An integrated big data system for power grid regulation Download PDFInfo
- Publication number
- CN110429507B CN110429507B CN201910772019.0A CN201910772019A CN110429507B CN 110429507 B CN110429507 B CN 110429507B CN 201910772019 A CN201910772019 A CN 201910772019A CN 110429507 B CN110429507 B CN 110429507B
- Authority
- CN
- China
- Prior art keywords
- chamber
- power grid
- pipe
- air guide
- rotating rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000033228 biological regulation Effects 0.000 title claims abstract description 18
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 42
- 238000009434 installation Methods 0.000 claims abstract description 25
- 238000003860 storage Methods 0.000 claims abstract description 17
- 230000017525 heat dissipation Effects 0.000 claims abstract description 11
- 238000009423 ventilation Methods 0.000 claims description 11
- 238000007689 inspection Methods 0.000 claims description 9
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 239000007769 metal material Substances 0.000 claims description 3
- 230000001360 synchronised effect Effects 0.000 claims description 3
- 230000001105 regulatory effect Effects 0.000 claims 1
- 238000001816 cooling Methods 0.000 abstract description 10
- 230000000694 effects Effects 0.000 abstract description 4
- 239000000428 dust Substances 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 4
- 238000004140 cleaning Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/26—Casings; Parts thereof or accessories therefor
- H02B1/28—Casings; Parts thereof or accessories therefor dustproof, splashproof, drip-proof, waterproof or flameproof
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/56—Cooling; Ventilation
- H02B1/565—Cooling; Ventilation for cabinets
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B15/00—Supervisory desks or panels for centralised control or display
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Power-Operated Mechanisms For Wings (AREA)
Abstract
本发明公开了一种电网调控一体化大数据系统,涉及电网调控领域,其包括壳体,壳体前侧的上部固定安装有倾斜设置的调控屏,所述壳体的内腔分为位于下部的储水腔室、位于前侧的安装腔室、位于后侧的上部开口的圆柱形导气腔室,储水腔室的顶壁上固定有竖向的圆管,所述圆柱形导气腔室内转动安装有竖向的转动杆,转动杆的中部固定有从动带轮,从动带轮传动连接有固定于壳体后侧的驱动电机。本发明中不仅能够实现水冷,还能同时实现风冷,两者相结合使得系统的散热效果好,降温速度快,从而能够保证正常的调控工作,另外,还能将产生的风吹向调控屏,从而能够吹掉调控屏上附着的灰尘。
The invention discloses an integrated big data system for power grid regulation, which relates to the field of power grid regulation. A water storage chamber, an installation chamber on the front side, a cylindrical air guide chamber with an upper opening on the rear side, a vertical circular tube is fixed on the top wall of the water storage chamber, and the cylindrical air guide A vertical rotating rod is rotatably installed in the chamber, and a driven pulley is fixed in the middle of the rotating rod, and the driven pulley is driven and connected with a driving motor fixed on the rear side of the casing. In the present invention, not only water cooling can be realized, but also air cooling can be realized at the same time. The combination of the two enables the system to have a good heat dissipation effect and a fast cooling speed, thereby ensuring the normal control work. In addition, the generated wind can also be blown to the control screen. , so as to blow off the dust attached to the control screen.
Description
技术领域technical field
本发明涉及电网调控领域,尤其涉及一种电网调控一体化大数据系统。The invention relates to the field of power grid regulation, in particular to an integrated big data system for power grid regulation.
背景技术Background technique
电力调度数据网是电网调度自动化、管理现代化的基础,是确保电网安全、稳定、经济运行的重要手段,是电力系统的重要基础设施,在协调电力系统发、送、变、配、用电等组成部分的联合运转及保证电网安全、经济、稳定、可靠的运行方面发挥了重要的作用,并有力的保障了电力生产、电力调度、水库调度、燃料调度、继电保护、安全自动装置、远动、电网调度自动化等通信需要,在电力生产及管理中的发挥着不可替代的作用。目前基于大数据的一体化电网调控系统已经普遍投入使用,然而,由于系统内部件较多,使得进行调控工作时,非常容易产生高温,这些高温散发不出去,容易引发危险,同时也会降低系统的反应速度,为此,在增强散热效果方面一直是人们迫切需要解决的问题。The power dispatching data network is the basis of power grid dispatch automation and management modernization, an important means to ensure the safety, stability and economic operation of the power grid, and an important infrastructure of the power system. The joint operation of the components plays an important role in ensuring the safe, economical, stable and reliable operation of the power grid, and effectively guarantees the power production, power dispatching, reservoir dispatching, fuel dispatching, relay protection, safety automatic devices, remote It plays an irreplaceable role in power production and management due to communication needs such as power grid automation and power grid dispatching automation. At present, the integrated power grid control system based on big data has been widely used. However, due to the large number of components in the system, it is very easy to generate high temperature during the control work. These high temperatures cannot be dissipated, which is easy to cause danger, and also reduces the system. Therefore, it has always been an urgent problem that people need to solve in terms of enhancing the heat dissipation effect.
发明内容SUMMARY OF THE INVENTION
本发明的目的是为了解决现有技术中存在的缺点,而提出的一种电网调控一体化大数据系统。The purpose of the present invention is to propose an integrated big data system for power grid regulation in order to solve the shortcomings in the prior art.
为了实现上述目的,本发明采用了如下技术方案:In order to achieve the above object, the present invention adopts the following technical solutions:
一种电网调控一体化大数据系统,包括壳体,壳体前侧的上部固定安装有倾斜设置的调控屏,所述壳体的内腔分为位于下部的储水腔室、位于前侧的安装腔室、位于后侧的上部开口的圆柱形导气腔室,储水腔室的顶壁上固定有竖向的圆管,所述圆柱形导气腔室内转动安装有竖向的转动杆,转动杆的中部固定有从动带轮,从动带轮传动连接有固定于壳体后侧的驱动电机,所述转动杆的上端沿长度方向固定安装有扇叶,转动杆的下端伸入圆管内并沿长度方向设有螺旋叶,所述安装腔室的侧壁上固定有上、下设置的两个中空板,两个中空板之间连通有多个散热管,位于下方的中空板与圆管的上端之间连通有进水管,位于上方的中空板连通有下端伸入储水腔室内的出水管,所述壳体的上部设有位于调控屏上方的进气孔,安装腔室和圆柱形导气腔室之间设有位于扇叶下方的导气孔。An integrated big data system for power grid regulation, comprising a casing, an upper part of the front side of the casing is fixedly installed with a regulation screen arranged obliquely, and the inner cavity of the casing is divided into a water storage chamber at the lower part and a water storage chamber at the front side. Installation chamber, a cylindrical air-guiding chamber with an upper opening on the rear side, a vertical circular pipe is fixed on the top wall of the water storage chamber, and a vertical rotating rod is rotatably installed in the cylindrical air-guiding chamber , a driven pulley is fixed in the middle of the rotating rod, and the driven pulley is connected with a driving motor fixed on the rear side of the casing. The upper end of the rotating rod is fixedly installed with a fan blade along the length direction, and the lower end of the rotating rod extends into A spiral blade is arranged in the circular tube and along the length direction, two hollow plates arranged on the upper and lower sides are fixed on the side wall of the installation chamber, and a plurality of radiating pipes are communicated between the two hollow plates, and the hollow plate located at the bottom A water inlet pipe is communicated with the upper end of the round pipe, the upper hollow plate is communicated with a water outlet pipe whose lower end extends into the water storage chamber, the upper part of the casing is provided with an air inlet hole located above the control screen, and the installation chamber An air guide hole located under the fan blade is arranged between the air guide chamber and the cylindrical air guide chamber.
优选的,所述壳体的顶部固定有导气罩,导气罩与圆柱形导气腔室连通,且导气罩的一侧固定并连通有两个分别位于调控屏两侧的通气管,通气管的下端封闭,且通气管上沿长度方向设有朝向调控屏设置的出气管。Preferably, an air guide hood is fixed on the top of the housing, the air guide hood is communicated with the cylindrical air guide chamber, and one side of the air guide hood is fixed and communicated with two air pipes respectively located on both sides of the control screen, The lower end of the ventilation pipe is closed, and the ventilation pipe is provided with an air outlet pipe facing the control screen along the length direction.
优选的,所述圆柱形导气腔室内固定有位于导气孔下方的安装板,安装板上设有与转动杆匹配的安装孔,且转动杆通过轴承转动安装于安装孔内。Preferably, an installation plate located below the air guide hole is fixed in the cylindrical air guide chamber, the installation plate is provided with an installation hole matched with the rotating rod, and the rotating rod is rotatably installed in the installation hole through a bearing.
优选的,所述驱动电机的输出轴固定连接有主动带轮,主动带轮与从动带轮通过同步带传动连接。Preferably, a driving pulley is fixedly connected to the output shaft of the driving motor, and the driving pulley and the driven pulley are connected through a synchronous belt.
优选的,所述壳体的下部右侧设有与储水腔室连通的加水管和排水管,且排水管位于加水管的下方,排水管上设有阀门。Preferably, the lower right side of the housing is provided with a water supply pipe and a drain pipe that communicate with the water storage chamber, and the drain pipe is located below the water supply pipe, and the drain pipe is provided with a valve.
优选的,所述散热管为波浪形,且散热管和出水管均为金属材料制成。Preferably, the heat dissipation pipe is wave-shaped, and both the heat dissipation pipe and the water outlet pipe are made of metal materials.
优选的,所述壳体的前侧设有与安装腔室连通的检修口,且壳体上铰接有与检修口匹配的检修门。Preferably, the front side of the casing is provided with an inspection port communicating with the installation chamber, and an inspection door matching the inspection port is hinged on the casing.
本发明的有益效果为:本发明中通过驱动电机、转动杆、扇叶、螺旋叶、圆管、中空板、散热管和出水管的设置,不仅能够实现水冷,还能同时实现风冷,两者相结合使得系统的散热效果好,降温速度快,从而能够保证正常的调控工作,而通过导气罩、通气管和出气管的设置,还能将产生的风吹向调控屏,从而能够吹掉调控屏上附着的灰尘,从而能够实现自动清洁工作,也方便使用者的使用,整个过程只需要一个驱动电机即可驱动完成,降低了安装成本。The beneficial effects of the present invention are as follows: in the present invention, through the arrangement of the driving motor, the rotating rod, the fan blade, the spiral blade, the round pipe, the hollow plate, the radiating pipe and the water outlet pipe, not only water cooling but also air cooling can be realized at the same time. The combination of the two can make the system have good heat dissipation effect and fast cooling speed, so as to ensure the normal control work, and through the setting of the air guide hood, the ventilation pipe and the air outlet pipe, the generated wind can also be blown to the control screen, so that the air can be blown to the control screen. The dust attached to the control screen can be removed, so that the automatic cleaning work can be realized, and it is also convenient for the user to use. The whole process can be driven by only one driving motor, which reduces the installation cost.
附图说明Description of drawings
图1为本发明的结构示意图。FIG. 1 is a schematic structural diagram of the present invention.
图2为本发明的正视示意图。FIG. 2 is a schematic front view of the present invention.
图中标号:1壳体、2储水腔室、3安装腔室、4圆柱形导气腔室、5导气罩、6圆管、7转动杆、8从动带轮、9扇叶、10螺旋叶、11中空板、12散热管、13出水管、14驱动电机、15通气管、16调控屏、17进水管、18进气孔、19加水管、20排水管、21检修门、22导气孔。Labels in the figure: 1 shell, 2 water storage chamber, 3 installation chamber, 4 cylindrical air guide chamber, 5 air guide hood, 6 round pipe, 7 rotating rod, 8 driven pulley, 9 fan blades, 10 spiral blades, 11 hollow plates, 12 cooling pipes, 13 water outlet pipes, 14 driving motors, 15 ventilation pipes, 16 control screens, 17 water inlet pipes, 18 air inlet holes, 19 water supply pipes, 20 drainage pipes, 21 access doors, 22 Air guide hole.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments.
参照图1-2,一种电网调控一体化大数据系统,包括壳体1,壳体1前侧的上部固定安装有倾斜设置的调控屏16,壳体1的内腔分为位于下部的储水腔室2、位于前侧的安装腔室3、位于后侧的上部开口的圆柱形导气腔室4,储水腔室2的顶壁上固定有竖向的圆管6,圆柱形导气腔室4内转动安装有竖向的转动杆7,转动杆7的中部固定有从动带轮8,从动带轮8传动连接有固定于壳体1后侧的驱动电机14,转动杆7的上端沿长度方向固定安装有扇叶9,转动杆7的下端伸入圆管6内并沿长度方向设有螺旋叶10,安装腔室3的侧壁上固定有上、下设置的两个中空板11,两个中空板11之间连通有多个散热管12,位于下方的中空板11与圆管6的上端之间连通有进水管17,位于上方的中空板11连通有下端伸入储水腔室2内的出水管13,壳体1的上部设有位于调控屏16上方的进气孔18,安装腔室3和圆柱形导气腔室4之间设有位于扇叶9下方的导气孔22。Referring to Figures 1-2, an integrated big data system for power grid regulation includes a
壳体1的顶部固定有导气罩5,导气罩5与圆柱形导气腔室4连通,且导气罩5的一侧固定并连通有两个分别位于调控屏16两侧的通气管15,通气管15的下端封闭,且通气管15上沿长度方向设有朝向调控屏16设置的出气管。An
圆柱形导气腔室4内固定有位于导气孔22下方的安装板,安装板上设有与转动杆7匹配的安装孔,且转动杆7通过轴承转动安装于安装孔内。The cylindrical air guide chamber 4 is fixed with a mounting plate below the air guide hole 22 , and the mounting plate is provided with a mounting hole matching the rotating rod 7 , and the rotating rod 7 is rotatably installed in the mounting hole through a bearing.
驱动电机14的输出轴固定连接有主动带轮,主动带轮与从动带轮8通过同步带传动连接。The output shaft of the
壳体1的下部右侧设有与储水腔室2连通的加水管19和排水管20,且排水管20位于加水管19的下方,排水管20上设有阀门。The lower right side of the
散热管12为波浪形,且散热管12和出水管13均为金属材料制成。The
壳体1的前侧设有与安装腔室3连通的检修口,且壳体1上铰接有与检修口匹配的检修门21。The front side of the
本发明在使用时,安装腔室3内还安装有现有的温度传感器和现有的单片机控制器,温度传感器用于感应安装腔室3内温度信息,当温度高于设定值时,控制器控制驱动电机14自动工作,此时,驱动电机14工作驱动传动转动杆7转动,转动杆7转动带动扇叶9和螺旋叶10转动,螺旋叶10转动配合圆管6使用可以将储水腔室2内水抽入圆管6内并通过进水管17进入中空板11和散热管12内后从出水管13回流到储水腔室2中,从而可以带走安装腔室3内的热量,实现水冷,且在此过程中,转动的扇叶9会产生向上的流动的气流,此时,安装腔室3内会被抽气,此时,外界气体通过进气孔18进入安装腔室3内并通过导气孔22进入圆柱形导气腔室4内,从而实现风冷,两者相结合使得系统的散热效果好,降温速度快,从而保证正常的调控工作,而在气体从圆柱形导气腔室4内进入导气罩5内后,气体会经过通气管15之后从出气管吹向调控屏16,从而可以吹掉调控屏16上附着的灰尘,从而能够实现自动清洁工作,也方便使用者的使用,整个过程只需要一个驱动电机14即可驱动完成,降低了安装成本。When the present invention is in use, an existing temperature sensor and an existing single-chip controller are also installed in the installation chamber 3. The temperature sensor is used to sense the temperature information in the installation chamber 3. When the temperature is higher than the set value, the The controller controls the
在本发明的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”、“顺时针”、“逆时针”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的设备或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", " rear, left, right, vertical, horizontal, top, bottom, inside, outside, clockwise, counterclockwise, etc., or The positional relationship is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, Therefore, it should not be construed as a limitation of the present invention.
此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。In addition, the terms "first" and "second" are only used for descriptive purposes, and should not be construed as indicating or implying relative importance or implying the number of indicated technical features. Thus, a feature defined as "first" or "second" may expressly or implicitly include one or more of that feature. In the description of the present invention, "plurality" means two or more, unless otherwise expressly and specifically defined.
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this. The equivalent replacement or change of the inventive concept thereof shall be included within the protection scope of the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910772019.0A CN110429507B (en) | 2019-08-20 | 2019-08-20 | An integrated big data system for power grid regulation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910772019.0A CN110429507B (en) | 2019-08-20 | 2019-08-20 | An integrated big data system for power grid regulation |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110429507A CN110429507A (en) | 2019-11-08 |
| CN110429507B true CN110429507B (en) | 2020-12-29 |
Family
ID=68415420
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910772019.0A Active CN110429507B (en) | 2019-08-20 | 2019-08-20 | An integrated big data system for power grid regulation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110429507B (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111298350B (en) * | 2019-12-03 | 2021-09-14 | 安徽普鸿暖通工程有限公司 | Fire-fighting equipment supervisory systems based on thing networking |
| CN112072507A (en) * | 2020-09-15 | 2020-12-11 | 上海泰首电气设备有限公司 | Electrical equipment box temperature control system |
| CN114390848B (en) * | 2020-10-21 | 2025-02-07 | 武汉软件工程职业学院 | A heat dissipation device for control equipment based on beam shaping |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009133621A (en) * | 2009-03-19 | 2009-06-18 | Mitsubishi Electric Corp | Air conditioner outdoor unit |
| CN108683108A (en) * | 2017-05-17 | 2018-10-19 | 漳州龙文区信创友工业设计有限公司 | A kind of method of power distribution cabinet dust-proof radiating |
| CN208151073U (en) * | 2018-03-30 | 2018-11-27 | 佛山市馨乐环保科技有限公司 | A kind of agricultural river water body prosthetic device |
| RU2696020C1 (en) * | 2018-09-04 | 2019-07-30 | Антон Андреевич Румянцев | Combined cooling system of electronic units |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN206619828U (en) * | 2017-03-03 | 2017-11-07 | 合肥景观园林工程有限责任公司 | A kind of gardens electric power box of heat sinking dedusting |
| CN107310012B (en) * | 2017-08-14 | 2019-05-24 | 中山市三和混凝土有限公司 | A kind of aggregate pre-cooler |
| CN107257096B (en) * | 2017-08-16 | 2019-04-23 | 温州鼎高电器成套有限公司 | A kind of outdoor building engineering electric power cabinet |
| CN107560455A (en) * | 2017-09-20 | 2018-01-09 | 江苏金航冷却塔有限公司 | A kind of high efficiency cooling tower |
| CN208874532U (en) * | 2018-10-22 | 2019-05-17 | 合肥晶晨光伏能源有限公司 | A kind of high-efficiency heat radiation structure of photovoltaic micro intelligent junction box |
-
2019
- 2019-08-20 CN CN201910772019.0A patent/CN110429507B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009133621A (en) * | 2009-03-19 | 2009-06-18 | Mitsubishi Electric Corp | Air conditioner outdoor unit |
| CN108683108A (en) * | 2017-05-17 | 2018-10-19 | 漳州龙文区信创友工业设计有限公司 | A kind of method of power distribution cabinet dust-proof radiating |
| CN208151073U (en) * | 2018-03-30 | 2018-11-27 | 佛山市馨乐环保科技有限公司 | A kind of agricultural river water body prosthetic device |
| RU2696020C1 (en) * | 2018-09-04 | 2019-07-30 | Антон Андреевич Румянцев | Combined cooling system of electronic units |
Also Published As
| Publication number | Publication date |
|---|---|
| CN110429507A (en) | 2019-11-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110429507B (en) | An integrated big data system for power grid regulation | |
| CN204786887U (en) | Automatically controlled box structure of air condensing units and air conditioner that has this structure | |
| CN203120322U (en) | Cabinet system of medium/high-power-density equipment | |
| CN218154664U (en) | Energy-conserving ventilation structure of green architectural design | |
| CN211531601U (en) | A server cabinet with heat dissipation function for power information communication room | |
| CN210838633U (en) | An electrical cabinet for intelligent cooling buildings | |
| CN216016539U (en) | Distribution network safety monitoring device based on 5G communication technology | |
| CN214676321U (en) | Electromechanical device high efficiency heat abstractor | |
| CN204285632U (en) | A kind of trapeziodal modulation monitoring room air-conditioning internal machine | |
| CN211177251U (en) | Electric room cooling and dustproof device | |
| CN107807596A (en) | Electric-power metering goods and materials week switch cabinet supervising device | |
| CN212649977U (en) | A automatically controlled cabinet of high-efficient heat dissipation for computer lab | |
| CN115379733A (en) | Control box with heat dissipation function | |
| CN218722146U (en) | Air conditioner monitoring controller based on thing networking | |
| CN219627125U (en) | Block terminal dehydrating unit | |
| CN207471781U (en) | A kind of centralization ventilating system for central air-conditioner | |
| CN221464434U (en) | External non-blocking blast cooling tower | |
| CN219892767U (en) | Block terminal with intelligence heat dissipation | |
| CN223375247U (en) | Intelligent valve heat abstractor | |
| CN218079400U (en) | Tunnel type air dust bathing room | |
| CN207269184U (en) | A motor with cooling function | |
| CN213540803U (en) | Speed regulating device of direct current fan | |
| CN219780786U (en) | An unattended remote monitoring device for pump rooms | |
| CN223855733U (en) | A bathroom heater panel that is easy to assemble | |
| CN223167903U (en) | An Internet of Things electricity consumption monitoring device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |