CN110306524B - Foundation reinforcing structure and method for hoisting heavy equipment close to unsealed building - Google Patents
Foundation reinforcing structure and method for hoisting heavy equipment close to unsealed building Download PDFInfo
- Publication number
- CN110306524B CN110306524B CN201910584848.6A CN201910584848A CN110306524B CN 110306524 B CN110306524 B CN 110306524B CN 201910584848 A CN201910584848 A CN 201910584848A CN 110306524 B CN110306524 B CN 110306524B
- Authority
- CN
- China
- Prior art keywords
- steel
- lattice column
- foundation
- rows
- steel sheet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003014 reinforcing effect Effects 0.000 title claims abstract description 45
- 238000000034 method Methods 0.000 title claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 264
- 239000010959 steel Substances 0.000 claims abstract description 264
- 239000002689 soil Substances 0.000 claims abstract description 60
- 230000005540 biological transmission Effects 0.000 claims abstract description 11
- 239000004567 concrete Substances 0.000 claims description 33
- 230000006641 stabilisation Effects 0.000 claims description 9
- 238000011105 stabilization Methods 0.000 claims description 9
- 239000011435 rock Substances 0.000 claims description 7
- 230000002349 favourable effect Effects 0.000 claims description 5
- 238000003466 welding Methods 0.000 claims description 4
- 230000002787 reinforcement Effects 0.000 claims description 3
- 238000005728 strengthening Methods 0.000 claims 2
- 239000011150 reinforced concrete Substances 0.000 claims 1
- 230000002411 adverse Effects 0.000 abstract description 5
- 230000000694 effects Effects 0.000 abstract description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 11
- 238000005056 compaction Methods 0.000 description 5
- 230000002093 peripheral effect Effects 0.000 description 4
- 238000005096 rolling process Methods 0.000 description 4
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 3
- 239000004576 sand Substances 0.000 description 3
- 238000007569 slipcasting Methods 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 239000006260 foam Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 239000011449 brick Substances 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
- E02D5/08—Locking forms; Edge joints; Pile crossings; Branch pieces
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Soil Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The invention discloses a foundation reinforcing structure and a method for hoisting heavy equipment close to an unsealed building, which solve the problem that the hoisting of a crane in the prior art can generate lateral soil pressure on the unsealed building, have the beneficial effects of effectively transferring the hoisting load of the crane and avoiding the adverse effect of the hoisting load of the heavy equipment on the close unsealed building, and have the following scheme: the foundation reinforcing structure comprises two rows of vertically arranged steel sheet piles, wherein the two rows of steel sheet piles are respectively arranged on the left side and the right side of the side wall of the unsealed building in a foundation pit; the two rows of steel sheet piles are connected through the first connecting piece, and the first connecting piece is layered and provided with a plurality of layers; the steel tube lattice column structures are arranged between the two rows of steel plate piles and are also vertically arranged to carry out vertical force transmission; and soil is backfilled and is filled between the two rows of steel plate piles and the steel tube lattice columns in a layered mode.
Description
Technical Field
The invention relates to the technical field of equipment hoisting, in particular to a foundation reinforcing structure and a foundation reinforcing method for hoisting heavy equipment close to an unsealed building.
Background
The hoisting of heavy-duty equipment close to the main structure of the building is mostly carried out after the construction of the main structure of the building is finished, in a complex environment of cross construction, before the main structure of the building is influenced by various factors and does not form an integral closed structure, such as in subway station construction engineering, a shield machine has large mass and needs to hoist the equipment from a shield receiving end, under the condition, a deep foundation pit excavated by slope is not backfilled, the peripheral side of the unsealed building is the deep foundation pit which is not backfilled, namely, the peripheral side of the main structure of the building does not have a reinforced foundation, and the hoisting equipment is directly arranged by backfilling soil, so that the quality of the backfilled soil body is convenient if the quality of the soil body has problems, the hoisting safety risk is directly increased, on the other hand, the hoisting equipment generates a certain lateral pressure on the building which is not constructed by backfilling soil body in the hoisting process, and the lateral pressure can generate adverse influence on the, cracks may be generated in the building, the service life of the main building structure which is not built is even affected, and catastrophic consequences can be caused in severe cases.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention provides a foundation reinforcing structure for hoisting heavy equipment close to an unsealed building, which can be used for arranging temporary retaining walls on the peripheral side of backfill soil, improving the stability of the backfill soil, forming a force transmission component through a steel pipe column and transmitting the stress of a crane on the backfill soil to an underground rock stratum so as to reduce the adverse effect of stratum side pressure generated by hoisting load on a main body structure of an unsealed station.
The concrete scheme of the foundation reinforcing structure hoisted by heavy equipment close to an unsealed building is as follows:
a foundation stabilization structure hoisted by heavy equipment proximate to an unsealed building, comprising:
the steel sheet piles which are vertically arranged are divided into two rows, and the two rows of steel sheet piles are respectively arranged on the left side and the right side of the side wall of the unsealed building in the foundation pit;
the two rows of steel sheet piles are connected through the first connecting piece, and the first connecting piece is layered and provided with a plurality of layers;
the steel tube lattice column structures are arranged between the two rows of steel plate piles and are also vertically arranged to carry out vertical force transmission;
and backfilling soil bodies, wherein the backfilling soil bodies are filled between the two rows of steel plate piles in a layered mode, and the height of the backfilling soil bodies is lower than that of the tops of the steel tube lattice column structures.
The foundation reinforcing structure integrally forms a reliable reinforced foundation, and is reliably connected by the first connecting piece through the arrangement of the two rows of steel sheet piles, so that a temporary retaining wall is formed at the position of the longitudinal foundation pit and the side wall of a building, the stress stability of a backfill soil body is effectively improved, the steel tube lattice columns can be used as force transmission components, the stress of hoisting equipment arranged at the top of the backfill soil, such as a crane, on the backfill soil is transmitted to the rock stratum at the lower part of the foundation pit through the steel tube lattice columns, and the lateral pressure of the hoisting equipment on the unsealed building structure in the hoisting process is effectively avoided.
Furthermore, in order to facilitate the setting of the steel sheet pile, each row of the bottom of the steel sheet pile is inserted into soil at the bottom of the foundation pit, so that the arrangement of the first connecting piece can be effectively facilitated, and meanwhile, the stress stability of the steel sheet pile is improved.
Furthermore, the steel sheet pile comprises a plurality of Larsen plates which are buckled with each other, the cross section of each Larsen plate is U-shaped, and the Larsen plates which are buckled with each other are favorable for improving the bending rigidity of the steel sheet pile.
Furthermore, the first connecting piece is a steel wire rope, two ends of the steel wire rope are respectively connected with the first I-shaped steel arranged on the outer side of the steel plate pile, the number of layers of the steel wire rope is the same as that of the first I-shaped steel, the Larson plate is provided with the opening to facilitate the steel wire rope to pass through, the two ends of the steel wire rope are conveniently fixed through the arrangement of the first I-shaped steel, the stress stability of the Larson plate is improved, and the first I-shaped steel is transversely arranged and is perpendicular to the Larson plate.
Further, each department the steel pipe lattice column structure all includes an at least steel pipe, and the steel pipe intussuseption is filled with the concrete to improve the intensity of steel pipe lattice column, steel pipe lattice column structure bottom sets up first steel sheet, and first steel sheet passes through the foundation ditch bottom surface and supports, and steel pipe lattice column structure top sets up the second steel sheet, and two adjacent steel pipes pass through the second connecting piece and connect in each department steel pipe lattice column structure.
Furthermore, the second connecting pieces are second I-shaped steels, multiple rows of second connecting pieces are arranged between every two adjacent steel pipes, and the second I-shaped steels are transversely arranged and are perpendicular to the arrangement directions of the steel pipes.
Further, in order to further improve the reliability of setting up of second steel sheet, second steel sheet and steel pipe welded connection, equally, the bottom welding of first steel sheet and steel pipe, and the size of first steel sheet and second steel sheet all is greater than the size of steel pipe in the corresponding steel pipe lattice column structure, and the second steel sheet reserves concrete placement hole.
Furthermore, each steel pipe lattice column structure all includes three steel pipes, and three steel pipes constitute three points of equilateral triangle and set up, are favorable to improving the stability of steel pipe lattice column structure, are equipped with the slip casting pipe between the steel pipe, and the slip casting pipe is sleeve valve pipe, and its length satisfies the slip casting requirement, and the central point of three steel pipes puts and puts unanimous with the central point of loop wheel machine such as truck crane landing leg.
Furthermore, the steel pipe lattice column structure comprises at least four positions, the four points of the rectangle formed by the four steel pipe lattice column structures are arranged, the central positions of the four steel pipe lattice column structures are consistent with the central positions of the fully extended support legs of the truck crane, the stress of the truck crane support legs on the foundation can be effectively transmitted downwards, and the lateral force generated by the hoisting equipment is dispersed and transmitted to the rock stratum at the bottom of the foundation pit.
Furthermore, a concrete reinforcing layer is arranged on the top of the backfilled soil body and the top of the steel tube lattice column structure, the concrete reinforcing layer comprises a reinforcing mesh, the reinforcing mesh is attached to a second steel plate, the lower layer of reinforcing mesh is favorable for connecting the concrete reinforcing layer and the steel tube lattice column structure into a whole, and square boxes for supporting the support legs of the truck crane are placed on the surface of the concrete reinforcing layer corresponding to the second steel plate.
The invention also provides a method for reinforcing a foundation reinforcing structure hoisted by heavy equipment close to an unsealed building (partially closed on the top and partially unsealed on the top), which comprises the following steps:
arranging a first steel plate on the bottom surface of the foundation pit, vertically arranging steel pipes of the steel pipe lattice column structure, and arranging adjacent steel pipe lattice column structures at intervals according to a set distance;
a row of steel sheet piles are respectively arranged on two sides (left and right sides) of the side wall of the unsealed building in the foundation pit;
the two rows of steel plate piles are connected through arranging a first connecting piece, the first connecting piece is arranged in layers, and soil is gradually backfilled between the two rows of steel plate piles in the process of arranging the first connecting piece in layers;
and when the soil body is backfilled to the top of the steel pipe, arranging a second steel plate at the top of the steel pipe, and backfilling the soil body and rolling to reach the specified compaction degree to ensure that the elevation is consistent with that of the second steel plate.
The method for reinforcing the foundation reinforcing structure hoisted by the heavy equipment close to the unsealed building can be used for setting a stable foundation reinforcing structure, so that the safety of the unsealed building is ensured, and the hoisting safety risk possibly caused by the backfill quality of the foundation pit in the station area of the hoisting equipment is avoided.
Compared with the prior art, the invention has the beneficial effects that:
1) according to the invention, through the arrangement of the integral foundation reinforcing structure, the stability of the foundation reinforcing structure can be fully improved, the hoisting safety risk possibly caused by the backfilling quality of the foundation pit in the station area of the hoisting equipment is effectively avoided, and the lateral pressure of a hoisting load on a building can be avoided by the force transmission mode of the foundation reinforcing structure, so that the safety of the unsealed building is ensured.
2) According to the invention, through the arrangement of the steel sheet pile structure and the first connecting piece, not only is the lateral retaining wall of the backfill soil body formed, but also the strength and the stability of the backfill soil body in the transverse direction are improved.
3) According to the invention, the steel tube lattice column structure is arranged to serve as a vertical force transmission structure, and the hoisting load can be transmitted to the holding rock stratum at the bottom of the foundation pit, so that the side pressure of the hoisting load on the building is avoided, and the vertical stability of the foundation structure is improved.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate exemplary embodiments of the invention and together with the description serve to explain the invention and not to limit the invention.
FIG. 1 is a schematic cross-sectional view of a current station and a foundation pit of an embodiment of the invention;
FIG. 2 is a schematic cross-sectional view of a crane foundation treatment in an embodiment of the present invention;
FIG. 3 is a schematic view of a treatment level of a crane foundation according to an embodiment of the present invention;
FIG. 4 is a schematic cross-sectional view of a retaining wall according to an embodiment of the present invention;
FIG. 5 is a schematic horizontal view of a retaining wall according to an embodiment of the present invention;
FIG. 6 is a schematic plan view of a steel pipe lattice column structure according to an embodiment of the present invention;
FIG. 7 is a schematic side view of a steel tube lattice column structure according to an embodiment of the present invention;
FIG. 8 is a top view of a crane in an embodiment of the present invention;
in the figure: 1. the concrete structure comprises a concrete reinforcing layer, 2 parts of backfill soil, 3 parts of a truck crane, 4 parts of a temporary storage platform, 5 parts of a crawler crane, 6 parts of a station main body structure, 7 parts of steel sheet piles, 8 parts of steel pipes, 9 parts of grouting sleeve valve pipes, 10 parts of steel wire ropes, 11 parts of foam bricks, 12 parts of back pressure earthwork, 13 parts of first I-shaped steel, 14 parts of concrete, 15 parts of second I-shaped steel, 16 parts of first steel plates, 17 parts of second steel plates, 18 parts of square boxes and 19 parts of truck crane supporting legs.
Detailed Description
It is to be understood that the following detailed description is exemplary and is intended to provide further explanation of the invention as claimed. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.
It is noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of exemplary embodiments according to the invention. As used herein, the singular forms "a", "an" and "the" are intended to include the plural forms as well, and it should be understood that when the terms "comprises" and/or "comprising" are used in this specification, they specify the presence of stated features, steps, operations, devices, components, and/or combinations thereof, unless the context clearly indicates otherwise.
As described in the background of the invention, the shortcomings of the prior art are overcome, and in order to solve the technical problems, the invention provides a foundation reinforcement structure for hoisting heavy equipment close to an unsealed building, which is further described below with reference to the attached drawings of the specification.
In a typical embodiment of the invention, as shown in fig. 1, the maximum pieces of a shield machine of a certain track traffic engineering are 130t of a front shield and 120t of a middle shield, which need to be hoisted, the receiving end main structure of a shield receiving station is only completed by about 30m, a closed integral structure is not formed, the depth of a foundation pit is 20m, the foundation pit of a station is excavated in a three-level slope-caving mode, wherein a second-level slope-caving platform is 1m higher than a second-level roof of the station, the height of the first-level roof of the station is 8.5m, the design soil covering thickness of the roof of the station is 4m, the periphery of the station is the foundation pit, and the hoisting construction of the.
In order to hoist shield equipment inside an unsealed station, a 350t crawler crane 5 is arranged at the top of the station, the crawler crane 5 hoists the shield equipment to a temporary storage platform 4 at the side part of the crawler crane, then hoisting is carried out by a crane such as a 500t truck crane 3 arranged at the side part of the station, the station of the truck crane needs a certain plane space, otherwise, the truck crane cannot enter and exit and hoist in a foundation pit, therefore, the embodiment provides a foundation reinforcing structure for hoisting heavy equipment close to the unsealed building, the structure comprises two rows of vertically arranged steel sheet piles 7, and the two rows of steel sheet piles 7 are respectively arranged at the left side and the right side of the end of the unsealed station in the foundation pit; the two rows of steel sheet piles 7 are connected through the first connecting piece, and the first connecting piece is layered and provided with a plurality of layers; the steel tube lattice column structures are arranged between the two rows of steel plate piles 7 and are also vertically arranged to carry out vertical force transmission; and the backfilled soil body 2 is filled between the two rows of steel sheet piles 7 in a layered mode, and the height of the backfilled soil body 2 is lower than that of the top of the steel tube lattice column structure.
In order to facilitate the arrangement of the steel sheet piles, the bottom of each row of steel sheet piles 7 is inserted into soil at the bottom of a foundation pit, sand bags are arranged at positions close to the side wall of the main structure 6 of the station and not less than 2m, so that the adverse effect on the station structure caused by the arrangement of the steel sheet piles is avoided, earth is backfilled between the steel sheet piles and the side wall of the main structure of the station, and the part of the side wall of the main structure of the station at the backfilled earth is backfilled after waterproof treatment is carried out according to the requirements of the station structure and the foam; the steel sheet pile 7 comprises a plurality of Larson plates which are buckled with each other, the sections of the Larson plates are U-shaped, the Larson plates buckled with each other are favorable for improving the bending rigidity of the steel sheet pile 7, the first connecting piece is divided into a plurality of layers and a plurality of rows to connect the Larson plates on two sides, in some embodiments, according to the surrounding environment condition of actual construction, the back pressure earthwork 12 is arranged on one side of the steel sheet pile or on the outer sides of the steel sheet piles on two sides, and the stability of the steel sheet.
The first connecting piece is a steel wire rope 10, as shown in fig. 4 and 5, two ends of the steel wire rope 10 are respectively connected with first i-beams 13 arranged on the outer sides of the steel sheet piles 7, the number of the arranged layers of the steel wire rope 10 is the same as that of the first i-beams 13, the larsen plate is provided with openings for the steel wire rope to pass through, the arrangement of the first i-beams 13 facilitates the fixation of the two ends of the steel wire rope 10, the first i-beams are transversely arranged and perpendicular to the larsen plate, the two ends of the steel wire rope 10 are fixed by rope clamps, after one end of the steel wire rope 10 is connected and fixed with the first i-beams 13 by the rope clamps, the other end of the steel wire rope is fixed by the rope clamps after passing around the.
The steel pipe lattice column structure of each department all includes an at least steel pipe 8, and the steel pipe 8 intussuseption is filled with the concrete to improve the intensity of steel pipe lattice column, in some embodiments, steel pipe lattice column structure bottom sets up first steel sheet 16, and first steel sheet 16 supports through the foundation ditch bottom surface, and steel pipe lattice column structure top sets up second steel sheet 17, and two adjacent steel pipes 8 pass through the second connecting piece in the steel pipe lattice column structure of each department and connect. The second connecting piece is a second I-shaped steel 15, a plurality of rows of second connecting pieces are arranged between every two adjacent steel pipes, and the second I-shaped steel 15 is transversely arranged and is perpendicular to the arrangement direction of the steel pipes 8.
Further, in some embodiments, as shown in fig. 2, a concrete reinforcing layer 1 is disposed on the top of the steel pipe lattice column structure and the backfill soil body, and the concrete reinforcing layer 1, the second steel plate 17 and the steel pipe lattice column structure form an organic whole, so as to further improve the strength of the foundation reinforcing structure and perform the function of transferring the hoisting load to the rock stratum at the bottom of the foundation pit.
The first steel plate 16 is a thick steel plate with the thickness of 1000 multiplied by 20mm, the second steel plate 17 is a thick steel plate with the thickness of 1000 multiplied by 20mm, a phi 200mm concrete pouring hole is reserved in the center of the second steel plate 17, the height of the steel pipe is consistent with the height of a backfill soil body, and a square box 18 is arranged at the position, corresponding to the lattice steel pipe column, of the upper part of the concrete reinforcing layer, so that the uniform transmission of hoisting load is facilitated. 3 steel pipes 8 are transversely and reliably welded by 20I-shaped steel to form a steel pipe lattice column; not less than 4 phi 50 sleeve valve grouting pipes are pre-buried between the steel pipes 8, concrete is poured into the steel pipes 8 through the pouring holes while the concrete reinforcing layer is poured, and sleeve valve pipe static pressure grouting is performed after the strength of the concrete reinforcing layer reaches more than 50% so as to further improve the compactness of soil bodies between the steel pipes.
In order to further improve the installation reliability of the second steel plate 17, the second steel plate 17 is welded to the steel pipe 8, and similarly, the first steel plate 16 is welded to the bottom end of the steel pipe 8. The steel pipe lattice column structure at each position includes three steel pipes 8, as shown in fig. 6 and 7, the three steel pipes 8 form three points of an equilateral triangle, and the three steel pipes 8 are arranged in the shape of an equilateral triangle, and the center distance is 1.5 m. The steel pipe lattice column structure comprises at least four positions, the four points of the rectangle formed by the steel pipe lattice column structure are arranged, and the four points are consistent with the center positions of the four support legs of the lifting equipment such as a truck crane, so that the stress of the truck crane support legs on the foundation can be effectively transmitted downwards, and the hoisting load generated by the lifting equipment is transmitted downwards to the bearing layer at the bottom of the foundation pit.
The foundation reinforcing structure integrally forms a reinforced foundation, the strength is stable, the foundation reinforcing structure is reliably connected through the two rows of steel sheet piles through the first connecting piece, two temporary retaining walls are arranged in the longitudinal direction of a foundation pit, the two retaining walls, the building side wall and the foundation pit side slope form a closed space, a backfill soil body is filled in the space, the stability of the backfill soil body is effectively improved, the steel tube lattice columns can be used as force transfer components, the stress of hoisting equipment such as a crane arranged at the top of the backfill soil to the backfill soil is transferred to a rock stratum at the lower part of the foundation pit through the steel tube lattice columns, and therefore the lateral pressure of the hoisting equipment to the building structure in the hoisting process is effectively avoided.
The invention also provides a method for reinforcing the foundation reinforcing structure hoisted by the heavy equipment close to the unsealed building, which comprises the following steps:
1) cleaning a 500t truck crane station area and a peripheral space, confirming the height of soil body to be backfilled, the excavated side slope and the back pressure range of the side slope, and confirming the earthwork project amount.
2) According to the rotating radius of a 500t truck crane and the space position requirement of a station determined by a shield hoisting scheme, the overall dimension of the 500t truck crane and the dimension of the plane in which the four support legs extend completely are combined to determine the center distance of the plane in which the four support legs extend completely, and the plane dimension of the station of the 500t truck crane is accurately determined by paying off according to the dimension of a square box filled with the support legs.
3) According to the determined station space range of the 500t truck crane, the boundary of the foundation to be reinforced is marked, steel sheet piles are arranged at the marking positions, sand bags are stacked in the range not less than 2m close to the main structure of the station to replace the steel sheet piles, the adverse effect of the steel sheet piles on the station structure is avoided, and the outer side of each steel sheet pile is appropriately backfilled with back pressure earthwork 12 to improve the stability of the soil body outside the steel sheet pile.
According to the actual conditions of a construction site, construction, scheme design requirements and the actual conditions around the engineering, a part of soil body is backfilled in a 'soil back pressure earthwork 12' area shown in figure 3, namely a north side area of a steel plate pile construction site, so that the stress stability of the steel plate pile is further improved.
4) At 6 sides of station major structure, accomplish the construction according to the waterproof requirement of station main part, accomplish station major structure inoxidizing coating construction at backfill height within range according to the design requirement to require the acceptance check work according to the design scheme.
5) And detecting the original ground bearing capacity condition according to the determined position of the 500t truck crane station, and determining whether reinforcement is needed or not according to the detection result. A plurality of 1000X 20mm thick steel plates are laid and reliably fixed within a determined station range according to a determined reinforcing scheme, phi 609X 16mm steel pipes are reliably welded in the center of each steel plate, the steel pipes are arranged according to three points of an equilateral triangle, and the verticality is required to meet the design requirement.
6) And (3) welding 20# I-steel among the 3 phi 609 steel pipes according to the designed interval, manufacturing the steel pipe lattice column, arranging a phi 50 sleeve valve grouting pipe outside each phi 609 steel pipe, arranging 1 phi 50 sleeve valve grouting pipe in the center of each 3 steel pipe, and reliably fixing and protecting the sleeve valve grouting pipes to ensure that the sleeve valve grouting pipes are not damaged when the soil body is backfilled.
7) After the lattice steel pipe column is manufactured, the consistency between the central position size of the steel pipe lattice columns at multiple positions and the central size of the fully-extended plane of the 500t truck crane supporting leg is checked again, and the fixing condition of the steel pipe lattice columns and the fixing and protecting condition of sleeve valve pipes are checked.
8) According to design requirements, the inner side of the steel pipe lattice column is filled with soil in a layered mode, compaction is carried out according to the design requirements, the compaction degree is detected, after the compaction degree of the backfill soil at the first layer meets the requirements, first I-shaped steel is placed on the outer side of the steel sheet pile according to the design requirements, the first I-shaped steel at two sides is connected through a phi 20 steel wire rope, the first I-shaped steel at one end is fixed with the steel wire rope through a buckle, after the steel wire rope at the other end is threaded, the steel wire rope is tensioned through a rope tensioner and then.
9) And 8) backfilling soil body, rolling and placing a steel wire rope 10 according to the designed elevation. According to the designed backfill requirement, the height of the backfill soil body 2 can be 4m, and the compaction degree is detected again after the soil body is backfilled. In the soil body rolling process, the steel tube lattice column is required to be prevented from being impacted, the sand bag displacement condition close to the station main body structure 6 is monitored, light pressure is required to be applied to the position close to the station main body structure 6 according to the station position of a 500t truck crane and the stress condition of hoisting load, and the station main body structure 6 is prevented from being influenced by external side pressure; and rolling the steel sheet piles at the two sides within the range of 1m according to the pressure required by design.
10) After soil body backfilling is finished, welding a second steel plate with the diameter of 1000 multiplied by 20mm at the top of each steel pipe 8 of the steel pipe lattice column, reserving a phi 200mm concrete pouring hole in the center of the steel plate, and enabling the height of the second steel plate to be consistent with that of a backfilled soil body; binding reinforcing steel bars above a backfill soil body in a station area of the truck crane, wherein the reinforcing steel bars on the upper portions of the steel pipe lattice columns are located on the upper portions of the second steel plates, and protecting the reserved sleeve valve pipes from being damaged during binding of the reinforcing steel bars; and (2) constructing a concrete reinforcing layer 1 after binding the outer side of the steel bar, pouring concrete into the steel pipe 8 and ensuring good vibration, wherein the concrete reinforcing layer 1 and the steel pipe lattice column form an integral force transmission structure, so that the hoisting load of the 500t truck crane is transmitted to a mudstone bearing layer at the lower part of the foundation pit through a crane supporting leg, a square box, the concrete reinforcing layer and the steel pipe lattice column.
11) And after the concrete reinforcing layer is poured, maintaining according to the technical requirement, and when the strength is not lower than 50% of the design requirement, carrying out static pressure grouting through the pre-embedded sleeve grouting valve pipe so as to improve the compactness of the soil body between the lattice columns of the lattice steel pipe, wherein the grouting pressure is not higher than 4 bar.
12) And after the concrete slab reaches the design strength, starting the hoisting construction of the shield equipment. And (3) stopping, installing a balance weight, checking a lifting appliance and a lock according to the stop position requirement when a 500t truck crane enters the field, completing acceptance check work, and carrying out lifting work of corresponding equipment through the truck crane.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (10)
1. The ground reinforced structure of heavy equipment hoist and mount of nearly closed building, its characterized in that includes:
the steel sheet piles which are vertically arranged are divided into two rows, and the two rows of steel sheet piles are respectively arranged on the left side and the right side of the unsealed building in the foundation pit;
the two rows of steel sheet piles are connected through the first connecting piece, and the first connecting piece is layered and provided with a plurality of layers;
the steel tube lattice column structures are arranged between the two rows of steel plate piles and are also vertically arranged to carry out vertical force transmission;
backfilling soil bodies which are filled between the two rows of steel sheet piles in a layered mode, wherein the height of the backfilling soil bodies is lower than that of the top of the steel tube lattice column structure;
the foundation reinforcing structure integrally forms a reliable reinforced foundation, the foundation reinforcing structure is reliably connected by a first connecting piece through the arrangement of two rows of steel sheet piles, a temporary retaining wall is formed at the position of the longitudinal foundation pit and the side wall of a building to improve the stress stability of a backfill soil body, a steel pipe lattice column is arranged as a force transmission component, the stress of a hoisting device crane arranged at the top of the backfill soil on the backfill soil is transmitted to a rock stratum at the lower part of the foundation pit through the steel pipe lattice column to avoid the lateral pressure of the hoisting device on the unsealed building structure in the hoisting process;
backfill the soil body with steel pipe lattice column structure's top sets up the concrete back up coat, and the concrete back up coat includes the reinforcing bar net, and steel pipe lattice column structure bottom sets up first steel sheet, and first steel sheet passes through the foundation ditch bottom surface and supports, and steel pipe lattice column structure top sets up the second steel sheet, and lower floor's reinforcing bar net pastes in the setting of second steel sheet and is favorable to being connected concrete back up coat and steel pipe lattice column structure as an organic whole, places the square chest that supports the truck crane landing leg on the surface of the concrete back up coat that the second steel sheet corresponds.
2. The heavy equipment hoisted foundation stabilization structure of an approaching unenclosed building according to claim 1, wherein the bottom of the steel sheet piles of each row is inserted into the soil at the bottom of a foundation pit.
3. The heavy equipment hoisted foundation stabilization structure of an adjoining unenclosed building of claim 1, wherein the steel sheet pile comprises a plurality of Larsen plates fastened to each other, and the Larsen plates are U-shaped in cross section.
4. The heavy equipment hoisted foundation stabilization structure of an approaching unenclosed building according to claim 1, wherein the first connecting member is a steel wire rope, and two ends of the steel wire rope are respectively connected with a first i-steel arranged outside the steel sheet pile.
5. The heavy equipment hoisted foundation stabilization structure of an approaching unenclosed building according to claim 1, wherein the steel tube lattice column structure at each position comprises at least one steel tube filled with concrete, a first steel plate is arranged at the bottom of the steel tube lattice column structure, a second steel plate is arranged at the top of the steel tube lattice column structure, and two adjacent steel tubes in each steel tube lattice column structure are connected through a second connecting piece.
6. The heavy equipment hoisted foundation stabilization structure of an approaching unenclosed building according to claim 5, wherein the second connecting piece is a second I-shaped steel, and a plurality of rows of second connecting pieces are arranged between two adjacent steel pipes; the second steel plate is connected with the steel pipe in a welding mode, and concrete pouring holes are reserved in the second steel plate.
7. The heavy equipment hoisted foundation stabilization structure of an adjoining unenclosed building of claim 1, wherein a concrete reinforcement layer is provided on top of the backfill soil and the steel tube lattice column structure.
8. The heavy equipment hoisted foundation stabilization structure of an adjoining unsealed building according to claim 5, wherein the steel tube lattice column structure at each place comprises three steel tubes, the three steel tubes are arranged at three points forming an equilateral triangle, and grouting pipes are arranged among the steel tubes.
9. The heavy equipment hoisted foundation stabilization structure of an approaching unenclosed building according to claim 5, wherein the steel tube lattice column structure comprises at least four positions, the four positions of the steel tube lattice column structure form four points of a rectangle to be arranged, and the central position of the four positions of the steel tube lattice column structure is consistent with the fully-extended central position of the crane supporting legs.
10. A method of strengthening a heavy equipment hoisted foundation strengthening structure of an approaching unenclosed building according to any one of claims 1 to 9, characterized by comprising:
arranging a first steel plate on the bottom surface of the foundation pit, vertically arranging steel pipes of the steel pipe lattice column structure, and arranging adjacent steel pipe lattice column structures at intervals according to a set distance;
arranging a row of steel sheet piles on two sides of the side wall of the unsealed building in the foundation pit;
the two rows of steel plate piles are connected through arranging a first connecting piece, the first connecting piece is arranged in layers, and soil is gradually backfilled between the two rows of steel plate piles in the process of arranging the first connecting piece in layers;
and when the soil body is backfilled to the top of the steel pipe, arranging a second steel plate on the top of the steel pipe, laying a reinforced concrete pouring slab on the upper part of the backfilled soil body and the top of the second steel plate, and pouring concrete into the steel pipe.
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910584848.6A CN110306524B (en) | 2019-07-01 | 2019-07-01 | Foundation reinforcing structure and method for hoisting heavy equipment close to unsealed building |
| PCT/CN2019/110664 WO2021000444A1 (en) | 2019-07-01 | 2019-10-11 | Foundation reinforcement structure and method for hoisting heavy equipment close to unclosed building |
| AU2019452705A AU2019452705B2 (en) | 2019-07-01 | 2019-10-11 | Foundation reinforcement structure and method for hoisting heavy equipment close to unclosed building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910584848.6A CN110306524B (en) | 2019-07-01 | 2019-07-01 | Foundation reinforcing structure and method for hoisting heavy equipment close to unsealed building |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110306524A CN110306524A (en) | 2019-10-08 |
| CN110306524B true CN110306524B (en) | 2020-12-18 |
Family
ID=68078663
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910584848.6A Active CN110306524B (en) | 2019-07-01 | 2019-07-01 | Foundation reinforcing structure and method for hoisting heavy equipment close to unsealed building |
Country Status (3)
| Country | Link |
|---|---|
| CN (1) | CN110306524B (en) |
| AU (1) | AU2019452705B2 (en) |
| WO (1) | WO2021000444A1 (en) |
Families Citing this family (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110306524B (en) * | 2019-07-01 | 2020-12-18 | 济南轨道交通集团有限公司 | Foundation reinforcing structure and method for hoisting heavy equipment close to unsealed building |
| CN113202107A (en) * | 2021-05-18 | 2021-08-03 | 青海送变电工程有限公司 | Intelligent device for excavating all-terrain deep foundation pit |
| CN113250206A (en) * | 2021-06-15 | 2021-08-13 | 浙江省水利水电勘测设计院 | Steel sheet pile reverse construction method underground structure |
| CN113882348B (en) * | 2021-09-01 | 2023-02-14 | 武汉市政工程设计研究院有限责任公司 | Method for pre-reinforcing soft soil body of deep soft soil deep foundation pit |
| CN113931228B (en) * | 2021-10-21 | 2023-01-10 | 中天建设集团有限公司 | Material platform construction method for basement construction |
| CN113982035B (en) * | 2021-10-25 | 2023-06-30 | 中国建筑一局(集团)有限公司 | Beam-column conversion structure in reverse construction method and construction method thereof |
| CN115217114B (en) * | 2022-06-24 | 2024-01-16 | 深圳市工勘岩土集团有限公司 | Construction method of foundation pit rescue back pressure platform |
| CN115262584A (en) * | 2022-09-07 | 2022-11-01 | 中国建筑第八工程局有限公司 | Construction method for closing subway deep foundation pit by bins in advance |
| CN115324077A (en) * | 2022-10-13 | 2022-11-11 | 山东飞鸿建设集团有限公司 | Foundation pit protection structure with lattice column supports |
| CN115749343A (en) * | 2022-10-26 | 2023-03-07 | 中铁一局集团(广州)建设工程有限公司 | Deep foundation pit peripheral building reinforcing and supporting structure and construction method |
| CN115749346A (en) * | 2022-11-04 | 2023-03-07 | 中建八局第二建设有限公司 | Garage roof load dispersion construction method |
| CN116065548B (en) * | 2022-12-07 | 2024-07-23 | 中交第三航务工程局有限公司 | Offshore prefabricated bearing platform construction method |
| CN118361112A (en) * | 2024-04-16 | 2024-07-19 | 中铁建设集团西安工程有限公司 | Construction method of lattice column hoisting and installation |
| CN120042608B (en) * | 2025-04-21 | 2025-08-26 | 中国铁路设计集团有限公司 | A construction method for a subway separated island-type underground excavation station |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN206110140U (en) * | 2016-10-26 | 2017-04-19 | 杭州市电力设计院有限公司 | A vertical solid that adds that is used for weak soil foundation ditch to put slope excavation greatly |
| CN109723062A (en) * | 2019-01-18 | 2019-05-07 | 济南轨道交通集团有限公司 | Heavy-duty equipment hoisting device and hoisting method based on construction environment close to deep foundation pit |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102009007931A1 (en) * | 2009-02-06 | 2010-08-12 | Soiltec Gmbh | Substructure for buildings |
| CN106168031B (en) * | 2016-08-26 | 2024-06-21 | 上海市政工程设计研究总院(集团)有限公司 | Multifunctional steel sheet pile cofferdam |
| CN107083774A (en) * | 2017-04-17 | 2017-08-22 | 浙江中成建工集团有限公司 | Multiple-layer horizontal connects double steel sheet piling pit supporting construction and its construction method |
| CN110306524B (en) * | 2019-07-01 | 2020-12-18 | 济南轨道交通集团有限公司 | Foundation reinforcing structure and method for hoisting heavy equipment close to unsealed building |
-
2019
- 2019-07-01 CN CN201910584848.6A patent/CN110306524B/en active Active
- 2019-10-11 AU AU2019452705A patent/AU2019452705B2/en active Active
- 2019-10-11 WO PCT/CN2019/110664 patent/WO2021000444A1/en not_active Ceased
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN206110140U (en) * | 2016-10-26 | 2017-04-19 | 杭州市电力设计院有限公司 | A vertical solid that adds that is used for weak soil foundation ditch to put slope excavation greatly |
| CN109723062A (en) * | 2019-01-18 | 2019-05-07 | 济南轨道交通集团有限公司 | Heavy-duty equipment hoisting device and hoisting method based on construction environment close to deep foundation pit |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2021000444A1 (en) | 2021-01-07 |
| AU2019452705B2 (en) | 2023-04-06 |
| CN110306524A (en) | 2019-10-08 |
| AU2019452705A1 (en) | 2021-10-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AU2019452705B2 (en) | Foundation reinforcement structure and method for hoisting heavy equipment close to unclosed building | |
| LU102302B1 (en) | Steel reinforcement cage for use in ventilation shaft diaphragm wall, and usage method | |
| CN110329925B (en) | Heavy equipment hoisting method for neighboring unsealed building | |
| CN110485429A (en) | A construction method of prestressed section steel assembled composite inner support | |
| JP6688263B2 (en) | Temporary cutoff method, temporary cutoff structure, support work, support work unit | |
| CN109024610A (en) | A kind of steel sheet pile purlin support system and the foundation ditch construction method using the support system | |
| CN105236275A (en) | Soil lifting system and soil lifting method for building deep foundation pit construction in narrow area | |
| CN205776273U (en) | Tall earth fill balance weight retaining wall and prestress anchorage cable combined support structure | |
| CN115897600A (en) | A construction method for a new foundation pit adjacent to the deep foundation pit adjacent area of an existing subway station | |
| CN116971430B (en) | Bridge pile foundation underpinning construction and deformation control method | |
| CN111997043A (en) | A segmented steel cage and a method for constructing a continuous wall under a low-headroom high-voltage line | |
| CN108797607B (en) | A construction method for supporting deep foundation pit with double-pipe diagonal bracing | |
| CN117703401A (en) | Construction method of bench beam structure for new underground excavation tunnel with small clearance span over existing tunnel | |
| CN109723062A (en) | Heavy-duty equipment hoisting device and hoisting method based on construction environment close to deep foundation pit | |
| CN111270681B (en) | Construction method and structure of supporting structure suitable for crossing foundation pit pipeline group | |
| CN212452655U (en) | A Reinforcement Structure for SMW Construction Method Pile Support System | |
| CN114032923A (en) | Multi-elevation deep foundation pit anchoring and pulling supporting structure combined with foundation and construction method thereof | |
| CN209941687U (en) | Heavy-duty equipment hoisting device based on proximity deep foundation pit construction environment | |
| CN102383440A (en) | Preset type tower crane deep foundation construction method and structure | |
| CN115929399B (en) | Construction protection device and construction protection method for electric power tunnel | |
| CN114525808B (en) | Deep foundation pit edge gantry crane ground beam construction method | |
| CN111395382A (en) | Prefabricated foundation for power transmission engineering | |
| CN212452684U (en) | Soil body protective structure between foundation ditch supporting construction bored concrete pile | |
| CN212956543U (en) | Active unloading structure of multi-support system deep foundation pit unearthing ramp | |
| CN108755669A (en) | Across tunnel steel reinforced concrete bored concrete pile, conversion beam construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |