CN110158630B - 一种深厚覆盖层地区大跨拱桥环形地下连续墙基础 - Google Patents
一种深厚覆盖层地区大跨拱桥环形地下连续墙基础 Download PDFInfo
- Publication number
- CN110158630B CN110158630B CN201910473506.7A CN201910473506A CN110158630B CN 110158630 B CN110158630 B CN 110158630B CN 201910473506 A CN201910473506 A CN 201910473506A CN 110158630 B CN110158630 B CN 110158630B
- Authority
- CN
- China
- Prior art keywords
- wall
- underground continuous
- continuous wall
- foundation
- annular
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 claims abstract description 55
- 239000004576 sand Substances 0.000 claims description 13
- 238000000034 method Methods 0.000 claims description 11
- 239000011150 reinforced concrete Substances 0.000 claims description 11
- 238000009412 basement excavation Methods 0.000 claims description 8
- 238000005266 casting Methods 0.000 claims description 5
- 238000004080 punching Methods 0.000 claims description 3
- 239000002002 slurry Substances 0.000 description 24
- 239000004567 concrete Substances 0.000 description 15
- 230000002787 reinforcement Effects 0.000 description 10
- 239000002689 soil Substances 0.000 description 9
- 229910000831 Steel Inorganic materials 0.000 description 7
- 239000010959 steel Substances 0.000 description 7
- 238000003801 milling Methods 0.000 description 6
- 238000006073 displacement reaction Methods 0.000 description 4
- 238000005553 drilling Methods 0.000 description 4
- 238000011065 in-situ storage Methods 0.000 description 4
- 238000004140 cleaning Methods 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 239000001768 carboxy methyl cellulose Substances 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 239000010802 sludge Substances 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 229920002134 Carboxymethyl cellulose Polymers 0.000 description 1
- DPXJVFZANSGRMM-UHFFFAOYSA-N acetic acid;2,3,4,5,6-pentahydroxyhexanal;sodium Chemical compound [Na].CC(O)=O.OCC(O)C(O)C(O)C(O)C=O DPXJVFZANSGRMM-UHFFFAOYSA-N 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- TZCXTZWJZNENPQ-UHFFFAOYSA-L barium sulfate Chemical compound [Ba+2].[O-]S([O-])(=O)=O TZCXTZWJZNENPQ-UHFFFAOYSA-L 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 235000010948 carboxy methyl cellulose Nutrition 0.000 description 1
- 239000008112 carboxymethyl-cellulose Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- ONCZQWJXONKSMM-UHFFFAOYSA-N dialuminum;disodium;oxygen(2-);silicon(4+);hydrate Chemical compound O.[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[Na+].[Na+].[Al+3].[Al+3].[Si+4].[Si+4].[Si+4].[Si+4] ONCZQWJXONKSMM-UHFFFAOYSA-N 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000011049 filling Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000016507 interphase Effects 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000001050 lubricating effect Effects 0.000 description 1
- 238000005461 lubrication Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 230000001007 puffing effect Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000005204 segregation Methods 0.000 description 1
- 239000011265 semifinished product Substances 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 239000011734 sodium Substances 0.000 description 1
- 229940080314 sodium bentonite Drugs 0.000 description 1
- 229910000280 sodium bentonite Inorganic materials 0.000 description 1
- 235000019812 sodium carboxymethyl cellulose Nutrition 0.000 description 1
- 229920001027 sodium carboxymethylcellulose Polymers 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Foundations (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910473506.7A CN110158630B (zh) | 2019-05-31 | 2019-05-31 | 一种深厚覆盖层地区大跨拱桥环形地下连续墙基础 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910473506.7A CN110158630B (zh) | 2019-05-31 | 2019-05-31 | 一种深厚覆盖层地区大跨拱桥环形地下连续墙基础 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110158630A CN110158630A (zh) | 2019-08-23 |
CN110158630B true CN110158630B (zh) | 2025-04-11 |
Family
ID=67630637
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910473506.7A Active CN110158630B (zh) | 2019-05-31 | 2019-05-31 | 一种深厚覆盖层地区大跨拱桥环形地下连续墙基础 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110158630B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111485571A (zh) * | 2020-05-26 | 2020-08-04 | 广西交科集团有限公司 | 深厚圆砾层下伏灰岩地基拱桥基础及其修建方法 |
CN112411590A (zh) * | 2020-11-25 | 2021-02-26 | 上海金鹿建设(集团)有限公司 | 一种地下连续墙结构及施工方法 |
CN112593562A (zh) * | 2020-12-03 | 2021-04-02 | 深圳市工勘岩土集团有限公司 | 环形地下连续墙成槽施工方法 |
CN113605368B (zh) * | 2021-07-27 | 2023-03-24 | 广西交通设计集团有限公司 | 用于厚覆盖层地区大跨拱桥格构式地下连续墙及施工方法 |
CN113914351A (zh) * | 2021-11-26 | 2022-01-11 | 华能陇东能源有限责任公司 | 一种用于湿陷性黄土地区的筒型风机基础结构及施工方法 |
CN115853007A (zh) * | 2022-11-17 | 2023-03-28 | 安徽省路桥工程集团有限责任公司 | 一种宫格式塔柱一体桩及其成型方法、应用 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108660935A (zh) * | 2018-05-29 | 2018-10-16 | 广西路桥工程集团有限公司 | 一种钢筋混凝土拱桥的施工方法 |
CN108999204A (zh) * | 2018-09-25 | 2018-12-14 | 大连理工大学 | 一种裙式加隔板地下连续墙-桩复合式基础 |
CN210315632U (zh) * | 2019-05-31 | 2020-04-14 | 广西路桥工程集团有限公司 | 一种深厚覆盖层地区大跨拱桥环形地下连续墙基础 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493475B (zh) * | 2011-12-06 | 2015-07-01 | 牛伟民 | 一种格构桩基础及其施工方法 |
CN204590038U (zh) * | 2015-04-15 | 2015-08-26 | 广东省基础工程集团有限公司 | 一种永久性基坑支护结构 |
CN204940298U (zh) * | 2015-07-17 | 2016-01-06 | 上海建工七建集团有限公司 | 一种基坑工程的复合围护结构 |
US10138616B2 (en) * | 2016-08-12 | 2018-11-27 | Wuhan Zhihe Geotechnical Engineering Co., Ltd. | Inverse construction method for deep, large and long pit assembling structure of suspension-type envelope enclosure |
CN107299640A (zh) * | 2017-08-14 | 2017-10-27 | 西南科技大学 | 一种变截面井筒式地下连续墙基础及其施工方法 |
CN108978677A (zh) * | 2018-09-04 | 2018-12-11 | 中铁大桥局集团有限公司 | 复杂地形下深基坑开挖组合支护结构 |
-
2019
- 2019-05-31 CN CN201910473506.7A patent/CN110158630B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108660935A (zh) * | 2018-05-29 | 2018-10-16 | 广西路桥工程集团有限公司 | 一种钢筋混凝土拱桥的施工方法 |
CN108999204A (zh) * | 2018-09-25 | 2018-12-14 | 大连理工大学 | 一种裙式加隔板地下连续墙-桩复合式基础 |
CN210315632U (zh) * | 2019-05-31 | 2020-04-14 | 广西路桥工程集团有限公司 | 一种深厚覆盖层地区大跨拱桥环形地下连续墙基础 |
Non-Patent Citations (1)
Title |
---|
"地下连续墙锚碇基础承载特性研究";陈旭浩;《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》;20190228(第2019年第2期);第C038-1307篇 * |
Also Published As
Publication number | Publication date |
---|---|
CN110158630A (zh) | 2019-08-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110158630B (zh) | 一种深厚覆盖层地区大跨拱桥环形地下连续墙基础 | |
CN108914931B (zh) | 一种装配式竖向盾构环型基桩与施工方法 | |
CN101215834A (zh) | 支腿式地下连续墙施工工法 | |
CN107524142A (zh) | 一种泥浆护壁钻孔灌注桩施工方法 | |
CN210315632U (zh) | 一种深厚覆盖层地区大跨拱桥环形地下连续墙基础 | |
CN101358453A (zh) | 复合型套箱围堰及其建造方法 | |
CN101481911A (zh) | 特殊地下连续墙施工方法 | |
CN111705786A (zh) | 一种复合地层地下连续墙与钻孔灌注桩竖向结合施工的方法 | |
CN110359476A (zh) | 一种钢板桩围堰内支撑与钻孔桩钢护筒安装用施工平台的施工方法 | |
CN104712341B (zh) | 浅覆土区域盾构掘进地层加固体系及其构建方法 | |
CN104164881A (zh) | 一种桩墙叠合悬臂基坑支护施工方法及结构 | |
CN202194149U (zh) | 一种止水帷幕 | |
CN114108649A (zh) | 淤泥质土层的基坑加固施工方法 | |
CN109610473A (zh) | 一种市政大型池体构筑物基坑支护体系的施工方法 | |
CN204174625U (zh) | 一种桩墙叠合悬臂基坑支护结构 | |
CN209854754U (zh) | 一种流砂地层半封闭沉井结构 | |
CN107299640A (zh) | 一种变截面井筒式地下连续墙基础及其施工方法 | |
CN204311456U (zh) | 基坑加固结构 | |
CN113502837B (zh) | 一种砂岩地层围堰引孔防漏渣施工工艺 | |
CN112281888A (zh) | 一种基坑沉箱开挖支护方法 | |
CN117738192A (zh) | 一种深井浅位开挖与沉井法相结合的施工方法 | |
CN111042171A (zh) | 一种适用于淤泥质软土地基、高地下水位的沉井施工方法 | |
CN209854757U (zh) | 用于深厚覆盖层地区的大跨拱桥环形地下连续墙基础 | |
CN215715426U (zh) | 桥梁深基坑围堰结构 | |
CN116756940A (zh) | 基于不同地质环境受力性能的顶管工程设计及施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20240817 Address after: No.21 Pingle Avenue, Liangqing District, Nanning City, Guangxi Zhuang Autonomous Region, 530201 Applicant after: GUANGXI ROAD AND BRIDGE ENGINEERING GROUP Co.,Ltd. Country or region after: China Applicant after: GUANGXI COMMUNICATION DESIGN GROUP Co.,Ltd. Address before: No. 17, Zhonghua Road, Xingning District, Nanning City, Guangxi Zhuang Autonomous Region, 530011 Applicant before: GUANGXI ROAD AND BRIDGE ENGINEERING GROUP Co.,Ltd. Country or region before: China |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |