CN110259108A - Method for installing scaffold - Google Patents

Method for installing scaffold Download PDF

Info

Publication number
CN110259108A
CN110259108A CN201910185173.8A CN201910185173A CN110259108A CN 110259108 A CN110259108 A CN 110259108A CN 201910185173 A CN201910185173 A CN 201910185173A CN 110259108 A CN110259108 A CN 110259108A
Authority
CN
China
Prior art keywords
vertical frame
lateral struts
scaffold
stretched
another
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910185173.8A
Other languages
Chinese (zh)
Inventor
J.斯坦布雷歇尔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Krause Werk GmbH and Co KG
Original Assignee
Krause Werk GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Krause Werk GmbH and Co KG filed Critical Krause Werk GmbH and Co KG
Publication of CN110259108A publication Critical patent/CN110259108A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/147Railings specially adapted for mounting prior to the mounting of the platform
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/14Comprising essentially pre-assembled two-dimensional frame-like elements, e.g. of rods in L- or H-shape, with or without bracing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/142Railings extensible or telescopic
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/16Struts or stiffening rods, e.g. diagonal rods
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/30Scaffolding bars or members with non-detachably fixed coupling elements
    • E04G7/302Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members
    • E04G7/303Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are only fixed at one of the bars or members to connect
    • E04G7/304Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are only fixed at one of the bars or members to connect with tying means for connecting the bars or members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/30Scaffolding bars or members with non-detachably fixed coupling elements
    • E04G7/302Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members
    • E04G7/303Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are only fixed at one of the bars or members to connect
    • E04G7/305Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are only fixed at one of the bars or members to connect without tying means for connecting the bars or members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/30Scaffolding bars or members with non-detachably fixed coupling elements
    • E04G7/34Scaffolding bars or members with non-detachably fixed coupling elements with coupling elements using positive engagement, e.g. hooks or pins
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Movable Scaffolding (AREA)
  • Ladders (AREA)

Abstract

The present invention relates to a kind of methods for installing scaffold (12), which includes upper and lower the first stacked vertical frame (22,38) for strutting the first plane, upper and lower the second stacked vertical frame (24,40) for strutting the second plane extended at interval with first plane (28).It establishes to be installed by least one the first and second vertical frame (22, 24) the first scaffold section (10) formed, at least one lateral struts (32 that can be stretched with first end (34) are fixed in the head zone of one of the vertical frame (24) of the first scaffold section, 132, 232, 332), and at the second end (36) that the opposite of the lateral struts that can be stretched is set, it is fixed with another vertical frame (38), then it is connect by another vertical frame lifter and with another vertical frame (22) of the first scaffold section.

Description

Method for installing scaffold
Technical field
The present invention relates to a kind of method for installing scaffold, which includes strutting the upper and lower of the first plane to be stacked The first vertical frame, strut upper and lower the second stacked vertical frame of the second plane extended with first plane spaced-apart Frame, preferably at least one by the lateral struts and/or diagonal section of the first vertical frame and the connection of the second vertical frame and preferably At least one platform extended between first and second plane.
Background technique
There are many methods for installing scaffold.For example, with reference to EP 2 411 598 B1 or DE 10 2014 222 249 A1。
When adding layer scaffold, there are erectors cannot sufficiently obtain fixed risk, especially if must be in foot hand Installment work is carried out on the platform (also referred to as supporting station) of the section of the upper surface of frame.
Summary of the invention
Task of the invention lies in the method for being further improved the above-mentioned type allows to unquestionably add layer foot hand Frame, wherein the work safety needed for guaranteeing simultaneously.Described plus layer should be also simplified compared with prior art in installation.
In order to solve the purpose, the present invention substantially provides as follows aspect:
A) establish by least one first and second vertical frame and preferably at least one make its connect the first lateral struts with/ Or the first scaffold section of diagonal section composition,
B) it is fixed with first end at least in the head zone of one of the vertical frame of the first scaffold section One lateral struts that can be stretched,
C) at the second end that the opposite of the lateral struts that can be stretched is set, it is fixed with another vertical frame, then will Another vertical frame lifter is simultaneously connect with another vertical frame of the first scaffold section.
Here, then can unclamp first end from vertical frame and be connect with another vertical frame, then will Another vertical frame lifter simultaneously connects (method and step d) with the vertical frame connecting first with the lateral struts that can be stretched.
Property that there is also following possibility, i.e., the lateral struts that will be stretched after adding layer by it is fixed, cannot stretch The lateral struts of contracting are replaced.It is carried out according to the method for the present invention in subsequent adding in layer using step b) and c).
According to the present invention, for vertical frame needed for installing for adding layer scaffold using extensible and can shorten , the lateral struts that can be stretched, be referred to as the second lateral struts, by means of second lateral struts come to vertical frame It is promoted, to be attached, to be such as inserted into the vertical frame with vertical frame after positioning by it.Meanwhile Referred to as the second lateral struts of installation auxiliary device are in the first and second vertical frames through installing as platform Rail stanchion works, and carries out adding layer by the described first and second vertical frames, which, which is located and fixed within, adds layer Between vertical frame.Therefore, it when using platform, due to having used the second lateral struts that can be stretched, has installed Railing.
It particularly provides, two the second lateral struts that can be stretched being separated from each other and another vertical frame connect It connects.
Second lateral struts are especially connect with the lateral crosspiece extended in the head zone of vertical frame herein, more really It says with cutting in its fringe region, i.e., it is adjacent with the vertical beam of vertical frame (Vertikalholmen), or by by tube section It is plugged into the narrowing or its beam extended vertically of vertical frame.
In order to realize the connection without a doubt between the second lateral struts and vertical frame or lateral crosspiece, can be used Fast lock closing member.For this purpose, the second lateral struts are respectively provided with from the recessed of longitudinal direction side extension in its corresponding end regions Portion, lateral crosspiece can be introduced into the recess portion, then to shift onto and to be fixed on recess portion by fixing element.
In order to dismantle corresponding scaffold, above method step carries out in reverse order, i.e., removes workbench first, Then unclamp and put down vertical frame, so as to then from through dismantling vertical frame unclamp the second lateral struts and with it is subsequent The upper end of vertical frame connects in such as lower plane, and vertical frame is removed from the plane.Then disassembly is set relatively Vertical frame.Correspondingly, scaffold is gradually disassembled according to the quantity of vertical frame stacked up and down.
Detailed description of the invention
Other details of the invention, advantages and features not only from claim, from the feature-obtained in them individually and/ Or combine-and obtained from the description of preferred embodiment below.Wherein:
Fig. 1 shows the first section of scaffold;
Fig. 2 shows the scaffold sections according to Fig. 1, have another vertical frame to be installed;
Fig. 3 shows the first scaffold section according to Fig. 1, has the another of the vertical frame of the first scaffold section of alignment A vertical frame;
Fig. 4 shows the scaffold for being added layer by means of another vertical frame;
Fig. 5 is according to the warp of Fig. 4 plus the scaffold of layer, with other workbench and other scaffold construction components;
Fig. 6 shows the lateral struts that can be stretched as rail stanchion;
Fig. 7 shows the interception part for the lateral struts that can be stretched;
Fig. 8 shows the connection between the lateral struts that can be stretched and vertical frame;And
Fig. 9 shows the connection of the crosspiece for the lateral struts and vertical frame that can be stretched.
Specific embodiment
The installation method according to the present invention for being used to add layer scaffold will be explained by attached drawing.Scaffold can be fixed Or moveable scaffold, without thus limiting the present invention.Furthermore, it is possible to install it is usually used, such as diagonal section, truss, The required or typical component for scaffold such as pillar, without being explained to this.In fact, those skilled in the art Know according to which scaffold member application or required statics must install, without being explained in greater detail.
In fig. 1 it is shown that the first section 10 of the scaffold 12 of layer to be added.Herein relate to a kind of moveable foot hand Frame.For this purpose, the moveable vertical frame 14 of setting comprising vertical and horizontal truss, wherein from height-adjustable foot Wheel (Fahrrollen) 18,20 starts to carry out.Using transverse truss 16, so that the first for strutting the first plane 26 is first vertical Frame 22 and the first the second vertical frame 24 for strutting the second plane 28 connect.Plane 26,28 extends with being separated from each other.? The platform 30 of (begehbare) of can walking is fixed between first and second truss 22,24, which is also referred to as supporting station (Belagb ü hne).
Additionally, there are the diagonal sections not marked in detail and/or the first lateral branch for reinforcing the first scaffold section 10 Column.In this respect, it is the common structure of scaffold.
In order to add a layer scaffold section 10, two lateral struts that can be stretched used according to the invention, wherein Fig. 1 extremely In 5 diagram, a lateral struts 32 in lateral struts are only can be seen in the side view based on reproduction.
Referred to as the second lateral struts, the lateral struts 32 that can stretch with end 34 in embodiment with the second vertical frame Frame 24 connects, more specifically preferably with the lateral crosspiece (Quersprosse) that extends in its head frame, such as On longitudinal beam by connecting or being plugged into vertical frame 24.It, such as can be from here, can be attached by fast lock closing member As being learnt according to the detailed diagram of Fig. 6.But it is also possible to using other connection types, such as lock connection or similar.
After the first end 34 for the second lateral struts 32 that can be stretched is connect with the second vertical frame 24, Neng Goushen The second end 36 that is opposite and setting of the lateral struts 32 of contracting is connect with another vertical frame 38, more specifically preferably same Sample connect with the lateral crosspiece extended in head zone, more specifically in their end regions.Certainly, there is also such as Lateral struts 32 are connect by lower possibility with the longitudinal beam of vertical frame.The lateral struts 32 that will be stretched and second are vertically The installation steps that frame 24 and another vertical frame 38 connect obtain in Fig. 1.
Then, while extending lateral struts 32, make another vertical frame 38 promoted and with the first vertical frame 22 Alignment, as shown in Figure 2.Then, by another vertical frame 38, i.e. second of first vertical frames of plane 26, with common Mode is connect with the first first vertical frame 22.
In installation steps related to this, the personnel for implementing operation are usually on platform 30.
After vertical frame 22,38 is connected to each other, by the first end of lateral struts 32 from the second vertical frame 24 It unclamps, to be connect with another vertical frame 40, more specifically equally in another vertical frame 40, the i.e. second vertical frame Head zone in.According to the explanation being previously completed, then lateral struts 32 are promoted and are shortening another vertical frame 40 While be aligned and be attached thereto with the second vertical frame 24.Therefore, the first second vertical frame 24 and second Two vertical frames 40 extend in the second plane 28, as shown in Figure 4.
After second of second vertical frames 40 are installed, due to the lateral struts 32 that can be stretched had it is available Railing, the railing use platform 42 for staying between second of first vertical frames 38 and second of second vertical frames 40 It is required.Therefore, according to security regulations, can work on platform 42, and can install other diagonal section or Lateral struts, as can be seen from Fig. 5, so as to use the scaffold 12 for adding layer in whole circumference.
According to above method step, scaffold 12 can pass through other sections plus layer.
In fig. 6 it is shown that the lateral struts 32 that can be stretched, have fast lock closing member in its end 34,36, with It is connect with vertical frame or its crosspiece.It can be seen that from detailed diagram A for this purpose, end regions have and extend from surface Recess portion 44, in embodiment, a section of the lateral crosspiece of one of vertical frame can be introduced into the recess portion.
Then, covering element 46 elapses on recess portion 44 and thus crosspiece, and is carried out by means of such as thumb screw 48 It is fixed, so that it is guaranteed that secure connection.Without departing from the present invention, the other connections for such as locking connection are equally possible 's.
If dismantling corresponding scaffold 12, carried out on the contrary according to aforementioned installation steps.Therefore, foot hand is being removed After diagonal section and other lateral struts in the section 100 of the upper surface of frame 12, platform 42 is removed first, then to pass through Second of second vertical frames 40 are unclamped from the first second vertical frame 24 and puts down second second as illustrated in fig. 3 and erects Straight frame 40.Then, the end 34 of the second lateral struts 32 is unclamped from vertical frame 40, so as to the first the second vertical frame The lateral crosspiece of frame 24 connects.It is then possible to which second of first vertical frames 38 are unclamped from the first first vertical frame 32 And put down, such as Fig. 1 it can be seen that.
As explaining the present invention by two scaffold sections 10,100, then self-evident scaffold can also be with With more than two sections, so that basis is constructed or is disassembled by the teachings of the present invention.
Fig. 7 shows a kind of interception part of a section of the embodiment for the lateral struts 132 that can be stretched, the cross It is made of to pillar inner tube 134 and outer tube 136.Here, inner and outer tubes 134,126 are preferably round tube.It is flexible in order to limit, outside Pipe 136 has the lantern ring 138 for the annular for preferably acting as retainer, which for example welds together with outer tube 136.Inner tube 134 have the protruding portion 140 to interact with retainer 138, which passes through the notch of the corresponding flute profile of outer tube. In addition, outer tube 136 has circular groove 142, the groove and the 144 phase interaction of ring-type element for surrounding (umgeben) inner tube 134 It is connect with, the ring-type element, for example by screw or rivet with inner tube.By measure related to this, inner and outer tubes are limited 134,136 scalability relative to each other.
Between the beam 234 of the lateral struts 232 and vertical frame that can stretch as can be drawn from Figure 8 extended vertically A kind of connection feasible program, central sill 234 narrow in end side.It, can be with grafting sleeve 238, the set on the section to narrow 236 Cylinder is fixed by falling type plug (Fallstecker) 240.Sleeve 234 is for example connect by means of welding with holding element 242, energy Enough flexible lateral struts 232 rotatably extend (axis 244) from the holding element.
Fig. 9 is intended to show that the connection between crosspiece 340 and the lateral struts that can be stretched 332, and middle rail 340 has example Such as tunnel profile.The lateral struts 332 that can be stretched pivotly are connect with holder, which is fixed on tunnel profile On 340.The lateral struts 232 that can be stretched can be pivoted around the longitudinal axis for being parallel to crosspiece.For this purpose, the cross that can be stretched It can be connect to pillar 232 by means of screw or solid rivet 334 with holder 336.
The pillar that can be stretched may remain in any plane.But therefore, each supporting station, which needs two, to stretch The pillar of contracting.
Alternatively, after each installation steps, the pillar that can be stretched can be replaced with fixed pillar.Therefore, Two pillars that can be stretched only are needed for total.Then on the last one supporting station, the branch that can stretch Column, which will retain, to be used.

Claims (10)

1. one kind is for the method for installing scaffold (12), the scaffold includes strut the first plane upper and lower stacked first Vertical frame (22,38), strut the second plane extended at interval with first plane (28) upper and lower stacked second Vertical frame (24,40), preferably at least one by lateral struts of the first vertical frame and the second vertical frame connection and/or right Corner and preferably at least one platform (30,42) extended between the first and second planes,
It is characterized in that,
A) the first scaffold section (10) being made of at least one first and second vertical frame (22,24) is established,
B) it is fixed in the head zone of one of the vertical frame (24) of the first scaffold section with first end (34) lateral struts (32,132,232,332) that at least one can stretch,
C) at the second end (36) that the opposite of the lateral struts that can be stretched is set, it is fixed with another vertical frame (38), then connect by another described vertical frame lifter and with another vertical frame (22) of the first scaffold section It connects.
2. the method as described in claim 1,
It is characterized in that,
D) after method and step c), the first end (34) is unclamped from vertical frame and with another vertical frame (40) it connects, is then erected by another described vertical frame lifter and with what is connect first with the lateral struts that can be stretched Straight frame is attached.
3. the method as described in claim 1,
It is characterized in that,
After method and step c), the lateral struts (32,132,232,332) that can be stretched are replaced by fixed pillar.
4. the method as described at least one of preceding claims,
It is characterized in that,
Two lateral struts (32,132,232,332) that can be stretched being separated from each other and another vertical frame (38,40) Connection.
5. the method as described at least one of preceding claims,
It is characterized in that,
Make another vertical frame (38. 40) in the lateral struts (32,132,232,332) that can be stretched or By the platform or another after vertical frame (the 22,24) connection of the first scaffold section (10) below person's lateral struts A platform (42) and the vertical frame, particularly another vertical frame extended in first and second plane (26,28) Connection.
6. the method as described at least one of preceding claims,
It is characterized in that,
According at least to method and step b), c), preferably in method and step b), c) and d) after, establish at least another scaffold Section, wherein platform is fixed in uppermost scaffold section before establishing another described scaffold section.
7. the method as described at least one of preceding claims,
It is characterized in that,
The lateral struts (32,132,232,332) that can be stretched or the lateral struts that can be stretched in vertical frame Lateral crosspiece (340) connection extended in the head zone of (24,38,40).
8. the method as described at least one of preceding claims,
It is characterized in that,
The lateral struts (32,132,232,332) that can be stretched or the lateral struts that can be stretched are by locking or quickly Fastening device (46,48) is connect with the vertical frame (24,38) or the lateral crosspiece.
9. the method as described at least one of preceding claims,
It is characterized in that,
The lateral struts (32) that can the be stretched preferably change with the beam of the vertical frame (24) extended vertically indirectly Thin end section (236) connection.
10. the method for dismantling scaffold, the scaffold are installed at least one of 9 according to claim 1,
It is characterized in that,
The disassembly carries out on the contrary with the method and step for installing scaffold.
CN201910185173.8A 2018-03-12 2019-03-12 Method for installing scaffold Pending CN110259108A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102018105660.5 2018-03-12
DE102018105660.5A DE102018105660A1 (en) 2018-03-12 2018-03-12 Method for mounting a scaffold

Publications (1)

Publication Number Publication Date
CN110259108A true CN110259108A (en) 2019-09-20

Family

ID=65763366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910185173.8A Pending CN110259108A (en) 2018-03-12 2019-03-12 Method for installing scaffold

Country Status (4)

Country Link
EP (1) EP3540148A1 (en)
CN (1) CN110259108A (en)
DE (1) DE102018105660A1 (en)
RU (1) RU2019106662A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3839172B1 (en) * 2019-12-20 2023-05-17 Tobler AG Railing post for a front railing, front railing for temporarily preventing falls from a new scaffolding level, scaffold for building, repair and/or assembly work and method for constructing a scaffold

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003025311A1 (en) * 2001-09-19 2003-03-27 Turner Access Limited Improvements in and relating to scaffolding
DE202004003628U1 (en) * 2004-03-05 2004-05-19 Wilhelm Layher Vermögensverwaltungs-Gmbh Device for the assembly of a temporary upright of a scaffold
US20040200668A1 (en) * 2003-04-14 2004-10-14 Benoit Duplessis Scaffolding system
CN2734895Y (en) * 2004-08-31 2005-10-19 北京康得环保科技股份有限公司 Step repairing rack
EP2175087A1 (en) * 2008-10-10 2010-04-14 Wilhelm Layher Verwaltungs-GmbH Method for mounting and demounting a mobile scaffold
DE102009021371A1 (en) * 2009-05-14 2010-11-18 Weiss, Johannes Guard rail-integrated scaffold frame for use on outer wall of building, has lock movably fastened to rail support for blocking fork of rail support, and locking surface engaged and connected with carrier section by pivoting or shifting
CN205116676U (en) * 2015-10-15 2016-03-30 苏州拓科装饰工程有限公司 Convenient to carry's scaffold

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010000472A1 (en) 2010-02-19 2011-08-25 Wilhelm Layher Verwaltungs-GmbH, 74363 Scaffolding and method for mounting or dismounting such scaffolding
DE102014222249A1 (en) 2014-10-31 2016-05-04 Hünnebeck GmbH Method and device for mounting a scaffold tower

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003025311A1 (en) * 2001-09-19 2003-03-27 Turner Access Limited Improvements in and relating to scaffolding
US20040200668A1 (en) * 2003-04-14 2004-10-14 Benoit Duplessis Scaffolding system
DE202004003628U1 (en) * 2004-03-05 2004-05-19 Wilhelm Layher Vermögensverwaltungs-Gmbh Device for the assembly of a temporary upright of a scaffold
CN2734895Y (en) * 2004-08-31 2005-10-19 北京康得环保科技股份有限公司 Step repairing rack
EP2175087A1 (en) * 2008-10-10 2010-04-14 Wilhelm Layher Verwaltungs-GmbH Method for mounting and demounting a mobile scaffold
DE102009021371A1 (en) * 2009-05-14 2010-11-18 Weiss, Johannes Guard rail-integrated scaffold frame for use on outer wall of building, has lock movably fastened to rail support for blocking fork of rail support, and locking surface engaged and connected with carrier section by pivoting or shifting
CN205116676U (en) * 2015-10-15 2016-03-30 苏州拓科装饰工程有限公司 Convenient to carry's scaffold

Also Published As

Publication number Publication date
DE102018105660A1 (en) 2019-09-12
RU2019106662A3 (en) 2020-09-17
RU2019106662A (en) 2020-09-17
EP3540148A1 (en) 2019-09-18

Similar Documents

Publication Publication Date Title
EP1944430B1 (en) Peripheral slab formwork system
KR200479716Y1 (en) system scaffold for architecture
CN110259108A (en) Method for installing scaffold
JP5824226B2 (en) Leading handrail
CN208502206U (en) Assembling the shaped steel suspension scaffolding
JP4996916B2 (en) Installation method of wire mesh panel and handrail
KR101905363B1 (en) Apparatus for using rectangle scaffold
US2468186A (en) Scaffold
JP2008297704A (en) Brace serving also as handrail
CN100387795C (en) Scaffold, beam for such scaffold and method of constructing such scaffold
JP4204605B2 (en) Assembly scaffold
JP7190134B2 (en) Receiving stage and its mounting method
ITRM20080631A1 (en) PARAPET FOR MODULAR SCAFFOLDING.
US20080001049A1 (en) Bracing Structure, Fastener and Method for Bracing a Support Structure Having Props for Ceiling Formworks
JP6491895B2 (en) Reinforcement frame for temporary structures
JP2019135355A (en) Support for temporary scaffold
JP6520533B2 (en) Overhead crane support device and load receiving member
JP2019027196A (en) Staircase opening handrail and temporary scaffold incorporating the same
CN104806003B (en) A kind of pylon is set up with scale rule, pylon and the quick erection method of pylon
JP3904873B2 (en) Handrail post and temporary handrail
KR20190041976A (en) Coupling device for scaffolding pipes
JP5860182B1 (en) FIXING STRUCTURE FOR SUSPENDED FOUNDATION AND METHOD OF ASSEMBLY
JP5502653B2 (en) Prop members and slabs and temporary scaffolds
JP2019112891A (en) Temporary scaffolding member
JP2009191506A (en) Handrail and prefabricated scaffolding

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190920

WD01 Invention patent application deemed withdrawn after publication