CN110273345A - Automatic luminous formula sponge road that drinks water of soil and comprehensive building rubbish preparation - Google Patents

Automatic luminous formula sponge road that drinks water of soil and comprehensive building rubbish preparation Download PDF

Info

Publication number
CN110273345A
CN110273345A CN201910657664.8A CN201910657664A CN110273345A CN 110273345 A CN110273345 A CN 110273345A CN 201910657664 A CN201910657664 A CN 201910657664A CN 110273345 A CN110273345 A CN 110273345A
Authority
CN
China
Prior art keywords
water
road
preparation
soil
sponge road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910657664.8A
Other languages
Chinese (zh)
Other versions
CN110273345B (en
Inventor
沈志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shen Zhiyong
Original Assignee
Jiangsu Yibihe Construction Structure Optimization Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yibihe Construction Structure Optimization Co ltd filed Critical Jiangsu Yibihe Construction Structure Optimization Co ltd
Priority to CN201910657664.8A priority Critical patent/CN110273345B/en
Publication of CN110273345A publication Critical patent/CN110273345A/en
Application granted granted Critical
Publication of CN110273345B publication Critical patent/CN110273345B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B26/00Compositions of mortars, concrete or artificial stone, containing only organic binders, e.g. polymer or resin concrete
    • C04B26/02Macromolecular compounds
    • C04B26/10Macromolecular compounds obtained otherwise than by reactions only involving carbon-to-carbon unsaturated bonds
    • C04B26/18Polyesters; Polycarbonates
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • E01C11/226Coherent pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C15/00Pavings specially adapted for footpaths, sidewalks or cycle tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/30Coherent pavings made in situ made of road-metal and binders of road-metal and other binders, e.g. synthetic material, i.e. resin
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00017Aspects relating to the protection of the environment
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00241Physical properties of the materials not provided for elsewhere in C04B2111/00
    • C04B2111/00284Materials permeable to liquids
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/40Porous or lightweight materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Architecture (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Mining & Mineral Resources (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Inorganic Chemistry (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to an automatic drinking and automatic lighting sponge road prepared from soil and comprehensive construction waste, which comprises the following components: the permeable surface layer that top-down laid in proper order, basic unit and isolation layer permeate water, the basic unit that permeates water is the polymer layer that permeates water, permeate the former soil horizon with the ponding of road surface top through the polymer layer that permeates water, rivers directly permeate the basic unit that buries after passing through the porous permeability that the road surface layer permeates water to the basic unit that permeates water in proper order, the water source normal position mutual compensation of natural precipitation has been realized, the air mutual compensation, guaranteeing that moisture can permeate water fast, reduce ponding, when the environmental protection, not only solved the closely knit closed structure system of road among the prior art, fragile, the poor quality problem of durability, but also reach higher road performance and the natural function of permeating water, not only realize the cyclic utilization of resource when beautifying the environment, and improved road bulk strength and bearing capacity.

Description

Soil and the automatic Autoluminescence type sponge road that drinks water of building complex rubbish preparation
Technical field
The present invention relates to a kind of construction engineering technical fields, utilize soil and building complex rubbish in particular to a kind of The automatic Autoluminescence type sponge road that drinks water of rubbish preparation.
Background technique
At present in the road of urban construction, bituminous pavement and the closely knit closed earth's surface of coagulating cement earth foundation are largely used Structure replaces original soil surface.Closing earth's surface also arranges city while improving traffic and road conditions, beautifying the environment Water system generates large effect, generates significant adverse effect to ecology and climatic environment.
Roadbed it is closely knit it is non-permeable by valuable natural precipitation completely with lower soil and underground water blocking, the big portion of precipitation Divide and be discharged into out by sewerage system pipe network, the excessive of urban groundwater extracts in addition, leads to Urban Underground water level increasingly It is low, " funnel type " level of ground water geologically is formd, causes ground decline, it is existing that coastal area also results in inwelling As.Since natural precipitation is usually that the drainage grade for first passing through ground or ground show that ditch is discharged into sewer, before entering sewer Need to the rainwash Jing Guo relatively long distance just can enter Urban Underground drainage system, will be generated in the case where heavy rainfall around here Biggish flow path surface, increases the burden of the city Cheng Yi drainage pipeline networks, or even the waterlogging of Urban Storm Flood type is caused to occur.Earth's surface In runoff process, the rainwater of initial relative clean is made to dissolve in a large amount of urban surface pollutant, this runoff also generates secondary Pollution, enters peripheral ground natural water by sewerage system, has aggravated the pollution level of natural water.Secondly in the rainy day Since hardened ground cannot drain in time, surface gathered water is caused, to pedestrian's trip and vehicle traveling is made troubles and security risk.Again Collective effect is built in person, this non-permeable road and surrounding cities, increases the tropical island effect in city.
The drainage pavement in technology is by increasing the porosity of pavement structure composition material come permeable at present, and water flow is saturating Advection is carried out to water shutoff layer or takes header tank outlet again, and mutually compensation, the air in situ that cannot achieve water flow mutually compensate, are durable Property is poor, and the functional requirement in sponge city is not achieved.
Summary of the invention
A kind of purpose of invention is to provide soil and the preparation of building complex rubbish is drunk water automatically Autoluminescence type sponge road, Existing sponge road disadvantage is not only solved, also solves the processing of the earthwork and building waste during road construction, improves money Source utilizes, and reduces the production cost of sponge road, improves architectural environment.
To achieve the goals above, technical solution used in the embodiment of the present invention is as follows:
The embodiment of the invention provides a kind of soil and the automatic Autoluminescence type sponge road that drinks water of building complex rubbish preparation, packets Include: permeable surface layer, porous base course and the separation layer being successively laid with from top to bottom, the porous base course are macromolecule Water permeable body.
Wherein, the porous base course includes support keel and the macromolecule seepy material that is coated on outside support keel.
Wherein, the macromolecule seepy material includes the raw material of following weight percent: mudstone charcoal ground-slag 40-70%, insatiable hunger With polyester resin 10-30%, curing agent 5-10%, aluminium powder 3-8%, reinforcing agent 0.5-1.5%, promotor 0.5-1.5%, cement 10- 20%, water 15-30%.
Wherein, the permeable surface layer includes the raw material of following weight percent: mudstone charcoal ground-slag 30-60%, unsaturated polyester (UP) Resin 10-30%, curing agent 2-10%, reinforcing agent 0.5-1.5%, luminescent powder 1-5%, water 15-30%.
A kind of preparation method preparing the Autoluminescence type sponge road that drinks water automatically, comprising the following steps:
1) separation layer is laid in native soil layer;
2) prepared by macromolecule seepy material: weighing weight percent is 40-70% mudstone charcoal ground-slag, 10-30% unsaturated polyester (UP) tree Rouge, 5-10% curing agent, 3-8% aluminium powder, 15-30% water are poured into full-automatic mixing plant, and full-automatic mixing plant opens rotation 5- Stop stirring after 10min, 10-20% cement is thrown to inside full-automatic mixing plant and stirs 1-3min, sequentially adds 0.5- 1.5% reinforcing agent, 0.5-1.5% promotor continue to stir, and stir grinding after 10-20 min, are prepared into macromolecule seepy material, with Standby rear use;
3) permeable surface layer preparation: weighing weight percent is 30-60% mudstone charcoal ground-slag, 5-20% unsaturated polyester resin, 2-10% Curing agent, 0.5-1.5% reinforcing agent, 1-5% luminescent powder, water 15-30% pour into the full-automatic mixing plant stirring of stirring powder after mixing evenly Mill, is made powder, for future use;
4) it makes support keel: using artificial and machinery production to be spliced by basic body of mental section, using more Mental section is spliced into the rectangular box that longitudinal cross-section is rectangular configuration, is attached on the inside of mental section by reinforcing member solid Certainly horizontal and vertical welding after, completes the company of metal mesh sheet in the side wall of rectangular box by the way of spot welding and binding It connects, forms Integral box metal truss, as support keel, support keel is laid on above separation layer;
5) the macromolecule seepy material prepared is poured according to the model of support keel using flowing water feeding manner: complete Highly pressurised liquid grouting pump is connected on automatic mixing plant, highly pressurised liquid grouting pump pours device to Integral box metal mesh by high pressure Frame pours, and makes it to be covered on separation layer with a thickness of the standard of 1000mm-1500mm, forms porous base course;
6) surface layer prepared is cast in by porous base course upper surface using flowing water feeding manner, makes permeable surface thickness 0.5mm-30mm。
The preparation method on a kind of pavement, the Autoluminescence type sponge road that drunk water automatically using preparation is prepared.
The preparation method of a kind of slope protection, the Autoluminescence type sponge road that drunk water automatically using preparation is prepared.
The preparation method on a kind of square, the Autoluminescence type sponge road that drunk water automatically using preparation is prepared.
Compared with the existing technology, the embodiment of the present invention has the advantages that
1, other mixing materials are combined to be processed into the macromolecule pervious material bed of material mudstone charcoal ground-slag that building waste and the earthwork make It is filled on separation layer, separation layer has the characteristics that improve support strength and prevents support keel from sinking;
2, sponge road only has three-decker, and structure is simple, easy to process, field fabrication, without transport;
3, water flow passes sequentially through that the permeable porous infiltration to base course of supercrust is permeable, water flow can be directly penetrating soil matrix layer, Realize the mutual compensation in water source original position of natural precipitation, air mutually compensates, is guaranteeing that moisture can be with rapid osmotic, reduction ponding, guarantor Retaining ring border;
4, road integration pours, and the whole shock resistance, intensity and solution existing road part for improving road sink or tilt to becoming The shortcomings that shape;
5, urban architecture removal rubbish, construction sludge garbage, construction and decoration rubbish, grassroot project earth excavation rubbish are effectively solved Rubbish can not handle problem, greatly improve productivity effect.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is sponge road structure layer of the present invention;
Fig. 2 is porous base course structural schematic diagram.
Fig. 3 is porous base course and permeable surface layer pouring structure schematic diagram.
Fig. 4 is silt charcoal ground-slag production flow diagram.
Specific embodiment
In conjunction with the accompanying drawings, the present invention is further explained in detail.These attached drawings are simplified schematic diagram, only with Illustration illustrates basic structure of the invention, therefore it only shows the composition relevant to the invention.
Embodiment 1
Referring to Fig. 1, the embodiment of the invention provides a kind of soil and the automatic Autoluminescence types that drinks water of building complex rubbish preparation Sponge road, comprising: permeable surface layer 1, porous base course 2 and the separation layer 3 being successively laid with from top to bottom, the porous base course are height Molecule Water permeable body layer.
Preferably, the porous base course 2 includes support keel 21 and the macromolecule pervious material being coated on outside support keel 21 Material 22.
Preferably, the macromolecule seepy material 22 includes the raw material of following weight percent: mudstone charcoal ground-slag 40-70%, Unsaturated polyester resin 10-30%, curing agent 5-10%, aluminium powder 3-8%, reinforcing agent 0.5-1.5%, promotor 0.5-1.5%, cement 10-20%, water 15-30%.
Preferably, the permeable surface layer 1 includes the raw material of following weight percent: mudstone charcoal ground-slag 30-60%, unsaturation Polyester resin 10-30%, curing agent 2-10%, reinforcing agent 0.5-1.5%, luminescent powder 1-5%, water 15-30%.
In the present embodiment, permeable surface layer 1 and porous base course 2 all have good water permeability, and water flow passes sequentially through surface layer 1 The permeable porous infiltration to base 2 is permeable, water flow can be directly penetrating soil matrix layer, and the water source for realizing natural precipitation is mutual in situ Compensation, air mutually compensate, while guaranteeing that moisture can be with rapid osmotic, reduction ponding, protection environment, not only solve existing The closely knit enclosed construction system of road, quality problems easy to damage, endurance quality is poor in technology, and reach higher road occupation Performance and natural pervious function.
Referring to Fig. 4, the porous base course 1 and permeable surface layer 2 in the present embodiment contain silt charcoal ground-slag, and in the application Mudstone charcoal ground-slag be to be made using building complex rubbish and the earthwork by below step: soil and building waste are poured into In dregs dispersing device 4, soil and building waste mixture are cut into the sheet mixture of 0.5-1mm thickness by dispersing device; Sheet mixture is delivered to sludge dehydration device 5 through the first conveying equipment, and sheet mixture is squeezed into through sludge dehydration device to be contained Mud cake of the water in 3-10%;Mud cake is delivered in drying unit 6 through the second conveying equipment and is dried, and keeps drying unit Inlet temperature is 600-800 DEG C, and tapping temperature is 70 DEG C -90 DEG C;Mud cake after drying is delivered to high pressure through third conveying equipment It is milled in milling device 7, the finished product powder (as silt charcoal ground-slag) for being 0.03-0.06mm at fineness by mud cake grinding, Solve these building wastes using be prepared in situ in situ, construct, integration digestion, become make sponge road matrix material Material solves building waste and process that the earthwork needs to handle again, improves the utilization of resources, reduces road production cost.
In the present embodiment, separation layer uses rubble, has gap between rubble, can occasionally guarantee the flowers and plants planted on road Root extends to native soil layer, increases the survival rate of flowers and plants, while also infiltrating into native soil layer using water flow.
Embodiment 2
Please refer to Fig. 2-3, a kind of preparation method for preparing the Autoluminescence type sponge road that drinks water automatically, comprising the following steps:
1) separation layer 3 is laid in native soil layer;
2) prepared by macromolecule seepy material 22: weighing weight percent is 40-70% mudstone charcoal ground-slag, 10-30% unsaturated polyester (UP) Resin, 5-10% curing agent, 3-8% aluminium powder, 15-30% water are poured into full-automatic mixing plant, and full-automatic mixing plant opens rotation 5- Stop stirring after 10min, 10-20% cement is thrown to inside full-automatic mixing plant and stirs 1-3min, sequentially adds 0.5- 1.5% reinforcing agent, 0.5-1.5% promotor continue to stir, and stir grinding after 10-20 min, are prepared into macromolecule seepy material, with Standby rear use;
3) permeable surface layer preparation: weighing weight percent is 30-60% mudstone charcoal ground-slag, 5-20% unsaturated polyester resin, 2-10% Curing agent, 0.5-1.5% reinforcing agent, 1-5% luminescent powder, water 15-30% pour into the full-automatic mixing plant stirring of stirring powder after mixing evenly Mill, is made powder for future use;
4) it makes support keel 21: using artificial and machinery production to be spliced by basic body of mental section, using more Root mental section 211 is spliced into the rectangular box that longitudinal cross-section is rectangular configuration, passes through reinforcing member on the inside of mental section 211 212 are attached fixed and then horizontal and vertical welding, are completed by the way of spot welding and binding in the side wall of rectangular box The connection of metal mesh sheet 213 forms Integral box metal truss, as support keel, support keel 21 is laid on separation layer 3 Top;
5) the macromolecule seepy material prepared is poured according to the model of support keel using flowing water feeding manner: complete Highly pressurised liquid grouting pump is connected on automatic mixing plant, highly pressurised liquid grouting pump pours device to Integral box metal mesh by high pressure Frame pours, and makes it to be covered on separation layer with a thickness of the standard of 1000mm-1500mm, forms porous base course 2;
6) the permeable surface layer 1 prepared is cast in by 2 upper surface of porous base course using flowing water feeding manner, keeps permeable surface layer 1 thick Degree is 0.5mm-30mm.
In the present embodiment, permeable surface layer and porous base course are formed for one-piece casting, are frame body with support keel 21, are realized Integration processing in road surface promotes antitorque road surface, resistance to compression and enhancing road surface support strength, reaches indeformable feature, prolong Long Road Service Life.
Embodiment 3
The preparation method on a kind of pavement, the Autoluminescence type sponge road that drunk water automatically using preparation is prepared, with sponge road Unlike road, the permeable surface layer and porous base course thickness on pavement and the permeable surface layer in sponge road and porous base course are not Together, in the present embodiment, pavement integrated can be poured with sponge road, while simplifying road surface manufacture craft, increase road Face is integrally antitorque, anti seismic efficiency.
Embodiment 4
The preparation method of a kind of slope protection, the Autoluminescence type sponge road that drunk water automatically using preparation is prepared.With sponge road Unlike, the permeable surface layer of slope protection and porous base course thickness in sponge road permeable surface layer and porous base course it is different, have Actually the pouring based on size with design of body.
Embodiment 5
The preparation method on a kind of square, the self-action sponge road that drunk water automatically using preparation is prepared.It is different from sponge road , the permeable surface layer on square and porous base course thickness from sponge road permeable surface layer and porous base course it is different, specifically With actually pouring based on size for design.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one Connect to body;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be indirect by intermediary It is connected, can be the connection inside two elements.For the ordinary skill in the art, on being understood with concrete condition State the concrete meaning of term in the present invention.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (8)

  1. The Autoluminescence type sponge road 1. a kind of soil and the preparation of building complex rubbish are drunk water automatically, it is characterised in that: include: certainly Permeable surface layer, porous base course and the separation layer being successively laid under above, the porous base course are macromolecule Water permeable body.
  2. The Autoluminescence type sponge road 2. soil according to claim 1 and the preparation of building complex rubbish are drunk water automatically, It is characterized in that:
    The porous base course includes support keel and the macromolecule seepy material that is coated on outside support keel.
  3. The Autoluminescence type sponge road 3. soil according to claim 2 and the preparation of building complex rubbish are drunk water automatically, It is characterized in that:
    The macromolecule seepy material includes the raw material of following weight percent: mudstone charcoal ground-slag 40-70%, unsaturated polyester (UP) tree Rouge 10-30%, curing agent 5-10%, aluminium powder 3-8%, reinforcing agent 0.5-1.5%, promotor 0.5-1.5%, cement 10-20%, water 15- 30%。
  4. The Autoluminescence type sponge road 4. soil according to claim 1 and the preparation of building complex rubbish are drunk water automatically, It is characterized in that:
    The permeable surface layer includes the raw material of following weight percent: mudstone charcoal ground-slag 30-60%, unsaturated polyester resin 10- 30%, curing agent 2-10%, reinforcing agent 0.5-1.5%, luminescent powder 1-5%, water 15-30%.
  5. 5. a kind of preparation method for preparing the Autoluminescence type sponge road that drinks water automatically, comprising the following steps:
    1) separation layer is laid in native soil layer;
    2) prepared by macromolecule seepy material: weighing weight percent is 40-70% mudstone charcoal ground-slag, 10-30% unsaturated polyester (UP) tree Rouge, 5-10% curing agent, 3-8% aluminium powder, 15-30% water are poured into full-automatic mixing plant, and full-automatic mixing plant opens rotation 5- Stop stirring after 10min, 10-20% cement is thrown to inside full-automatic mixing plant and stirs 1-3min, sequentially adds 0.5- 1.5% reinforcing agent, 0.5-1.5% promotor continue to stir, and stir grinding after 10-20 min, are prepared into macromolecule seepy material, with Standby rear use;
    3) permeable surface layer preparation: weighing weight percent is 30-60% mudstone charcoal ground-slag, 5-20% unsaturated polyester resin, 2-10% Curing agent, 0.5-1.5% reinforcing agent, 1-5% luminescent powder, water 15-30% pour into the full-automatic mixing plant stirring of stirring powder after mixing evenly Mill, is made powder, for future use;
    4) it makes support keel: using artificial and machinery production to be spliced by basic body of mental section, using more Mental section is spliced into the rectangular box that longitudinal cross-section is rectangular configuration, is attached on the inside of mental section by reinforcing member solid Certainly horizontal and vertical welding after, completes the company of metal mesh sheet in the side wall of rectangular box by the way of spot welding and binding It connects, forms Integral box metal truss, as support keel, support keel is laid on above separation layer;
    5) the macromolecule seepy material prepared is poured according to the model of support keel using flowing water feeding manner: complete Highly pressurised liquid grouting pump is connected on automatic mixing plant, highly pressurised liquid grouting pump pours device to Integral box metal mesh by high pressure Frame pours, and makes it to be covered on separation layer with a thickness of the standard of 1000mm-1500mm, forms base;
    6) surface layer prepared is cast in by base upper surface using flowing water feeding manner, makes surface thickness 0.5mm-30mm.
  6. 6. a kind of pavement, it is characterised in that: using the preparation method for the Autoluminescence type sponge road that drinks water automatically described in power 5 It is prepared.
  7. 7. a kind of slope protection, it is characterised in that: using the preparation method system for the Autoluminescence type sponge road that drinks water automatically described in power 5 It is standby to form.
  8. 8. a kind of square, it is characterised in that: using the preparation method system for the Autoluminescence type sponge road that drinks water automatically described in power 5 It is standby to form.
CN201910657664.8A 2019-07-20 2019-07-20 Automatic luminous sponge road for preparing soil and comprehensive building rubbish and automatically drinking water Active CN110273345B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910657664.8A CN110273345B (en) 2019-07-20 2019-07-20 Automatic luminous sponge road for preparing soil and comprehensive building rubbish and automatically drinking water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910657664.8A CN110273345B (en) 2019-07-20 2019-07-20 Automatic luminous sponge road for preparing soil and comprehensive building rubbish and automatically drinking water

Publications (2)

Publication Number Publication Date
CN110273345A true CN110273345A (en) 2019-09-24
CN110273345B CN110273345B (en) 2024-05-28

Family

ID=67965019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910657664.8A Active CN110273345B (en) 2019-07-20 2019-07-20 Automatic luminous sponge road for preparing soil and comprehensive building rubbish and automatically drinking water

Country Status (1)

Country Link
CN (1) CN110273345B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111285638A (en) * 2020-02-20 2020-06-16 山西平朔煤矸石发电有限责任公司 Paving method suitable for permeable pavement

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594155A (en) * 2015-01-19 2015-05-06 薛志东 Permeable pavement laying method
CN107034767A (en) * 2017-06-26 2017-08-11 湖南顺天建设集团有限公司 A kind of full pervious concrete pavement structure of regeneration aggregate and its construction method
CN109853323A (en) * 2018-12-28 2019-06-07 无锡市城归设计有限责任公司 A kind of sponge urban ecology diafiltration ground structure and its construction method
CN210395033U (en) * 2019-07-20 2020-04-24 江苏懿必合建筑结构优化有限公司 Automatic luminous formula sponge road that drinks water of soil and comprehensive building rubbish preparation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594155A (en) * 2015-01-19 2015-05-06 薛志东 Permeable pavement laying method
CN107034767A (en) * 2017-06-26 2017-08-11 湖南顺天建设集团有限公司 A kind of full pervious concrete pavement structure of regeneration aggregate and its construction method
CN109853323A (en) * 2018-12-28 2019-06-07 无锡市城归设计有限责任公司 A kind of sponge urban ecology diafiltration ground structure and its construction method
CN210395033U (en) * 2019-07-20 2020-04-24 江苏懿必合建筑结构优化有限公司 Automatic luminous formula sponge road that drinks water of soil and comprehensive building rubbish preparation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111285638A (en) * 2020-02-20 2020-06-16 山西平朔煤矸石发电有限责任公司 Paving method suitable for permeable pavement

Also Published As

Publication number Publication date
CN110273345B (en) 2024-05-28

Similar Documents

Publication Publication Date Title
CN103174076A (en) Road water draining and filtering structure
CN105862548B (en) The system for preventing surface gathered water and city rain-flood resources from reclaiming and recycling
CN105926408A (en) Garden ecological rainwater feeding and draining system
CN110629629A (en) Recycled aggregate permeable pavement structure and method
CN202730583U (en) Road water draining and water filtering structure
CN209338948U (en) A kind of water-permeable pavement structure
CN106012744A (en) Ecological water permeable pavement
CN109338839B (en) Urban seepage storage system for recycling construction waste
CN110273345A (en) Automatic luminous formula sponge road that drinks water of soil and comprehensive building rubbish preparation
CN210597544U (en) Automatic water-drinking filtering type integral pipeline for pouring soil and construction waste and pipe well thereof
CN213114892U (en) Functional rainwater garden suitable for sponge city
CN104293354A (en) Anti-hydrophobic soil stabilizer as well as preparation method and application thereof
CN208201555U (en) A kind of sponge urban water-through paved road suitable for assembled roadbed
CN208917622U (en) A kind of regenerative pervious pavement structure
CN210395033U (en) Automatic luminous formula sponge road that drinks water of soil and comprehensive building rubbish preparation
CN208748463U (en) A kind of town road rainwater infiltration storage row's integral system
CN108342943A (en) A kind of sponge urban water-through paved road suitable for assembled roadbed
CN109577130A (en) A kind of porous pavement of quaternity and preparation method thereof
CN104045282B (en) Nonporous closed water-permeable drainage ditch cover plate and manufacturing method thereof
CN214116117U (en) Sponge city permeable pavement
CN209384055U (en) A kind of logical village's Recycling Base cement concrete drainage pavement structure of low cost
CN108086461B (en) Percolation water-saving circulation system
CN206359859U (en) A kind of pavement pavement structure
CN207405431U (en) A kind of greening dividing strip of ecological, environmental protective
CN206655076U (en) A kind of new municipal porous pavement road drainage system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220507

Address after: 223600 No. 369, Qiaonan group, shuangyao village, TANGJian Town, Shuyang County, Suqian City, Jiangsu Province

Applicant after: Shen Zhiyong

Address before: 223600 Room 101, building 54, Subei Cheshi Commercial Plaza, Shucheng Town, Suqian City, Jiangsu Province

Applicant before: Jiangsu Yibihe Construction Structure Optimization Co.,Ltd.

GR01 Patent grant
GR01 Patent grant