (zh) | 一种混凝土坝体内廊道模板支撑架装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20191112 |