CN110173347A - A kind of waste heat recycling system and operation method of coal mine equipment in use - Google Patents
A kind of waste heat recycling system and operation method of coal mine equipment in use Download PDFInfo
- Publication number
- CN110173347A CN110173347A CN201910453148.3A CN201910453148A CN110173347A CN 110173347 A CN110173347 A CN 110173347A CN 201910453148 A CN201910453148 A CN 201910453148A CN 110173347 A CN110173347 A CN 110173347A
- Authority
- CN
- China
- Prior art keywords
- water
- valve
- heat exchanger
- flue gas
- temperature
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D15/00—Adaptations of machines or engines for special use; Combinations of engines with devices driven thereby
- F01D15/08—Adaptations for driving, or combinations with, pumps
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02B—INTERNAL-COMBUSTION PISTON ENGINES; COMBUSTION ENGINES IN GENERAL
- F02B43/00—Engines characterised by operating on gaseous fuels; Plants including such engines
- F02B43/10—Engines or plants characterised by use of other specific gases, e.g. acetylene, oxyhydrogen
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02B—INTERNAL-COMBUSTION PISTON ENGINES; COMBUSTION ENGINES IN GENERAL
- F02B63/00—Adaptations of engines for driving pumps, hand-held tools or electric generators; Portable combinations of engines with engine-driven devices
- F02B63/04—Adaptations of engines for driving pumps, hand-held tools or electric generators; Portable combinations of engines with engine-driven devices for electric generators
- F02B63/042—Rotating electric generators
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02G—HOT GAS OR COMBUSTION-PRODUCT POSITIVE-DISPLACEMENT ENGINE PLANTS; USE OF WASTE HEAT OF COMBUSTION ENGINES; NOT OTHERWISE PROVIDED FOR
- F02G5/00—Profiting from waste heat of combustion engines, not otherwise provided for
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02G—HOT GAS OR COMBUSTION-PRODUCT POSITIVE-DISPLACEMENT ENGINE PLANTS; USE OF WASTE HEAT OF COMBUSTION ENGINES; NOT OTHERWISE PROVIDED FOR
- F02G5/00—Profiting from waste heat of combustion engines, not otherwise provided for
- F02G5/02—Profiting from waste heat of exhaust gases
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04B—POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
- F04B35/00—Piston pumps specially adapted for elastic fluids and characterised by the driving means to their working members, or by combination with, or adaptation to, specific driving engines or motors, not otherwise provided for
- F04B35/04—Piston pumps specially adapted for elastic fluids and characterised by the driving means to their working members, or by combination with, or adaptation to, specific driving engines or motors, not otherwise provided for the means being electric
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04B—POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
- F04B39/00—Component parts, details, or accessories, of pumps or pumping systems specially adapted for elastic fluids, not otherwise provided for in, or of interest apart from, groups F04B25/00 - F04B37/00
- F04B39/06—Cooling; Heating; Prevention of freezing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B1/00—Methods of steam generation characterised by form of heating method
- F22B1/02—Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers
- F22B1/18—Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers the heat carrier being a hot gas, e.g. waste gas such as exhaust gas of internal-combustion engines
- F22B1/1807—Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers the heat carrier being a hot gas, e.g. waste gas such as exhaust gas of internal-combustion engines using the exhaust gases of combustion engines
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J15/00—Arrangements of devices for treating smoke or fumes
- F23J15/06—Arrangements of devices for treating smoke or fumes of coolers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D19/00—Details
- F24D19/10—Arrangement or mounting of control or safety devices
- F24D19/1006—Arrangement or mounting of control or safety devices for water heating systems
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D3/00—Hot-water central heating systems
- F24D3/10—Feed-line arrangements, e.g. providing for heat-accumulator tanks, expansion tanks ; Hydraulic components of a central heating system
- F24D3/1058—Feed-line arrangements, e.g. providing for heat-accumulator tanks, expansion tanks ; Hydraulic components of a central heating system disposition of pipes and pipe connections
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B30/00—Heat pumps
- F25B30/04—Heat pumps of the sorption type
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28B—STEAM OR VAPOUR CONDENSERS
- F28B1/00—Condensers in which the steam or vapour is separate from the cooling medium by walls, e.g. surface condenser
- F28B1/02—Condensers in which the steam or vapour is separate from the cooling medium by walls, e.g. surface condenser using water or other liquid as the cooling medium
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28D—HEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
- F28D7/00—Heat-exchange apparatus having stationary tubular conduit assemblies for both heat-exchange media, the media being in contact with different sides of a conduit wall
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02B—INTERNAL-COMBUSTION PISTON ENGINES; COMBUSTION ENGINES IN GENERAL
- F02B43/00—Engines characterised by operating on gaseous fuels; Plants including such engines
- F02B43/10—Engines or plants characterised by use of other specific gases, e.g. acetylene, oxyhydrogen
- F02B2043/103—Natural gas, e.g. methane or LNG used as a fuel
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02G—HOT GAS OR COMBUSTION-PRODUCT POSITIVE-DISPLACEMENT ENGINE PLANTS; USE OF WASTE HEAT OF COMBUSTION ENGINES; NOT OTHERWISE PROVIDED FOR
- F02G2260/00—Recuperating heat from exhaust gases of combustion engines and heat from cooling circuits
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/30—Technologies for a more efficient combustion or heat usage
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/10—Internal combustion engine [ICE] based vehicles
- Y02T10/12—Improving ICE efficiencies
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/10—Internal combustion engine [ICE] based vehicles
- Y02T10/30—Use of alternative fuels, e.g. biofuels
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Heat-Pump Type And Storage Water Heaters (AREA)
Abstract
本发明公开了一种煤矿在用设备的余热回收利用系统及运行方法,其特征在于,它包括:内燃机组、发电机组、通风冷却装置、水水换热器、余热锅炉、汽轮机组、凝汽器、冷却塔、第一空压机、第二空压机、电动机、烟气型吸收式热泵、烟气换热器、热水储罐和烟囱,以内燃机组的高温缸套水、空压机的高温压缩空气和凝汽器的低温循环水作为余热资源,回收各类余热来加热低温供热水为煤矿用户提供生活热水,再利用余热锅炉输出的高温烟气进一步加热低温供热水为煤矿用户供暖。本发明梯级回收利用余热锅炉的排烟余热、空压机的高温压缩空气、内燃机的高温缸套水余热和汽轮机的低温循环水余热,提高了煤矿整体系统的能源利用效率,满足煤矿不同用能需求。
The invention discloses a waste heat recovery and utilization system and operation method of equipment in use in coal mines. device, cooling tower, first air compressor, second air compressor, electric motor, flue gas absorption heat pump, flue gas heat exchanger, hot water storage tank and chimney, high temperature cylinder jacket water of internal combustion unit, air compressor The high-temperature compressed air of the machine and the low-temperature circulating water of the condenser are used as waste heat resources, and various waste heat is recovered to heat the low-temperature hot water supply to provide domestic hot water for coal mine users, and then the high-temperature flue gas output from the waste heat boiler is used to further heat the low-temperature hot water supply Heating for coal mine users. The present invention recycles and utilizes waste heat from waste heat boilers, high-temperature compressed air from air compressors, high-temperature jacket water waste heat from internal combustion engines, and low-temperature circulating water waste heat from steam turbines, which improves the energy utilization efficiency of the overall system of the coal mine and satisfies the different energy requirements of the coal mine. need.
Description
技术领域technical field
本发明属于煤矿瓦斯利用、余热回收利用领域,具体涉及一种煤矿在用设备的余热回收利用系统及运行方法。The invention belongs to the fields of coal mine gas utilization and waste heat recovery and utilization, and in particular relates to a waste heat recovery and utilization system and operation method of in-use coal mine equipment.
背景技术Background technique
瓦斯是仅次于二氧化碳的主要温室气体,单位质量瓦斯所产生的温室效应相当于同质量二氧化碳的21倍。煤炭在开采中,往往同时伴生大量瓦斯气体,这是主要的瓦斯工业排放源之一,减少煤矿的瓦斯排放,可以有效减少温室气体的排放。同时,煤矿瓦斯的主要成分为甲烷,是优质洁净的气体能源。Gas is the main greenhouse gas second only to carbon dioxide, and the greenhouse effect produced by a unit mass of gas is equivalent to 21 times that of the same mass of carbon dioxide. During the mining of coal, a large amount of gas is often associated with it. This is one of the main sources of gas industry emissions. Reducing gas emissions from coal mines can effectively reduce greenhouse gas emissions. At the same time, the main component of coal mine gas is methane, which is a high-quality and clean gas energy source.
我国是能源消费大国,2017年中国能源产量为359000万吨标准煤,其中天然气产量占能源总产量比重在不断上升,从2013年的4.4%上升到2017年的5.4%。近年来,我国未被利用的煤矿瓦斯绝对量也呈逐年增加趋势,且总量巨大。如果将煤矿生产过程中的不同浓度的瓦斯收集起来加以利用,既可以有效地解决煤矿瓦斯事故,改善矿区生产生活条件,又有利于增加清洁能源供应、减少温室气体排放,达到保护生命、节约资源、保护环境的多重目标。my country is a big energy consumer. In 2017, China's energy output was 3.59 billion tons of standard coal, of which natural gas production accounted for an increasing proportion of total energy output, from 4.4% in 2013 to 5.4% in 2017. In recent years, the absolute amount of unused coal mine gas in my country has also been increasing year by year, and the total amount is huge. If the gas with different concentrations in the coal mine production process is collected and used, it can not only effectively solve the coal mine gas accidents, improve the production and living conditions in the mining area, but also help to increase the supply of clean energy and reduce greenhouse gas emissions, so as to protect life and save resources. , Multiple goals of environmental protection.
我国煤矿空压机及内燃机使用量非常大,机组运行过程中65%~85%的能源消耗转化为热量排放到空气中,造成大量的能源浪费。这些热量如果得不到及时有效控制,还会对机械设备造成严重损坏。为提高煤矿空压机、内燃机及汽轮机的能源利用率,减少环境污染,保护机械设备运行安全,本发明提供了一种煤矿在用设备的余热回收利用系统及运行方法。The use of air compressors and internal combustion engines in coal mines in my country is very large, and 65% to 85% of energy consumption during unit operation is converted into heat and discharged into the air, resulting in a large amount of energy waste. If the heat is not effectively controlled in time, it will also cause serious damage to mechanical equipment. In order to improve the energy utilization rate of coal mine air compressors, internal combustion engines and steam turbines, reduce environmental pollution, and protect the operation safety of mechanical equipment, the invention provides a waste heat recovery and utilization system and operation method for equipment in use in coal mines.
发明内容Contents of the invention
本发明的目的在于克服现有技术中存在的上述不足,而提供一种设计合理,性能可靠的煤矿在用设备的余热回收利用系统及运行方法。The object of the present invention is to overcome the above-mentioned deficiencies in the prior art, and provide a waste heat recovery and utilization system and operation method of coal mine in-use equipment with reasonable design and reliable performance.
本发明解决上述问题所采用的技术方案是:一种煤矿在用设备的余热回收利用系统及运行方法,其特征在于,它包括:内燃机组、发电机组、通风冷却装置、水水换热器、余热锅炉、汽轮机组、凝汽器、冷却塔、第一空压机、第二空压机、第一气水换热器、第二气水换热器、电动机、烟气型吸收式热泵、烟气换热器、热水储罐和烟囱,所述内燃机组的进气口连接有煤矿瓦斯,所述内燃机组驱动发电机组发电,所述内燃机组的缸套水出口同时与通风冷却装置的进水口和水水换热器的高温进水口连接,且在通风冷却装置的进水口和水水换热器的高温进水口分别安装有第二阀门和第三阀门,所述内燃机组的缸套水进口同时与通风冷却装置的出水口和水水换热器的高温出水口连接,且在通风冷却装置的出水口和水水换热器的高温出水口分别安装有第一阀门和第四阀门,所述内燃机的烟气出口与余热锅炉的烟气进口连接,所述余热锅炉的蒸汽出口与汽轮机组的进汽口连接,所述汽轮机组的排汽口与凝汽器的乏汽进口连接,所述凝汽器的凝结水出口与余热锅炉的给水进口连接,所述凝汽器的循环水出口同时与冷却塔的进水口和烟气型吸收式热泵的低温进水口连接,且在冷却塔的进水口和烟气型吸收式热泵的低温进水口分别安装有第五阀门和第七阀门,所述凝汽器的循环水进口同时与冷却塔的出水口和烟气型吸收式热泵的低温出水口连接,且在冷却塔的出水口和烟气型吸收式热泵的低温出水口分别安装有第六阀门和第八阀门,所述汽轮机组驱动第一空压机做功,所述第一空压机的进气口连接有新鲜空气,所述第一空压机的出气口与第一气水换热器的进气口连接,所述电动机驱动第二空压机做功,所述第二空压机的进气口连接有新鲜空气,所述第二空压机的出气口与第二气水换热器的进气口连接,所述水水换热器的低温进水口与供热给水管的出水端连接,且在水水换热器的低温进水口安装有第十五阀门,所述水水换热器的低温出水口与供热水连通管的进水端连接,且在水水换热器的低温出水口安装有第十六阀门,所述第一气水换热器的低温进水口与供热给水管的出水端连接,且在第一气水换热器的低温进水口安装有第十一阀门,所述第一气水换热器的低温出水口与供热水连通管的进水端连接,且在第一气水换热器的低温出水口安装有第十二阀门,所述第二气水换热器的低温进水口与供热给水管的出水端连接,且在第二气水换热器的低温进水口安装有第十三阀门,所述第二气水换热器的低温出水口与供热水连通管的进水端连接,且在第二气水换热器的低温出水口安装有第十四阀门,所述烟气型吸收式热泵的中温进水口与供热给水管的出水端连接,且在烟气型吸收式热泵的中温进水口安装有第九阀门,所述烟气型吸收式热泵的中温出水口与供热水连通管的进水端连接,且在烟气型吸收式热泵的中温出水口安装有第十阀门,所述烟气型吸收式热泵的驱动烟气进口与余热锅炉的烟气出口连接,且在烟气型吸收式热泵的驱动烟气进口安装有第二十一阀门,所述烟气型吸收式热泵的驱动烟气出口与烟囱的烟气进口连接,且在烟气型吸收式热泵的驱动烟气出口安装有第二十二阀门,所述热水储罐的进水口与供热水连通管的出水端连接,且在热水储罐的进水口安装有第十七阀门,所述热水储罐的出水口与供生活热水管的进水端连接,且在热水储罐的出水口安装有第十九阀门,所述烟气换热器的进水口与供热水连通管的出水端连接,且在烟气换热器的进水口安装有第十八阀门,所述烟气换热器的出水口与采暖供水管的进水端连接,且在烟气换热器的出水口安装有第二十阀门,所述烟气换热器的烟气进口与余热锅炉的烟气出口连接,且在烟气换热器的烟气进口安装有第二十三阀门,所述烟气换热器的烟气出口与烟囱的烟气进口连接,且在烟气换热器的烟气出口安装有第二十四阀门。The technical solution adopted by the present invention to solve the above problems is: a waste heat recovery and utilization system and operation method of equipment in use in coal mines, which is characterized in that it includes: an internal combustion unit, a generator set, a ventilation cooling device, a water-to-water heat exchanger, Waste heat boiler, steam turbine unit, condenser, cooling tower, first air compressor, second air compressor, first air-water heat exchanger, second air-water heat exchanger, electric motor, flue gas type absorption heat pump, Flue gas heat exchanger, hot water storage tank and chimney, the air inlet of the internal combustion unit is connected with coal mine gas, the internal combustion unit drives the generator set to generate electricity, and the cylinder jacket water outlet of the internal combustion unit is connected The water inlet is connected to the high-temperature water inlet of the water-water heat exchanger, and the water inlet of the ventilation cooling device and the high-temperature water inlet of the water-water heat exchanger are respectively installed with a second valve and a third valve. The water inlet is connected to the water outlet of the ventilation cooling device and the high-temperature water outlet of the water-water heat exchanger, and the first valve and the fourth valve are respectively installed on the water outlet of the ventilation cooling device and the high-temperature water outlet of the water-water heat exchanger , the flue gas outlet of the internal combustion engine is connected to the flue gas inlet of the waste heat boiler, the steam outlet of the waste heat boiler is connected to the steam inlet of the steam turbine unit, and the steam exhaust port of the steam turbine unit is connected to the exhaust steam inlet of the condenser , the condensed water outlet of the condenser is connected to the feedwater inlet of the waste heat boiler, and the circulating water outlet of the condenser is connected to the water inlet of the cooling tower and the low-temperature water inlet of the flue gas absorption heat pump at the same time, and the cooling The water inlet of the tower and the low-temperature water inlet of the flue gas type absorption heat pump are respectively equipped with the fifth valve and the seventh valve, and the circulating water inlet of the condenser is simultaneously connected with the water outlet of the cooling tower and the flue gas type absorption heat pump. The low-temperature water outlet is connected, and the sixth valve and the eighth valve are respectively installed at the water outlet of the cooling tower and the low-temperature water outlet of the flue gas absorption heat pump. The steam turbine unit drives the first air compressor to do work, and the first The air inlet of the air compressor is connected with fresh air, the air outlet of the first air compressor is connected with the air inlet of the first air-water heat exchanger, the motor drives the second air compressor to do work, and the first air compressor The air inlet of the second air compressor is connected with fresh air, the air outlet of the second air compressor is connected with the air inlet of the second air-water heat exchanger, and the low-temperature water inlet of the water-water heat exchanger is connected with the water supply The water outlet end of the hot water supply pipe is connected, and a fifteenth valve is installed at the low-temperature water inlet of the water-water heat exchanger, and the low-temperature water outlet of the water-water heat exchanger is connected with the water inlet end of the hot water supply communication pipe, and A sixteenth valve is installed at the low-temperature water outlet of the water-water heat exchanger, and the low-temperature water inlet of the first air-water heat exchanger is connected to the water outlet of the heating water supply pipe, and the The low temperature water inlet is equipped with an eleventh valve, the low temperature water outlet of the first air-water heat exchanger is connected to the water inlet end of the hot water supply communication pipe, and the low temperature water outlet of the first air-water heat exchanger is installed with The twelfth valve, the low-temperature water inlet of the second air-water heat exchanger is connected to the water outlet of the heating water supply pipe, and the thirteenth valve is installed at the low-temperature water inlet of the second air-water heat exchanger, the The low-temperature water outlet of the second air-water heat exchanger is connected to the water inlet end of the hot water supply communication pipe, and in the second air-water heat exchanger A fourteenth valve is installed at the low-temperature water outlet of the flue gas-type absorption heat pump, and the medium-temperature water inlet of the flue gas-type absorption heat pump is connected to the water outlet end of the heating water supply pipe, and a ninth valve is installed at the medium-temperature water inlet of the flue gas-type absorption heat pump , the medium-temperature water outlet of the flue gas-type absorption heat pump is connected to the water inlet end of the hot water supply communication pipe, and a tenth valve is installed at the medium-temperature water outlet of the flue gas-type absorption heat pump, and the flue gas-type absorption heat pump The driving flue gas inlet of the heat pump is connected to the flue gas outlet of the waste heat boiler, and a twenty-first valve is installed at the driving flue gas inlet of the flue gas-type absorption heat pump, and the driving flue gas outlet of the flue gas-type absorption heat pump is connected to the The flue gas inlet of the chimney is connected, and a twenty-second valve is installed at the flue gas type absorption heat pump driving flue gas outlet, the water inlet of the hot water storage tank is connected with the water outlet of the hot water supply communication pipe, and the The water inlet of the hot water storage tank is equipped with a seventeenth valve, the water outlet of the hot water storage tank is connected to the water inlet end of the domestic hot water pipe, and the water outlet of the hot water storage tank is equipped with a nineteenth valve , the water inlet of the flue gas heat exchanger is connected to the water outlet of the hot water supply communication pipe, and an eighteenth valve is installed at the water inlet of the flue gas heat exchanger, and the water outlet of the flue gas heat exchanger is connected to The water inlet end of the heating water supply pipe is connected, and a 20th valve is installed at the water outlet of the flue gas heat exchanger. The flue gas inlet of the flue gas heat exchanger is connected with the flue gas outlet of the waste heat boiler, and The flue gas inlet of the heat exchanger is equipped with a twenty-third valve, the flue gas outlet of the flue gas heat exchanger is connected with the flue gas inlet of the chimney, and the flue gas outlet of the flue gas heat exchanger is installed with a twenty-third valve. Four valves.
进一步而言,所述内燃机组的高温缸套水侧同时与通风冷却装置和水水换热器连接,既可以利用对外散热排放的方式进行缸套水的冷却,又可以利用余热回收供热的方式进行缸套水的冷却。Furthermore, the water side of the high-temperature cylinder jacket of the internal combustion unit is connected with the ventilation cooling device and the water-water heat exchanger at the same time, which can not only cool the cylinder jacket water by means of external heat dissipation, but also use waste heat recovery to supply heat. Cooling of cylinder jacket water.
进一步而言,所述余热锅炉同时与烟气型吸收式热泵和烟气换热器连接,既可以为烟气型吸收式热泵提供驱动热源,又可以为煤矿用户提供采暖热源。Furthermore, the waste heat boiler is connected with the flue gas absorption heat pump and the flue gas heat exchanger at the same time, which can not only provide a driving heat source for the flue gas absorption heat pump, but also provide a heating heat source for coal mine users.
进一步而言,所述凝汽器的低温循环水侧同时与烟气型吸收式热泵和冷却塔连接,可以利用对外散热排放的方式进行低温循环水的冷却,又可以利用余热回收供热的方式进行低温循环水的冷却。Furthermore, the low-temperature circulating water side of the condenser is connected to the flue gas-type absorption heat pump and the cooling tower at the same time, and the low-temperature circulating water can be cooled by the way of external heat dissipation and discharged, and the way of heat supply can be recovered by using waste heat Cooling with low-temperature circulating water.
进一步而言,所述水水换热器、第一气水换热器、第二气水换热器和烟气型吸收式热泵为串联连接,利用水水换热器、第一气水换热器、第二气水换热器和烟气型吸收式热泵同时对来自供热给水管的低温供热水进行第一次加热。Further, the water-water heat exchanger, the first air-water heat exchanger, the second air-water heat exchanger and the flue gas type absorption heat pump are connected in series, and the water-water heat exchanger, the first air-water heat exchanger The heater, the second air-water heat exchanger and the flue gas type absorption heat pump simultaneously heat the low-temperature hot water from the heating water supply pipe for the first time.
进一步而言,所述热水储罐通过供热水连通管同时与水水换热器、第一气水换热器、第二气水换热器和烟气型吸收式热泵连接,通过回收利用内燃机组的高温缸套水余热、第一空压机的高温压缩空气余热、第二空压机的高温压缩空气余热和凝汽器的低温循环水余热来为煤矿用户提供生活热水。Further, the hot water storage tank is simultaneously connected with the water-water heat exchanger, the first air-water heat exchanger, the second air-water heat exchanger and the flue gas-type absorption heat pump through the hot water supply communication pipe. Use the high-temperature jacket water waste heat of the internal combustion unit, the high-temperature compressed air waste heat of the first air compressor, the high-temperature compressed air waste heat of the second air compressor, and the low-temperature circulating water waste heat of the condenser to provide domestic hot water for coal mine users.
进一步而言,所述烟气换热器通过供热水连通管同时与水水换热器、第一气水换热器、第二气水换热器和烟气型吸收式热泵连接,来自供热给水管的低温供热水被第一次加热后输送至烟气换热器,经过第二次加热后由采暖供水管输出为煤矿用户供暖。Further, the flue gas heat exchanger is simultaneously connected with the water-water heat exchanger, the first air-water heat exchanger, the second air-water heat exchanger and the flue gas-type absorption heat pump through the hot water supply communication pipe. The low-temperature hot water from the heating water supply pipe is heated for the first time and sent to the flue gas heat exchanger. After the second heating, it is output by the heating water supply pipe to provide heating for coal mine users.
如上所述的煤矿在用设备的余热回收利用系统的运行方法,其特征在于,运行方法如下:The operation method of the waste heat recovery and utilization system of the equipment in use in the coal mine as described above is characterized in that the operation method is as follows:
煤矿瓦斯进入内燃机组燃烧做功来驱动发电机组进行发电,此时,关闭第一阀门和第二阀门,打开第三阀门、第四阀门、第十五阀门和第十六阀门,内燃机组形成的高温烟气进入余热锅炉,内燃机组形成的高温缸套水进入水水换热器,加热来自供热给水管的低温供热水,被降温后的缸套水再返回内燃机组对其进行冷却,形成一个循环;The coal mine gas enters the internal combustion unit and burns to do work to drive the generator set to generate electricity. At this time, close the first valve and the second valve, open the third valve, the fourth valve, the fifteenth valve and the sixteenth valve, and the high temperature generated by the internal combustion unit The flue gas enters the waste heat boiler, and the high-temperature jacket water formed by the internal combustion unit enters the water-water heat exchanger to heat the low-temperature hot water from the heating water supply pipe. The cooled jacket water returns to the internal combustion unit to cool it, forming a cycle;
利用发电机组产生的电能驱动电动机做功,来带动第二空压机对新鲜空气进行压缩,此时,打开第十三阀门和第十四阀门,第二空压机形成的高温高压空气进入第二气水换热器,加热来自供热给水管的低温供热水;Use the electric energy generated by the generator set to drive the motor to do work to drive the second air compressor to compress the fresh air. At this time, open the thirteenth valve and the fourteenth valve, and the high-temperature and high-pressure air formed by the second air compressor enters the second air compressor. The air-water heat exchanger heats the low-temperature hot water from the heating water supply pipe;
余热锅炉产生的蒸汽进入汽轮机组进行做功驱动第一空压机压缩新鲜空气,汽轮机组的排汽进入凝汽器冷凝后形成凝结水再返回余热锅炉,形成一个循环,此时,打开第十一阀门和第十二阀门,第一空压机形成的高温高压空气进入第一气水换热器,加热来自供热给水管的低温供热水;The steam generated by the waste heat boiler enters the steam turbine unit to perform work and drives the first air compressor to compress fresh air. The exhaust steam of the steam turbine unit enters the condenser to condense and form condensed water before returning to the waste heat boiler to form a cycle. At this time, open the eleventh valve and the twelfth valve, the high-temperature and high-pressure air formed by the first air compressor enters the first air-water heat exchanger to heat the low-temperature hot water from the heating water supply pipe;
关闭第五阀门和第六阀门,打开第七阀门、第八阀门、第九阀门、第十阀门、第十一阀门和第十二阀门,余热锅炉输出的高温烟气进入烟气型吸收式热泵作为驱动热源,以凝汽器输出的低温循环水作为低温热源,加热来自供热给水管的低温供热水;Close the fifth valve and the sixth valve, open the seventh valve, the eighth valve, the ninth valve, the tenth valve, the eleventh valve and the twelfth valve, and the high-temperature flue gas output by the waste heat boiler enters the flue gas absorption heat pump As a driving heat source, the low-temperature circulating water output from the condenser is used as a low-temperature heat source to heat the low-temperature hot water from the heating water supply pipe;
打开第十七阀门和第十九阀门,经过水水换热器、第一气水换热器、第二气水换热器和烟气型吸收式热泵同时加热后的低温供热水通过供热水连通管先进入热水储罐,然后再通过供生活热水管为煤矿用户提供生活热水,此时,利用热水储罐来缓冲生活热水需求负荷的波动;Open the seventeenth valve and the nineteenth valve, and the low-temperature hot water heated by the water-water heat exchanger, the first air-water heat exchanger, the second air-water heat exchanger and the flue gas absorption heat pump passes through the water supply The hot water connecting pipe first enters the hot water storage tank, and then provides domestic hot water to coal mine users through the domestic hot water supply pipe. At this time, the hot water storage tank is used to buffer the fluctuation of domestic hot water demand load;
打开第十八阀门、第二十阀门、第二十三阀门和二十四阀门,经过水水换热器、第一气水换热器、第二气水换热器和烟气型吸收式热泵同时加热后的低温供热水通过供热水连通管还进入烟气换热器,利用余热锅炉输出的高温烟气对其进行第二次加热,然后通过采暖供水管输出为煤矿用户供暖。Open the 18th valve, 20th valve, 23rd valve and 24th valve, pass through the water-water heat exchanger, the first air-water heat exchanger, the second air-water heat exchanger and the flue gas absorption type The low-temperature hot water heated by the heat pump at the same time enters the flue gas heat exchanger through the hot water connecting pipe, and is heated for the second time by the high-temperature flue gas output from the waste heat boiler, and then output through the heating water supply pipe to provide heating for coal mine users.
上述的一种煤矿在用设备的余热回收利用系统及运行方法中:In the waste heat recovery and utilization system and operation method of the above-mentioned coal mine in-use equipment:
在非采暖季时,煤矿用户无供暖需求,此时,需要关闭第十八阀门、第二十阀门、第二十三阀门和二十四阀门,经过水水换热器、第一气水换热器、第二气水换热器和烟气型吸收式热泵同时加热后的低温供热水不再进入烟气换热器,而是全部进入热水储罐,然后再通过供生活热水管为煤矿用户提供生活热水。In the non-heating season, coal mine users have no heating demand. At this time, it is necessary to close the 18th valve, the 20th valve, the 23rd valve and the 24th valve. The low-temperature hot water heated by the heat exchanger, the second air-water heat exchanger and the flue gas absorption heat pump at the same time no longer enters the flue gas heat exchanger, but all enters the hot water storage tank, and then passes through the domestic hot water supply Pipes provide domestic hot water for coal mine users.
上述的一种煤矿在用设备的余热回收利用系统的运行方法中:In the operation method of the waste heat recovery and utilization system of the above-mentioned coal mine in-use equipment:
所述水水换热器、第一气水换热器、第二气水换热器和烟气型吸收式热泵均为独立运行;The water-to-water heat exchanger, the first air-to-water heat exchanger, the second air-to-water heat exchanger and the flue gas-type absorption heat pump all operate independently;
此时,打开第一阀门和第二阀门,关闭第三阀门、第四阀门、第十五阀门和第十六阀门,内燃机组形成的高温缸套水不再进入水水换热器中加热低温供热水,而是进入通风冷却装置利用对外散热排放的方式进行冷却;At this time, open the first valve and the second valve, close the third valve, the fourth valve, the fifteenth valve and the sixteenth valve, and the high-temperature jacket water formed by the internal combustion unit will no longer enter the water-to-water heat exchanger to heat the low-temperature Instead of supplying hot water, it enters the ventilation cooling device and uses the way of external heat dissipation for cooling;
此时,打开第五阀门和第六阀门,关闭第七阀门、第八阀门、第九阀门、第十阀门、第十一阀门和第十二阀门,凝汽器中加热后的低温循环水不再进入烟气型吸收式热泵,而是进入冷却塔利用对外散热排放的方式进行冷却;At this time, open the fifth valve and the sixth valve, close the seventh valve, the eighth valve, the ninth valve, the tenth valve, the eleventh valve and the twelfth valve. Then enter the flue gas type absorption heat pump, but enter the cooling tower and use the way of external heat dissipation for cooling;
此时,关闭第十一阀门和第十二阀门,不再利用第一气水换热器加热来自供热给水管的低温供热水;At this time, the eleventh valve and the twelfth valve are closed, and the first air-water heat exchanger is no longer used to heat the low-temperature hot water from the heating water supply pipe;
此时关闭第十三阀门和第十四阀门,不再利用第二气水换热器加热来自供热给水管的低温供热水。At this time, the thirteenth valve and the fourteenth valve are closed, and the second air-water heat exchanger is no longer used to heat the low-temperature hot water from the heating water supply pipe.
本发明与现有技术相比,具有以下优点和效果:设计合理,结构简单,性能可靠,合理设计煤矿在用设备的余热回收利用系统及运行方法,从而实现:以煤矿各类用能的需求,以“温度对口、梯级利用”为原则,梯级回收利用余热锅炉的排烟余热、空压机的高温压缩空气、内燃机的高温缸套水余热和汽轮机的低温循环水余热,提高了煤矿整体系统的能源利用效率,既满足了煤矿对不同用能的需求,又减少了能量回收利用过程中的不可逆损失,进一步提高了系统的能效水平,在有效减少环境污染的同时,保护了机械设备运行安全。因此,本发明具有非常大的实际应用价值。Compared with the prior art, the present invention has the following advantages and effects: reasonable design, simple structure, reliable performance, reasonable design of the waste heat recovery and utilization system and operation method of the equipment in use in coal mines, so as to realize: meet the needs of various types of energy consumption in coal mines , based on the principle of "temperature matching and cascade utilization", cascade recovery and utilization of exhaust heat from waste heat boilers, high-temperature compressed air from air compressors, high-temperature cylinder jacket water waste heat from internal combustion engines, and low-temperature circulating water waste heat from steam turbines have improved the overall coal mine system. The high energy utilization efficiency not only meets the needs of coal mines for different energy consumption, but also reduces the irreversible loss in the process of energy recovery and utilization, further improves the energy efficiency level of the system, and protects the operation safety of mechanical equipment while effectively reducing environmental pollution. . Therefore, the present invention has very large practical application value.
附图说明Description of drawings
图1是本发明实施例中的煤矿在用设备的余热回收利用系统的结构示意图。Fig. 1 is a schematic structural diagram of a waste heat recovery and utilization system of equipment in use in a coal mine in an embodiment of the present invention.
具体实施方式Detailed ways
下面结合附图并通过实施例对本发明作进一步的详细说明,以下实施例是对本发明的解释而本发明并不局限于以下实施例。The present invention will be further described in detail below in conjunction with the accompanying drawings and examples. The following examples are explanations of the present invention and the present invention is not limited to the following examples.
实施例。Example.
参见图1,本实施例中的煤矿在用设备的余热回收利用系统包括内燃机组1、发电机组2、通风冷却装置3、水水换热器4、余热锅炉5、汽轮机组6、凝汽器7、冷却塔8、第一空压机9、第二空压机10、第一气水换热器11、第二气水换热器12、电动机13、烟气型吸收式热泵14、烟气换热器15、热水储罐16和烟囱17。Referring to Fig. 1, the waste heat recovery and utilization system of coal mine equipment in use in this embodiment includes an internal combustion unit 1, a generator set 2, a ventilation cooling device 3, a water-to-water heat exchanger 4, a waste heat boiler 5, a steam turbine unit 6, and a condenser 7. Cooling tower 8, first air compressor 9, second air compressor 10, first air-water heat exchanger 11, second air-water heat exchanger 12, electric motor 13, flue gas type absorption heat pump 14, smoke Gas heat exchanger 15, hot water storage tank 16 and chimney 17.
本实施例中的内燃机组1的进气口连接有煤矿瓦斯101,内燃机组1驱动发电机组2发电,内燃机组1的缸套水出口同时与通风冷却装置3的进水口和水水换热器4的高温进水口连接,且在通风冷却装置3的进水口和水水换热器4的高温进水口分别安装有第二阀门22和第三阀门23,内燃机组1的缸套水进口同时与通风冷却装置3的出水口和水水换热器4的高温出水口连接,且在通风冷却装置3的出水口和水水换热器4的高温出水口分别安装有第一阀门21和第四阀门24,内燃机组1的烟气出口与余热锅炉5的烟气进口连接。The air inlet of the internal combustion unit 1 in this embodiment is connected with coal mine gas 101, the internal combustion unit 1 drives the generator set 2 to generate electricity, and the cylinder jacket water outlet of the internal combustion unit 1 is simultaneously connected with the water inlet of the ventilation cooling device 3 and the water-water heat exchanger The high temperature water inlet of 4 is connected, and the water inlet of ventilation cooling device 3 and the high temperature water inlet of water-water heat exchanger 4 are respectively installed with second valve 22 and third valve 23, and the cylinder jacket water inlet of internal combustion unit 1 is connected with The water outlet of the ventilation cooling device 3 is connected with the high-temperature water outlet of the water-water heat exchanger 4, and the first valve 21 and the fourth valve 21 are respectively installed at the water outlet of the ventilation cooling device 3 and the high-temperature water outlet of the water-water heat exchanger 4. The valve 24 connects the flue gas outlet of the internal combustion unit 1 with the flue gas inlet of the waste heat boiler 5 .
本实施例中的余热锅炉5的蒸汽出口与汽轮机组6的进汽口连接,汽轮机组6的排汽口与凝汽器7的乏汽进口连接,凝汽器7的凝结水出口与余热锅炉5的给水进口连接,凝汽器7的循环水出口同时与冷却塔8的进水口和烟气型吸收式热泵14的低温进水口连接,且在冷却塔8的进水口和烟气型吸收式热泵14的低温进水口分别安装有第五阀门25和第七阀门27,凝汽器7的循环水进口同时与冷却塔8的出水口和烟气型吸收式热泵14的低温出水口连接,且在冷却塔8的出水口和烟气型吸收式热泵14的低温出水口分别安装有第六阀门26和第八阀门28,汽轮机组6驱动第一空压机9做功,第一空压机9的进气口连接有新鲜空气102,第一空压机9的出气口与第一气水换热器11的进气口连接。In this embodiment, the steam outlet of the waste heat boiler 5 is connected to the steam inlet of the steam turbine unit 6, the steam exhaust port of the steam turbine unit 6 is connected to the exhaust steam inlet of the condenser 7, and the condensed water outlet of the condenser 7 is connected to the waste heat boiler 5, the circulating water outlet of the condenser 7 is connected to the water inlet of the cooling tower 8 and the low-temperature water inlet of the flue gas absorption heat pump 14, and the water inlet of the cooling tower 8 and the flue gas absorption heat pump The low-temperature water inlet of the heat pump 14 is respectively equipped with a fifth valve 25 and a seventh valve 27, and the circulating water inlet of the condenser 7 is simultaneously connected with the water outlet of the cooling tower 8 and the low-temperature water outlet of the flue gas-type absorption heat pump 14, and A sixth valve 26 and an eighth valve 28 are respectively installed at the water outlet of the cooling tower 8 and the low-temperature water outlet of the flue gas type absorption heat pump 14. The steam turbine unit 6 drives the first air compressor 9 to perform work, and the first air compressor 9 The air inlet of the first air compressor 9 is connected with the fresh air 102, and the air outlet of the first air compressor 9 is connected with the air inlet of the first air-water heat exchanger 11.
本实施例中的电动机13驱动第二空压机10做功,第二空压机10的进气口连接有新鲜空气102,第二空压机10的出气口与第二气水换热器12的进气口连接,水水换热器4的低温进水口与供热给水管103的出水端连接,且在水水换热器4的低温进水口安装有第十五阀门35,水水换热器4的低温出水口与供热水连通管106的进水端连接,且在水水换热器4的低温出水口安装有第十六阀门36,第一气水换热器11的低温进水口与供热给水管103的出水端连接,且在第一气水换热器11的低温进水口安装有第十一阀门31,第一气水换热器11的低温出水口与供热水连通管106的进水端连接,且在第一气水换热器11的低温出水口安装有第十二阀门32,第二气水换热器12的低温进水口与供热给水管103的出水端连接,且在第二气水换热器12的低温进水口安装有第十三阀门33,第二气水换热器12的低温出水口与供热水连通管106的进水端连接,且在第二气水换热器12的低温出水口安装有第十四阀门34。The motor 13 in the present embodiment drives the second air compressor 10 to do work, the air inlet of the second air compressor 10 is connected with fresh air 102, and the air outlet of the second air compressor 10 is connected to the second air-water heat exchanger 12 The low-temperature water inlet of the water-to-water heat exchanger 4 is connected to the water outlet of the heating water supply pipe 103, and a fifteenth valve 35 is installed on the low-temperature water inlet of the water-to-water heat exchanger 4, and the water-to-water exchange The low-temperature water outlet of the heater 4 is connected to the water inlet end of the hot water supply communication pipe 106, and a sixteenth valve 36 is installed at the low-temperature water outlet of the water-water heat exchanger 4, and the low-temperature water outlet of the first air-water heat exchanger 11 The water inlet is connected to the water outlet of the heating water supply pipe 103, and an eleventh valve 31 is installed at the low temperature water inlet of the first air-water heat exchanger 11, and the low temperature water outlet of the first air-water heat exchanger 11 is connected to the heat supply The water inlet end of the water communication pipe 106 is connected, and a twelfth valve 32 is installed at the low-temperature water outlet of the first air-water heat exchanger 11, and the low-temperature water inlet of the second air-water heat exchanger 12 is connected with the heating water supply pipe 103 The water outlet of the second air-water heat exchanger 12 is connected to the water outlet, and a thirteenth valve 33 is installed at the low-temperature water inlet of the second air-water heat exchanger 12, and the low-temperature water outlet of the second air-water heat exchanger 12 is connected to the water inlet of the hot water supply communication pipe 106 connected, and a fourteenth valve 34 is installed at the low-temperature water outlet of the second air-water heat exchanger 12 .
本实施例中的烟气型吸收式热泵14的中温进水口与供热给水管103的出水端连接,且在烟气型吸收式热泵14的中温进水口安装有第九阀门29,烟气型吸收式热泵14的中温出水口与供热水连通管106的进水端连接,且在烟气型吸收式热泵14的中温出水口安装有第十阀门30,烟气型吸收式热泵14的驱动烟气进口与余热锅炉5的烟气出口连接,且在烟气型吸收式热泵14的驱动烟气进口安装有第二十一阀门41,烟气型吸收式热泵14的驱动烟气出口与烟囱17的烟气进口连接,且在烟气型吸收式热泵14的驱动烟气出口安装有第二十二阀门42,热水储罐16的进水口与供热水连通管106的出水端连接,且在热水储罐16的进水口安装有第十七阀门37,热水储罐16的出水口与供生活热水管104的进水端连接,且在热水储罐16的出水口安装有第十九阀门39。The medium-temperature water inlet of the flue gas-type absorption heat pump 14 in this embodiment is connected to the water outlet end of the heating water supply pipe 103, and a ninth valve 29 is installed on the medium-temperature water inlet of the flue gas-type absorption heat pump 14. The medium-temperature water outlet of the absorption heat pump 14 is connected to the water inlet end of the hot water supply communication pipe 106, and a tenth valve 30 is installed on the medium-temperature water outlet of the flue gas-type absorption heat pump 14, and the driving of the flue gas-type absorption heat pump 14 The flue gas inlet is connected to the flue gas outlet of the waste heat boiler 5, and a twenty-first valve 41 is installed at the driving flue gas inlet of the flue gas type absorption heat pump 14, and the driving flue gas outlet of the flue gas type absorption heat pump 14 is connected to the chimney 17 is connected to the flue gas inlet, and a twenty-second valve 42 is installed at the driven flue gas outlet of the flue gas type absorption heat pump 14, and the water inlet of the hot water storage tank 16 is connected to the water outlet of the hot water supply communication pipe 106, And the seventeenth valve 37 is installed at the water inlet of the hot water storage tank 16, the water outlet of the hot water storage tank 16 is connected with the water inlet end of the domestic hot water pipe 104, and the water outlet of the hot water storage tank 16 is installed There is a nineteenth valve 39 .
本实施例中的烟气换热器15的进水口与供热水连通管106的出水端连接,且在烟气换热器15的进水口安装有第十八阀门38,烟气换热器15的出水口与采暖供水管105的进水端连接,且在烟气换热器15的出水口安装有第二十阀门40,烟气换热器15的烟气进口与余热锅炉5的烟气出口连接,且在烟气换热器15的烟气进口安装有第二十三阀门43,烟气换热器15的烟气出口与烟囱17的烟气进口连接,且在烟气换热器15的烟气出口安装有第二十四阀门40。The water inlet of the flue gas heat exchanger 15 in this embodiment is connected to the water outlet end of the hot water supply communication pipe 106, and an eighteenth valve 38 is installed at the water inlet of the flue gas heat exchanger 15, the flue gas heat exchanger The water outlet of 15 is connected to the water inlet end of the heating water supply pipe 105, and a twentieth valve 40 is installed at the water outlet of the flue gas heat exchanger 15, and the flue gas inlet of the flue gas heat exchanger 15 is connected to the flue gas of the waste heat boiler 5. The gas outlet is connected, and a twenty-third valve 43 is installed at the flue gas inlet of the flue gas heat exchanger 15. The flue gas outlet of the flue gas heat exchanger 15 is connected with the flue gas inlet of the chimney 17, and the flue gas heat exchange The flue gas outlet of the device 15 is equipped with a twenty-fourth valve 40 .
在本实施例中,内燃机组1的高温缸套水侧同时与通风冷却装置3和水水换热器4连接,凝汽器7的低温循环水侧同时与烟气型吸收式热泵14和冷却塔8连接,既可以利用对外散热排放的方式进行缸套水和低温循环水的冷却,又可以利用余热回收供热的方式进行缸套水和低温循环水的冷却。In this embodiment, the high-temperature cylinder jacket water side of the internal combustion unit 1 is connected with the ventilation cooling device 3 and the water-water heat exchanger 4 at the same time, and the low-temperature circulating water side of the condenser 7 is connected with the flue gas-type absorption heat pump 14 and the cooling system at the same time. Tower 8 is connected, which can not only cool the jacket water and low-temperature circulating water by means of external heat dissipation, but also cool the jacket water and low-temperature circulating water by using waste heat recovery for heating.
在本实施例中,余热锅炉5同时与烟气型吸收式热泵14和烟气换热器15连接,既可以为烟气型吸收式热泵14提供驱动热源,又可以为煤矿用户提供采暖热源。In this embodiment, the waste heat boiler 5 is connected with the flue gas absorption heat pump 14 and the flue gas heat exchanger 15 at the same time, which can not only provide a driving heat source for the flue gas absorption heat pump 14, but also provide a heating heat source for coal mine users.
在本实施例中,水水换热器4、第一气水换热器11、第二气水换热器12和烟气型吸收式热泵14为串联连接,利用水水换热器4、第一气水换热器11、第二气水换热器12和烟气型吸收式热泵14同时对来自供热给水管103的低温供热水进行第一次加热。In this embodiment, the water-water heat exchanger 4, the first air-water heat exchanger 11, the second air-water heat exchanger 12, and the flue gas type absorption heat pump 14 are connected in series, and the water-water heat exchanger 4, The first air-water heat exchanger 11 , the second air-water heat exchanger 12 and the flue gas type absorption heat pump 14 simultaneously heat the low-temperature hot water from the heating water supply pipe 103 for the first time.
本实施例涉及的煤矿在用设备的余热回收利用系统的运行方法如下:The operation method of the waste heat recovery and utilization system of the coal mine in-use equipment involved in this embodiment is as follows:
在采暖季时期:During the heating season:
煤矿瓦斯101进入内燃机组1燃烧做功来驱动发电机组2进行发电,此时,关闭第一阀门21和第二阀门22,打开第三阀门23、第四阀门24、第十五阀门35和第十六阀门36,内燃机组1形成的高温烟气进入余热锅炉5,内燃机组1形成的高温缸套水进入水水换热器4,加热来自供热给水管103的低温供热水,被降温后的缸套水再返回内燃机组1对其进行冷却,形成一个循环;The coal mine gas 101 enters the internal combustion unit 1 to burn and do work to drive the generator unit 2 to generate electricity. At this time, the first valve 21 and the second valve 22 are closed, and the third valve 23, the fourth valve 24, the fifteenth valve 35 and the tenth valve are opened. Six valves 36, the high-temperature flue gas formed by the internal combustion unit 1 enters the waste heat boiler 5, and the high-temperature jacket water formed by the internal combustion unit 1 enters the water-water heat exchanger 4 to heat the low-temperature hot water from the heating water supply pipe 103, and after being cooled The cylinder jacket water returns to the internal combustion unit 1 to cool it, forming a cycle;
利用发电机组2产生的电能驱动电动机13做功,来带动第二空压机10对新鲜空气102进行压缩,此时,打开第十三阀门33和第十四阀门34,第二空压机10形成的高温高压空气进入第二气水换热器12,加热来自供热给水管103的低温供热水;The electric energy generated by the generator set 2 is used to drive the electric motor 13 to do work to drive the second air compressor 10 to compress the fresh air 102. At this time, the thirteenth valve 33 and the fourteenth valve 34 are opened, and the second air compressor 10 forms a The high-temperature and high-pressure air enters the second air-water heat exchanger 12 to heat the low-temperature hot water from the heating water supply pipe 103;
余热锅炉5产生的蒸汽进入汽轮机组6进行做功驱动第一空压机9压缩新鲜空气102,汽轮机组6的排汽进入凝汽器7冷凝后形成凝结水再返回余热锅炉5,形成一个循环,此时,打开第十一阀门31和第十二阀门32,第一空压机9形成的高温高压空气进入第一气水换热器11,加热来自供热给水管103的低温供热水;The steam generated by the waste heat boiler 5 enters the steam turbine unit 6 to perform work to drive the first air compressor 9 to compress fresh air 102, and the exhaust steam of the steam turbine unit 6 enters the condenser 7 to condense to form condensed water and then returns to the waste heat boiler 5 to form a cycle. At this time, the eleventh valve 31 and the twelfth valve 32 are opened, and the high-temperature and high-pressure air formed by the first air compressor 9 enters the first air-water heat exchanger 11 to heat the low-temperature hot water from the heating water supply pipe 103;
关闭第五阀门25和第六阀门26,打开第七阀门27、第八阀门28、第九阀门29、第十阀门30、第十一阀门41和第十二阀门42,余热锅炉5输出的高温烟气进入烟气型吸收式热泵14作为驱动热源,以凝汽器7输出的低温循环水作为低温热源,加热来自供热给水管103的低温供热水;Close the fifth valve 25 and the sixth valve 26, open the seventh valve 27, the eighth valve 28, the ninth valve 29, the tenth valve 30, the eleventh valve 41 and the twelfth valve 42, the high temperature output from the waste heat boiler 5 The flue gas enters the flue gas-type absorption heat pump 14 as a driving heat source, and the low-temperature circulating water output from the condenser 7 is used as a low-temperature heat source to heat the low-temperature hot water from the heating water supply pipe 103;
打开第十七阀门37和第十九阀门39,经过水水换热器4、第一气水换热器11、第二气水换热器12和烟气型吸收式热泵14同时加热后的低温供热水通过供热水连通管106先进入热水储罐16,然后再通过供生活热水管104为煤矿用户提供生活热水,此时,利用热水储罐16来缓冲生活热水需求负荷的波动;Open the seventeenth valve 37 and the nineteenth valve 39, after the water-water heat exchanger 4, the first air-water heat exchanger 11, the second air-water heat exchanger 12 and the flue gas type absorption heat pump 14 are heated simultaneously The low-temperature hot water enters the hot water storage tank 16 first through the hot water supply connecting pipe 106, and then provides domestic hot water for coal mine users through the domestic hot water supply pipe 104. At this time, the hot water storage tank 16 is used to buffer the domestic hot water Fluctuations in demand load;
打开第十八阀门38、第二十阀门40、第二十三阀门43和二十四阀门44,经过水水换热器4、第一气水换热器11、第二气水换热器12和烟气型吸收式热泵14同时加热后的低温供热水通过供热水连通管106还进入烟气换热器15,利用余热锅炉5输出的高温烟气对其进行第二次加热,然后通过采暖供水管105输出为煤矿用户供暖。Open the eighteenth valve 38, the twentieth valve 40, the twenty-third valve 43 and the twenty-fourth valve 44, and pass through the water-water heat exchanger 4, the first air-water heat exchanger 11, and the second air-water heat exchanger 12 and the flue gas type absorption heat pump 14 simultaneously heat the low-temperature hot water through the hot water connecting pipe 106 and enter the flue gas heat exchanger 15, and use the high-temperature flue gas output from the waste heat boiler 5 to heat it for the second time. Then output heating for coal mine users through the heating water supply pipe 105 .
在采暖季时期,煤矿用户无供暖需求,上述运行方法中需进行如下改变:During the heating season, coal mine users have no heating demand, and the above operation method needs to be changed as follows:
此时,需要关闭第十八阀门38、第二十阀门40、第二十三阀门43和二十四阀门44,经过水水换热器4、第一气水换热器11、第二气水换热器12和烟气型吸收式热泵14同时加热后的低温供热水不再进入烟气换热器15,而是全部进入热水储罐16,然后再通过供生活热水管104为煤矿用户提供生活热水。At this time, it is necessary to close the eighteenth valve 38, the twentieth valve 40, the twenty-third valve 43 and the twenty-fourth valve 44, and pass through the water-water heat exchanger 4, the first air-water heat exchanger 11, and the second air-water heat exchanger 4. The low-temperature hot water heated simultaneously by the water heat exchanger 12 and the flue gas absorption heat pump 14 no longer enters the flue gas heat exchanger 15, but all enters the hot water storage tank 16, and then passes through the domestic hot water pipe 104 Provide domestic hot water for coal mine users.
在本实施例涉及的煤矿在用设备的余热回收利用系统的运行方法中,水水换热器4、第一气水换热器11、第二气水换热器12和烟气型吸收式热泵14均为独立运行。当打开第一阀门21和第二阀门22,关闭第三阀门23、第四阀门24、第十五阀门35和第十六阀门36的时候,内燃机组1形成的高温缸套水不再进入水水换热器4中加热低温供热水,而是进入通风冷却装置3利用对外散热排放的方式进行冷却;当打开第五阀门25和第六阀门26,关闭第七阀门27、第八阀门28、第九阀门29、第十阀门30、第十一阀门41和第十二阀门42的时候,凝汽器7中加热后的低温循环水不再进入烟气型吸收式热泵14,而是进入冷却塔8利用对外散热排放的方式进行冷却;当关闭第十一阀门31和第十二阀门32的时候,不再利用第一气水换热器11加热来自供热给水管103的低温供热水;当关闭第十三阀门33和第十四阀门34的时候,不再利用第二气水换热器12加热来自供热给水管103的低温供热水。In the operation method of the waste heat recovery and utilization system of coal mine in-use equipment involved in this embodiment, the water-water heat exchanger 4, the first air-water heat exchanger 11, the second air-water heat exchanger 12 and the flue gas type absorption The heat pumps 14 all operate independently. When the first valve 21 and the second valve 22 are opened, and the third valve 23, the fourth valve 24, the fifteenth valve 35 and the sixteenth valve 36 are closed, the high-temperature jacket water formed by the internal combustion unit 1 no longer enters the water The water heat exchanger 4 heats the low-temperature hot water supply, but enters the ventilation and cooling device 3 and uses the mode of external heat dissipation for cooling; when the fifth valve 25 and the sixth valve 26 are opened, the seventh valve 27 and the eighth valve 28 are closed , the ninth valve 29, the tenth valve 30, the eleventh valve 41 and the twelfth valve 42, the low-temperature circulating water heated in the condenser 7 no longer enters the flue gas type absorption heat pump 14, but enters The cooling tower 8 is cooled by means of external heat dissipation; when the eleventh valve 31 and the twelfth valve 32 are closed, the first air-water heat exchanger 11 is no longer used to heat the low-temperature heat from the heat supply pipe 103 Water: when the thirteenth valve 33 and the fourteenth valve 34 are closed, the second air-water heat exchanger 12 is no longer used to heat the low-temperature hot water from the heating water supply pipe 103 .
此外,需要说明的是,本说明书中所描述的具体实施例,其零、部件的形状、所取名称等可以不同,本说明书中所描述的以上内容仅仅是对本发明结构所作的举例说明。凡依据本发明专利构思的构造、特征及原理所做的等效变化或者简单变化,均包括于本发明专利的保护范围内。本发明所属技术领域的技术人员可以对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,只要不偏离本发明的结构或者超越本权利要求书所定义的范围,均应属于本发明的保护范围。In addition, it should be noted that the specific embodiments described in this specification may be different in parts, shapes and names of parts, and the above content described in this specification is only an illustration of the structure of the present invention. All equivalent changes or simple changes based on the structure, features and principles of the patent concept of the present invention are included in the protection scope of the patent of the present invention. Those skilled in the art to which the present invention belongs can make various modifications or supplements to the described specific embodiments or adopt similar methods to replace them, as long as they do not deviate from the structure of the present invention or exceed the scope defined in the claims. All should belong to the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910453148.3A CN110173347B (en) | 2019-05-28 | 2019-05-28 | Waste heat recycling system of coal mine in-use equipment and operation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910453148.3A CN110173347B (en) | 2019-05-28 | 2019-05-28 | Waste heat recycling system of coal mine in-use equipment and operation method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110173347A true CN110173347A (en) | 2019-08-27 |
| CN110173347B CN110173347B (en) | 2020-02-28 |
Family
ID=67696510
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910453148.3A Active CN110173347B (en) | 2019-05-28 | 2019-05-28 | Waste heat recycling system of coal mine in-use equipment and operation method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110173347B (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110887270A (en) * | 2019-10-30 | 2020-03-17 | 鞍钢股份有限公司 | Multistage utilization system and method for waste heat of air compressor |
| CN111156734A (en) * | 2020-01-15 | 2020-05-15 | 东北电力大学 | Total heat recovery type absorption-compression type coupling heat pump system capable of operating under variable working conditions |
| CN111156733A (en) * | 2020-01-15 | 2020-05-15 | 东北电力大学 | Biomass flue gas waste heat total heat recovery type absorption-compression coupled heat pump system |
| CN112282876A (en) * | 2020-11-30 | 2021-01-29 | 山东胜利通海集团东营天蓝节能科技有限公司 | A combined heat and power device based on natural gas generator |
| CN114856735A (en) * | 2022-04-25 | 2022-08-05 | 中国能源建设集团江苏省电力设计院有限公司 | Air turbine coupling gas turbine power generation system based on compressed air energy storage |
| CN116412410A (en) * | 2023-03-31 | 2023-07-11 | 河南英格迪普节能设备有限公司 | Method and device for cascade utilization of waste heat of flue gas from mine gas power generation |
| CN117823387A (en) * | 2024-01-16 | 2024-04-05 | 国网江苏省电力有限公司常州市金坛区供电分公司 | Steam compressor unit used in smart waste heat steam generation system |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103017238A (en) * | 2012-12-25 | 2013-04-03 | 浙江工商大学 | Waste heat recovery heating system of biomass power plant |
| JP2014034924A (en) * | 2012-08-09 | 2014-02-24 | Hitachi Power Solutions Co Ltd | Exhaust heat recovery device of internal combustion engine and cogeneration system |
| EP2762713A1 (en) * | 2011-09-30 | 2014-08-06 | Nissan Motor Co., Ltd. | Rankine cycle |
| CN104533551A (en) * | 2014-08-29 | 2015-04-22 | 中国华能集团清洁能源技术研究院有限公司 | Waste heat recovery IGCC (integrated gasification combined cycle) combined heat and power generation central heating system and method |
| CN105003351A (en) * | 2015-07-21 | 2015-10-28 | 天津大学 | Multi-energy-form output energy tower for stepwise recycling gas engine waste heat energy |
-
2019
- 2019-05-28 CN CN201910453148.3A patent/CN110173347B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2762713A1 (en) * | 2011-09-30 | 2014-08-06 | Nissan Motor Co., Ltd. | Rankine cycle |
| JP2014034924A (en) * | 2012-08-09 | 2014-02-24 | Hitachi Power Solutions Co Ltd | Exhaust heat recovery device of internal combustion engine and cogeneration system |
| CN103017238A (en) * | 2012-12-25 | 2013-04-03 | 浙江工商大学 | Waste heat recovery heating system of biomass power plant |
| CN104533551A (en) * | 2014-08-29 | 2015-04-22 | 中国华能集团清洁能源技术研究院有限公司 | Waste heat recovery IGCC (integrated gasification combined cycle) combined heat and power generation central heating system and method |
| CN105003351A (en) * | 2015-07-21 | 2015-10-28 | 天津大学 | Multi-energy-form output energy tower for stepwise recycling gas engine waste heat energy |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110887270A (en) * | 2019-10-30 | 2020-03-17 | 鞍钢股份有限公司 | Multistage utilization system and method for waste heat of air compressor |
| CN110887270B (en) * | 2019-10-30 | 2021-07-02 | 鞍钢股份有限公司 | A system and method for multi-stage utilization of waste heat from an air compressor |
| CN111156734A (en) * | 2020-01-15 | 2020-05-15 | 东北电力大学 | Total heat recovery type absorption-compression type coupling heat pump system capable of operating under variable working conditions |
| CN111156733A (en) * | 2020-01-15 | 2020-05-15 | 东北电力大学 | Biomass flue gas waste heat total heat recovery type absorption-compression coupled heat pump system |
| CN111156734B (en) * | 2020-01-15 | 2022-11-08 | 东北电力大学 | Total heat recovery type absorption-compression type coupling heat pump system capable of operating under variable working conditions |
| CN111156733B (en) * | 2020-01-15 | 2022-11-08 | 东北电力大学 | Biomass flue gas waste heat total heat recovery type absorption-compression coupling heat pump system |
| CN112282876A (en) * | 2020-11-30 | 2021-01-29 | 山东胜利通海集团东营天蓝节能科技有限公司 | A combined heat and power device based on natural gas generator |
| CN114856735A (en) * | 2022-04-25 | 2022-08-05 | 中国能源建设集团江苏省电力设计院有限公司 | Air turbine coupling gas turbine power generation system based on compressed air energy storage |
| CN114856735B (en) * | 2022-04-25 | 2023-11-17 | 中国能源建设集团江苏省电力设计院有限公司 | Air turbine coupling gas turbine power generation system based on compressed air energy storage |
| CN116412410A (en) * | 2023-03-31 | 2023-07-11 | 河南英格迪普节能设备有限公司 | Method and device for cascade utilization of waste heat of flue gas from mine gas power generation |
| CN116412410B (en) * | 2023-03-31 | 2026-03-13 | 河南英格迪普节能设备有限公司 | Methods and devices for the cascade utilization of waste heat from coal mine gas power generation |
| CN117823387A (en) * | 2024-01-16 | 2024-04-05 | 国网江苏省电力有限公司常州市金坛区供电分公司 | Steam compressor unit used in smart waste heat steam generation system |
Also Published As
| Publication number | Publication date |
|---|---|
| CN110173347B (en) | 2020-02-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102878603B (en) | Gas-steam circulation combined double-stage coupling heat pump heat supply device | |
| CN105485649B (en) | A kind of efficient waste heat recycling utilization system | |
| CN201321918Y (en) | Heat power and cold cogeneration device for waste heat utilization of large-scale marine diesel engine | |
| CN215292608U (en) | Waste heat recovery cogeneration system based on organic Rankine cycle and absorption heat exchange | |
| CN205825455U (en) | A kind of solar energy assisted coal fired unit hybrid power system run under multi-mode | |
| CN110173347B (en) | Waste heat recycling system of coal mine in-use equipment and operation method | |
| CN110145408A (en) | A comprehensive energy supply system and its operation method for recovering wide-concentration gas in coal mines | |
| CN113899006B (en) | A heat supply system that utilizes low-pressure heating and drainage to drive heat pumps to recover waste heat from circulating water | |
| CN106499455A (en) | Combined-cycle power plant's soda pop backheat and fuel heating integrated put forward effect system | |
| CN108036384A (en) | A kind of energy source station system and operation method based on thermoelectricity unit steam extraction | |
| CN202452758U (en) | System for improving cooling efficiency of power plant through waste heat recovery | |
| CN202868822U (en) | A device for recovering waste heat from flue gas in a power plant by using a jet heat pump | |
| CN109356724B (en) | Coupling method of flue gas waste heat supply and air inlet cooling and gas heating | |
| CN205332168U (en) | Waste heat comprehensive recovery utilization system of thermal power factory | |
| CN219103728U (en) | Converter flue gas waste heat utilization system | |
| CN203271834U (en) | Britten-steam Rankine-ammonia vapour Rankine combined cycle generating set | |
| CN112856849A (en) | Thermal power system energy storage peak regulation system for recovering latent heat in flue gas and working method | |
| CN208040541U (en) | Gas turbine cycle flue gas waste heat recovery and inlet gas cooling association system | |
| CN208594974U (en) | A kind of Combined cycle gas-steam turbine UTILIZATION OF VESIDUAL HEAT IN unit using compression heat pump | |
| CN203980632U (en) | Recovered flue gas heat-pump apparatus | |
| CN214147847U (en) | Waste heat recovery system for coupling internal combustion engine and coal-fired unit condensed water and water supply system | |
| CN203489246U (en) | Boiler smoke waste-heat application system | |
| CN206440032U (en) | A kind of recovery Steam Turbine exhaust steam residual heat system based on heat pump | |
| CN102494329B (en) | Device for utilizing flue gas waste heat of boiler comprehensively | |
| CN210801685U (en) | A combined cooling, heating and power supply system for biogas combined cycle |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A heat recovery utilization system and operation method for equipment used in coal mines Granted publication date: 20200228 Pledgee: Agricultural Bank of China Limited Hangzhou Gongshu Branch Pledgor: ZHEJIANG YIYANG ENERGY TECHNOLOGY Co.,Ltd.|CHANGZHI YIYANG ENERGY TECHNOLOGY CO.,LTD. Registration number: Y2026980020103 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right |