CN110306491A CN201910712075.5A CN201910712075A CN110306491A CN 110306491 A CN110306491 A CN 110306491A CN 201910712075 A CN201910712075 A CN 201910712075A CN 110306491 A CN110306491 A CN 110306491A
Authority
CN
China
Prior art keywords
retaining wall
ecological
wall
slope
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910712075.5A
Other languages
Chinese (zh)
Inventor
王杰
曹凯飞
林勋凭
罗方贵
鲜丕成
周鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Shanghai Dredging Co Ltd.
Original Assignee
CCCC Shanghai Dredging Co Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Shanghai Dredging Co Ltd. filed Critical CCCC Shanghai Dredging Co Ltd.
Priority to CN201910712075.5A priority Critical patent/CN110306491A/en
Publication of CN110306491A publication Critical patent/CN110306491A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G20/00Cultivation of turf, lawn or the like; Apparatus or methods therefor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/14Preformed blocks or slabs for forming essentially continuous surfaces; Arrangements thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Botany (AREA)
  • Architecture (AREA)
  • Revetment (AREA)

Abstract

本发明公开了一种河道生态护岸施工工艺,分干流A河段、干流B河段、支流C河段、支流D河段、支流E河段进行施工。干流A河段施工时,第一种施工方式采用构筑埋石砼矮挡墙+生态砌块护坡的复合形式,第二种施工方式采用平铺式生态框护坡的形式。干流B河段施工时,第一种施工方式也采用构筑埋石砼矮挡墙+生态砌块护坡的复合形式,第二种施工方式采用构筑格宾石笼挡墙+生态砌块护坡的复合形式,第三种施工方式采用构筑二级挡墙的形式。支流C河段施工时,采用构筑干砌块石挡墙的形式。支流D河段施工时,采用构筑植生型阶梯式生态框挡墙+草皮护坡的复合形式。支流E河段施工时,采用构筑埋石砼矮挡墙的形式。本发明确保了生态形式多种多样。

The invention discloses a river channel ecological bank revetment construction process, which is divided into the A section of the main stream, the B section of the main stream, the C section of the tributary, the D section of the tributary, and the E section of the tributary. During the construction of section A of the main stream, the first construction method adopts the composite form of building buried stone concrete low retaining wall + ecological block slope protection, and the second construction method adopts the form of tiled ecological frame slope protection. During the construction of the B section of the main stream, the first construction method also adopts the composite form of building buried stone concrete low retaining wall + ecological block slope protection, and the second construction method adopts the composite form of building gabion gabion retaining wall + ecological block slope protection form, the third construction method adopts the form of building a secondary retaining wall. During the construction of the C section of the tributary, the form of dry block stone retaining wall shall be constructed. During the construction of the D river section of the tributary, a composite form of planting stepped ecological frame retaining wall + turf slope protection is adopted. During the construction of the E section of the tributary, a low retaining wall with buried stone concrete is adopted. The invention ensures a wide variety of ecological forms.

Description

一种河道生态护岸施工工艺A construction technology for river ecological bank protection

技术领域technical field

本发明涉及一种河道生态护岸施工工艺。The invention relates to a construction technology for river channel ecological revetment.

背景技术Background technique

近年来,在经济发展和人口增长的压力下,我国居民的用水量急剧增加,但由于雨污分流不明确、配套的污水管网搭建不完善、相应的污水处理设施建设滞后等原因,大量污水排入河中,造成水体生态环境失衡,环境问题突出。因此改善水环境质量是一项迫切并艰巨的任务。In recent years, under the pressure of economic development and population growth, the water consumption of Chinese residents has increased sharply. Discharging into the river will cause the ecological environment of the water body to be unbalanced and the environmental problems will be prominent. Therefore, improving the quality of water environment is an urgent and arduous task.

河道治理方法主要是生态护岸。但是生态护岸要考虑的因素很多,如:The main method of river course management is ecological revetment. However, there are many factors to be considered for ecological revetment, such as:

(1)在用地允许的条件下,结合河岸地形,能缓坡尽量缓坡,原则上不做直立硬质挡墙;(1) Under the conditions of the land use, combined with the terrain of the river bank, the slope can be as gentle as possible, and the vertical hard retaining wall is not built in principle;

(2)因地制宜、兼顾生态,为动植物提供的觅食、栖息、产卵、避难所;(2) Provide animals and plants with food, habitat, spawning and shelters according to local conditions and taking into account ecology;

(3)结合具体河段的水位特点,统筹环境景观、工程造价、施工条件、风浪特性等因素;(3) Combined with the water level characteristics of the specific river section, factors such as environmental landscape, project cost, construction conditions, wind and wave characteristics, etc. shall be considered as a whole;

(4)应遵循与城市、乡镇总体规划相结合的原则,结合总体规划,进行局部的路堤结合布置。(4) The principle of combining with the overall planning of cities and towns should be followed, and local embankments should be arranged in combination with the overall planning.

综上,采用与周围自然景观协调的结构形式,并在满足工程安全的前提下,确保生态形式多种多样一直是业内人士致力于要研究的问题。To sum up, adopting a structural form that is in harmony with the surrounding natural landscape and ensuring a variety of ecological forms on the premise of satisfying project safety has always been a problem that people in the industry are committed to researching.

发明内容Contents of the invention

本发明的目的在于克服现有技术的缺陷而提供一种河道生态护岸施工工艺,它采用与周围自然景观协调的结构形式,在满足工程安全的前提下,确保生态形式多种多样。The purpose of the present invention is to overcome the defects of the prior art and provide a river ecological revetment construction process, which adopts a structural form coordinated with the surrounding natural landscape, and ensures various ecological forms on the premise of satisfying engineering safety.

本发明的目的是这样实现的:一种河道生态护岸施工工艺,分干流A河段、干流B河段、支流C河段、支流D河段、支流E河段进行施工;The purpose of the present invention is achieved like this: a kind of river course ecological revetment construction technology, divides main stream A river section, main stream B river section, tributary C river section, tributary D river section, tributary E river section to carry out construction;

进行干流A河段施工时,采用两种施工方式,第一种施工方式采用构筑埋石砼矮挡墙+生态砌块护坡的复合形式,第二种施工方式采用平铺式生态框护坡的形式;When carrying out the construction of the A section of the main stream, two construction methods are adopted. The first construction method adopts the composite form of building buried stone concrete low retaining wall + ecological block slope protection, and the second construction method adopts the form of tiled ecological frame slope protection ;

进行构筑埋石砼矮挡墙时,先采用C20现浇砼修筑矮挡墙基础,再在矮挡墙基础上采用C20砼埋石修筑矮墙体;矮挡墙基础埋深0.5m,矮挡墙基础的前部设置墙趾和齿墙;矮墙体的迎水面的坡度为1:0.3,背水面的坡度为1:0.1;矮墙体的面层采用M10砂浆砌筑块石,矮墙体的顶面设置剧面条石压顶板:矮墙体与矮挡墙基础每隔15m设置一道宽度为0.2m的伸缩缝,并采用沥青浆填缝;矮墙体内每隔2m设置一根排水管,每根排水管外包一层土工布,排水管的出水口距离基础0.75m;When constructing the low retaining wall with buried stone concrete, first use C20 cast-in-place concrete to build the foundation of the low retaining wall, and then use C20 concrete buried stone to build the low wall on the foundation of the low retaining wall; The front part of the wall foundation is provided with a wall toe and a tooth wall; the slope of the facing surface of the low wall is 1:0.3, and the slope of the back surface is 1:0.1; The top surface of the body is provided with a dramatic stone-pressed roof: an expansion joint with a width of 0.2m is set every 15m between the low wall body and the low retaining wall foundation, and the joint is filled with asphalt slurry; a drainage joint is installed every 2m in the low wall body. Each drainage pipe is covered with a layer of geotextile, and the outlet of the drainage pipe is 0.75m away from the foundation;

进行生态砌块护坡时,先将河道两岸修筑成坡度为1:1.5的坡面,接着在坡面上铺设一层土工布,再铺筑生态砌块,然后在生态砌块的生态孔中填充种植土,并种植草皮,最后在护坡的顶端采用路沿石压顶;When carrying out ecological block slope protection, first build a slope with a slope of 1:1.5 on both sides of the river, then lay a layer of geotextile on the slope, then lay ecological blocks, and then fill in the ecological holes of the ecological blocks Plant soil and plant turf, and finally use roadside stones to press the top of the slope protection;

进行平铺式生态框护坡时,先将河道两岸修筑成坡度为1:2的坡面,接着在坡面上依次铺设一层土工布和一层碎石,再铺筑平铺式生态框;每块平铺式生态框内自下而上依次填充碎石和种植土,种植土中播种混合草种;护坡的护脚采用C20现浇砼,护脚埋深1m,护脚每隔15m设置一道宽度为0.2m的伸缩缝,并采用沥青浆填缝;在护坡的顶端采用路沿石压顶;When carrying out the slope protection of the tiled ecological frame, first build a slope with a slope of 1:2 on both sides of the river, then lay a layer of geotextile and a layer of gravel on the slope, and then pave the tiled ecological frame; Each tiled ecological frame is filled with gravel and planting soil from bottom to top, and mixed grass seeds are sown in the planting soil; the foot protection of the slope protection is made of C20 cast-in-place concrete, the foot protection is buried at a depth of 1m, and the foot protection is set every 15m An expansion joint with a width of 0.2m is filled with asphalt slurry; the top of the slope protection is topped with curb stones;

进行干流B河段施工时,采用三种施工方式,第一种施工方式也采用构筑埋石砼矮挡墙+生态砌块护坡的复合形式,第二种施工方式采用构筑格宾石笼挡墙+生态砌块护坡的复合形式,第三种施工方式采用构筑二级挡墙的形式;When carrying out the construction of the B section of the main stream, three construction methods are adopted. The first construction method also adopts the compound form of building buried stone concrete low retaining wall + ecological block slope protection, and the second construction method adopts the construction of gabion gabion retaining wall +The composite form of ecological block slope protection, the third construction method adopts the form of building a secondary retaining wall;

进行构筑格宾石笼挡墙时,先采用C20现浇砼修筑挡墙的基础,再在基础的顶面上构筑格宾石笼挡墙;基础埋深0.5m,基础的前部设置墙趾和齿墙;格宾石笼挡墙由下层格宾石笼和上层格宾石笼构成;所述下层格宾石笼的宽度为上层格宾石笼的宽度的1.67倍,下层格宾石笼和上层格宾石笼的孔径相同;下层格宾石笼和上层格宾石笼内填充的粒径为1.5~2倍孔径的块石,外露面侧采用粒径不小于2倍孔径的块石摆放;采用由PVC包裹的镀锌钢丝将下层格宾石笼和上层格宾石笼绑扎成整体;在格宾石笼挡墙的背面设置一层土工布;在格宾石笼挡墙的顶面覆盖一层种植土,用于种植爬藤;When constructing the gabion retaining wall, first use C20 cast-in-place concrete to build the foundation of the retaining wall, and then build the gabion retaining wall on the top surface of the foundation; And the tooth wall; the gabion gabion retaining wall is composed of the lower gabion gabion and the upper gabion gabion; the width of the lower gabion is 1.67 times the width of the upper gabion, and the lower gabion The pore size of the upper gabion is the same as that of the upper gabion; the lower gabion and the upper gabion are filled with block stones with a particle size of 1.5 to 2 times the pore size, and the exposed side uses block stones with a particle size not less than 2 times the pore size. Placement; use galvanized steel wire wrapped by PVC to bind the lower gabion gabion and the upper gabion gabion into a whole; set a layer of geotextile on the back of the gabion gabion retaining wall; The top surface is covered with a layer of planting soil for planting climbing vines;

进行构筑二级挡墙时,先采用C20现浇砼修筑第一级挡墙基础,再在第一级挡墙基础上采用C20砼埋石修筑第一级挡墙体;第一级挡墙基础埋深0.5m,第一级挡墙基础的前部设置墙趾和齿墙;第一级挡墙体的迎水面的坡度为1:0.3,背水面的坡度为1:0.1;第一级挡墙体的面层采用M10砂浆砌筑块石,第一级挡墙体的顶面设置C20砼压顶板,第一级挡墙体与第一级挡墙基础每隔15m设置一道宽度为0.2m的伸缩缝,并采用沥青浆填缝;第一级挡墙体内每隔2m设置一根排水管,每个排水管外包一层土工布,排水管的出水口距离基础0.75m;When constructing the second-level retaining wall, first use C20 cast-in-place concrete to build the first-level retaining wall foundation, and then use C20 concrete buried stones to build the first-level retaining wall body on the first-level retaining wall foundation; the first-level retaining wall foundation The burial depth is 0.5m, and the front part of the first-level retaining wall foundation is provided with wall toes and tooth walls; the slope of the first-level retaining wall is 1:0.3 on the water-facing surface, and the slope on the back-water surface is 1:0.1; the first-level retaining wall The surface layer of the wall is built with M10 mortar masonry stones, the top surface of the first-level retaining wall is provided with a C20 concrete roof plate, and the first-level retaining wall and the first-level retaining wall foundation are provided with a width of 0.2m every 15m The expansion joints are filled with asphalt slurry; a drainage pipe is installed every 2m in the first-level retaining wall, and each drainage pipe is covered with a layer of geotextile, and the outlet of the drainage pipe is 0.75m away from the foundation;

第二级挡墙设在第一级挡墙的压顶板的前端背后2m处;先采用C20现浇砼修筑第二级挡墙基础,再在第二级挡墙基础上采用干砌块石修筑第二级挡墙体;第二级挡墙基础埋深0.5m,第二级挡墙基础的前部设置墙趾;第二级挡墙体采用干砌块石,第二级挡墙体的迎水面的坡度为1:0.3,背水面的坡度为1:0.1;第二级挡墙体的顶面设置C20砼压顶板:第二级挡墙体与第二级挡墙基础每隔15m设置一道宽度为0.2m的伸缩缝,并采用沥青浆填缝;第二级挡墙体的背面还布置一层土工布;第二级挡墙体的压顶板的顶面上还设置仿木护栏;The second-level retaining wall is located 2m behind the front end of the top plate of the first-level retaining wall; the foundation of the second-level retaining wall is first built with C20 cast-in-place concrete, and then the foundation of the second-level retaining wall is built with dry block stones The second-level retaining wall body; the second-level retaining wall foundation is buried at a depth of 0.5m, and the front part of the second-level retaining wall foundation is provided with a wall toe; the second-level retaining wall body is made of dry block stone, and the second-level retaining wall body The slope of the facing surface is 1:0.3, and the slope of the back surface is 1:0.1; the top surface of the second-level retaining wall is provided with a C20 concrete roof plate: the second-level retaining wall and the foundation of the second-level retaining wall are installed every 15m An expansion joint with a width of 0.2m is filled with asphalt slurry; a layer of geotextile is arranged on the back of the second-level retaining wall; imitation wood guardrails are also set on the top surface of the top plate of the second-level retaining wall;

进行支流C河段施工时,采用构筑干砌块石挡墙的形式,先采用C20现浇砼修筑墙身基础,再在墙身基础上采用干砌块石修筑墙身;墙身基础埋深0.5m,墙身基础的前部设置墙趾和齿墙;墙身的迎水坡的坡度为1:0.3,背水坡的坡度为1:0.1;墙身的顶面设置C20砼压顶板:墙身与墙身基础每隔15m设置一道宽度为0.2m的伸缩缝,并采用沥青浆填缝;墙身的背面还布置一层土工布;墙身的压顶板的顶面上还设置仿木护栏;When carrying out the construction of the C section of the tributary, adopt the form of constructing the dry block stone retaining wall, first use C20 cast-in-place concrete to build the wall foundation, and then use the dry block stone to build the wall body on the wall foundation; the buried depth of the wall body foundation 0.5m, set the wall toe and tooth wall at the front of the wall foundation; the slope of the facing water slope of the wall is 1:0.3, and the slope of the backwater slope is 1:0.1; the top surface of the wall is set with C20 concrete pressure roof: wall Set an expansion joint with a width of 0.2m every 15m between the body and the wall foundation, and fill the joint with asphalt slurry; a layer of geotextile is arranged on the back of the wall; and imitation wood guardrails are also set on the top surface of the top plate of the wall ;

进行支流D河段施工时,采用构筑植生型阶梯式生态框挡墙+草皮护坡的复合形式;When carrying out the construction of the D river section of the tributary, the composite form of building a plant-type stepped ecological frame retaining wall + turf slope protection is adopted;

进行构筑植生型阶梯式生态框挡墙时,先采用C20现浇砼修筑挡墙基础,再在挡墙基础上采用阶梯式生态框构筑挡墙体;挡墙基础埋深0.75m,挡墙基础的前部设置墙趾和齿墙;挡墙体的迎水面的坡度为1:0.3,背水面的坡度为1:0.3;每个阶梯式生态框内自下而上依次填充块石和种植土,种植土中种植挺水植物;挡墙体的背后依次铺设一层碎石和一层土工布;When constructing the planting-type stepped ecological frame retaining wall, first use C20 cast-in-place concrete to build the retaining wall foundation, and then use the stepped ecological frame to construct the retaining wall body on the retaining wall foundation; the retaining wall foundation is buried at a depth of 0.75m, and the retaining wall foundation The front part of the wall is provided with a wall toe and a tooth wall; the slope of the retaining wall facing the water is 1:0.3, and the slope of the back surface is 1:0.3; each stepped ecological frame is filled with stones and planting soil in sequence from bottom to top, Emergent plants are planted in the planting soil; a layer of gravel and a layer of geotextile are laid in sequence behind the retaining wall;

进行草皮护坡时,先将河道两岸修筑成坡度为1:2的坡面,再在坡面上铺设种植土,并种植草皮;When carrying out turf slope protection, first build a slope with a slope of 1:2 on both sides of the river, and then lay planting soil on the slope and plant turf;

进行支流E河段施工时,采用构筑埋石砼矮挡墙的形式。When carrying out the construction of the E section of the tributary, a low retaining wall of buried stone concrete is adopted.

上述的河道生态护岸施工工艺,其中,进行所述生态砌块护坡时,所述生态砌块为预制钢筋砼结构且强度等级不低于C25;生态砌块铺筑时采用逐层干砌,最下层生态砌块的一半与压顶板浇筑在一起,最上层生态砌块的一半与路沿石浇筑在一起;相邻生态砌块连接时,一块生态砌块的凸条卡入相邻生态砌块的凹槽中。The above-mentioned river channel ecological revetment construction technology, wherein, when performing the ecological block slope protection, the ecological block is a prefabricated reinforced concrete structure and the strength level is not lower than C25; Half of the lower ecological blocks are poured together with the pressure roof, and half of the uppermost ecological blocks are poured together with the curbstone; when adjacent ecological blocks are connected, the convex strip of one ecological block is stuck into the adjacent ecological block in the groove.

上述的河道生态护岸施工工艺,其中,进行干流A河道施工时,所述平铺式生态框为预制钢筋砼结构且强度等级不低于C30,各块平铺式生态框之间通过设在角部的螺杆连接。The above-mentioned river channel ecological revetment construction technology, wherein, when carrying out the construction of the main stream A river channel, the tiled ecological frame is a prefabricated reinforced concrete structure and the strength level is not lower than C30, and the tiled ecological frames are set at corners part of the screw connection.

上述的河道生态护岸施工工艺,其中,进行支流D河道施工时,所述阶梯式生态框为预制钢筋砼结构且强度等级不低于C30;每个阶梯式生态框内填充的块石为150~200mm粒径的河卵石,每块阶梯式生态框的两侧面均开设螺栓连接孔,使相邻的阶梯式生态框通过螺杆连接。The above-mentioned river channel ecological revetment construction technology, wherein, when carrying out tributary D river channel construction, the said stepped ecological frame is a prefabricated reinforced concrete structure and the strength level is not lower than C30; the block stones filled in each stepped ecological frame are 150~ For river pebbles with a particle size of 200mm, bolt connection holes are provided on both sides of each stepped ecological frame, so that adjacent stepped ecological frames are connected by screws.

本发明的河道生态护岸施工工艺具有以下特点:针对不同的河水流速、坡岸的基质以及景观的要求采用不同类型的护岸方式,进行了分段治理,不仅降低了成本及减少对环境的影响,充分利用场地原有河网水系、山洪沟道、坑塘、湿地等融汇贯通,完善区域防洪排涝系统,丰富生物多样性,发挥湿地涵养净化功能,塑造良好生境空间,构建城市雨洪廊道,发挥河流调蓄雨洪的作用,体现与洪为友的生态智慧。同时为居民生活提供舒适环境,改善周边村落形象,促进河道两岸生态环境的可持续发展。The river channel ecological revetment construction process of the present invention has the following characteristics: different types of revetment methods are adopted for different river flow rates, slope bank substrates and landscape requirements, and segmental treatment is carried out, which not only reduces the cost and reduces the impact on the environment, Make full use of the site's original river network system, mountain torrent channel, pit pond, wetland, etc. to integrate and connect, improve the regional flood control and drainage system, enrich biodiversity, play the function of wetland conservation and purification, create a good habitat space, and build an urban rainwater corridor , give full play to the role of rivers in regulating and storing rain and floods, and embody the ecological wisdom of being friends with floods. At the same time, it provides a comfortable environment for residents, improves the image of surrounding villages, and promotes the sustainable development of the ecological environment on both sides of the river.

附图说明Description of drawings

图1是本发明的河道生态护岸施工工艺中进行干流A河段施工时采用构筑埋石砼矮挡墙+生态砌块护坡的复合形式的断面图;Fig. 1 is the sectional view of the composite form of building buried stone concrete low retaining wall+ecological block slope protection when carrying out the construction of main stream A river section in the river channel ecological bank protection construction technology of the present invention;

图2是生态砌块的铺设示意图;Fig. 2 is the laying schematic diagram of ecological block;

图3是本发明的河道生态护岸施工工艺中进行干流A河段施工时采用平铺式生态框护坡的形式的断面图;Fig. 3 is the sectional view of the form of adopting the form of tiling ecological frame slope protection when carrying out the construction of main stream A river section in the river channel ecological bank protection construction technology of the present invention;

图4是平铺式生态框的拼接示意图;Fig. 4 is a splicing schematic diagram of a tiled ecological frame;

图5是本发明的河道生态护岸施工工艺中进行干流B河段施工时采用构筑构筑格宾石笼挡墙+生态砌块护坡的复合形式的断面图;Fig. 5 is the sectional view of the composite form of building gabion gabion retaining wall+ecological block slope protection when carrying out the construction of main stream B river section in the river channel ecological revetment construction technology of the present invention;

图6是本发明的河道生态护岸施工工艺中进行干流B河段施工时采用构筑二级挡墙的形式的断面图;Fig. 6 is the sectional view that adopts the form of building secondary retaining wall when carrying out the construction of main stream B river section in the river course ecological revetment construction technology of the present invention;

图7是本发明的河道生态护岸施工工艺中进行支流C河段施工时采用构筑干砌块石挡墙的形式的断面图;Fig. 7 is the sectional view of the form of building a dry block stone retaining wall when carrying out tributary C river section construction in the river channel ecological revetment construction technology of the present invention;

图8是本发明的河道生态护岸施工工艺中进行支流D河段施工时采用构筑植生型阶梯式生态框挡墙+草皮护坡的复合形式的断面图;Fig. 8 is the sectional view of the composite form of constructing the vegetation type stepped ecological frame retaining wall+turf slope protection when carrying out tributary D river section construction in the river channel ecological revetment construction technology of the present invention;

图9是阶梯式生态框的结构示意图;Fig. 9 is a structural schematic diagram of a stepped ecological frame;

图10是本发明的河道生态护岸施工工艺中进行支流E河段施工时采用构筑埋石砼矮挡墙的形式的断面图。Fig. 10 is a cross-sectional view of building a low retaining wall with buried stone concrete when carrying out the construction of the tributary E river section in the river channel ecological bank revetment construction technology of the present invention.

具体实施方式Detailed ways

下面将结合附图对本发明作进一步说明。The present invention will be further described below in conjunction with accompanying drawing.

本发明的河道生态护岸施工工艺涉及的河道包括上游的A河段和下游的干流B河段,干流A河段上自上而下具有支流C河段、支流D河段和支流E河段。The river channel involved in the river channel ecological revetment construction process of the present invention includes an upstream river section A and a downstream main stream B river section, and the main stream A river section has a tributary C river section, a tributary D river section and a tributary E river section from top to bottom.

本发明的河道生态护岸施工工艺分干流A河段、干流B河段、支流C河段、支流D河段、支流E河段进行施工。The river channel ecological revetment construction technology of the present invention is divided into main stream A section, main stream B section, tributary C section, tributary D section, and tributary E section for construction.

进行干流A河段施工时,采用两种施工方式,第一种施工方式采用构筑埋石砼矮挡墙+生态砌块护坡的复合形式,第二种施工方式采用平铺式生态框护坡的形式;When carrying out the construction of the A section of the main stream, two construction methods are adopted. The first construction method adopts the composite form of building buried stone concrete low retaining wall + ecological block slope protection, and the second construction method adopts the form of tiled ecological frame slope protection ;

进行构筑埋石砼矮挡墙时,先采用C20现浇砼修筑矮挡墙基础10,再在矮挡墙基础10上采用C20砼埋石修筑矮墙体11;矮挡墙基础10埋深0.5m,矮挡墙基础10的前部设置宽度为0.5m的墙趾和宽度为0.5m的齿墙;矮墙体11的顶宽为0.7m,迎水面的坡度为1:0.3,背水面的坡度为1:0.1;矮墙体11的面层采用厚度为0.25m的M10砂浆砌筑块石,矮墙体11的顶面设置厚度为0.2m的剧面条石压顶板12:矮墙体11与矮挡墙基础10每隔15m设置一道宽度为0.2m的伸缩缝,并采用沥青浆填缝;矮墙体11内每隔2m设置一根排水管13,每根排水管13外包一层土工布,排水管13的出水口距离矮挡墙基础10为0.75m。When constructing the low retaining wall with buried stone concrete, first use C20 cast-in-place concrete to build the low retaining wall foundation 10, and then use C20 concrete buried stones to build the low retaining wall body 11 on the low retaining wall foundation 10; the low retaining wall foundation 10 is buried at a depth of 0.5 m, the front part of the low retaining wall foundation 10 is provided with a wall toe with a width of 0.5m and a tooth wall with a width of 0.5m; The slope is 1:0.1; the surface layer of the low wall 11 is made of M10 mortar with a thickness of 0.25m to build block stones, and the top surface of the low wall 11 is set with a 0.2m-thick dramatic stone top plate 12: the low wall 11 Set an expansion joint with a width of 0.2m every 15m with the low retaining wall foundation 10, and use asphalt slurry to fill the joint; set a drainage pipe 13 every 2m in the low wall body 11, and each drainage pipe 13 is covered with a layer of geotechnical Cloth, the water outlet of the drain pipe 13 is 0.75m away from the low retaining wall foundation 10.

进行生态砌块护坡时,先用回填土将河道两岸修筑成坡度为1:1.5的坡面,接着在坡面上铺设一层400g/m2土工布14作为反滤层,土工布14的搭接长度不小于300mm,再铺筑生态砌块16,然后在生态砌块16的生态孔160中填充种植土15,并种植草皮,最后在护坡的顶端采用路沿石压顶17,路沿石17的厚度×宽度=0.2m×0.35m(见图1);生态砌块16为预制钢筋砼结构且强度等级不低于C25;生态砌块16铺筑时采用逐层干砌,最下层生态砌块的一半与压顶板浇筑在一起,最上层生态砌块的一半与路沿石浇筑在一起;相邻生态砌块连接时,一块生态砌块16的凸条161卡入相邻生态砌块的凹槽162中(见图2)。When carrying out ecological block slope protection, first use backfill soil to build a slope with a slope of 1:1.5 on both sides of the river, and then lay a layer of 400g/ m2 geotextile 14 on the slope as a reverse filter layer. The connection length is not less than 300mm, and then pave the ecological block 16, then fill the planting soil 15 in the ecological hole 160 of the ecological block 16, and plant turf, and finally use the curb stone to press the top 17 on the top of the slope protection, and the curb stone 17 Thickness × width = 0.2m × 0.35m (see Figure 1); the ecological block 16 is a prefabricated reinforced concrete structure and the strength grade is not lower than C25; Half of the block is poured together with the top plate, and half of the uppermost ecological block is poured together with the curbstone; when adjacent ecological blocks are connected, the convex strip 161 of an ecological block 16 is stuck into the adjacent ecological block. In the groove 162 (see Figure 2).

进行平铺式生态框护坡时,先将河道两岸修筑成坡度为1:2的坡面,接着在坡面上依次铺设一层400g/m2的土工布21和一层厚度为200mm的碎石22作为反滤层,土工布21的搭接长度不小于300mm,再铺筑平铺式生态框23(见图3);平铺式生态框23的厚度为0.3m,每块平铺式生态框23内自下而上依次填充厚度为100mm的碎石和厚度为200mm的种植土,种植土中播种混合草种;护坡的护脚20采用C20现浇砼,护脚20埋深1m,护脚20每隔15m设置一道宽度为0.2m的伸缩缝,并采用沥青浆填缝;在护坡的顶端采用路沿石24压顶,路沿石24的厚度×宽度=0.2m×0.35m。平铺式生态框23为钢筋砼结构,强度等级不低于C30,各块平铺式生态框23之间通过设在角部的螺杆230连接(见图4)。When carrying out flat ecological frame slope protection, first build a slope with a slope of 1:2 on both sides of the river, and then lay a layer of 400g/ m2 geotextile 21 and a layer of gravel with a thickness of 200mm on the slope. 22 as an anti-filter layer, the lap length of the geotextile 21 is not less than 300mm, and then the tiled ecological frame 23 (seeing figure 3) is paved; the thickness of the tiled ecological frame 23 is 0.3m, and each tiled ecological frame Frame 23 is filled with crushed stones with a thickness of 100mm and planting soil with a thickness of 200mm from bottom to top in order, and mixed grass seeds are sown in the planting soil; the foot protection 20 of the slope protection adopts C20 cast-in-situ concrete, and the foot protection 20 is buried at a depth of 1m. Set an expansion joint with a width of 0.2m every 15m at the foot 20, and use asphalt slurry to fill the joint; use curb stone 24 to press the top of the slope protection, and the thickness of the curb stone 24 × width = 0.2m × 0.35m. The tiled ecological frame 23 is a reinforced concrete structure with a strength grade not lower than C30, and each tiled ecological frame 23 is connected by a screw 230 at a corner (see FIG. 4 ).

进行干流B河段施工时,采用三种施工方式,第一种施工方式也采用构筑埋石砼矮挡墙+生态砌块护坡的复合形式,第二种施工方式采用构筑格宾石笼挡墙+生态砌块护坡的复合形式,第三种施工方式采用构筑二级挡墙的形式;When carrying out the construction of the B section of the main stream, three construction methods are adopted. The first construction method also adopts the compound form of building buried stone concrete low retaining wall + ecological block slope protection, and the second construction method adopts the construction of gabion gabion retaining wall +The composite form of ecological block slope protection, the third construction method adopts the form of building a secondary retaining wall;

进行构筑格宾石笼挡墙时,先采用C20现浇砼修筑挡墙的基础30,再在基础30的顶面上构筑格宾石笼挡墙31;基础30埋深0.5m,基础30的前部设置宽度为0.5m的墙趾和宽度为0.5m的齿墙;格宾石笼挡墙31放置在基础30的顶面上;格宾石笼挡墙31由放置在基础30的顶面上的下层格宾石笼311和放置在下层格宾石笼311的顶面后部的上层格宾石笼312构成;下层格宾石笼311的的长×宽×高=4m×1.25m×0.75m;上层格宾石笼312的长×宽×高=4m×0.75m×0.75m,下层格宾石笼311和上层格宾石笼312的孔径均为10cm×12cm;使水生动物可以穿入石笼内;下层格宾石笼311和上层格宾石笼312内填充的粒径为1.5~2倍孔径的块石,外露面侧采用粒径不小于2倍孔径的块石摆放;采用由PVC包裹的镀锌钢丝将下层格宾石笼311和上层格宾石笼312绑扎成整体;在格宾石笼挡墙31的背面设置一层400g/m2土工布32作为反滤,土工布32的搭接长度不小于300mm;在格宾石笼挡墙31的顶面覆盖一层10cm厚的种植土33,用于种植爬藤。When building the gabion retaining wall, first use C20 cast-in-place concrete to build the foundation 30 of the retaining wall, and then build the gabion retaining wall 31 on the top surface of the foundation 30; A wall toe with a width of 0.5m and a tooth wall with a width of 0.5m are set at the front; the gabion retaining wall 31 is placed on the top surface of the foundation 30; the gabion retaining wall 31 is placed on the top surface of the foundation 30 The upper lower gabion gabion 311 and the upper gabion gabion 312 placed on the top rear portion of the lower gabion gabion 311 constitute; the length × width × height of the lower gabion gabion 311=4m × 1.25m × 0.75m; the length × width × height of the upper gabion gabion 312=4m × 0.75m × 0.75m, the aperture of the lower gabion gabion 311 and the upper gabion gabion 312 is 10cm × 12cm; the aquatic animals can wear into the gabion; the lower gabion gabion 311 and the upper gabion gabion 312 are filled with block stones with a particle size of 1.5 to 2 times the aperture, and placed on the exposed side with a particle size not less than 2 times the aperture; The lower gabion gabion 311 and the upper gabion gabion 312 are bound together by galvanized steel wire wrapped in PVC; a layer of 400g/ m2 geotextile 32 is set on the back of the gabion gabion retaining wall 31 as a reverse filter, The overlapping length of the geotextile 32 is not less than 300 mm; the top surface of the gabion gabion retaining wall 31 is covered with a layer of 10 cm thick planting soil 33 for planting climbing vines.

格宾石笼挡墙抗冲刷能力强,空隙率较高,具有良好的渗透性和较好的生态性。Gabion gabion retaining wall has strong erosion resistance, high porosity, good permeability and good ecology.

进行生态砌块护坡时,先将河道两岸修筑成坡度为1:1.5的坡面,接着在坡面上铺设一层400g/m2土工布34,作为反滤层,土工布34的搭接长度不小于300mm,再铺筑生态砌块36;生态砌块36的孔洞中填充种植土,并种植草皮;在护坡的顶端采用路沿石37压顶,路沿石37的厚度×宽度=0.2m×0.35m(见图5)。When performing ecological block slope protection, first build a slope with a slope of 1:1.5 on both sides of the river, and then lay a layer of 400g/ m2 geotextile 34 on the slope as a filter layer. The lap length of geotextile 34 No less than 300mm, then pave the ecological block 36; fill the holes of the ecological block 36 with planting soil, and plant turf; use curb stone 37 to press the top of the slope protection, and the thickness of the curb stone 37 × width = 0.2m × 0.35m (see Figure 5).

进行构筑二级挡墙时,先采用C20现浇砼修筑第一级挡墙基础40a,再在第一级挡墙基础40a上采用C20砼埋石修筑第一级挡墙体41a;第一级挡墙基础40a埋深0.5m,第一级挡墙基础40a的前部设置宽度为0.5m的墙趾和宽度为0.5m的齿墙;第一级挡墙体41a的高度为1.5m,顶宽为0.7m,迎水面的坡度为1:0.3,背水面的坡度为1:0.1;第一级挡墙体41a的面层采用厚度为0.25m的M10砂浆砌筑块石,第一级挡墙体41a的顶面设置厚度为0.2m的C20砼压顶板42a:第一级挡墙体41a与第一级挡墙基础40a每隔15m设置一道宽度为0.2m的伸缩缝,并采用沥青浆填缝;第一级挡墙体41a内每隔2m设置一根排水管43,每根排水管43外包一层土工布,排水管43的出水口距离第一级挡墙基础40a为0.75m。When constructing the secondary retaining wall, first use C20 cast-in-place concrete to build the first-level retaining wall foundation 40a, and then use C20 concrete to bury stones on the first-level retaining wall foundation 40a to build the first-level retaining wall body 41a; the first-level The retaining wall foundation 40a has a buried depth of 0.5m, and the front part of the first-stage retaining wall foundation 40a is provided with a wall toe with a width of 0.5m and a tooth wall with a width of 0.5m; the height of the first-stage retaining wall body 41a is 1.5m, and the top The width is 0.7m, the slope of the upstream surface is 1:0.3, and the slope of the back surface is 1:0.1; the surface layer of the first-stage retaining wall 41a is made of M10 mortar with a thickness of 0.25m. The top surface of the wall 41a is provided with a C20 concrete roof plate 42a with a thickness of 0.2m: the first-stage retaining wall body 41a and the first-stage retaining wall foundation 40a are provided with an expansion joint with a width of 0.2m every 15m, and asphalt slurry is used Filling: a drainage pipe 43 is set every 2m in the first-level retaining wall body 41a, each drainage pipe 43 is covered with a layer of geotextile, and the water outlet of the drainage pipe 43 is 0.75m away from the first-level retaining wall foundation 40a.

第二级挡墙设在第一级挡墙的压顶板的前端背后2m处,先采用C20现浇砼修筑第二级挡墙基础40b,再在第二级挡墙基础40b上采用干砌块石修筑第二级挡墙体41b;第二级挡墙基础40b埋深0.5m,第二级挡墙基础40b的前部设置宽度为0.3m的墙趾;第二级挡墙体41b的顶宽为0.7m,迎水面的坡度为1:0.3,背水面的坡度为1:0.1;第二级挡墙体41b的顶面设置厚度为0.2m的C20砼压顶板42b:第二级挡墙体41b与第二级挡墙基础40b每隔15m设置一道宽度为0.2m的伸缩缝,并采用沥青浆填缝;第二级挡墙体41b的背面还布置一层土工布44;第二级挡墙体41b的压顶板42b的顶面上还设置仿木护栏45(见图6)。The second-level retaining wall is set 2m behind the front end of the top plate of the first-level retaining wall, and the foundation 40b of the second-level retaining wall is first built with C20 cast-in-place concrete, and then dry blocks are used on the foundation 40b of the second-level retaining wall Build the second-level retaining wall body 41b with stone; the second-level retaining wall foundation 40b is buried at a depth of 0.5m, and the front part of the second-level retaining wall foundation 40b is provided with a wall toe with a width of 0.3m; The width is 0.7m, the slope of the upstream surface is 1:0.3, and the slope of the back surface is 1:0.1; the top surface of the second-level retaining wall body 41b is provided with a C20 concrete roof plate 42b with a thickness of 0.2m: the second-level retaining wall The body 41b and the second-level retaining wall foundation 40b are provided with an expansion joint with a width of 0.2m every 15m, and the joints are filled with asphalt slurry; a layer of geotextile 44 is arranged on the back of the second-level retaining wall body 41b; the second-level An imitation wood guardrail 45 (see FIG. 6 ) is also arranged on the top surface of the top plate 42b of the retaining wall body 41b.

进行支流C河段施工时,采用构筑干砌块石挡墙的形式,先采用C20现浇砼修筑墙身基础50,再在墙身基础50上采用干砌块石修筑墙身51;墙身基础50埋深0.5m,墙身基础50的前部设置宽度为0.5m的墙趾和宽度为0.5m的齿墙;墙身51的顶宽为0.7m,迎水面的坡度为1:0.3,背水面的坡度为1:0.1;墙身51的顶面设置厚度为0.2m的C20砼压顶板:墙身51与墙身基础50每隔15m设置一道宽度为0.2m的伸缩缝,并采用沥青浆填缝;墙身51的背面还布置一层土工布53;墙身51的压顶板52的顶面上还设置仿木护栏54(见图7)。When carrying out the construction of the river section C of the tributary, adopt the form of constructing the dry block stone retaining wall, first adopt C20 cast-in-place concrete to build the body of wall foundation 50, then adopt dry block stone to build the body of wall 51 on the body of wall foundation 50; The foundation 50 is buried at a depth of 0.5m, and the front part of the wall foundation 50 is provided with a wall toe with a width of 0.5m and a tooth wall with a width of 0.5m; the top width of the wall 51 is 0.7m, and the slope of the facing surface is 1:0.3. The slope of the backside is 1:0.1; the top surface of the wall 51 is provided with a C20 concrete roof plate with a thickness of 0.2m: the wall 51 and the wall foundation 50 are provided with an expansion joint with a width of 0.2m every 15m, and asphalt Grout caulking; the back side of body of wall 51 also arranges one deck geotextile 53; The imitation wood guardrail 54 (seeing Fig. 7) is also set on the top surface of the top plate 52 of body of wall 51.

进行支流D河段施工时,采用构筑植生型阶梯式生态框挡墙+草皮护坡的复合形式;When carrying out the construction of the D river section of the tributary, the composite form of building a plant-type stepped ecological frame retaining wall + turf slope protection is adopted;

进行构筑植生型阶梯式生态框挡墙时,先采用C20现浇砼修筑挡墙基础60,再在挡墙基础60上采用采用阶梯式生态框构62筑挡墙体61;挡墙基础60埋深0.75m,挡墙基础60的前部设置宽度为0.5m的墙趾和宽度为0.5m的齿墙;挡墙体61的高度不超过2m,挡墙体61的迎水面的坡度为1:0.3,背水面的坡度为1:0.3;阶梯式生态框62内自下而上依次填充0.3m厚的块石和0.2m厚的种植土65,种植土中种植挺水植物;挡墙体61的背后依次铺设一层厚度为300mm的碎石64和一层400g/m2土工布63作为反滤层,土工布63的搭接长度不小于300mm(见图8)。阶梯式生态框62为预制钢筋砼结构且强度等级不低于C30,每个阶梯式生态框62内填充的块石为150~200mm粒径的河卵石,每块阶梯式生态框62的两侧面均开设螺栓连接孔620(见图9),使相邻的阶梯式生态框62通过螺杆连接。When constructing the planting-type stepped ecological frame retaining wall, first use C20 cast-in-place concrete to build the retaining wall foundation 60, and then adopt the stepped ecological frame structure 62 to build the retaining wall body 61 on the retaining wall foundation 60; the retaining wall foundation 60 is buried 0.75m deep, the front portion of the retaining wall foundation 60 is provided with a wall toe with a width of 0.5m and a tooth wall with a width of 0.5m; 0.3, the slope of the backside is 1:0.3; the stepped ecological frame 62 is filled with 0.3m thick rocks and 0.2m thick planting soil 65 from bottom to top, and emergent plants are planted in the planting soil; the retaining wall 61 A layer of gravel 64 with a thickness of 300mm and a layer of 400g/m 2 geotextile 63 are successively laid on the back as the reverse filter layer, and the lap length of the geotextile 63 is not less than 300mm (see Figure 8). The stepped ecological frame 62 is a prefabricated reinforced concrete structure and its strength level is not lower than C30. The stones filled in each stepped ecological frame 62 are river pebbles with a particle size of 150-200mm. The two sides of each stepped ecological frame 62 Bolt connection holes 620 (see FIG. 9 ) are all provided, so that adjacent stepped ecological frames 62 are connected by screws.

植生型阶梯式生态框挡墙具有结构整体性好、良好的渗透性,抗冲能力强,植物可在生态框内生长,绿化率可达25%以上,生态景观效果较好,而且具有施工方便,快捷等特点。The vegetation-type stepped ecological frame retaining wall has good structural integrity, good permeability, and strong impact resistance. Plants can grow in the ecological frame, and the greening rate can reach more than 25%. The ecological landscape effect is good, and it is convenient for construction. , fast and other characteristics.

进行草皮护坡时,先将河道两岸修筑成坡度为1:2的坡面,再在坡面上铺设种植土,并种植草皮66。When carrying out turf slope protection, first build a slope with a slope of 1:2 on both sides of the river, then lay planting soil on the slope, and plant turf66.

进行支流E河段施工时,采用构筑埋石砼矮挡墙的形式;先采用C20现浇砼修筑矮挡墙基础70,再在矮挡墙基础上采用C20砼埋石修筑矮墙体71;矮挡墙基础70埋深0.5m,矮挡墙基础70的前部设置宽度为0.5m的墙趾和宽度为0.5m的齿墙;矮墙体71的顶宽为0.7m,迎水面的坡度为1:0.3,背水面的坡度为1:0.1;矮墙体71的面层采用厚度为0.25m的M10砂浆砌筑块石,矮墙体71的顶面设置厚度为0.2m的C20砼压顶板72:矮墙体71与矮挡墙基础70每隔15m设置一道宽度为0.2m的伸缩缝,并采用沥青浆填缝;矮墙体71内每隔2m设置一根排水管73,每根排水管73外包一层土工布,排水管73的出水口距离矮挡墙基础70为0.75m(见图10)。When carrying out the construction of the E section of the tributary, adopt the form of building a low retaining wall with buried stone concrete; first use C20 cast-in-place concrete to build the low retaining wall foundation 70, and then use C20 concrete buried stone to build the low wall body 71 on the low retaining wall foundation; The low retaining wall foundation 70 has a buried depth of 0.5m, and the front part of the low retaining wall foundation 70 is provided with a wall toe with a width of 0.5m and a tooth wall with a width of 0.5m; The slope of the back surface is 1:0.1; the surface layer of the low wall 71 is made of M10 mortar with a thickness of 0.25m to build block stones, and the top surface of the low wall 71 is set with C20 concrete with a thickness of 0.2m. Board 72: set an expansion joint with a width of 0.2m every 15m between the low wall body 71 and the low retaining wall foundation 70, and fill the joint with asphalt slurry; set a drainage pipe 73 every 2m in the low wall body 71, each The drainage pipe 73 is covered with a layer of geotextile, and the water outlet of the drainage pipe 73 is 0.75m away from the low retaining wall foundation 70 (see Figure 10).

以上实施例仅供说明本发明之用,而非对本发明的限制,有关技术领域的技术人员,在不脱离本发明的精神和范围的情况下,还可以作出各种变换或变型,因此所有等同的技术方案也应该属于本发明的范畴,应由各权利要求所限定。The above embodiments are only for the purpose of illustrating the present invention, rather than limiting the present invention. Those skilled in the relevant technical fields can also make various changes or modifications without departing from the spirit and scope of the present invention. Therefore, all equivalent The technical solutions should also belong to the category of the present invention and should be defined by each claim.

Claims (4)

1.一种河道生态护岸施工工艺,分干流A河段、干流B河段、支流C河段、支流D河段、支流E河段进行施工,其特征在于,1. a kind of river course ecological revetment construction technology, divides main stream A river section, main stream B river section, tributary C river section, tributary D river section, tributary E river section to carry out construction, is characterized in that, 进行干流A河段施工时,采用两种施工方式,第一种施工方式采用构筑埋石砼矮挡墙+生态砌块护坡的复合形式,第二种施工方式采用平铺式生态框护坡的形式;When carrying out the construction of the A section of the main stream, two construction methods are adopted. The first construction method adopts the composite form of building buried stone concrete low retaining wall + ecological block slope protection, and the second construction method adopts the form of tiled ecological frame slope protection ; 进行构筑埋石砼矮挡墙时,先采用C20现浇砼修筑矮挡墙基础,再在矮挡墙基础上采用C20砼埋石修筑矮墙体;矮挡墙基础埋深0.5m,矮挡墙基础的前部设置墙趾和齿墙;矮墙体的迎水面的坡度为1:0.3,背水面的坡度为1:0.1;矮墙体的面层采用M10砂浆砌筑块石,矮墙体的顶面设置剧面条石压顶板:矮墙体与矮挡墙基础每隔15m设置一道宽度为0.2m的伸缩缝,并采用沥青浆填缝;矮墙体内每隔2m设置一根排水管,每根排水管外包一层土工布,排水管的出水口距离基础0.75m;When constructing the low retaining wall with buried stone concrete, first use C20 cast-in-place concrete to build the foundation of the low retaining wall, and then use C20 concrete buried stone to build the low wall on the foundation of the low retaining wall; The front part of the wall foundation is provided with a wall toe and a tooth wall; the slope of the facing surface of the low wall is 1:0.3, and the slope of the back surface is 1:0.1; The top surface of the body is provided with a dramatic stone-pressed roof: an expansion joint with a width of 0.2m is set every 15m between the low wall body and the low retaining wall foundation, and the joint is filled with asphalt slurry; a drainage joint is installed every 2m in the low wall body. Each drainage pipe is covered with a layer of geotextile, and the outlet of the drainage pipe is 0.75m away from the foundation; 进行生态砌块护坡时,先将河道两岸修筑成坡度为1:1.5的坡面,接着在坡面上铺设一层土工布,再铺筑生态砌块,然后在生态砌块的生态孔中填充种植土,并种植草皮,最后在护坡的顶端采用路沿石压顶;When carrying out ecological block slope protection, first build a slope with a slope of 1:1.5 on both sides of the river, then lay a layer of geotextile on the slope, then lay ecological blocks, and then fill in the ecological holes of the ecological blocks Plant soil and plant turf, and finally use roadside stones to press the top of the slope protection; 进行平铺式生态框护坡时,先将河道两岸修筑成坡度为1:2的坡面,接着在坡面上依次铺设一层土工布和一层碎石,再铺筑平铺式生态框;每块平铺式生态框内自下而上依次填充碎石和种植土,种植土中播种混合草种;护坡的护脚采用C20现浇砼,护脚埋深1m,护脚每隔15m设置一道宽度为0.2m的伸缩缝,并采用沥青浆填缝;在护坡的顶端采用路沿石压顶;When carrying out the slope protection of the tiled ecological frame, first build a slope with a slope of 1:2 on both sides of the river, then lay a layer of geotextile and a layer of gravel on the slope, and then pave the tiled ecological frame; Each tiled ecological frame is filled with gravel and planting soil from bottom to top, and mixed grass seeds are sown in the planting soil; the foot protection of the slope protection is made of C20 cast-in-place concrete, the foot protection is buried at a depth of 1m, and the foot protection is set every 15m An expansion joint with a width of 0.2m is filled with asphalt slurry; the top of the slope protection is topped with curb stones; 进行干流B河段施工时,采用三种施工方式,第一种施工方式也采用构筑埋石砼矮挡墙+生态砌块护坡的复合形式,第二种施工方式采用构筑格宾石笼挡墙+生态砌块护坡的复合形式,第三种施工方式采用构筑二级挡墙的形式;When carrying out the construction of the B section of the main stream, three construction methods are adopted. The first construction method also adopts the compound form of building buried stone concrete low retaining wall + ecological block slope protection, and the second construction method adopts the construction of gabion gabion retaining wall +The composite form of ecological block slope protection, the third construction method adopts the form of building a secondary retaining wall; 进行构筑格宾石笼挡墙时,先采用C20现浇砼修筑挡墙的基础,再在基础的顶面上构筑格宾石笼挡墙;基础埋深0.5m,基础的前部设置墙趾和齿墙;格宾石笼挡墙由下层格宾石笼和上层格宾石笼构成;所述下层格宾石笼的宽度为上层格宾石笼的宽度的1.67倍,下层格宾石笼和上层格宾石笼的孔径相同;下层格宾石笼和上层格宾石笼内填充的粒径为1.5~2倍孔径的块石,外露面侧采用粒径不小于2倍孔径的块石摆放;采用由PVC包裹的镀锌钢丝将下层格宾石笼和上层格宾石笼绑扎成整体;在格宾石笼挡墙的背面设置一层土工布;在格宾石笼挡墙的顶面覆盖一层种植土,用于种植爬藤;When constructing the gabion retaining wall, first use C20 cast-in-place concrete to build the foundation of the retaining wall, and then build the gabion retaining wall on the top surface of the foundation; And the tooth wall; the gabion gabion retaining wall is composed of the lower gabion gabion and the upper gabion gabion; the width of the lower gabion is 1.67 times the width of the upper gabion, and the lower gabion The pore size of the upper gabion is the same as that of the upper gabion; the lower gabion and the upper gabion are filled with block stones with a particle size of 1.5 to 2 times the pore size, and the exposed side uses block stones with a particle size not less than 2 times the pore size. Placement; use galvanized steel wire wrapped by PVC to bind the lower gabion gabion and the upper gabion gabion into a whole; set a layer of geotextile on the back of the gabion gabion retaining wall; The top surface is covered with a layer of planting soil for planting climbing vines; 进行构筑二级挡墙时,先采用C20现浇砼修筑第一级挡墙基础,再在第一级挡墙基础上采用C20砼埋石修筑第一级挡墙体;第一级挡墙基础埋深0.5m,第一级挡墙基础的前部设置墙趾和齿墙;第一级挡墙体的迎水面的坡度为1:0.3,背水面的坡度为1:0.1;第一级挡墙体的面层采用M10砂浆砌筑块石,第一级挡墙体的顶面设置C20砼压顶板,第一级挡墙体与第一级挡墙基础每隔15m设置一道宽度为0.2m的伸缩缝,并采用沥青浆填缝;第一级挡墙体内每隔2m设置一根排水管,每个排水管外包一层土工布,排水管的出水口距离基础0.75m;When constructing the second-level retaining wall, first use C20 cast-in-place concrete to build the first-level retaining wall foundation, and then use C20 concrete buried stones to build the first-level retaining wall body on the first-level retaining wall foundation; the first-level retaining wall foundation The burial depth is 0.5m, and the front part of the first-level retaining wall foundation is provided with wall toes and tooth walls; the slope of the first-level retaining wall is 1:0.3 on the water-facing surface, and the slope on the back-water surface is 1:0.1; the first-level retaining wall The surface layer of the wall is built with M10 mortar masonry stones, the top surface of the first-level retaining wall is provided with a C20 concrete roof plate, and the first-level retaining wall and the first-level retaining wall foundation are provided with a width of 0.2m every 15m The expansion joints are filled with asphalt slurry; a drainage pipe is installed every 2m in the first-level retaining wall, and each drainage pipe is covered with a layer of geotextile, and the outlet of the drainage pipe is 0.75m away from the foundation; 第二级挡墙设在第一级挡墙的压顶板的前端背后2m处;先采用C20现浇砼修筑第二级挡墙基础,再在第二级挡墙基础上采用干砌块石修筑第二级挡墙体;第二级挡墙基础埋深0.5m,第二级挡墙基础的前部设置墙趾;第二级挡墙体采用干砌块石,第二级挡墙体的迎水面的坡度为1:0.3,背水面的坡度为1:0.1;第二级挡墙体的顶面设置C20砼压顶板:第二级挡墙体与第二级挡墙基础每隔15m设置一道宽度为0.2m的伸缩缝,并采用沥青浆填缝;第二级挡墙体的背面还布置一层土工布;第二级挡墙体的压顶板的顶面上还设置仿木护栏;The second-level retaining wall is located 2m behind the front end of the top plate of the first-level retaining wall; the foundation of the second-level retaining wall is first built with C20 cast-in-place concrete, and then the foundation of the second-level retaining wall is built with dry block stones The second-level retaining wall body; the second-level retaining wall foundation is buried at a depth of 0.5m, and the front part of the second-level retaining wall foundation is provided with a wall toe; the second-level retaining wall body is made of dry block stone, and the second-level retaining wall body The slope of the facing surface is 1:0.3, and the slope of the back surface is 1:0.1; the top surface of the second-level retaining wall is provided with a C20 concrete roof plate: the second-level retaining wall and the foundation of the second-level retaining wall are installed every 15m An expansion joint with a width of 0.2m is filled with asphalt slurry; a layer of geotextile is arranged on the back of the second-level retaining wall; imitation wood guardrails are also set on the top surface of the top plate of the second-level retaining wall; 进行支流C河段施工时,采用构筑干砌块石挡墙的形式,先采用C20现浇砼修筑墙身基础,再在墙身基础上采用干砌块石修筑墙身;墙身基础埋深0.5m,墙身基础的前部设置墙趾和齿墙;墙身的迎水坡的坡度为1:0.3,背水坡的坡度为1:0.1;墙身的顶面设置C20砼压顶板:墙身与墙身基础每隔15m设置一道宽度为0.2m的伸缩缝,并采用沥青浆填缝;墙身的背面还布置一层土工布;墙身的压顶板的顶面上还设置仿木护栏;When carrying out the construction of the C section of the tributary, adopt the form of constructing the dry block stone retaining wall, first use C20 cast-in-place concrete to build the wall foundation, and then use the dry block stone to build the wall body on the wall foundation; the buried depth of the wall body foundation 0.5m, set the wall toe and tooth wall at the front of the wall foundation; the slope of the facing water slope of the wall is 1:0.3, and the slope of the backwater slope is 1:0.1; the top surface of the wall is set with C20 concrete pressure roof: wall Set an expansion joint with a width of 0.2m every 15m between the body and the wall foundation, and fill the joint with asphalt slurry; a layer of geotextile is arranged on the back of the wall; and imitation wood guardrails are also set on the top surface of the top plate of the wall ; 进行支流D河段施工时,采用构筑植生型阶梯式生态框挡墙+草皮护坡的复合形式;When carrying out the construction of the D river section of the tributary, the composite form of building a plant-type stepped ecological frame retaining wall + turf slope protection is adopted; 进行构筑植生型阶梯式生态框挡墙时,先采用C20现浇砼修筑挡墙基础,再在挡墙基础上采用阶梯式生态框构筑挡墙体;挡墙基础埋深0.75m,挡墙基础的前部设置墙趾和齿墙;挡墙体的迎水面的坡度为1:0.3,背水面的坡度为1:0.3;每个阶梯式生态框内自下而上依次填充块石和种植土,种植土中种植挺水植物;挡墙体的背后依次铺设一层碎石和一层土工布;When constructing the planting-type stepped ecological frame retaining wall, first use C20 cast-in-place concrete to build the retaining wall foundation, and then use the stepped ecological frame to construct the retaining wall body on the retaining wall foundation; the retaining wall foundation is buried at a depth of 0.75m, and the retaining wall foundation The front part of the wall is provided with a wall toe and a tooth wall; the slope of the retaining wall facing the water is 1:0.3, and the slope of the back surface is 1:0.3; each stepped ecological frame is filled with stones and planting soil in sequence from bottom to top, Emergent plants are planted in the planting soil; a layer of gravel and a layer of geotextile are laid in sequence behind the retaining wall; 进行草皮护坡时,先将河道两岸修筑成坡度为1:2的坡面,再在坡面上铺设种植土,并种植草皮;When carrying out turf slope protection, first build a slope with a slope of 1:2 on both sides of the river, and then lay planting soil on the slope and plant turf; 进行支流E河段施工时,采用构筑埋石砼矮挡墙的形式。When carrying out the construction of the E section of the tributary, a low retaining wall of buried stone concrete is adopted. 2.根据权利要求1所述的河道生态护岸施工工艺,其特征在于,进行所述生态砌块护坡时,所述生态砌块为预制钢筋砼结构且强度等级不低于C25;生态砌块铺筑时采用逐层干砌,最下层生态砌块的一半与压顶板浇筑在一起,最上层生态砌块的一半与路沿石浇筑在一起;相邻生态砌块连接时,一块生态砌块的凸条卡入相邻生态砌块的凹槽中。2. The river channel ecological revetment construction process according to claim 1, characterized in that, when carrying out the slope protection of the ecological block, the ecological block is a prefabricated reinforced concrete structure and the strength grade is not lower than C25; During construction, dry laying is adopted layer by layer. Half of the ecological blocks on the bottom layer are poured together with the top plate, and half of the ecological blocks on the top layer are poured together with the curbstones; when adjacent ecological blocks are connected, the The ribs snap into the grooves of adjacent eco-blocks. 3.根据权利要求1所述的河道生态护岸施工工艺,其特征在于,进行干流A河道施工时,所述平铺式生态框为预制钢筋砼结构且强度等级不低于C30,各块平铺式生态框之间通过设在角部的螺杆连接。3. The river channel ecological revetment construction process according to claim 1, characterized in that, when carrying out the main stream A river channel construction, the tiled ecological frame is a prefabricated reinforced concrete structure and the strength grade is not lower than C30, and each block is tiled The type ecological frames are connected by screws arranged at the corners. 4.根据权利要求1所述的河道生态护岸施工工艺,其特征在于,进行支流D河道施工时,所述阶梯式生态框为预制钢筋砼结构且强度等级不低于C30;每个阶梯式生态框内填充的块石为150~200mm粒径的河卵石,每块阶梯式生态框的两侧面均开设螺栓连接孔,使相邻的阶梯式生态框通过螺杆连接。4. The river channel ecological revetment construction technique according to claim 1, wherein, when carrying out tributary D river channel construction, the stepped ecological frame is a prefabricated reinforced concrete structure and the strength grade is not less than C30; each stepped ecological frame The stones filled in the frame are river pebbles with a particle size of 150-200mm. Bolt connection holes are provided on both sides of each stepped ecological frame, so that adjacent stepped ecological frames are connected by screws.
CN201910712075.5A 2019-08-02 2019-08-02 A kind of river channel ecology bank protection construction technique Pending CN110306491A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910712075.5A CN110306491A (en) 2019-08-02 2019-08-02 A kind of river channel ecology bank protection construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910712075.5A CN110306491A (en) 2019-08-02 2019-08-02 A kind of river channel ecology bank protection construction technique

Publications (1)

Publication Number Publication Date
CN110306491A true CN110306491A (en) 2019-10-08

Family

ID=68082909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910712075.5A Pending CN110306491A (en) 2019-08-02 2019-08-02 A kind of river channel ecology bank protection construction technique

Country Status (1)

Country Link
CN (1) CN110306491A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111815498A (en) * 2020-07-16 2020-10-23 福建省金盾建设工程有限公司 A kind of construction method of berm for municipal engineering
CN112030877A (en) * 2020-08-28 2020-12-04 浙江建工水利水电建设有限公司 Bank protection engineering construction method and bank protection structure thereof
CN112301949A (en) * 2020-11-17 2021-02-02 上海勘测设计研究院有限公司 Vertical ecological retaining wall
CN112359777A (en) * 2020-11-17 2021-02-12 上海勘测设计研究院有限公司 Ecological revetment structure of urban mountain river course
CN113802521A (en) * 2021-08-25 2021-12-17 上海园林绿化建设有限公司 Ecological fish tank stone revetment and construction method thereof
CN114086505A (en) * 2020-08-06 2022-02-25 河北广宸建筑工程检测有限公司 River course slope protection structure for hydraulic engineering and laying construction method
CN114351649A (en) * 2021-11-26 2022-04-15 中国电建集团西北勘测设计研究院有限公司 Step type river bank protection construction method suitable for deep soft soil stratum
CN116289749A (en) * 2023-02-15 2023-06-23 广州市盾建建设有限公司 Easy-to-manage river surge ecological slope protection retaining wall
CN118673562A (en) * 2024-06-26 2024-09-20 惠州市水土保持监督监测站 Mountain river gabion ecological bank protection engineering design system and method
CN119090367A (en) * 2024-07-23 2024-12-06 惠州市水土保持监督监测站 Small watershed river ecological management method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070033301A (en) * 2006-10-26 2007-03-26 주식회사 한국건설관리공사 Vegetation type hollow block
CN203846450U (en) * 2014-05-22 2014-09-24 嘉兴市五丰水泥制品制造有限公司 Riverway retaining wall
CN205046578U (en) * 2015-09-29 2016-02-24 上海市水利工程设计研究院有限公司 Ecological gabion retaining wall
CN206052637U (en) * 2016-08-24 2017-03-29 上海市水利工程设计研究院有限公司 A kind of environmental height flood control barricade

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070033301A (en) * 2006-10-26 2007-03-26 주식회사 한국건설관리공사 Vegetation type hollow block
CN203846450U (en) * 2014-05-22 2014-09-24 嘉兴市五丰水泥制品制造有限公司 Riverway retaining wall
CN205046578U (en) * 2015-09-29 2016-02-24 上海市水利工程设计研究院有限公司 Ecological gabion retaining wall
CN206052637U (en) * 2016-08-24 2017-03-29 上海市水利工程设计研究院有限公司 A kind of environmental height flood control barricade

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
徐复兴等: "《高切坡防护技术与工程实例》", 31 May 2017 *
李理: "山区河道生态堤防工程设计", 《安徽水利水电职业技术学院学报》 *
杨东香: "南京某河道护岸选型方案设计", 《中国水运》 *
钦震杰等: "新型生态砌块在河道整治工程中的应用", 《新型生态砌块在河道整治工程中的应用 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111815498A (en) * 2020-07-16 2020-10-23 福建省金盾建设工程有限公司 A kind of construction method of berm for municipal engineering
CN114086505A (en) * 2020-08-06 2022-02-25 河北广宸建筑工程检测有限公司 River course slope protection structure for hydraulic engineering and laying construction method
CN112030877A (en) * 2020-08-28 2020-12-04 浙江建工水利水电建设有限公司 Bank protection engineering construction method and bank protection structure thereof
CN112301949A (en) * 2020-11-17 2021-02-02 上海勘测设计研究院有限公司 Vertical ecological retaining wall
CN112359777A (en) * 2020-11-17 2021-02-12 上海勘测设计研究院有限公司 Ecological revetment structure of urban mountain river course
CN113802521A (en) * 2021-08-25 2021-12-17 上海园林绿化建设有限公司 Ecological fish tank stone revetment and construction method thereof
CN114351649A (en) * 2021-11-26 2022-04-15 中国电建集团西北勘测设计研究院有限公司 Step type river bank protection construction method suitable for deep soft soil stratum
CN114351649B (en) * 2021-11-26 2023-01-24 中国电建集团西北勘测设计研究院有限公司 Step type river bank protection construction method suitable for deep soft soil stratum
CN116289749A (en) * 2023-02-15 2023-06-23 广州市盾建建设有限公司 Easy-to-manage river surge ecological slope protection retaining wall
CN118673562A (en) * 2024-06-26 2024-09-20 惠州市水土保持监督监测站 Mountain river gabion ecological bank protection engineering design system and method
CN119090367A (en) * 2024-07-23 2024-12-06 惠州市水土保持监督监测站 Small watershed river ecological management method and system

Similar Documents

Publication Publication Date Title
CN110306491A (en) A kind of river channel ecology bank protection construction technique
CN106149625B (en) A kind of ecological self-purification type landscape revetment reconstruction structure and its construction method
CN209429048U (en) One kind being suitable for Mountainous Area in North China karez formula underground and catchments water delivery water storage gallery
CN104074166A (en) Method for recovering dried-up river
CN206681021U (en) Multi-functional side slope reinforced structure
CN105887757A (en) Ecological slope protection composite retaining wall structure and construction method
CN205242205U (en) a road drain
CN113152354B (en) Structure and method for pre-positioned in-situ water ecological restoration of tidal river reach
CN108166520B (en) Water and soil conservation method for electric power transmission line engineering construction
CN102704437A (en) Coal mining subsidence area cultivation water source reconstruction method suitable for complex mountain area
CN206438465U (en) A kind of ecological self-purification type landscape revetment reconstruction structure
CN110172884B (en) Mountain highway subgrade and construction method
CN217480070U (en) Multistage ecological revetment of mountain area river course
CN115839067A (en) Construction technology of green subgrade and side slope of expressway in silt soil area
CN113944138A (en) Construction method of natural bank slope protection structure based on sponge city concept
CN216839238U (en) Ecological revetment structure based on sponge city construction
CN112854131B (en) Ecological revetment in water source protection area and construction method thereof
CN207633300U (en) A kind of Gullied Rolling Loess Region mud-stone flow disaster recycling control structure
CN205776070U (en) Ecological revetment is combined retaining wall structure
CN108755597A (en) A kind of prefabricated component check dam and preparation method thereof and application method
CN204803902U (en) Log slope protection structure
CN202323906U (en) Assembly type culvert component
CN106836243A (en) A kind of sponge greenery patches of suitable mountain topography and its building method
CN118241595A (en) A construction method for improving water quality in a small river basin by improving water flow dynamics
CN210507515U (en) A greening gravity retaining wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191008