CN110397081B - 一种中埋式橡胶止水带固定方法及钢筋骨架结构 - Google Patents
一种中埋式橡胶止水带固定方法及钢筋骨架结构 Download PDFInfo
- Publication number
- CN110397081B CN110397081B CN201910648088.0A CN201910648088A CN110397081B CN 110397081 B CN110397081 B CN 110397081B CN 201910648088 A CN201910648088 A CN 201910648088A CN 110397081 B CN110397081 B CN 110397081B
- Authority
- CN
- China
- Prior art keywords
- frame
- waterstop
- steel reinforcement
- fixing
- framework structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 41
- 239000010959 steel Substances 0.000 title claims abstract description 41
- 229920001971 elastomer Polymers 0.000 title claims abstract description 28
- 230000002787 reinforcement Effects 0.000 title claims abstract description 25
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 29
- 238000010276 construction Methods 0.000 claims abstract description 7
- 230000000087 stabilizing Effects 0.000 claims description 21
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 20
- 241001465382 Physalis alkekengi Species 0.000 claims description 14
- 229910052742 iron Inorganic materials 0.000 claims description 10
- 238000003466 welding Methods 0.000 claims description 10
- 230000001681 protective Effects 0.000 claims description 9
- 230000000875 corresponding Effects 0.000 claims description 3
- 238000004080 punching Methods 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 6
- 238000001764 infiltration Methods 0.000 abstract description 4
- 238000009434 installation Methods 0.000 abstract description 4
- 230000002035 prolonged Effects 0.000 abstract description 4
- 238000000926 separation method Methods 0.000 abstract description 4
- 210000002356 Skeleton Anatomy 0.000 abstract 1
- 238000000034 method Methods 0.000 description 5
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 2
- 210000000709 Aorta Anatomy 0.000 description 1
- 241000239290 Araneae Species 0.000 description 1
- 229920001821 Foam rubber Polymers 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000000903 blocking Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 239000000789 fastener Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reaction Methods 0.000 description 1
- 230000000452 restraining Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0001—Rubbers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
- E02D2300/0034—Steel; Iron in wire form
Abstract
本发明公开了一种中埋式橡胶止水带固定方法及钢筋骨架结构,涉及管廊施工技术领域。该中埋式橡胶止水带固定用钢筋骨架结构,包括外框架,所述外框架通过连接管固定连接有内框架,所述内框架外套设有支撑框架,且支撑框架与内框架之间通过连接管固定连接。该中埋式橡胶止水带固定方法及钢筋骨架结构,通过钢筋骨架结构以及止水带的固定方法的改良,可以很好的对管廊伸缩缝位置的止水带进行可靠的固定,从而可以很好的保证止水带安装的位置以及倾仰程度满足设计要求,可以有效的控制管廊伸缩缝位置渗水情况,从而充分发挥止水带的止水、阻隔的作用,延长了管廊的使用寿命。
Description
技术领域
本发明涉及管廊施工技术领域,具体为一种中埋式橡胶止水带固定方法及钢筋骨架结构。
背景技术
地下综合管廊在近些年取得了飞速发展,城市地下综合管廊的建设依旧很是火爆,城市地下综合管廊的建设能够充分解决城市蜘蛛网、马路拉链现象,是城市的大动脉,是不可缺少的市政工程,城市综合管廊的设计通常为100年,其建设过程中的进度和质量越来越受到关注。
在现有技术中,难以很好的对管廊伸缩缝位置的止水带进行可靠的固定,从而难以很好的保证止水带安装的位置以及倾仰程度满足设计要求,从而难以有效的控制管廊伸缩缝位置渗水情况,无法充分发挥止水带的止水、阻隔的作用,从而缩短了管廊的使用寿命。
发明内容
(一)解决的技术问题
针对现有技术的不足,本发明提供了一种中埋式橡胶止水带固定方法及钢筋骨架结构,解决了在现有技术中,难以很好的对管廊伸缩缝位置的止水带进行可靠的固定,从而难以很好的保证止水带安装的位置以及倾仰程度满足设计要求,从而难以有效的控制管廊伸缩缝位置渗水情况,无法充分发挥止水带的止水、阻隔的作用的问题。
(二)技术方案
为实现以上目的,本发明通过以下技术方案予以实现:一种中埋式橡胶止水带固定用钢筋骨架结构,包括外框架,所述外框架通过连接管固定连接有内框架,所述内框架外套设有支撑框架,且支撑框架与内框架之间通过连接管固定连接。
所述支撑框架包括两个受力框架,且位于左侧的受力框架通过连接管与内框架固定连接,所述受力框架上设置有稳定机构,所述稳定机构的一侧设置有横向杆,所述横向杆远离稳定机构的一端焊接于受力框架上,所述稳定机构的一侧且位于横向杆的顶部和底部均设置有斜向杆,且相邻的稳定机构通过斜向杆连接。
所述稳定机构包括套环,所述套环套设于受力框架的表面,所述套环的一侧焊接有防护外壳,所述横向杆的一端依次贯穿防护外壳、套环的左侧和受力框架并延伸至受力框架的右侧,所述横向杆的表面且位于防护外壳内套设有焊接板,所述斜向杆的一端焊接于焊接板上,所述横向杆的表面且位于焊接板与受力框架之间螺纹连接有与焊接板配合设置的限制螺母。
优选的,所述连接管与其对应框架的连接方式为焊接。
优选的,所述套环内腔的右侧设置有海绵垫。
一种中埋式橡胶止水带的固定方法,包括上述中埋式橡胶止水带固定用钢筋骨架结构,并采用如下步骤:
S1、在施工管廊底板钢筋前,根据管廊断面的尺寸预先制作好用于固定中埋式止水带的钢筋骨架,钢筋骨架采用上述中埋式橡胶止水带固定用钢筋骨架结构;
S2、将中埋式止水带安放至骨架中,在止水带的钢边打孔,并与钢筋骨架通过铁丝连接,从而形成一个整体;
S3、在钢筋骨架和止水带之间设置铁皮;
S4、在铁皮上设置3cm凹槽;
S5、将挤塑板设置于3cm凹槽内。
优选的,所述管廊底板为管廊第一次浇筑混凝土的部位。
(三)有益效果
本发明提供了一种中埋式橡胶止水带固定方法及钢筋骨架结构。具备以下有益效果:该中埋式橡胶止水带固定方法及钢筋骨架结构,通过钢筋骨架结构以及止水带的固定方法的改良,可以很好的对管廊伸缩缝位置的止水带进行可靠的固定,从而可以很好的保证止水带安装的位置以及倾仰程度满足设计要求,可以有效的控制管廊伸缩缝位置渗水情况,从而充分发挥止水带的止水、阻隔的作用,延长了管廊的使用寿命。
附图说明
图1为本中埋式橡胶止水带的固定方法的示意图;
图2为本中埋式橡胶止水带固定用钢筋骨架结构示意图;
图3为支撑框架的结构示意图;
图4为稳定机构的结构示意图。
图中:1、管廊底板;2、管廊断面;3、钢筋骨架;31、支撑框架;311、稳定机构;3111、防护外壳;3112、焊接板;3113、限制螺母;3114、套环;3115、海绵垫;312、斜向杆;313、受力框架;314、横向杆;32、外框架;33、连接管;34、内框架;4、3cm凹槽;5、铁皮;6、整体。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1-4,本发明提供一种技术方案:一种中埋式橡胶止水带固定用钢筋骨架结构,包括外框架32,外框架32通过连接管33固定连接有内框架34,内框架34外套设有支撑框架31,且支撑框架31与内框架34之间通过连接管33固定连接,连接管33与其对应框架的连接方式为焊接。
支撑框架31包括两个受力框架313,且位于左侧的受力框架313通过连接管33与内框架34固定连接,受力框架313上设置有稳定机构311,稳定机构311的一侧设置有横向杆314,横向杆314远离稳定机构311的一端焊接于受力框架313上,稳定机构311的一侧且位于横向杆314的顶部和底部均设置有斜向杆312,且相邻的稳定机构311通过斜向杆312连接。
稳定机构311包括套环3114,套环3114内腔的右侧设置有海绵垫3115,套环3114套设于受力框架313的表面,套环3114的一侧焊接有防护外壳3111,横向杆314的一端依次贯穿防护外壳3111、套环3114的左侧和受力框架313并延伸至受力框架313的右侧,横向杆314的表面且位于防护外壳3111内套设有焊接板3112,斜向杆312的一端焊接于焊接板3112上,横向杆314的表面且位于焊接板3112与受力框架313之间螺纹连接有与焊接板3112配合设置的限制螺母3113。
一种中埋式橡胶止水带的固定方法,包括上述中埋式橡胶止水带固定用钢筋骨架结构,并采用如下步骤:
S1、在施工管廊底板1钢筋前,根据管廊断面2的尺寸预先制作好用于固定中埋式止水带的钢筋骨架3,钢筋骨架3采用上述中埋式橡胶止水带固定用钢筋骨架结构,其中管廊底板1为管廊第一次浇筑混凝土的部位;
S2、将中埋式止水带安放至骨架中,在止水带的钢边打孔,并与钢筋骨架3通过铁丝连接,从而形成一个整体6;
S3、在钢筋骨架3和止水带之间设置铁皮5;
S4、在铁皮5上设置3cm凹槽4;
S5、将挤塑板设置于3cm凹槽4内。
本发明,在管廊伸缩缝施工过程中更好的控制中埋式止水带的位置以及倾仰角度,从而防止在混凝土浇筑过程中产生中埋式止水带移位、角度偏差等问题,使得止水带充分发挥止水、隔离作用,阻绝地下水进入到管廊,保护管廊内部管线,大大提高管廊的使用寿命。
综上所述,该中埋式橡胶止水带固定方法及钢筋骨架结构,通过钢筋骨架结构以及止水带的固定方法的改良,可以很好的对管廊伸缩缝位置的止水带进行可靠的固定,从而可以很好的保证止水带安装的位置以及倾仰程度满足设计要求,可以有效的控制管廊伸缩缝位置渗水情况,从而充分发挥止水带的止水、阻隔的作用,延长了管廊的使用寿命。
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。
Claims (5)
1.一种中埋式橡胶止水带固定用钢筋骨架结构,其特征在于:包括外框架(32),所述外框架(32)通过连接管(33)固定连接有内框架(34),所述内框架(34)外套设有支撑框架(31),且支撑框架(31)与内框架(34)之间通过连接管(33)固定连接;
所述支撑框架(31)包括两个受力框架(313),且位于左侧的受力框架(313)通过连接管(33)与内框架(34)固定连接,所述受力框架(313)上设置有稳定机构(311),所述稳定机构(311)的一侧设置有横向杆(314),所述横向杆(314)远离稳定机构(311)的一端焊接于受力框架(313)上,所述稳定机构(311)的一侧且位于横向杆(314)的顶部和底部均设置有斜向杆(312),且相邻的稳定机构(311)通过斜向杆(312)连接;
所述稳定机构(311)包括套环(3114),所述套环(3114)套设于受力框架(313)的表面,所述套环(3114)的一侧焊接有防护外壳(3111),所述横向杆(314)的一端依次贯穿防护外壳(3111)、套环(3114)的左侧和受力框架(313)并延伸至受力框架(313)的右侧,所述横向杆(314)的表面且位于防护外壳(3111)内套设有焊接板(3112),所述斜向杆(312)的一端焊接于焊接板(3112)上,所述横向杆(314)的表面且位于焊接板(3112)与受力框架(313)之间螺纹连接有与焊接板(3112)配合设置的限制螺母(3113)。
2.根据权利要求1所述的一种中埋式橡胶止水带固定用钢筋骨架结构,其特征在于:所述连接管(33)与其对应框架的连接方式为焊接。
3.根据权利要求1所述的一种中埋式橡胶止水带固定用钢筋骨架结构,其特征在于:所述套环(3114)内腔的右侧设置有海绵垫(3115)。
4.一种中埋式橡胶止水带的固定方法,其特征在于:包括权利要求1所述的中埋式橡胶止水带固定用钢筋骨架结构,并采用如下步骤:
S1、在施工管廊底板(1)钢筋前,根据管廊断面(2)的尺寸预先制作好用于固定中埋式止水带的钢筋骨架(3),钢筋骨架(3)采用上述中埋式橡胶止水带固定用钢筋骨架结构;
S2、将中埋式止水带安放至骨架中,在止水带的钢边打孔,并与钢筋骨架(3)通过铁丝连接,从而形成一个整体(6);
S3、在钢筋骨架(3)和止水带之间设置铁皮(5);
S4、在铁皮(5)上设置3cm凹槽(4);
S5、将挤塑板设置于3cm凹槽(4)内。
5.根据权利要求4所述的一种中埋式橡胶止水带的固定方法,其特征在于:所述管廊底板(1)为管廊第一次浇筑混凝土的部位。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910648088.0A CN110397081B (zh) | 2019-07-18 | 2019-07-18 | 一种中埋式橡胶止水带固定方法及钢筋骨架结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910648088.0A CN110397081B (zh) | 2019-07-18 | 2019-07-18 | 一种中埋式橡胶止水带固定方法及钢筋骨架结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110397081A CN110397081A (zh) | 2019-11-01 |
CN110397081B true CN110397081B (zh) | 2020-11-10 |
Family
ID=68324546
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910648088.0A Active CN110397081B (zh) | 2019-07-18 | 2019-07-18 | 一种中埋式橡胶止水带固定方法及钢筋骨架结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110397081B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110952494B (zh) * | 2019-11-28 | 2021-07-20 | 中国水利水电第五工程局有限公司 | 一种混合双止水模板及其施工方法 |
CN112695807B (zh) * | 2020-12-11 | 2022-07-01 | 中国二十冶集团有限公司 | 用于橡胶止水带的后植安装方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106182359A (zh) * | 2016-08-30 | 2016-12-07 | 长沙楚鸿机械有限公司 | 混凝土单仓综合管廊卧式成型模具、系统及管廊模塑方法 |
CN107386103A (zh) * | 2017-07-27 | 2017-11-24 | 北京欧亚机械设备股份有限公司 | 桥梁伸缩缝及其施工工艺 |
CN107882060A (zh) * | 2017-12-17 | 2018-04-06 | 中铁四局集团市政工程有限公司 | 叠合式预制的两舱拼装管廊结构及其施工方法 |
CN208329009U (zh) * | 2018-04-12 | 2019-01-04 | 中国铁道科学研究院铁道建筑研究所 | 一种中埋式止水带 |
-
2019
- 2019-07-18 CN CN201910648088.0A patent/CN110397081B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106182359A (zh) * | 2016-08-30 | 2016-12-07 | 长沙楚鸿机械有限公司 | 混凝土单仓综合管廊卧式成型模具、系统及管廊模塑方法 |
CN107386103A (zh) * | 2017-07-27 | 2017-11-24 | 北京欧亚机械设备股份有限公司 | 桥梁伸缩缝及其施工工艺 |
CN107882060A (zh) * | 2017-12-17 | 2018-04-06 | 中铁四局集团市政工程有限公司 | 叠合式预制的两舱拼装管廊结构及其施工方法 |
CN208329009U (zh) * | 2018-04-12 | 2019-01-04 | 中国铁道科学研究院铁道建筑研究所 | 一种中埋式止水带 |
Also Published As
Publication number | Publication date |
---|---|
CN110397081A (zh) | 2019-11-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110397081B (zh) | 一种中埋式橡胶止水带固定方法及钢筋骨架结构 | |
CN103015719B (zh) | 钻前工程钢筋混凝土废水池整体浇筑工艺 | |
CN108867860A (zh) | 一种预制钢筋混凝土梁板体系与预制柱结构整体装配施工方法 | |
CN111980408A (zh) | 一种大体积混凝土冷却水循环及施工方法 | |
CN106193644A (zh) | 带筏板基础建筑物的地下室改造结构 | |
CN108149706A (zh) | 一种现浇暗梁及叠合板拼接的预制装配式综合管廊及其施工方法 | |
CN207944339U (zh) | 一种用于城市高架桥的预制叠合式防撞墙 | |
CN206971268U (zh) | 地下综合管廊施工用的顶板移动模架体 | |
CN203795601U (zh) | 预制混凝土构件水平连接节点 | |
CN208668596U (zh) | 一种钢筋混凝土梁板体系与预制柱装配节点 | |
KR20110050898A (ko) | 콘크리트 일체성을 향상시키는 수직조인트 부재 | |
CN106759478A (zh) | 一种预制管廊施工方法 | |
CN208501735U (zh) | 预制管廊 | |
CN206928323U (zh) | 一种环筋扣合装配式综合管廊 | |
CN111305470A (zh) | 一种超高层首节空腹式几何体型钢混凝土柱施工工法 | |
CN206035043U (zh) | 一种外包钢板阶梯状预制装配式矩形地下粮仓 | |
CN104831919B (zh) | 一种用于预制整浇井字楼盖结构的支撑体系 | |
CN205662948U (zh) | 严寒地区路面检查井盖 | |
CN109184740A (zh) | 装配式管节及其制作方法 | |
CN213417893U (zh) | 一种装配式综合管廊 | |
CN108086353A (zh) | 一种用现浇暗梁拼接的空芯墙板混合预制装配式综合管廊及其施工方法 | |
CN109403516A (zh) | 一种地下室外墙施工方法 | |
CN209011158U (zh) | 装配式预制管廊节 | |
CN104727276B (zh) | 混凝土伸缩缝双止水结构的制造方法 | |
CN207934043U (zh) | 一种永久临时结合的基坑支撑围檩系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |