CN110374232A - Circular arc type connector and purifying board construction method of installation for purifying board installation - Google Patents
Circular arc type connector and purifying board construction method of installation for purifying board installation Download PDFInfo
- Publication number
- CN110374232A CN110374232A CN201910632561.6A CN201910632561A CN110374232A CN 110374232 A CN110374232 A CN 110374232A CN 201910632561 A CN201910632561 A CN 201910632561A CN 110374232 A CN110374232 A CN 110374232A
- Authority
- CN
- China
- Prior art keywords
- supporting element
- purifying board
- plug division
- shackle member
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 32
- 238000010276 construction Methods 0.000 title claims abstract description 17
- 230000007704 transition Effects 0.000 claims description 36
- 239000002002 slurry Substances 0.000 claims description 21
- 238000009958 sewing Methods 0.000 claims description 12
- 238000005452 bending Methods 0.000 claims description 6
- 239000004568 cement Substances 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 6
- 239000003351 stiffener Substances 0.000 claims description 6
- 238000003466 welding Methods 0.000 claims description 6
- 239000011521 glass Substances 0.000 claims description 5
- 230000001681 protective effect Effects 0.000 claims description 3
- 238000007569 slipcasting Methods 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims 1
- 238000004140 cleaning Methods 0.000 abstract description 14
- 239000000243 solution Substances 0.000 description 9
- 229910000831 Steel Inorganic materials 0.000 description 6
- 239000010959 steel Substances 0.000 description 6
- 238000010586 diagram Methods 0.000 description 3
- 238000003780 insertion Methods 0.000 description 3
- 230000037431 insertion Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 239000011162 core material Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000011490 mineral wool Substances 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 241000628997 Flos Species 0.000 description 1
- FYYHWMGAXLPEAU-UHFFFAOYSA-N Magnesium Chemical compound [Mg] FYYHWMGAXLPEAU-UHFFFAOYSA-N 0.000 description 1
- 229920005830 Polyurethane Foam Polymers 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 239000004411 aluminium Substances 0.000 description 1
- 230000000844 anti-bacterial effect Effects 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 229910052749 magnesium Inorganic materials 0.000 description 1
- 239000011777 magnesium Substances 0.000 description 1
- 230000001151 other effect Effects 0.000 description 1
- 238000005498 polishing Methods 0.000 description 1
- 239000011496 polyurethane foam Substances 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 239000011044 quartzite Substances 0.000 description 1
- 229910000679 solder Inorganic materials 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/82—Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
Abstract
The present invention relates to a kind of circular arc type connectors and purifying board construction method of installation for purifying board installation.Circular arc type connector for purifying board installation includes straight line linkage section and corner linkage section;The straight line linkage section includes the first supporting element and the first shackle member that section is in U-shape, and the corner linkage section includes the second shackle member being arc-shaped and the second supporting element.Purifying board is installed to ground using the above-mentioned circular arc type connector for purifying board installation by purifying board construction method of installation, and purifying board after the installation is completed, not will form dead end of cleanning on the ground, is easy to cleaning worker cleaning.
Description
Technical field
The present invention relates to purifying board mounting technique field, be especially for purifying board installation circular arc type connector and
Purifying board construction method of installation.
Background technique
Purifying board is also known as clean board, is using rock wool, polyurethane foam, quartzite, glass silk floss, paper honeycomb, pottery aluminium sheet, glass
One of magnesium plate paper wasp is used as core material, using materials such as Coil Coating Products, stainless steels as made of plane materiel.With unique anti-
Dirt, antistatic, antibacterial, fire prevention and other effects are widely used in electronics, pharmacy, food, biology, space flight and aviation, precision instrument system
It makes and scientific research etc. requires indoor environment harsh cleaning project field.
It currently will use the purifying board using rock wool as core material in the kitchen in some hotels and be one layer of fire prevention guarantor along metope
Shield.Referring to Fig.1, in current hotel kitchen, two parallel angle steel of setting usually at each metope, corresponding two
The inner concave of root angle steel mutually backwards, forms the slot being inserted into for purifying board between two angle steel, and angle steel and ground bolt connect
It connects, purifying board lower end is inserted into slot.Purifying board is connected on ground as connector using angle steel and bolt, although implementing
Get up to be relatively easy to, but due to being easy to be sprinkled with some water on the ground in kitchen hotel, and bolt evagination is outside, causes
Staff is difficult to clean out on bolt and angle-bar joint using mop, in order to clean out bolt and angle-bar joint
Cleaning worker is wiped usually using rag, heavy workload.And it is loaded onto only in the junction of adjacent metope (i.e. at corner)
It still will form the corner of square after change plate, staff is also very inconvenient to being cleared up at corner using mop.
Summary of the invention
The object of the present invention is to provide a kind of circular arc type connectors for purifying board installation, its advantage is that: it can will be net
Change plate to be fixed up with ground, and cleaning worker is facilitated to sweep cleaning.
Above-mentioned purpose of the invention has the technical scheme that the circular arc type for purifying board installation connects
Fitting, including straight line linkage section and corner linkage section;
The straight line linkage section includes the first supporting element and the first shackle member that section is in U-shape, and first supporting element includes
The first support portion that section is inverted U shape, first support portion lower edge, which is connected with, to be turned down to outside the first support portion downwards
The first cambered surface transition part, the first cambered surface transition part is connected with the first plug division far from the first support portion on one side,
First plug division extends straight down away from one side of the first cambered surface transition part;First support portion closed side is along its length
Degree direction is arranged at intervals with the first pouring hole;
The corner linkage section includes the second shackle member being arc-shaped and the second supporting element, and the section of second shackle member is in
U-shaped;Second supporting element includes the second support portion that section is inverted U shape, and second support portion lower edge is connected with
The the second cambered surface transition part turned down to outside the second support portion downwards, the described one side of second cambered surface transition part far from the second support portion
It is connected with the second plug division, second plug division extends straight down away from one side of the second cambered surface transition part;It is described
Second support portion closed side is arranged at intervals with the second pouring hole along its length.
Through the above technical solutions, first being opened up on the ground when being connected to purifying board on ground using straight line linkage section
Then first plug division is inserted into two inserting grooves respectively and guarantees that the first plug division does not have completely by two linear inserting grooves
Enter in inserting groove, concrete slurry is then injected into the first supporting element, the first shackle member is then welded to the first supporting element
On, finally purifying board, which is inserted into the first shackle member, to connect together purifying board with ground;Since the first plug division is complete
It is fully inserted into inserting groove and the setting of the first cambered surface transition part is so that be in have an arc mistake between the second support portion and ground
Face is crossed, consequently facilitating staff sweeps cleaning;
When being connected to purifying board on ground using corner linkage section, the inserting groove of two arc line types is first opened up on the ground, so
The second plug division is inserted into respectively in two inserting grooves afterwards and guarantees that the second plug division is submerged in inserting groove completely, then to second
Concrete slurry is injected in supporting element, then the second shackle member is welded on the second supporting element, finally by purifying board insertion the
Purifying board can be connected together with ground in two shackle members;Since the second plug division is fully inserted into inserting groove and second
The setting of cambered surface transition part is so that in there is an arc transiting surface between the second support portion and ground, consequently facilitating staff beats
Clear away reason;
When in use, straight line linkage section is arranged along metope, and corner linkage section is set at corner as transition, will be arranged adjacent
Straight line linkage section at two metopes connects, and forms arc corner, in order to which cleaning worker at corner to clearing up.
The present invention is further arranged to: being fixed between the first cambered surface transition part along the first support length direction interval
There is stiffener;Stiffener is fixed at intervals with along the second support length direction between the second cambered surface transition part.
Through the above technical solutions, avoid after injecting concrete slurry into the first supporting element and the second supporting element, by
It is expanded in concrete setting, the first supporting element and the second supporting element is caused to deform.
The present invention is further arranged to: first support portion includes two the first plates parallel to each other and several edges
First plate length direction is arranged at intervals at the first connection strap between two the first plates;First plate top edge direction
The bending of first connection strap forms the first horizontal support platform, and first connection strap and the first support platform lower surface are welded,
The first pouring hole is formed between two neighboring first connection strap.
Through the above technical solutions, manufacture straight line linkage section easy to produce, saves making material;First support platform is set
On the one hand setting can be convenient worker the first connection strap and the first plate is welded together, on the other hand can be very good to first
Shackle member is supported, and the first shackle member is placed on the first supporting element convenient for construction personnel.
The present invention is further arranged to: second support portion includes the second arc-shaped plate, is located at the second plate one
Side and third plate identical with the second plate radian and the second plate and are arranged at intervals at along the second plate length direction
The second connection strap between three plates, second plate top edge form the second horizontal support towards third panel-bending
Platform;Third plate top edge forms horizontal third support platform, second connection strap towards the second panel-bending
Both ends welded respectively with the second support platform lower surface and third support platform lower surface, between two neighboring second connection strap
Form the second pouring hole.
Through the above technical solutions, manufacture straight line linkage section easy to produce, saves making material;Second support platform and
On the one hand the setting of three support platforms can be convenient worker and the second connection strap be welded on the second plate and third plate, another
Aspect can be very good to be supported the second shackle member, and the second shackle member is placed into the second supporting element convenient for construction personnel
On.
It is a further object to provide a kind of purifying board construction methods of installation, its advantage is that: purifying board installs
Bi Hou not will form dead end of cleanning on the ground, be easy to cleaning worker cleaning.
Above-mentioned purpose of the invention has the technical scheme that purifying board construction method of installation, utilizes
Circular arc type connector described in any one of claim 1-4 for purifying board installation carrys out execution part step for purifying board
It is installed on ground, which includes the following steps:
1): drawing the label for representing the orthographic projection on the ground of the first plug division and the second plug division on the ground according to design drawing
Line;
2) inserting groove for the first plug division and the second plug division, is outputed on the ground according to mark line;
3) the first supporting element and the second supporting element, are plugged into inserting groove corresponding position;
4), the first adjacent supporting element is welded together, the second supporting element is welded to the first supporting element adjacent thereto
Together;
5), concrete slurry is injected into the first supporting element and the second supporting element;
6), the first shackle member is welded on corresponding first supporting element, the second shackle member is welded in corresponding second shackle member,
The first adjacent shackle member is welded together with the second shackle member;
7), that weld grinding is smooth;
8), corresponding purifying board is inserted into corresponding first shackle member or the second shackle member;
9) it, is sealed between connecting sewing, the second plug division and inserting groove between the first plug division and inserting groove using glass cement
The connecting sewing between connecting sewing and purifying board and the second shackle member between connecting sewing, purifying board and the first shackle member;
10) protective film, torn on purifying board.
Through the above technical solutions, can be enhanced by injecting concrete slurry into the first supporting element and the second supporting element
The bonding strength of first supporting element and the second supporting element and ground, while the first supporting element and the second supporting element are supported,
It avoids the first supporting element and the second supporting element from trampling or collide with, causes to generate recess on the first supporting element and the second supporting element;It will
Weld grinding is smooth, can be to avoid when using mop cleaning circular arc type connector and ground junction, and solder joint scratches mop.
The present invention is further arranged to: the grafting groove width outputed in step 2 is greater than the thickness and second of the first plug division
The thickness of plug division;And guarantee same straight line connection behind the first plug division and the second plug division insertion inserting groove corresponding position
Two the first plug divisions in section are away from each other side and abut respectively with the side of two inserting groove lie farthest aways, and, same turn
Two the second plug divisions on the linkage section of angle are away from each other side and abut respectively with the side of two inserting groove lie farthest aways.
Through the above technical solutions, on the one hand convenient for the first plug division and the second plug division to be inserted into inserting groove, it is another
Aspect can be such that the concrete slurry injected in the first supporting element and the second supporting element flows into inserting groove, to make straight line
Linkage section and corner linkage section can be more stable be fixed to ground on
The present invention is further arranged to: step 3) includes:
3-1: straight line concrete precast block is placed between the part that two inserting grooves correspond to rectilinear connecting sections, in two inserting grooves
Corner concrete precast block is placed between the part of corresponding corner interconnecting piece;
3-2: corresponding first supporting element or the second supporting element are plugged into inserting groove corresponding position one by one along inserting groove.
Through the above technical solutions, the setting of concrete precast block can make to inject in the first supporting element and the second supporting element
Concrete slurry solidify faster.
The present invention is further arranged to: being welded in the form of being fully welded in step 4);In step 6) using spot welding or
The form of section weldering is welded.
Through the above technical solutions, being welded in the form of being fully welded in step 4), can be supported to avoid to first
When injecting concrete slurry in part and the second supporting element, concrete slurry is oozed out from weld seam;Spot welding or section are used in step 6)
The form of weldering is welded, high-efficient.
The present invention is further arranged to: mixed with cement expansive material in concrete slurry used in step 5);
When carrying out step 5), after concrete slurry did not had the first cambered surface transition part and the second cambered surface transition part, stop slip casting.
Through the above technical solutions, volume increases, after concrete slurry being made to be frozen into concrete block so as to right
First supporting element and the second supporting element are effectively supported.
In conclusion advantageous effects of the invention are as follows: purifying board after the installation is completed, not will form cleaning on the ground
Dead angle is easy to cleaning worker cleaning.
Detailed description of the invention
Fig. 1 is the connection structure of the purifying board and ground in current hotel kitchen;
Fig. 2 is to embody the schematic diagram that the structure of straight line linkage section in circular arc type connector is done;
Fig. 3 is to embody the schematic diagram that the structure of corner linkage section in circular arc type connector is done;
Fig. 4 is that purifying board is installed to the effect diagram to ground using purifying board construction method of installation disclosed in the present application.
In figure, 1, straight line linkage section;11, the first shackle member;12, the first supporting element;121, the first support portion;1211,
One pouring hole;1212, the first plate;1213, the first connection strap;122, the first cambered surface transition part;123, the first plug division;124,
Stiffener;2, corner linkage section;21, the second shackle member;22, the second supporting element;221, the second support portion;2211, it second pours
Hole;2212, the second plate;2213, third plate;2214, the second connection strap;222, the second cambered surface transition part;223, it second inserts
Socket part;3, angle steel;4, bolt.
Specific embodiment
In claims of the present invention, specification and above-mentioned attached drawing, unless otherwise specifically limited, for the noun of locality,
Such as using up, down, left, right, before and after, center, transverse direction, longitudinal direction, level, vertical, top, bottom, interior, clockwise, instruction counterclockwise
The word of orientation or positional relationship is orientation and positional relationship based on the figure, and merely to the description of simplification of the invention,
Rather than the device or element of indication or suggestion meaning must have specific orientation or be constructed and operated in a specific orientation, so
It can not be interpreted as limiting specific protection scope of the invention.
The invention discloses a kind of circular arc type connectors for purifying board installation, connect referring to Fig. 2 and Fig. 3, including straight line
Connect section 1 and corner linkage section 2.
Referring to Fig. 2, straight line linkage section 1 includes the first supporting element 12 and the first shackle member 11 that section is in U-shape.First
Support member 12 includes the first support portion 121 for being inverted U shape of section, is connected with downwards in 121 lower edge of the first support portion to the
The the first cambered surface transition part 122 turned down outside one support portion 121, the first cambered surface transition part 122 far from the first support portion 121 one
While being connected with the first plug division 123, the first plug division 123 is prolonged straight down away from one side of the first cambered surface transition part 122
It stretches.Preferably, the section of the first cambered surface transition part 122 is in quarter circular arc.
First support portion 121 includes two the first plates 1212 parallel to each other and several along 1212 length of the first plate
Direction is arranged at intervals at the first connection strap 1213 between two the first plates 1212.The top edge of first plate 1212 is towards the
The bending of one connection strap 1213, forms the first horizontal support platform.First connection strap 1213 and the first support platform lower surface are welded
It connects, forms the first pouring hole 1211 between two adjacent the first connection straps 1213.
Referring to Fig. 3, corner linkage section 2 includes the second shackle member 21 being arc-shaped and the second supporting element 22, the second clamping
The radian of part 21 and the second supporting element 22 is identical as arc length.The section of second shackle member 21 is in U-shape.
Second supporting element 22 includes the second support portion 221 that section is inverted U shape, and 221 lower edge of the second support portion integrally connects
It is connected to the second cambered surface transition part 222 turned down to outside the second support portion 221 downwards, the second cambered surface transition part 222 is far from second
Support part 221 is connected with the second plug division 223 on one side, and the second plug division 223 deviates from one side of the second cambered surface transition part 222
Extend straight down.Preferably, the section of the second cambered surface transition part 222 is in quarter circular arc.
Second support portion 221 include the second arc-shaped plate 2212, be located at 2212 side of the second plate and with the second plate
The identical third plate 2213 of 2212 radian of part and the second plate 2212 is arranged at intervals at along 2212 length direction of the second plate
The second connection strap 2214 between third plate 2213.Second plate, 2212 top edge is bent towards third plate 2213, shape
At the second horizontal support platform;2213 top edge of third plate is bent towards the second plate 2212, forms horizontal third branch
Platform is supportted, the both ends of the second connection strap 2214 are welded with the second support platform lower surface and third support platform lower surface respectively,
The second pouring hole 2211 is formed between two neighboring second connection strap 2214.
Further, referring to Fig. 2 and Fig. 3, between the first cambered surface transition part 122 between 12 length direction of the first supporting element
Every being fixed with stiffener 124, also it is fixed at intervals with and adds along 22 length direction of the second supporting element between the second cambered surface transition part 222
Strong item 124.To reinforce the structure of the first supporting element 12 and the second supporting element 22, reduce the first supporting element 12 and second
A possibility that supporting element 22 deforms.
The invention also discloses a kind of purifying board construction method of installation, which has used above-mentioned
For purifying board installation circular arc type connector, the purifying board construction method of installation the following steps are included:
1): being drawn on the ground according to design drawing and represent the first plug division 123 and the second orthographic projection on the ground of plug division 223
Mark line.
2) inserting groove for the first plug division 123 and the second plug division 223, is outputed on the ground according to mark line.
Specifically, the width of inserting groove should be greater than the thickness of the first plug division 123 and the thickness of the second plug division 223,
And after guaranteeing party the first plug division 123 and the second plug division 223 insertion inserting groove corresponding position, on same straight line linkage section 1
Two the first plug divisions 123 are away from each other side and abut respectively with the side of two inserting groove lie farthest aways, and, same corner connects
It connects two in section 2 the second plug divisions 223 and is away from each other side and abutted respectively with the side of two inserting groove lie farthest aways.
3) the first supporting element 12 and the second supporting element 22, are plugged into inserting groove corresponding position.
4), using the welding form being fully welded, the first adjacent supporting element 12 is welded together, the second supporting element 22 is same
First supporting element 12 adjacent thereto is welded together.
5), concrete slurry is injected into the first supporting element 12 and the second supporting element 22;
Specifically, concrete slurry can be made to solidify mixed with cement expansive material in concrete slurry used in this step
After concrete block, volume increases, and so as to effectively be supported to the first supporting element 12 and the second supporting element 22, avoids the
One supporting element 12 and the second supporting element 22 are trampled or collide with, and cause to generate recess on the first supporting element 12 and the second supporting element 22.
Since the width of inserting groove is greater than the thickness of the first plug division 123 and the thickness of the second plug division 223, so swollen mixed with concrete
Swollen dose of concrete slurry can squeeze the first plug division 123 and the second plug division 223 after solidification, to make the first supporting element
12 and second supporting element 22 can be more stable fix on the ground, improve honest intensity.Correspondingly, in order to avoid concrete grout
Liquid in process of setting since volume increases, the first supporting element 12, the second supporting element 22 are supportted it is bad, to 12 He of the first supporting element
In second supporting element 22 when injection concrete slurry, concrete slurry did not had the first cambered surface transition part 122 and the second cambered surface transition
Behind portion 222, stop slip casting.
6) the first shackle member 11 is welded on corresponding first supporting element 12, by second by, the form welded using spot welding or section
Shackle member 21 is welded in corresponding second shackle member 21, and adjacent the first shackle member 11 and the second shackle member 21 are welded to one
It rises.
7), using sander or polishing machine that weld grinding is smooth.
8), corresponding purifying board is inserted into corresponding first shackle member 11 or the second shackle member 21.
9) connecting sewing between the first plug division 123 and inserting groove, the second plug division 223, are sealed using glass cement and is inserted
Between connecting sewing between connecting sewing, purifying board and the first shackle member 11 and purifying board and the second shackle member 21 between access slot
Connecting sewing.
10) protective film, torn on purifying board.
Further, step 3) includes:
3-1: straight line concrete precast block is placed between the part that two inserting grooves correspond to rectilinear connecting sections, in two inserting grooves
Corner concrete precast block is placed between the part of corresponding corner interconnecting piece;
3-2: corresponding first supporting element 12 or the second supporting element 22 are plugged into inserting groove corresponding position one by one along inserting groove.
Straight line concrete precast block is the strip concrete precast block that section is in isosceles triangle, when the first supporting element 12
When being plugged into inserting groove, straight line concrete precast block is not contacted with 12 inner wall of the first supporting element.Corner concrete precast block is
Section is in the arc line shaped concrete precast block of isosceles triangle, the arc of the radian of corner concrete precast block and the second supporting element 22
Spend identical, when the second supporting element 22 is plugged into inserting groove, straight line concrete precast block does not connect with 12 inner wall of the first supporting element
Touching.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this
Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it
It is interior.
Claims (9)
1. for the circular arc type connector of purifying board installation, it is characterized in that: including straight line linkage section (1) and corner linkage section (2);
The first shackle member (11) that the straight line linkage section (1) is in U-shape including the first supporting element (12) and section, described first
Supporting element (12) includes the first support portion (121) that section is inverted U shape, the first support portion (121) lower edge integrally connected
There is the first cambered surface transition part (122) turned down outside to the first support portion (121) downwards, the first cambered surface transition part (122) is remote
From being connected on one side the first plug division (123) for the first support portion (121), first plug division (123) deviates from first
One side of cambered surface transition part (122) extends straight down;First support portion (121) closed side is spaced along its length to be set
It is equipped with the first pouring hole (1211);
The corner linkage section (2) includes the second shackle member (21) being arc-shaped and the second supporting element (22), second card
The section of fitting (21) is in U-shape;Second supporting element (22) includes the second support portion (221) that section is inverted U shape, and described
Two support portions (221) lower edge is connected with the second cambered surface transition part turned down outside to the second support portion (221) downwards
(222), the second cambered surface transition part (222) is connected with the second plug division far from the second support portion (221) on one side
(223), second plug division (223) extends straight down away from one side of the second cambered surface transition part (222);Described second
Support part (221) closed side is arranged at intervals with the second pouring hole (2211) along its length.
2. the circular arc type connector according to claim 1 for purifying board installation, it is characterized in that: the first cambered surface mistake
It crosses between portion (122) and is fixed at intervals with stiffener (124) along the first supporting element (12) length direction;The second cambered surface transition part
(222) along the second supporting element (22), length direction is fixed at intervals with stiffener (124) between.
3. the circular arc type connector according to claim 1 for purifying board installation, it is characterized in that: first support portion
(121) include two the first plates (1212) parallel to each other and it is several along the first plate (1212) length direction interval be arranged
The first connection strap (1213) between two the first plates (1212);First plate (1212) top edge connects towards first
Narrow bars (1213) bending, forms the first horizontal support platform, first connection strap (1213) and the first support platform following table
Face is welded, and forms the first pouring hole (1211) between two neighboring first connection strap (1213).
4. the circular arc type connector according to claim 1 for purifying board installation, it is characterized in that: second support portion
(221) include arc-shaped the second plate (2212), be located at the second plate (2212) side and with the second plate (2212) radian
Identical third plate (2213) and the second plate (2212) and the are arranged at intervals at along the second plate (2212) length direction
The second connection strap (2214) between three plates (2213), the second plate (2212) top edge is towards third plate (2213)
Bending, forms the second horizontal support platform;Third plate (2213) top edge is bent towards the second plate (2212), shape
At horizontal third support platform, the both ends of second connection strap (2214) respectively with the second support platform lower surface and third
Support platform lower surface is welded, and forms the second pouring hole (2211) between two neighboring second connection strap (2214).
5. purifying board construction method of installation, it is characterized in that: being pacified using purifying board is used for described in any one of claim 1-4
The circular arc type connector of dress carrys out execution part step and purifying board is installed on ground, which includes such as
Lower step:
1): being drawn on the ground according to design drawing and representing the first plug division (123) and the second plug division (223) on the ground just
The mark line of projection;
2) inserting groove for the first plug division (123) and the second plug division (223), is outputed on the ground according to mark line;
3) the first supporting element (12) and the second supporting element (22), are plugged into inserting groove corresponding position;
4), adjacent the first supporting element (12) is welded together, by the second supporting element (22) with the first support adjacent thereto
Part (12) is welded together;
5) concrete slurry, is injected into the first supporting element (12) and the second supporting element (22);
6), the first shackle member (11) is welded on corresponding first supporting element (12), the second shackle member (21) is welded to correspondence
In second shackle member (21), adjacent the first shackle member (11) is welded together with the second shackle member (21);
7), that weld grinding is smooth;
8), corresponding purifying board is inserted into corresponding first shackle member (11) or the second shackle member (21);
9), using between glass cement sealing the first plug division (123) and inserting groove connecting sewing, the second plug division (223) with it is slotting
Connecting sewing and purifying board and the second shackle member (21) between connecting sewing, purifying board between access slot and the first shackle member (11)
Between connecting sewing;
10) protective film, torn on purifying board.
6. purifying board construction method of installation according to claim 5, it is characterized in that: the grafting groove width outputed in step 2
Greater than the thickness of the first plug division (123) and the thickness of the second plug division (223);And guarantee when the first plug division (123) and the
After inserting groove corresponding position is inserted into two plug divisions (223), two the first plug division (123) phases on same straight line linkage section (1)
It is abutted respectively with the side of two inserting groove lie farthest aways away from side, and, two second on same corner linkage section (2)
Plug division (223) is away from each other side and abuts respectively with the side of two inserting groove lie farthest aways.
7. purifying board construction method of installation according to claim 5, it is characterized in that: step 3) includes:
3-1: straight line concrete precast block is placed between the part that two inserting grooves correspond to rectilinear connecting sections, in two inserting grooves
Corner concrete precast block is placed between the part of corresponding corner interconnecting piece;
3-2: corresponding first supporting element (12) or the second supporting element (22) are plugged into inserting groove and correspond to position one by one along inserting groove
Set place.
8. purifying board construction method of installation according to claim 5, it is characterized in that: in step 4) using the form being fully welded into
Row welding;It is welded in the form of spot welding or section weldering in step 6).
9. purifying board construction method of installation according to claim 5, it is characterized in that: concrete slurry used in step 5)
It is interior mixed with cement expansive material;
When carrying out step 5), after concrete slurry did not had the first cambered surface transition part (122) and the second cambered surface transition part (222), stop
Only slip casting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910632561.6A CN110374232B (en) | 2019-07-13 | 2019-07-13 | Arc-shaped connecting piece for installing purification plate and purification plate installation construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910632561.6A CN110374232B (en) | 2019-07-13 | 2019-07-13 | Arc-shaped connecting piece for installing purification plate and purification plate installation construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110374232A true CN110374232A (en) | 2019-10-25 |
CN110374232B CN110374232B (en) | 2020-08-07 |
Family
ID=68253066
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910632561.6A Active CN110374232B (en) | 2019-07-13 | 2019-07-13 | Arc-shaped connecting piece for installing purification plate and purification plate installation construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110374232B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200451966Y1 (en) * | 2010-10-20 | 2011-01-27 | 후지이엠씨(주) | Assembly structure of clean room panel |
KR20150069694A (en) * | 2013-12-16 | 2015-06-24 | (주) 제이오 | Floor base for clean room |
CN204475587U (en) * | 2014-12-22 | 2015-07-15 | 上海朗脉洁净技术股份有限公司 | Circular arc-shaped corner upright post base structure |
CN205348466U (en) * | 2016-01-21 | 2016-06-29 | 苏州凯奥净化科技有限公司 | Toilet changes corner connector |
CN206368462U (en) * | 2017-01-11 | 2017-08-01 | 张旭东 | A kind of architecture indoor finishing uses antifouling grooved rail |
CN208533971U (en) * | 2018-07-04 | 2019-02-22 | 江苏百分号食用菌智能装备科技有限公司 | A kind of no dead angle mill construction |
-
2019
- 2019-07-13 CN CN201910632561.6A patent/CN110374232B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200451966Y1 (en) * | 2010-10-20 | 2011-01-27 | 후지이엠씨(주) | Assembly structure of clean room panel |
KR20150069694A (en) * | 2013-12-16 | 2015-06-24 | (주) 제이오 | Floor base for clean room |
CN204475587U (en) * | 2014-12-22 | 2015-07-15 | 上海朗脉洁净技术股份有限公司 | Circular arc-shaped corner upright post base structure |
CN205348466U (en) * | 2016-01-21 | 2016-06-29 | 苏州凯奥净化科技有限公司 | Toilet changes corner connector |
CN206368462U (en) * | 2017-01-11 | 2017-08-01 | 张旭东 | A kind of architecture indoor finishing uses antifouling grooved rail |
CN208533971U (en) * | 2018-07-04 | 2019-02-22 | 江苏百分号食用菌智能装备科技有限公司 | A kind of no dead angle mill construction |
Also Published As
Publication number | Publication date |
---|---|
CN110374232B (en) | 2020-08-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104806011A (en) | Raft plate post-cast strip pouring template and construction method thereof | |
CN110374232A (en) | Circular arc type connector and purifying board construction method of installation for purifying board installation | |
CN209942071U (en) | Flashing joint structure for steel skeleton light plate roof and parapet wall | |
CN205955191U (en) | Constructional column side template device for concreting | |
CN203839870U (en) | Wall-mounted concealed distribution box | |
CN207538233U (en) | The construction tool of wall containing waterstop | |
CN209162909U (en) | A kind of interface waterproof construction of new-old concrete | |
CN216664542U (en) | Basement outer wall construction joint antiseep wall body and construction structures thereof | |
CN207944718U (en) | A kind of pre-buried mounting structure of terminal box | |
CN105317057A (en) | Reinforced manhole cover plate of which upper part is provided with stainless steel plates | |
CN208502236U (en) | A kind of edge banding apparatus for concrete floor edge in steel construction | |
CN206418775U (en) | A kind of arm support and concrete spraying machine | |
CN207686288U (en) | The manufacture of the horizontal hole to be provided of wall and plugging device | |
CN110230256A (en) | Expansion gap device | |
CN207647172U (en) | A kind of sealing is returned template reinforcing device | |
CN209584826U (en) | Expansion gap device | |
CN207714148U (en) | Cast-in-situ box girder mold plate connecting mechanism and cast-in-situ box girder support shuttering | |
CN208650503U (en) | A kind of aluminum alloy pattern plate convenient for construction and installation | |
CN209620569U (en) | A kind of single side wall moulding board apparatus | |
CN208857852U (en) | A kind of waterproof layer protective device | |
CN208380594U (en) | A kind of variable section is by multiple formwork-support | |
CN106013253B (en) | Subway transfer station connecting joint structure and connecting node construction method | |
CN209243944U (en) | Side fascia riser parapet and Vierendeel girder connection structure | |
CN209703721U (en) | A kind of expansion joint plate in concrete walls | |
CN112282366B (en) | Beam-column joint plugging device and beam-column joint plugging method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |