CN110284712A - A batch control method is connect in the pre-buried cup formula taper sheath progress template of having enough to meet the need of concrete structure - Google Patents

A batch control method is connect in the pre-buried cup formula taper sheath progress template of having enough to meet the need of concrete structure Download PDF

Info

Publication number
CN110284712A
CN110284712A CN201910574286.7A CN201910574286A CN110284712A CN 110284712 A CN110284712 A CN 110284712A CN 201910574286 A CN201910574286 A CN 201910574286A CN 110284712 A CN110284712 A CN 110284712A
Authority
CN
China
Prior art keywords
cup formula
template
screw rod
buried
connector sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910574286.7A
Other languages
Chinese (zh)
Inventor
卫芷
韩俊
董洁
刘勇庆
王新龙
李余
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shanxi Sijian Group Co Ltd
Original Assignee
China Shanxi Sijian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shanxi Sijian Group Co Ltd filed Critical China Shanxi Sijian Group Co Ltd
Priority to CN201910574286.7A priority Critical patent/CN110284712A/en
Publication of CN110284712A publication Critical patent/CN110284712A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14—Bracing or strutting arrangements for formwalls; Devices for aligning forms
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention belongs to the formwork erection of architectural engineering concrete structure outer, column and elevator stair position construction fields, it discloses one kind and connects a batch control method in the pre-buried cup formula taper sheath progress template of having enough to meet the need of concrete structure, it is in each layer template construction, horizontal location line is arranged in present template top, then by several pre-buried cup formula clamping systems are equidistantly horizontally disposed at floor respective heights, joint part mortar leakage prevention, running pulp are locked using cup formula clamping system;The cup formula clamping system includes cup formula connector sleeve, pre embedded bolt and support shuttering screw rod, pre embedded bolt and support shuttering screw rod docks and pass through fastening nut by cup formula connector sleeve and jackscrew is fixed.The method of the invention improves concrete wall operating efficiency during formwork erection, instead of the construction technology that original tradition is complicated, it is also more rigorous effective to the control of concrete quality simultaneously, so that the construction period is optimised and is can be effectively controlled, saves time cost and cost of labor and taper sheath can repeatedly have enough to meet the need.

Description

A batch control method is connect in the pre-buried cup formula taper sheath progress template of having enough to meet the need of concrete structure
Technical field
The invention belongs to the formwork erection of architectural engineering concrete structure outer, column and elevator stair position construct field, A batch control method is connect in the pre-buried cup formula taper sheath progress template of having enough to meet the need of concrete structure more particularly to one kind.
Background technique
Traditional shear wall formwork erection is all made of split bolt form and carries out formwork reinforcement construction, and for every interlayer exterior wall Top mode locking similarly uses split bolt mode locking, although it can play good drawing when bearing concrete lateral pressure and other loads Knot effect, but need in subsequent one layer of template construction to verify root position again and be reinforced, and strengthened edge not can guarantee Tightly, there is running pulp hidden danger when connecing stubble check and correction deviation and concrete placings, substantially reduce exterior wall and elevator stair concrete impression quality.
Summary of the invention
Present invention seek to address that split bolt connects a batch faulting of slab ends, running pulp, pitted skin and other issues in each interlayer concrete, and then provide It is a kind of concrete structure it is pre-buried have enough to meet the need cup formula taper sheath and carry out template connect a batch control method.
The present invention adopts the following technical scheme:
One kind concrete structure it is pre-buried have enough to meet the need cup formula taper sheath carry out template connect a batch control method, be in each layer template construction, Horizontal location line is arranged in present template top, then locks at floor respective heights by being equidistantly horizontally disposed with several pre-buried cup formulas Modular system locks joint part mortar leakage prevention, running pulp using cup formula clamping system;The cup formula clamping system includes the connection of cup formula Set, pre embedded bolt and support shuttering screw rod, pre embedded bolt and support shuttering screw rod dock by cup formula connector sleeve and pass through fastening Nut and jackscrew are fixed;Specific construction process is as follows:
Cup formula connector sleeve, support shuttering screw rod are screwed by horizontal equidistant progress pre embedded bolt and cup formula connector sleeve, pre embedded bolt Cup formula connector sleeve is screwed on the outside of template, one template proximate of outside of cup formula connector sleeve is tight, and 3 types are utilized on the outside of cup formula connector sleeve Card carries out mould locking and fixes;
After concrete placings, removes outer wall template and exposes reserved taper cup formula connector sleeve, be screwed into support shuttering screw rod again, Subsequent one layer of template can be placed directly on support shuttering screw rod, and template proximate lower layer is made to have poured concrete exterior wall, then utilize cup formula Connector sleeve, support shuttering screw rod and 3 type cards carry out mode locking reinforcing to template, flitch, steel pipe, it is ensured that upper former connects with lower layer's concrete It is tight seamless at stubble, it improves concrete integral smoothness and connects a batch quality;
Formula taper sheath connector can reversely be removed with screw rod, can be utilized again after pre-buried use.
Cup formula clamping system is distributed pre-buried by 500mm spacing.
Pre embedded bolt is screwed into the length of cup formula taper sheath not less than 15mm;Support shuttering screw rod is screwed into the length of cup formula taper sheath Degree is not less than 15mm, guarantees the connective stability of cup formula clamping system.
Compared with conventional template is reinforced, the method for the present invention is had the following beneficial effects:
1, it is more convenient to construct, easy to operate, can be used in turn, improve efficiency;
2, each interlayer of optimization template proofreads step, saves the duration;
3, the problems such as solving each interlayer concrete faulting of slab ends, running pulp, pitted skin improves concrete and connects a batch quality.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of cup formula clamping system;
Fig. 2 is that cup formula mode locking exterior wall reinforces schematic diagram (lower layer);
Fig. 3 is that cup formula mode locking exterior wall reinforces schematic diagram (upper layer);
In figure: 1- cup formula clamping system, 2- template, 3- flitch, 4- steel pipe, 5-3 type card, 6- split bolt, 7- exterior wall, the building 8- Plate;11- fastening bolt, 12- fastening nut, 13- cup formula connector sleeve, 14- jackscrew, 15- pre embedded bolt, 16- support shuttering screw rod.
Specific embodiment
It is of the present invention to carry out template to connect a batch control method being using cup formula in the pre-buried cup formula taper sheath that has enough to meet the need of concrete structure Clamping system is in the pre-buried setting of progress suitable for reading of each layer template.The cup formula clamping system includes by cup formula connector, pre embedded bolt It is formed with support shuttering screw rod and standing finish.It needs that horizontal location line first is arranged on template top when template construction, by every 500mm Spacing carries out pre embedded bolt and cup formula connector (the built-in long 30mm of screw thread) setting, pre embedded bolt are screwed into connector 15mm, supports Template screw rod is equally screwed into 15mm on the outside of template, must be tight with template proximate on the outside of connector, and outside carries out 3 type cards and carries out Mould locking is fixed.
After concrete placings, removes outer wall template and expose reserved cup formula taper sheath connector, be screwed into support shuttering again Screw rod, subsequent one layer of template can be placed directly on support shuttering screw rod, so that template proximate lower layer has been poured concrete exterior wall, then utilize Cup formula connector, support shuttering screw rod and 3 type cards carry out mode locking reinforcing to template, flitch, steel pipe, it is ensured that upper former and lower layer Concrete joint part is tightly seamless, improves concrete integral smoothness and connects a batch quality.
Cup formula taper sheath connector can reversely be removed with screw rod, can be utilized again after pre-buried use.
Use of the method for the invention in engineering substantially increases concrete wall operating efficiency during formwork erection, Instead of the construction technology that original tradition is complicated, at the same it is also more rigorous effective to the control of concrete quality, enable the construction period Optimize and can be effectively controlled, main is to save time cost and cost of labor and taper sheath can repeatedly have enough to meet the need.

Claims (4)

1. a kind of connect a batch control method in the pre-buried cup formula taper sheath progress template of having enough to meet the need of concrete structure, which is characterized in that be each When layer template construction, horizontal location line is arranged in present template top, then by equidistant horizontally disposed at floor respective heights Several pre-buried cup formula clamping systems lock joint part mortar leakage prevention, running pulp using cup formula clamping system;The cup formula clamping system Including cup formula connector sleeve, pre embedded bolt and support shuttering screw rod, pre embedded bolt and support shuttering screw rod pass through cup formula connector sleeve pair It connects and passes through fastening nut and jackscrew is fixed;Specific construction process is as follows:
Cup formula connector sleeve, support shuttering screw rod are screwed by horizontal equidistant progress pre embedded bolt and cup formula connector sleeve, pre embedded bolt Cup formula connector sleeve is screwed on the outside of template, one template proximate of outside of cup formula connector sleeve is tight, and 3 types are utilized on the outside of cup formula connector sleeve Card carries out mould locking and fixes;
After concrete placings, removes outer wall template and exposes reserved taper cup formula connector sleeve, be screwed into support shuttering screw rod again, Subsequent one layer of template can be placed directly on support shuttering screw rod, and template proximate lower layer is made to have poured concrete exterior wall, then utilize cup formula Connector sleeve, support shuttering screw rod and 3 type cards carry out mode locking reinforcing to template, flitch, steel pipe, it is ensured that upper former connects with lower layer's concrete It is tight seamless at stubble, it improves concrete integral smoothness and connects a batch quality;
Formula taper sheath connector can reversely be removed with screw rod, can be utilized again after pre-buried use.
2. the pre-buried cup formula taper sheath progress template of having enough to meet the need of concrete structure according to claim 1 connects a batch control method, special Sign is that cup formula clamping system is distributed pre-buried by 500mm spacing.
3. the pre-buried cup formula taper sheath progress template of having enough to meet the need of concrete structure according to claim 1 connects a batch control method, special Sign is that pre embedded bolt is screwed into the length of cup formula taper sheath not less than 15mm.
4. the pre-buried cup formula taper sheath progress template of having enough to meet the need of concrete structure according to claim 1 connects a batch control method, special Sign is that support shuttering screw rod is screwed into the length of cup formula taper sheath not less than 15mm.
CN201910574286.7A 2019-06-28 2019-06-28 A batch control method is connect in the pre-buried cup formula taper sheath progress template of having enough to meet the need of concrete structure Pending CN110284712A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910574286.7A CN110284712A (en) 2019-06-28 2019-06-28 A batch control method is connect in the pre-buried cup formula taper sheath progress template of having enough to meet the need of concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910574286.7A CN110284712A (en) 2019-06-28 2019-06-28 A batch control method is connect in the pre-buried cup formula taper sheath progress template of having enough to meet the need of concrete structure

Publications (1)

Publication Number Publication Date
CN110284712A true CN110284712A (en) 2019-09-27

Family

ID=68019479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910574286.7A Pending CN110284712A (en) 2019-06-28 2019-06-28 A batch control method is connect in the pre-buried cup formula taper sheath progress template of having enough to meet the need of concrete structure

Country Status (1)

Country Link
CN (1) CN110284712A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116026526A (en) * 2023-02-24 2023-04-28 三一重型装备有限公司 Balance detection device and rotor assembly balance adjustment method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2806473A1 (en) * 1978-02-16 1979-08-23 Dausend Hans Werner Conical formwork spacer for concrete wall - has sealing cap inserted onto ring ledges in holes for mortar filling
CN103741944A (en) * 2013-12-23 2014-04-23 上海建工五建集团有限公司 Fixation assembly, template system comprising fixation assembly and wall pouring method
CN205840313U (en) * 2016-07-22 2016-12-28 山西二建集团有限公司 Exterior wall joint part plank sheathing installs structure
CN106836565A (en) * 2017-02-15 2017-06-13 山西二建集团有限公司 Three-section water stop screw rod control shear wall exterior wall connects a batch method
CN208310221U (en) * 2018-05-02 2019-01-01 田世兵 A kind of fixed device of side mode

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2806473A1 (en) * 1978-02-16 1979-08-23 Dausend Hans Werner Conical formwork spacer for concrete wall - has sealing cap inserted onto ring ledges in holes for mortar filling
CN103741944A (en) * 2013-12-23 2014-04-23 上海建工五建集团有限公司 Fixation assembly, template system comprising fixation assembly and wall pouring method
CN205840313U (en) * 2016-07-22 2016-12-28 山西二建集团有限公司 Exterior wall joint part plank sheathing installs structure
CN106836565A (en) * 2017-02-15 2017-06-13 山西二建集团有限公司 Three-section water stop screw rod control shear wall exterior wall connects a batch method
CN208310221U (en) * 2018-05-02 2019-01-01 田世兵 A kind of fixed device of side mode

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116026526A (en) * 2023-02-24 2023-04-28 三一重型装备有限公司 Balance detection device and rotor assembly balance adjustment method

Similar Documents

Publication Publication Date Title
CN207131072U (en) A kind of super thick shear wall corner template reinforcing device
CN101265748B (en) Tools type section steel fastener steel tube outer scaffold
CN102493341A (en) Construction method for hollow thin-walled high pier non-bracket formwork turnover of railway
CN206616862U (en) Formwork root bracing means
CN209384451U (en) An Easy-to-splice Shear Wall Connection Structure
CN110206229A (en) A kind of concrete column splicing structure and its construction method
CN105201532A (en) Ring excavation construction method for underground large-span spherical-cap-shaped dome under weak surrounding rock
CN105781100A (en) Template component for sidewall of subway station
CN205804939U (en) template assembly for subway station side wall
CN217734853U (en) Overload small clear distance beam adjustable disc buckle formwork support frame
CN204875558U (en) Shaped steel runs through inside and outside compound support formula bracket system of encorbelmenting
CN116791750B (en) Construction method for reverse newly-built column connection structure based on self-locking anchoring technology
CN213359004U (en) A stably spliced lifting wall
CN210396093U (en) Double-shear wall deformation joint steel formwork
CN201891174U (en) Stiff connecting node for ring girder and ring-shaped bracket column
CN214996171U (en) Prefabricated wall body support system
CN203834683U (en) Plate girder and wall connecting structure
CN104234418A (en) Early removal formwork for fabrication of reinforced concrete beams and construction method thereof
CN204000936U (en) Outer wall of basement single surface formwork system based on fastener type steel pipe earth anchor truss
CN205894670U (en) Template structure for concrete joint construction between floors
CN109972510A (en) A kind of assembled combined bridge deck system of the bar away from adjustable U-bolt connector
CN112609979A (en) Wall connecting piece erecting method for connecting ultrahigh external frame of external wall
CN112627034A (en) Synchronous construction method for turning over mold of high pier of bridge
CN207144467U (en) A kind of neighboring walls small space model sheetinstallat structure
CN213539700U (en) Basement outer wall internal stay draws unilateral formwork structure outward

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190927

RJ01 Rejection of invention patent application after publication