CN110216627A - Device is removed in locomotive split pin - Google Patents
Device is removed in locomotive split pin Download PDFInfo
- Publication number
- CN110216627A CN110216627A CN201910524573.7A CN201910524573A CN110216627A CN 110216627 A CN110216627 A CN 110216627A CN 201910524573 A CN201910524573 A CN 201910524573A CN 110216627 A CN110216627 A CN 110216627A
- Authority
- CN
- China
- Prior art keywords
- split pin
- central strut
- sleeve
- locomotive
- paracone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25B—TOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING, OR HOLDING
- B25B27/00—Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for
- B25B27/02—Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for connecting objects by press fit or detaching same
- B25B27/08—Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for connecting objects by press fit or detaching same inserting or withdrawing cotter pins
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The present invention relates to a kind of locomotive split pins to remove device.It includes: that the locomotive split pin dismounting device includes central strut, paracone eave tile, hits set and support handle that device is removed in the locomotive split pin, the paracone eave tile is fixed on the first end of the central strut, the support handle is fixed on the second end of the central strut, the set that hits is sheathed on the central strut, and the set that hits can be slided along the central strut.Locomotive split pin is caught on using paracone eave tile, using the reciprocating motion covered on central strut is hit, the principle that the pulling force generated during hitting set and hitting support handle extracts split pin realizes the purpose for removing locomotive split pin, disassembly difficulty is small compared with general utility tool, and work efficiency is high.
Description
Technical field
The present invention relates to locomotive inspection and repairs, remove device more particularly to a kind of locomotive split pin.
Background technique
Split pin is a part of the common anti-loose device of various mechanical equipments, and the use on locomotive is more extensive.
For upkeep operation due to many position narrow spaces, general utility tool dismantles big, the traditional maintenance method for dismounting of difficulty, generallys use logical
It is used cooperatively with tool such as pliers, screwdriver, hammer etc., some positions are limited by space to be difficult to split out, and working efficiency is low.
Summary of the invention
Based on this, the present invention provides a kind of locomotive split pin dismounting device, and it is difficult using general utility tool to solve locomotive split pin
The problem of to remove.
A kind of locomotive split pin dismounting device, it includes: central strut, paracone hook that device is removed in the locomotive split pin
Head hits set and support handle, and the paracone eave tile is connect with the first end of the central strut, and the support handle is fixed on institute
The second end of central strut is stated, the set that hits is sheathed on the central strut, and the set that hits can be slided along the central strut.
Paracone eave tile hits set and support handle cooperation for being paracone eave tile for catching on locomotive split pin, central strut
Pulling force is provided.During locomotive split pin is removed at the position of limited space, locomotive split pin is caught on using paracone eave tile,
It avoids the occurrence of narrow space general utility tool and is difficult to the problem of removing, manpower, which is placed in, to be hit at set, is covered on central strut using hitting
Reciprocating motion, the principle that split pin is extracted by the pulling force that generates during hitting set and hitting support handle realizes dismounting locomotive
The purpose of split pin.Compared with using general utility tool, dismantlement work can be quickly finished, improves working efficiency;Pulling, which is hit, to be covered
Locomotive split pin can be removed by moving back and forth on central strut, easy to operate, conventional tool improper use is avoided to cause to hurt sb.'s feelings,
The occurrence of hurting device.
The paracone eave tile includes extension and pointed nose in one of the embodiments, one end of the extension with
The first end of the central strut connects, the fixed pointed nose of the other end.
Described hit covers the end outer rim far from the paracone eave tile equipped with cricoid protrusion in one of the embodiments,.
It further includes finger protecting baffle plate that device is removed in the locomotive split pin in one of the embodiments, the handguard gear
Plate is fixed on the central strut, and is located at the support handle and described is hit between set.
The finger protecting baffle plate is elastic baffle in one of the embodiments,.
It further includes connecting elements that device is removed in the locomotive split pin in one of the embodiments, and the paracone hooks
Head is fixed by the first end of the connecting elements and the central strut.
The connecting elements includes interconnecting piece in one of the embodiments, and one end of the interconnecting piece is hollow and interior
Internal screw thread is arranged in portion, and the other end of the interconnecting piece is closing, and the paracone eave tile is fixed on the closed one end of the interconnecting piece,
External screw thread is arranged in the first end of the central strut, and the first end of the central strut is threadedly coupled with the interconnecting piece.
The connecting elements includes nut cap and first sleeve in one of the embodiments, and the first of the central strut
End is hollow, and the first hole is provided in first end, and the nut cap is set in the central strut, and the nut cap is equipped with convex
The first hole setting is protruded in portion, the protrusion;One end of the first sleeve be it is hollow, the other end be closing, the paracone
Eave tile is fixed on the closed one end of the first sleeve, and the first sleeve is equipped with flange, and the first sleeve can be along described
Central strut movement matches the protrusion with the flange.
The connecting elements further includes spring in one of the embodiments, is hollow, the spring inside the nut cap
Be set to it is described it is hollow in, and be located between two protrusions.
The connecting elements includes second sleeve, swivel nut and screw in one of the embodiments, the second sleeve
One end be it is hollow, the other end is closing, and the paracone eave tile is fixed on the closed one end of the second sleeve, the second sleeve
It is equipped with through-hole, the swivel nut is fixed in the second sleeve, and the swivel nut is corresponding with the through-hole, in the swivel nut
Screw thread is arranged in portion, and recess portion is arranged in the first end of the central strut, and the screw is threadedly coupled with the swivel nut, and the screw
It is fixed on the recess portion across the swivel nut, the through-hole.
Detailed description of the invention
Fig. 1 is the schematic diagram that device is removed in an embodiment locomotive split pin;
Fig. 2 is the schematic diagram that device is removed in another embodiment locomotive split pin;
Fig. 3 is enlarged drawing at A in Fig. 2;
Fig. 4 is the schematic diagram that device is removed in the split pin of 3rd embodiment locomotive;
Fig. 5 is enlarged drawing at B in Fig. 4.
10, central strut, the 101, first hole, 102, recess portion, 103, first end, 104, second end, 20, paracone eave tile, 201
Extension, 202, pointed nose, 30, connecting elements, 301, interconnecting piece, 311, nut cap, 3111, protrusion, 3112, waist, 312,
One sleeve, 3121, flange, 313, spring, 321, second sleeve, 322, swivel nut, 323, screw, 40, hit set, 50, support handle,
60, finger protecting baffle plate.
Specific embodiment
It should be noted that it can directly on the other element when element is referred to as " being fixed on " another element
Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it, which can be, is directly connected to
To another element or it may be simultaneously present centering elements.On the contrary, when element is referred to as " directly existing " another element "upper",
There is no intermediary elements.Heretofore described " first ", " second " do not represent specific quantity and sequence, are only used for title
Differentiation.
As described in Figure 1, one embodiment of the application provides a kind of locomotive split pin dismounting device, and the locomotive split pin is torn open
Except device includes: central strut 10, paracone eave tile 20, hits set 40 and support handle 50, the paracone eave tile 20 and the center
The first end 103 of strut 10 connects, and the support handle 50 is fixed on the second end 104 of the central strut 10, described to hit set
40 are sheathed on the central strut 10, and the set 40 that hits can be slided along the central strut 10.
Paracone eave tile 20 for catching on locomotive split pin, central strut 10, hit set 40 and the cooperation of support handle 50 for for
Paracone eave tile provides pulling force.During locomotive split pin is removed at the position of limited space, caught on using paracone eave tile 20
Locomotive split pin avoids the occurrence of locomotive narrow space general utility tool and is difficult to the problem of removing, and one hand of people, which is placed in, to be hit at set 40,
Another hand fixes support handle 50, using the reciprocating motion covered on central strut is hit, hits support handle 50 hitting set 40
The principle that the pulling force generated in the process extracts split pin realizes the purpose for removing locomotive split pin.With use general utility tool phase
Than that can quickly finish dismantlement work, improve working efficiency;Set 40 is hit in pulling, and move back and forth on central strut 10 can be by machine
Vehicle split pin is removed, easy to operate, avoids the occurrence of that conventional tool improper use causes to hurt sb.'s feelings, hurts device.
Support handle 50 is except being also used to central strut 10 and in addition to hitting 40 cooperation of set for providing pulling force for paracone eave tile 20
Fixed support handle 50 carries out offer support.
The paracone eave tile 20 includes extension 201 and pointed nose 202, the extension in one of the embodiments,
201 one end is connect with the first end 103 of the central strut 10, the fixed pointed nose 202 of the other end.Pointed nose 202 is used
In catching on locomotive split pin, extension 201 prevents from hitting set 40 at center for making pointed nose 202 far from the central strut 10
When sliding on strut 10, manpower and locomotive opening pin contacts avoid the occurrence of the case where breaking manpower, have safety.
The 40 end outer rims far from the paracone eave tile 20 of set of hitting are equipped with cricoid convex in one of the embodiments,
It rises.Manpower, which is placed on, to be hit on set 40, is made to hit set 40 and is hit support handles 50, the protrusion can avoid occurring in the process manpower and
Hit 40 separation of set.
It further includes finger protecting baffle plate 60, the handguard that device is removed in the locomotive split pin in one of the embodiments,
Baffle 60 is fixed on the central strut 10, and is covered between 40 positioned at the support handle 50 and described hit.The finger protecting baffle plate
The case where 60 can prevent from hitting set 40 when hitting support handle, crush operating personnel's hand.
The finger protecting baffle plate 60 is elastic baffle in one of the embodiments,.The finger protecting baffle plate 60 is by elastic material system
At the elastic force of increase manpower and finger protecting baffle plate 60 plays the role of protecting manpower.
It further includes connecting elements 30, the paracone that device is removed in the locomotive split pin in one of the embodiments,
Eave tile 20 is fixed by the first end 103 of the connecting elements 30 and the central strut 10.Before being connected using connecting elements 30
Sharp eave tile 20 and central strut 10 can replace different paracone eave tiles 20 according to different conditions, are convenient for replacement paracone and hook
First 20.
As described in Figure 1, the connecting elements 30 includes interconnecting piece 301, the interconnecting piece in one of the embodiments,
301 one end is hollow, and internal setting internal screw thread, the other end of the interconnecting piece 301 are closing, and the paracone eave tile 20 is solid
Due to the closed one end of the interconnecting piece 301, external screw thread, the central strut is arranged in the first end 103 of the central strut 10
103 first end 103 is threadedly coupled with the interconnecting piece 301.Paracone eave tile 20 is fixedly welded on interconnecting piece 301 closed one
End, interconnecting piece 301 are threadedly coupled with central strut 10, this kind of structure is simple, when in use by tightening and unscrewing realization
Paracone eave tile 20 is detachably connected with central strut 10.
As described in Fig. 2,3, in the second embodiment, the connecting elements 30 includes nut cap 311 and first sleeve 312,
The first end 103 of the central strut 10 is hollow, and the first hole is provided in first end 103, and the nut cap 311 is set to described
In central strut 10, the nut cap 311 is equipped with protrusion 3111, and the first hole setting is protruded in the protrusion 3111;Described
One end of one sleeve 312 be it is hollow, the other end be closing, it is closed that the paracone eave tile 20 is fixed on the first sleeve 312
One end, the first sleeve 312 are equipped with flange 3121, and the first sleeve 312 can be moved along the central strut 10 makes institute
Protrusion 3111 is stated to match with the flange 3121.Paracone eave tile 20 is fixedly welded on the closed one end of first sleeve 312,
Direction level by first sleeve 312 along central strut 10 is slided, and is made in flange 3121 and the nut cap 311 in first sleeve 312
Protrusion 3111 cooperate, flange 3121 and protrusion 3111 increase the frictional force between first sleeve 312 and central strut 10, prevent
First sleeve 312 and nut cap 311 are detached from.In use by the cooperation and separation realization of flange 3121 and protrusion 3111
Heart strut 10 is detachably connected with first sleeve 312.Waist 3112 is additionally provided in nut cap 311, for preventing nut cap 311 therefrom
It falls off on heart strut 10.
As described in Fig. 2,3, the hollow one end end of first sleeve 312 is arranged to be bent to 3121 direction of flange, purpose
First sleeve 312 is easy for across central strut 10 and nut cap 311, is fixed on first sleeve 312 in nut cap 311.
The connecting elements 30 further includes spring 313 in one of the embodiments, be inside the nut cap 311 it is hollow,
The spring 313 be set to it is described it is hollow in, and be located between two protrusions 3111.By the way that spring 313 is arranged, by the
During one sleeve 312 is assembled with nut cap 311, first sleeve 312 need to be only pushed up along the side of central strut 10 to incite somebody to action
First sleeve 312 is fixed in nut cap 311, and structure is simple, easy to operate.
As described in Fig. 4,5, in third embodiment, the connecting elements 30 includes second sleeve 321,322 and of swivel nut
Screw 323, one end of the second sleeve 321 be it is hollow, the other end is closing, and the paracone eave tile 20 is fixed on described second
The closed one end of sleeve 321, the second sleeve 321 are equipped with through-hole, and the swivel nut 322 is fixed on the second sleeve 321
On, and the swivel nut 322 is corresponding with the through-hole, screw thread is set inside the swivel nut 322, the first of the central strut 10
End setting recess portion 102, the screw 323 is threadedly coupled with the swivel nut 322, and the screw 323 across the swivel nut 322,
The through-hole is fixed on the recess portion 102.When cooperating second sleeve 321 and central strut 10, the second swivel nut 321 is worn
Central strut 10 is crossed, when the through-hole of the 102 face second sleeve 321 of recess portion of central strut 10, screw 323 is passed through into swivel nut
322 and tightening screw 323, it is stuck in the bottom of screw 323 on recess portion 102 and is fixed, increase second sleeve 321 and center branch
Frictional force between bar 10 prevents second sleeve 321 from separating with central strut 10.
The locomotive split pin removes device and is suitable for various working environments, can fast and effeciently remove opening for each position
Mouth pin, improves working efficiency, reduces the security risk in operation.Traditional upkeep operation mode is changed simultaneously, using described
Locomotive split pin removes device and removes quick, safety during split pin, improves working efficiency.
It frequently encounters split pin in locomotive inspection and repair operation to remove because operating environment is narrow, what general utility tool was difficult to remove asks
Topic, device is removed in the locomotive split pin can fast and safely complete upkeep operation, improve working efficiency, reduce previous operation
In security risk, avoid the occurrence of hurting sb.'s feelings caused by conventional tool improper use, hurt device.
The locomotive split pin is removed device and is hooked paracone eave tile 20 in disassembly process using Mechanics of Machinery principle
Firmly split pin, a hand are fixed at support handle 50, and another hand, which is placed on, to be hit at set 40, pull hit set 40 back and forth, using hitting
The reciprocating motion of set 40, the pulling force generated when hitting to the direction of support handle remove locomotive split pin.Paracone eave tile 20
It can be matched according to the split pin of different model, hitting set 40 by firmly pulling extracts split pin from locomotive, reaches split pin
Dismounting purpose.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality
It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention
Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.
Claims (10)
1. device is removed in a kind of locomotive split pin, which is characterized in that it includes: center branch that device is removed in the locomotive split pin
Bar, paracone eave tile hit set and support handle, and the paracone eave tile is connect with the first end of the central strut, the support hand
Handle is fixed on the second end of the central strut, and the set that hits is sheathed on the central strut, and the set that hits can be in described
The sliding of heart strut.
2. device is removed in locomotive split pin according to claim 1, which is characterized in that the paracone eave tile includes extension
And pointed nose, one end of the extension are connect with the first end of the central strut, the fixed pointed nose of the other end.
3. device is removed in locomotive split pin according to claim 1, which is characterized in that the set that hits is hooked far from the paracone
The end outer rim of head is equipped with cricoid protrusion.
4. device is removed in locomotive split pin according to claim 1, which is characterized in that dress is removed in the locomotive split pin
Setting further includes finger protecting baffle plate, and the finger protecting baffle plate is fixed on the central strut, and is located at the support handle and hits with described
Between set.
5. device is removed in locomotive split pin according to claim 4, which is characterized in that the finger protecting baffle plate is elasticity gear
Plate.
6. device is removed in locomotive split pin described in -5 any one according to claim 1, which is characterized in that the locomotive is opened
It further includes connecting elements that mouth pin, which removes device, the first end that the paracone eave tile passes through the connecting elements and the central strut
It is fixed.
7. device is removed in locomotive split pin according to claim 6, which is characterized in that the connecting elements includes connection
Portion, one end of the interconnecting piece is hollow, and internal setting internal screw thread, the other end of the interconnecting piece are closing, the paracone
Eave tile is fixed on the closed one end of the interconnecting piece, and external screw thread is arranged in the first end of the central strut, the central strut
First end is threadedly coupled with the interconnecting piece.
8. device is removed in locomotive split pin according to claim 6, which is characterized in that the connecting elements include nut cap and
First sleeve, the first end of the central strut is hollow, and the first hole is provided in first end, and the nut cap is set in described
In heart strut, the nut cap is equipped with protrusion, and the first hole setting is protruded in the protrusion;During one end of the first sleeve is
Sky, the other end are closing, and the paracone eave tile is fixed on the closed one end of the first sleeve, and the first sleeve is equipped with convex
Edge, the first sleeve can be moved along the central strut matches the protrusion with the flange.
9. device is removed in locomotive split pin according to claim 8, which is characterized in that the connecting elements further includes bullet
Spring, be inside the nut cap it is hollow, the spring be set to it is described it is hollow in, and be located between two protrusions.
10. device is removed in locomotive split pin according to claim 6, which is characterized in that the connecting elements includes second
Sleeve, swivel nut and screw, one end of the second sleeve be it is hollow, the other end is closing, and the paracone eave tile is fixed on described
The closed one end of second sleeve, the second sleeve are equipped with through-hole, and the swivel nut is fixed in the second sleeve, and described
Swivel nut is corresponding with the through-hole, and screw thread is arranged inside the swivel nut, and recess portion, the spiral shell is arranged in the first end of the central strut
Nail is threadedly coupled with the swivel nut, and the screw passes through the swivel nut, the through-hole is fixed on the recess portion.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910524573.7A CN110216627A (en) | 2019-06-18 | 2019-06-18 | Device is removed in locomotive split pin |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910524573.7A CN110216627A (en) | 2019-06-18 | 2019-06-18 | Device is removed in locomotive split pin |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110216627A true CN110216627A (en) | 2019-09-10 |
Family
ID=67817468
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910524573.7A Pending CN110216627A (en) | 2019-06-18 | 2019-06-18 | Device is removed in locomotive split pin |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110216627A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111975711A (en) * | 2020-07-15 | 2020-11-24 | 国网浙江台州市路桥区供电有限公司 | Multifunctional equipment for disassembling pin shaft |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201279767Y (en) * | 2008-10-29 | 2009-07-29 | 河南省电力公司郑州供电公司 | Multifunctional pin dismantling device |
| FR2963269A1 (en) * | 2010-07-28 | 2012-02-03 | Peugeot Citroen Automobiles Sa | Device for extraction and insertion of spring type pin that is used for assembly of two parts in automobile field, has gripping unit assembled on rod to draw manually on rod to realize extraction of pin |
| CN102398247A (en) * | 2010-09-08 | 2012-04-04 | 奇瑞汽车股份有限公司 | Tool for detaching engine injector |
| CN203973475U (en) * | 2014-06-25 | 2014-12-03 | 中国神华能源股份有限公司 | Pin removal |
| CN205394384U (en) * | 2016-02-29 | 2016-07-27 | 国网山东省电力公司禹城市供电公司 | Terminal row wiring interchangeable head screwdriver |
| CN205799334U (en) * | 2016-06-08 | 2016-12-14 | 杭州骏腾工具制造有限公司 | There is the ratchet spanner of the most fixing screwdriver bit function |
| CN205928519U (en) * | 2016-07-27 | 2017-02-08 | 中国石油天然气股份有限公司 | Combination tool for pumping unit |
| CN208147756U (en) * | 2018-04-25 | 2018-11-27 | 成都飞机工业(集团)有限责任公司 | A kind of fast-connecting type pin removal |
| CN208428192U (en) * | 2018-03-29 | 2019-01-25 | 四川川煤华荣能源股份有限公司 | Pin removal |
| CN208592790U (en) * | 2018-07-10 | 2019-03-12 | 中国石油天然气股份有限公司 | Stem removal device |
| CN210147992U (en) * | 2019-06-18 | 2020-03-17 | 神华包神铁路集团有限责任公司 | Locomotive split pin dismounting device |
-
2019
- 2019-06-18 CN CN201910524573.7A patent/CN110216627A/en active Pending
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201279767Y (en) * | 2008-10-29 | 2009-07-29 | 河南省电力公司郑州供电公司 | Multifunctional pin dismantling device |
| FR2963269A1 (en) * | 2010-07-28 | 2012-02-03 | Peugeot Citroen Automobiles Sa | Device for extraction and insertion of spring type pin that is used for assembly of two parts in automobile field, has gripping unit assembled on rod to draw manually on rod to realize extraction of pin |
| CN102398247A (en) * | 2010-09-08 | 2012-04-04 | 奇瑞汽车股份有限公司 | Tool for detaching engine injector |
| CN203973475U (en) * | 2014-06-25 | 2014-12-03 | 中国神华能源股份有限公司 | Pin removal |
| CN205394384U (en) * | 2016-02-29 | 2016-07-27 | 国网山东省电力公司禹城市供电公司 | Terminal row wiring interchangeable head screwdriver |
| CN205799334U (en) * | 2016-06-08 | 2016-12-14 | 杭州骏腾工具制造有限公司 | There is the ratchet spanner of the most fixing screwdriver bit function |
| CN205928519U (en) * | 2016-07-27 | 2017-02-08 | 中国石油天然气股份有限公司 | Combination tool for pumping unit |
| CN208428192U (en) * | 2018-03-29 | 2019-01-25 | 四川川煤华荣能源股份有限公司 | Pin removal |
| CN208147756U (en) * | 2018-04-25 | 2018-11-27 | 成都飞机工业(集团)有限责任公司 | A kind of fast-connecting type pin removal |
| CN208592790U (en) * | 2018-07-10 | 2019-03-12 | 中国石油天然气股份有限公司 | Stem removal device |
| CN210147992U (en) * | 2019-06-18 | 2020-03-17 | 神华包神铁路集团有限责任公司 | Locomotive split pin dismounting device |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111975711A (en) * | 2020-07-15 | 2020-11-24 | 国网浙江台州市路桥区供电有限公司 | Multifunctional equipment for disassembling pin shaft |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203864624U (en) | A pop-up window breaker | |
| CN205363745U (en) | Portable pin removal | |
| CN202934563U (en) | Mechanical arm used for removing bird's nests on poles and towers | |
| CN208592790U (en) | Stem removal device | |
| CN205501339U (en) | Wind gap bush dismounting device | |
| CN210147992U (en) | Locomotive split pin dismounting device | |
| CN214352153U (en) | Machine part extracting tool | |
| CN110403523A (en) | Dirt cup component and dust catcher with it | |
| CN201931040U (en) | Rivet nut gun | |
| CN209954610U (en) | A kind of clip nail quick release pattern nail gun | |
| US2514565A (en) | Bottle cap remover with resilient liner | |
| CN209919797U (en) | Special frock is dismantled to filament cutter copper bar chain round pin axle | |
| CN202622690U (en) | Nail extracting tool | |
| CN207477561U (en) | A kind of ultrasonic wave demolition device | |
| CN201279767Y (en) | Multifunctional pin dismantling device | |
| CN205465959U (en) | Semi -automatic pin removal | |
| CN211388542U (en) | Impact type aircraft hanging beam dismounting tool | |
| CN208362997U (en) | Brooming extracting tool | |
| CN209648579U (en) | A kind of steel-wire screw-socket strikes handle specific purpose tool | |
| CN102389937B (en) | Double-handle type rivet nut gun | |
| CN205889077U (en) | Five metals hammer that can have debugging handle length function | |
| CN207980270U (en) | A kind of handle of chest expander | |
| CN217292217U (en) | Electric hammer for daily training of fire engineering | |
| CN207432092U (en) | A kind of integral type attaching/detaching apparatus of labyrinth-type excluder interior sealing component | |
| CN207127823U (en) | A kind of Special tool for fastening of EMUs tooth form bolt |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190910 |
|
| RJ01 | Rejection of invention patent application after publication |