- CN110219214A CN110219214A CN201910481712.2A CN201910481712A CN110219214A CN 110219214 A CN110219214 A CN 110219214A CN 201910481712 A CN201910481712 A CN 201910481712A CN 110219214 A CN110219214 A CN 110219214A
- Authority
- CN
- China
- Prior art keywords
- ring road
- road
- main line
- lane
- underway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C1/00—Design or layout of roads, e.g. for noise abatement, for gas absorption
- E01C1/04—Road crossings on different levels; Interconnections between roads on different levels
Abstract
The invention discloses multiple exit tolerance grade separations, including grade separation main structure and grade separation tolerance structure composition, the grade separation main structure includes overpass road and underway, the first right-hand rotation ring road is connected separately between the side and underway on the overpass road, 4th right-hand rotation ring road, second left rotaring ring road, 4th left rotaring ring road, first, which turns right, assists ring road, second turns left to assist ring road, third, which is turned right, assists ring road and third to turn left to assist ring road, the second right-hand rotation ring road is connected separately between the other side and underway on the overpass road, third right-hand rotation ring road, first left rotaring ring road, third left rotaring ring road, second, which turns right, assists ring road, 4th turns left to assist ring road, first, which turns left to assist ring road and third to turn right, assists ring road.All designs of the present invention carry out inside grade separation, improve the utilization rate of grade separation inner space resource, provide multiple main line outlets, a plurality of operating path to wagon flow is turned to, increase the convenience of traveler.
Description
Technical field
The present invention relates to grade separation technical field, specific field is multiple exit tolerance grade separation.
Background technique
This reality is with the improvement of living standards, resident trip becomes more diverse, in terms of the trip quality such as comfortable, quick
It is required that also higher and higher.Super expressway (such as highway, city expressway) and other roads carry out crossings on different level, not by traffic
Signal interference is driven a vehicle continuously along victory, is favored by traveler.Grade separation is as the essential element of super expressway, and vehicle is vertical
Bank of Communications is sailed can encounter this problem often: being unfamiliar with due to the carelessness of driver or to road conditions, lead to miss outlet, vehicle must not
Without long-distance detour return correct road, or do not stint it is illegal drive in the wrong direction return to former outlet.This single exit design is to friendship
Logical participant brings the inconvenience of extreme, on the one hand, the detour of long range increases travel time cost, and to a certain degree
On increase the traffic pressure in other sections, on the other hand, on super expressway driving in the wrong direction, there are major safety risks, to lives and properties
Safety causes larger threat." reasonable " demand for considering traffic participant, for this purpose, it is proposed that multiple exit tolerance grade separation.
Summary of the invention
The purpose of the present invention is to provide multiple exit tolerance grade separations, to solve the problems mentioned in the above background technology.
To achieve the above object, the invention provides the following technical scheme: multiple exit tolerance grade separation, including grade separation main body knot
Structure and grade separation tolerance structure composition, the grade separation main structure include overpass road and underway, in the overpass road
Portion is set to the upside of underway, and the overpass road and underway are two-way lane, and overpass road and underway
Middle part serve as theme Through Lane, one end of each main line Through Lane is equipped with entrance, the two of the overpass road
Side is respectively equipped with the first tolerant lane and the second tolerant lane, the two sides of the underway be respectively equipped with third tolerance lane and
4th tolerant lane is set between the main line Through Lane and the first tolerant lane in the close first tolerant lane on the overpass road
There are several main lines to export, the first right-hand rotation ring road, the 4th right side are connected separately between the side and underway on the overpass road
Turn ring road, the second left rotaring ring road, the 4th left rotaring ring road, first turn right auxiliary ring road, second turn left auxiliary ring road, third turn right it is auxiliary
It helps ring road and third to turn left to assist ring road, is connected separately with the second right-hand rotation between the other side and underway on the overpass road
Ring road, third right-hand rotation ring road, the first left rotaring ring road, third left rotaring ring road, second, which are turned right, assists ring road, the 4th to turn left to assist circle
Road, first turn left to assist ring road and third right-hand rotation auxiliary ring road, the first left-hand rotation auxiliary ring road and third left-hand rotation auxiliary ring road
Between be equipped with third and turn around ring road, the third auxiliary ring road and second that turns left turns left to be equipped with second between auxiliary ring road and turns around circle
Road, the described second auxiliary ring road and the 4th that turns left turn left to be equipped with the 4th between auxiliary ring road and turn around ring road, the described 4th turn left it is auxiliary
Ring road and first is helped to turn left to be equipped with first between auxiliary ring road and turn around ring road.
Preferably, the first right-hand rotation auxiliary ring road completes transformation, and main line by the 4th left rotaring ring road of underway
Remaining direction, which is turned right, to be assisted ring road and turns left ring road is assisted similarly to be arranged.
Preferably, described first turn around ring road by first turn left auxiliary ring road and underway second turn right auxiliary circle
Complete transformation in road;Remaining direction of main line ring road that turns around similarly is arranged.
Preferably, each tolerant lane is separated with main line Through Lane by traffic marking, and all turning wagon flows of main line are handed over
It knits and operates in tolerant ring road completion, reduce the influence to straight going on main road wagon flow.
Preferably, described first ring road is turned around and second ring road that turns around is located at below overpass road;The third turns around circle
Road and the 4th ring road that turns around are located above underway.
Preferably, each tolerant lane main line outlet, each turning ring road have been equipped with complete identifier marking system, guide
All directions wagon flow is correctly run.
Preferably, each ring road is one-way trip.
The passing method of multiple exit tolerance grade separation, includes the following steps: to please refer to Fig. 2 and Fig. 3, when overpass routes east
To western wagon flow right-hand rotation path I are as follows: drive into the first tolerant lane by main line outlet a, enter underway from the first right-hand rotation ring road
Third tolerance lane is collaborated through entrance f and underway straight traffic, completes to turn right;The overpass is routed to the east of western vehicle
Flow right-hand rotation path II are as follows: a is exported by main line or main line outlet b drives into the first tolerant lane, when right-turning vehicles miss the first right-hand rotation
When ring road, the third tolerance lane of underway is entered from the first right-hand rotation auxiliary ring road, through entrance f and underway straight traffic
Interflow completes to turn right;The overpass is routed to the east of western wagon flow right-hand rotation path III are as follows: by main line export a or main line outlet b or
Main line outlet c or main line outlet d drive into the first tolerant lane, when right-turning vehicles miss the first right-hand rotation ring road and the first right-hand rotation auxiliary
When ring road, the tolerant lane of opposite second is returned to from first ring road that turns around, enters the of underway by the second left rotaring ring road
Three tolerant lanes, collaborate through entrance f and underway straight traffic, complete to turn right;Remaining direction right-hand rotation path of main line is similarly.
Fig. 4 and Fig. 5 are please referred to, when overpass is routed to the east of western wagon flow left-hand rotation path I are as follows: export a by main line or main line goes out
Mouth b or main line outlet c drive into the first tolerant lane, the 4th tolerant lane of underway are entered through the first left rotaring ring road, through entering
Mouth g and underway straight traffic are collaborated, and complete;The overpass is routed to the east of western wagon flow left-hand rotation path II are as follows: by
Main line outlet a or main line outlet b or main line outlet c or main line outlet d drive into the first tolerant lane, when left turning vehicle misses first
When left rotaring ring road, turns left to assist ring road to enter the 4th tolerant lane of underway through first, keep straight on through entrance g and underway
Wagon flow interflow, completes;The overpass is routed to the east of western wagon flow left-hand rotation path III are as follows: exports a by main line or main line goes out
Mouth b or main line outlet c or main line outlet d drive into the first tolerant lane, when left turning vehicle misses the first left rotaring ring road and first left side
When turning auxiliary ring road, the tolerant lane of opposite second is returned to through first ring road that turns around, from auxiliary by turning right west to the second of eastern wagon flow
It helps ring road to enter the 4th tolerant lane of underway, is collaborated by entrance g and underway straight traffic, complete;Main line
Remaining direction left-hand rotation path is similarly.
Fig. 6 and Fig. 7 are please referred to, when the described overpass routing is turned around path I to the east of western wagon flow are as follows: by main line export a or
Main line outlet b or main line outlet c drive into the first tolerant lane, borrow the 4th tolerant vehicle that the first left rotaring ring road enters underway
Road returns to the second tolerant lane on overpass road from the third left rotaring ring road of underway, through entrance e and overpass road straight traffic
Stream interflow, completes to turn around;The described overpass routing is turned around path II to the east of western wagon flow are as follows: exports a by main line or main line exports b
Or main line outlet c or main line outlet d drive into the first tolerant lane and fall when head end operation misses the first left rotaring ring road from first
Head ring road enters the tolerant lane of opposite second, collaborates through entrance e and overpass road straight traffic, completes to turn around;Main line remaining
Path turn around similarly in direction.
Compared with prior art, the beneficial effects of the present invention are: multiple exit tolerance grade separation, all designs of the present invention exist
It is carried out inside grade separation, improves the utilization rate of grade separation inner space resource, provide multiple main line outlets, a plurality of fortune to wagon flow is turned to
Walking along the street diameter increases the convenience of traveler.
Detailed description of the invention
Fig. 1 is overlooking structure diagram of the invention;
Fig. 2 is that overpass of the present invention is routed to the east of western wagon flow right-hand rotation operating path schematic diagram;
Fig. 3 is the path annotated map in Fig. 2;
Fig. 4 is that overpass of the present invention is routed to the east of western wagon flow left turn maneuver path schematic diagram;
Fig. 5 is the path annotated map in Fig. 4;
Fig. 6 is that overpass of the present invention routing is turned around operating path schematic diagram to the east of western wagon flow;
Fig. 7 is the path annotated map in Fig. 6.
In figure: 1- overpass road, 2- underway, the first right-hand rotation of 3- ring road, the second right-hand rotation of 4- ring road, 5- the first left-hand rotation circle
Road, the second left rotaring ring road of 6-, 7- third right-hand rotation ring road, the 4th right-hand rotation ring road of 8-, 9- third left rotaring ring road, the 4th left-hand rotation circle of 10-
The tolerant lane road, 11- first, the tolerant lane 12- second, 13- third tolerance lane, the tolerant lane 14- the 4th, 15- first fall
Head ring road, 16- second turn around ring road, 17- third turn around ring road, 18- the 4th turn around ring road, 19- first turn right auxiliary ring road,
20- second, which turns right, assists ring road, 21- first to turn left to assist ring road, the left-hand rotation auxiliary of 22- second ring road, 23- third right-hand rotation auxiliary circle
Road, 24- third, which are turned right, assists ring road, 25- third to turn left to assist ring road, the left-hand rotation auxiliary ring road of 26- the 4th.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Fig. 1-7 is please referred to, the present invention provides a kind of technical solution: multiple exit tolerance grade separation, including grade separation main structure
With grade separation tolerance structure composition, the grade separation main structure includes overpass road 1 and underway 2, in the overpass road
Portion is set to the upside of underway, and the overpass road and underway are two-way lane, and overpass road and underway
Middle part serve as theme Through Lane, one end of each main line Through Lane is equipped with entrance, the two of the overpass road
Side is respectively equipped with the first tolerant lane 11 and the second tolerant lane 12, and the two sides of the underway are respectively equipped with third tolerance vehicle
Road 13 and the 4th tolerant lane 14, the main line Through Lane and the first tolerant vehicle close to the first tolerant lane on the overpass road
It is equipped with several main lines between road to export, the first right-hand rotation ring road is connected separately between the side and underway on the overpass road
3, the 4th right-hand rotation ring road 8, the second left rotaring ring road 6, the 4th left rotaring ring road 10, first, which are turned right, assists ring road 19, second to turn left to assist
Ring road 22, third, which are turned right, assists ring road 24 and third to turn left to assist ring road 25, the other side on the overpass road and underway
Between to be connected separately with the second right-hand rotation ring road 4, third right-hand rotation ring road 7, the first left rotaring ring road 5, third left rotaring ring road 9, second right
Turn the auxiliary ring road 26, first that turns left of auxiliary ring road the 20, the 4th and turns left auxiliary ring road 21 and third is turned right auxiliary ring road 23, described the
One turns left auxiliary ring road and third turns left to be equipped with third between auxiliary ring road and turn around ring road 17, the third turn left auxiliary ring road with
Second, which turns left, is equipped with second between auxiliary ring road and turns around ring road 16, and the described second auxiliary ring road that turns left turns left to assist ring road with the 4th
Between be equipped with the 4th and turn around ring road 18, the described 4th auxiliary ring road and first that turns left turns left to be equipped with first between auxiliary ring road and turns around
Ring road 15.
Specifically, the first right-hand rotation auxiliary ring road completes transformation by the 4th left rotaring ring road of underway, and main
Remaining direction of line, which is turned right, to be assisted ring road and turns left ring road is assisted similarly to be arranged.
Specifically, described first turn around ring road by first turn left auxiliary ring road and underway second turn right assist
Ring road completes transformation;Remaining direction of main line ring road that turns around similarly is arranged.
Specifically, each tolerance lane is separated with main line Through Lane by traffic marking, all turning wagon flows of main line
Weaving is completed in tolerant ring road, reduces the influence to straight going on main road wagon flow.
Specifically, described first turns around ring road and second ring road that turns around is located at below overpass road;The third turns around
Ring road and the 4th ring road that turns around are located above underway.
Specifically, the outlet of each tolerance lane main line, each turning ring road have been equipped with complete identifier marking system, draw
All directions wagon flow is led correctly to run.
Specifically, each ring road is one-way trip.
The passing method of multiple exit tolerance grade separation, includes the following steps: to please refer to Fig. 2 and Fig. 3, when overpass routes east
To western wagon flow right-hand rotation path I are as follows: drive into the first tolerant lane by main line outlet a, enter underway from the first right-hand rotation ring road
Third tolerance lane is collaborated through entrance f and underway straight traffic, completes to turn right;The overpass is routed to the east of western vehicle
Flow right-hand rotation path II are as follows: a is exported by main line or main line outlet b drives into the first tolerant lane, when right-turning vehicles miss the first right-hand rotation
When ring road, the third tolerance lane of underway is entered from the first right-hand rotation auxiliary ring road, through entrance f and underway straight traffic
Interflow completes to turn right;The overpass is routed to the east of western wagon flow right-hand rotation path III are as follows: by main line export a or main line outlet b or
Main line outlet c or main line outlet d drive into the first tolerant lane, when right-turning vehicles miss the first right-hand rotation ring road and the first right-hand rotation auxiliary
When ring road, the tolerant lane of opposite second is returned to from first ring road that turns around, enters the of underway by the second left rotaring ring road
Three tolerant lanes, collaborate through entrance f and underway straight traffic, complete to turn right;Remaining direction right-hand rotation path of main line is similarly.
Fig. 4 and Fig. 5 are please referred to, when overpass is routed to the east of western wagon flow left-hand rotation path I are as follows: export a by main line or main line goes out
Mouth b or main line outlet c drive into the first tolerant lane, the 4th tolerant lane of underway are entered through the first left rotaring ring road, through entering
Mouth g and underway straight traffic are collaborated, and complete;The overpass is routed to the east of western wagon flow left-hand rotation path II are as follows: by
Main line outlet a or main line outlet b or main line outlet c or main line outlet d drive into the first tolerant lane, when left turning vehicle misses first
When left rotaring ring road, turns left to assist ring road to enter the 4th tolerant lane of underway through first, keep straight on through entrance g and underway
Wagon flow interflow, completes;The overpass is routed to the east of western wagon flow left-hand rotation path III are as follows: exports a by main line or main line goes out
Mouth b or main line outlet c or main line outlet d drive into the first tolerant lane, when left turning vehicle misses the first left rotaring ring road and first left side
When turning auxiliary ring road, the tolerant lane of opposite second is returned to through first ring road that turns around, from auxiliary by turning right west to the second of eastern wagon flow
It helps ring road to enter the 4th tolerant lane of underway, is collaborated by entrance g and underway straight traffic, complete;Main line
Remaining direction left-hand rotation path is similarly.
Fig. 6 and Fig. 7 are please referred to, when the described overpass routing is turned around path I to the east of western wagon flow are as follows: by main line export a or
Main line outlet b or main line outlet c drive into the first tolerant lane, borrow the 4th tolerant vehicle that the first left rotaring ring road enters underway
Road returns to the second tolerant lane on overpass road from the third left rotaring ring road of underway, through entrance e and overpass road straight traffic
Stream interflow, completes to turn around;The described overpass routing is turned around path II to the east of western wagon flow are as follows: exports a by main line or main line exports b
Or main line outlet c or main line outlet d drive into the first tolerant lane and fall when head end operation misses the first left rotaring ring road from first
Head ring road enters the tolerant lane of opposite second, collaborates through entrance e and overpass road straight traffic, completes to turn around;Main line remaining
Path turn around similarly in direction.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (8)
1. multiple exit tolerance grade separation, including grade separation main structure and grade separation tolerance structure composition, it is characterised in that: the grade separation
Main structure includes overpass road (1) and underway (2), and the middle part of the overpass road (1) is set to the upper of underway (2)
Side, the overpass road (1) and underway (2) are two-way lane, and the middle part of overpass road (1) and underway (2)
It serves as theme Through Lane, one end of each main line Through Lane is equipped with entrance, the two sides point of the overpass road (1)
Not She You the first tolerant lane (11) and the second tolerance lane (12), it is wide that the two sides of the underway (2) are respectively equipped with third
Hold lane (13) and the 4th tolerant lane (14), the main line straight trip close to the first tolerant lane (11) of the overpass road (1)
It is equipped with several main lines between lane and the first tolerant lane (11) to export, the side and underway (2) of the overpass road (1)
Between be connected separately with the first right-hand rotation ring road (3), the 4th right-hand rotation ring road (8), the second left rotaring ring road (6), the 4th left rotaring ring road
(10), the first right-hand rotation auxiliary ring road (19), second turn left to assist ring road (22), third right-hand rotation that ring road (24) and third is assisted to turn left
It assists ring road (25), is connected separately with the second right-hand rotation ring road between the other side and underway (2) of the overpass road (1)
(4), third right-hand rotation ring road (7), the first left rotaring ring road (5), third left rotaring ring road (9), second, which are turned right, assists ring road (20), the 4th
Turn left to assist ring road (26), first to turn left to assist ring road (21) and third right-hand rotation auxiliary ring road (23), the first left-hand rotation auxiliary
Ring road (21) and third turn left to assist to turn around ring road (17) equipped with third between ring road (25), and the third turns left to assist ring road
(25) be equipped between auxiliary ring road (22) of turning left second and second turn around ring road (16), described second turn left auxiliary ring road (22) with
4th, which turns left, assists turning around ring road (18) equipped with the 4th between ring road (26), and the described 4th turns left to assist ring road (26) and first left side
Turn to turn around ring road (15) equipped with first between auxiliary ring road (21).
2. multiple exit tolerance grade separation according to claim 1, it is characterised in that: described first, which turns right, assists ring road (19)
Transformation is completed by the 4th left rotaring ring road (10) of underway (2), and remaining direction of main line turns right and assists ring road and turn left auxiliary
Ring road is helped similarly to be arranged.
3. multiple exit tolerance grade separation according to claim 1, it is characterised in that: described first turn around ring road (15) by
First the second right-hand rotation for turning left auxiliary ring road (21) and underway (2) assists ring road (20) to complete transformation;Remaining direction of main line
The ring road that turns around similarly is arranged.
4. multiple exit tolerance grade separation according to claim 1, it is characterised in that: each tolerance lane and main line straight traffic
Road is separated by traffic marking.
5. multiple exit tolerance grade separation according to claim 1, it is characterised in that: described first turns around ring road (15) and
Two ring roads (16) that turn around are located at below overpass road (1);The third turns around ring road (17) and the 4th ring road (18) that turns around is located at
Above underway (2).
6. multiple exit tolerance grade separation according to claim 1, it is characterised in that: each tolerance lane main line exports, is each
Turning ring road has been equipped with complete identifier marking system.
7. multiple exit tolerance grade separation according to claim 1, it is characterised in that: each ring road is one-way trip
8. the passing method of multiple exit tolerance grade separation according to claim 1 includes the following steps: when overpass road
(1) by the east of western wagon flow right-hand rotation path I are as follows: the first tolerant lane (11) is driven by main line outlet a, from the first right-hand rotation ring road (3)
Into the third tolerance lane (13) of underway (2), collaborate through entrance f and underway (2) straight traffic, completes to turn right;
The overpass road (1) is by the east of western wagon flow right-hand rotation path II are as follows: exports a by main line or main line outlet b drives into the first tolerance
It turns right from first and ring road (19) is assisted to enter underway when right-turning vehicles miss the first right-hand rotation ring road (3) in lane (11)
(2) third tolerance lane (13) is collaborated through entrance f and underway (2) straight traffic, completes to turn right;The overpass
Road (1) is by the east of western wagon flow right-hand rotation path III are as follows: exports a or main line outlet b or main line outlet c by main line or main line outlet d is sailed
Enter the first tolerant lane (11), when right-turning vehicles miss the first right-hand rotation ring road (3) and first turn right assist ring road (19) when, from the
One, which turns around, the second opposite tolerance lane (12) of ring road (15) return, enters underway (2) by the second left rotaring ring road (6)
Third tolerance lane (13) is collaborated through entrance f and underway (2) straight traffic, completes to turn right;Remaining direction right-hand rotation road of main line
Diameter is similarly.
When overpass road (1) is by the east of western wagon flow left-hand rotation path I are as follows: export a or main line outlet b by main line or main line outlet c is sailed
Enter the first tolerant lane (11), the 4th tolerant lane (14) of underway (2) is entered through the first left rotaring ring road (5), through entrance g
Collaborate with underway (2) straight traffic, completes;The overpass road (1) is by the east of western wagon flow left-hand rotation path II are as follows:
A or main line outlet b or main line outlet c are exported by main line or main line outlet d drives into the first tolerant lane (11), when left turning vehicle mistake
When crossing the first left rotaring ring road (5), the 4th tolerant lane (14) of underway (2) is entered through the first left-hand rotation auxiliary ring road (21),
Collaborate through entrance g and underway (2) straight traffic, completes;The overpass road (1) is by the east of western wagon flow left-hand rotation road
Diameter III are as follows: a or main line outlet b or main line outlet c are exported by main line or main line outlet d drives into the first tolerant lane (11), works as a left side
Change trains or buses to miss the first left rotaring ring road (5) and first turn left auxiliary ring road (21) when, through first turn around ring road (15) return it is opposite
The second tolerant lane (12), from by west to the second of eastern wagon flow turn right auxiliary ring road (20) enter underway (2) the 4th
Tolerant lane (14) is collaborated by entrance g and underway (2) straight traffic, completes;Remaining direction left-hand rotation path of main line is same
Reason.
When the overpass road (1) to the east of western wagon flow by turning around path I are as follows: export a or main line outlet b by main line or main line goes out
Mouth c drives into the first tolerant lane (11), borrows the 4th tolerant lane (14) that the first left rotaring ring road (5) enter underway (2),
The second tolerant lane (12) that overpass road (1) is returned from the third left rotaring ring road (9) of underway (2), through entrance e on across
Road (1) straight traffic interflow, completes to turn around;The overpass road (1) to the east of western wagon flow by turning around path II are as follows: by main line
Outlet a or main line outlet b or main line outlet c or main line outlet d drive into the first tolerant lane (11), when head end operation misses first
When left rotaring ring road (5), ring road (15) are turned around into the opposite second tolerant lane (12), through entrance e and overpass road from first
(1) straight traffic is collaborated, and completes to turn around;Path turn around similarly in remaining direction of main line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910481712.2A CN110219214A (en) | 2019-06-04 | 2019-06-04 | Multiple exit tolerance grade separation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910481712.2A CN110219214A (en) | 2019-06-04 | 2019-06-04 | Multiple exit tolerance grade separation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110219214A true CN110219214A (en) | 2019-09-10 |
Family
ID=67819309
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910481712.2A Pending CN110219214A (en) | 2019-06-04 | 2019-06-04 | Multiple exit tolerance grade separation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110219214A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112982048A (en) * | 2021-02-25 | 2021-06-18 | 中国路桥工程有限责任公司 | Intelligent interchange system and implementation method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09137409A (en) * | 1995-11-14 | 1997-05-27 | Mitsubishi Heavy Ind Ltd | Ramp bridge type highway grade separation facility |
CN201116354Y (en) * | 2007-08-27 | 2008-09-17 | 郑权泽 | Double-layer cloverleaf junction |
CN102296503A (en) * | 2011-05-25 | 2011-12-28 | 杨光 | Improved clover leaf overpass |
CN202787004U (en) * | 2012-09-17 | 2013-03-13 | 上海市政工程设计研究总院(集团)有限公司 | Junction type all-communication flyover crossing structure |
CN103924493A (en) * | 2014-04-14 | 2014-07-16 | 李朝 | Expressway with error correcting road |
CN207699961U (en) * | 2017-12-19 | 2018-08-07 | 长安大学 | A kind of high speed intersection ring road structure |
CN108560342A (en) * | 2018-06-14 | 2018-09-21 | 刘志涛 | Combined type straight trip flat turn viaduct |
-
2019
- 2019-06-04 CN CN201910481712.2A patent/CN110219214A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09137409A (en) * | 1995-11-14 | 1997-05-27 | Mitsubishi Heavy Ind Ltd | Ramp bridge type highway grade separation facility |
CN201116354Y (en) * | 2007-08-27 | 2008-09-17 | 郑权泽 | Double-layer cloverleaf junction |
CN102296503A (en) * | 2011-05-25 | 2011-12-28 | 杨光 | Improved clover leaf overpass |
CN202787004U (en) * | 2012-09-17 | 2013-03-13 | 上海市政工程设计研究总院(集团)有限公司 | Junction type all-communication flyover crossing structure |
CN103924493A (en) * | 2014-04-14 | 2014-07-16 | 李朝 | Expressway with error correcting road |
CN207699961U (en) * | 2017-12-19 | 2018-08-07 | 长安大学 | A kind of high speed intersection ring road structure |
CN108560342A (en) * | 2018-06-14 | 2018-09-21 | 刘志涛 | Combined type straight trip flat turn viaduct |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112982048A (en) * | 2021-02-25 | 2021-06-18 | 中国路桥工程有限责任公司 | Intelligent interchange system and implementation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2014173028A1 (en) | Level intersection crisscross interactive pedestrian-car-bus convenience anti-bottleneck mode traffic | |
WO2014075635A1 (en) | Method for improving intersection traffic throughput capacity | |
CN201634978U (en) | Road intersection system of T-shaped junction | |
KR20070106184A (en) | Intersection structure and signal control method for effective allocation of car signal time | |
CN108797246B (en) | Vehicle passing system and passing control method for ring-shaped intersection | |
CN101591879A (en) | Cross road smooth-type road structure and traffic route thereof | |
CN110219214A (en) | Multiple exit tolerance grade separation | |
CN201620325U (en) | Cross road unblocked type road construction and traffic route thereof | |
CN105625127B (en) | A kind of intersection of Chinese knot-type viaduct | |
CN207987643U (en) | System is canalized in Four-Lane Road T-shaped road junction | |
CN207987645U (en) | System is canalized in Four-Lane Road intersection | |
CN207619758U (en) | High flow capacity intersection | |
CN208563017U (en) | Y type mutilevel overpass | |
CN207904681U (en) | A kind of rotor viaduct | |
CN202298397U (en) | Road facility capable of keeping vehicles on urban cross road smooth | |
CN202766940U (en) | Road facility for enabling vehicles on lanes to run in non-intersected mode | |
CN207904682U (en) | A kind of eight-trigram type viaduct | |
CN102345260A (en) | Smooth type cross road in cities | |
CN106065551A (en) | A kind of without waiting for quickly through crossroad | |
CN106284009A (en) | Cross interchange overpass | |
CN105986534A (en) | Crossroad viaduct without traffic light | |
CN107034752B (en) | A kind of safe and efficient accessible distribution lane formula traffic road junction | |
CN107151955A (en) | The intersecting traffic system in crossroad zero | |
CN108342934A (en) | A kind of rotor viaduct | |
CN102094373A (en) | Series all-through overpass |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190910 |