CN110158602B - 一种软土地质深基坑支护开挖施工结构及施工方法 - Google Patents
一种软土地质深基坑支护开挖施工结构及施工方法 Download PDFInfo
- Publication number
- CN110158602B CN110158602B CN201910494700.3A CN201910494700A CN110158602B CN 110158602 B CN110158602 B CN 110158602B CN 201910494700 A CN201910494700 A CN 201910494700A CN 110158602 B CN110158602 B CN 110158602B
- Authority
- CN
- China
- Prior art keywords
- block
- pile
- foundation pit
- construction
- soft soil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 60
- 239000002689 soil Substances 0.000 title claims abstract description 59
- 238000009412 basement excavation Methods 0.000 title claims abstract description 41
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 33
- 239000010959 steel Substances 0.000 claims abstract description 33
- 239000004567 concrete Substances 0.000 claims abstract description 31
- 239000000203 mixture Substances 0.000 claims description 18
- 239000004927 clay Substances 0.000 claims description 8
- 229910052570 clay Inorganic materials 0.000 claims description 8
- 238000005507 spraying Methods 0.000 claims description 6
- 238000004891 communication Methods 0.000 claims description 3
- 238000005553 drilling Methods 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 238000007789 sealing Methods 0.000 abstract description 3
- 239000010410 layer Substances 0.000 description 8
- 238000000034 method Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000011178 precast concrete Substances 0.000 description 2
- 239000004568 cement Substances 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 239000002356 single layer Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910494700.3A CN110158602B (zh) | 2019-06-10 | 2019-06-10 | 一种软土地质深基坑支护开挖施工结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910494700.3A CN110158602B (zh) | 2019-06-10 | 2019-06-10 | 一种软土地质深基坑支护开挖施工结构及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110158602A CN110158602A (zh) | 2019-08-23 |
CN110158602B true CN110158602B (zh) | 2020-09-29 |
Family
ID=67627857
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910494700.3A Active CN110158602B (zh) | 2019-06-10 | 2019-06-10 | 一种软土地质深基坑支护开挖施工结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110158602B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110777835B (zh) * | 2019-10-31 | 2021-04-27 | 安徽省路港工程有限责任公司 | 钢管桩支护桩基承台支模体系的施工方法 |
CN110984170B (zh) * | 2019-11-25 | 2021-07-16 | 上海水务建设工程有限公司 | 半自动基坑钢支撑安装方法及钢支撑安装辅助装置 |
CN111535332A (zh) * | 2020-05-13 | 2020-08-14 | 福建岩土工程勘察研究院有限公司 | 一种软土地区钢板桩基坑支护结构失稳的加固方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100720321B1 (ko) * | 2005-04-19 | 2007-05-25 | 주식회사 서영엔지니어링 | 작용하중에 따라 발생되는 변위와 반력을 직접회복 및상쇄하도록 제어하는 자동싱크로나이즈지지시스템 및 이의설치방법 |
CN104947682A (zh) * | 2015-05-06 | 2015-09-30 | 中国地质大学(武汉) | 一种基坑支护施工方法及其装置 |
CN105604576A (zh) * | 2016-01-20 | 2016-05-25 | 中铁隆工程集团有限公司 | 一种软岩地层暗挖大断面隧道施工方法及支护体系 |
CN107476313A (zh) * | 2017-08-22 | 2017-12-15 | 江苏省岩土工程公司 | 一种斜抛撑支护系统及与基础底板同时施工的方法 |
CN109403333A (zh) * | 2018-11-02 | 2019-03-01 | 福建工程学院 | 一种上软下硬富水地层深基坑逆作施工方法 |
CN109778866A (zh) * | 2018-12-20 | 2019-05-21 | 上海建工集团股份有限公司 | 用于基坑中心岛盆式开挖的组合支护体系及其施工方法 |
-
2019
- 2019-06-10 CN CN201910494700.3A patent/CN110158602B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100720321B1 (ko) * | 2005-04-19 | 2007-05-25 | 주식회사 서영엔지니어링 | 작용하중에 따라 발생되는 변위와 반력을 직접회복 및상쇄하도록 제어하는 자동싱크로나이즈지지시스템 및 이의설치방법 |
CN104947682A (zh) * | 2015-05-06 | 2015-09-30 | 中国地质大学(武汉) | 一种基坑支护施工方法及其装置 |
CN105604576A (zh) * | 2016-01-20 | 2016-05-25 | 中铁隆工程集团有限公司 | 一种软岩地层暗挖大断面隧道施工方法及支护体系 |
CN105604576B (zh) * | 2016-01-20 | 2018-08-21 | 中铁隆工程集团有限公司 | 一种软岩地层暗挖大断面隧道施工方法 |
CN107476313A (zh) * | 2017-08-22 | 2017-12-15 | 江苏省岩土工程公司 | 一种斜抛撑支护系统及与基础底板同时施工的方法 |
CN109403333A (zh) * | 2018-11-02 | 2019-03-01 | 福建工程学院 | 一种上软下硬富水地层深基坑逆作施工方法 |
CN109778866A (zh) * | 2018-12-20 | 2019-05-21 | 上海建工集团股份有限公司 | 用于基坑中心岛盆式开挖的组合支护体系及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN110158602A (zh) | 2019-08-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110158602B (zh) | 一种软土地质深基坑支护开挖施工结构及施工方法 | |
CN109914472B (zh) | 一种软土地区装配式综合管廊及其施工方法 | |
CN102322269A (zh) | 一种盾构机超早接收支护结构及超早接收方法 | |
CN106013052A (zh) | 钢板桩与沉井组合式地下停车库及其施工方法 | |
CN108035379B (zh) | 一种综合管廊及其施工方法 | |
CN212641473U (zh) | 邻近既有建筑的基坑支护结构 | |
CN111236241A (zh) | 基于半盖挖法的软弱富水地层地铁基坑加固开挖方法 | |
CN112982481A (zh) | 一种管廊上跨地铁交叉节点处的结构施工方法 | |
CN111236952A (zh) | 一种全回收装配式矩形顶管工作井钢结构支护装置及其工作井的施工方法 | |
CN111622251A (zh) | 一种装配式沉井结构及其施工方法 | |
US11384501B2 (en) | Method for sealing post-cast strip in foundation with no gap | |
CN210177527U (zh) | 一种小型独立承台基础现场预制结构 | |
CN211816394U (zh) | 一种基岩地区不排水挡土墙结构 | |
CN113550322A (zh) | 紧邻深浅基坑围护体系及施工方法 | |
CN111608435A (zh) | 一种地铁车站与高架桥合建结构及其施工方法 | |
CN212052780U (zh) | 一种斜支式深基坑支护结构 | |
CN208650067U (zh) | 地下增层开挖新型支护结构 | |
CN212317585U (zh) | 一种地铁车站与高架桥合建结构 | |
CN211172070U (zh) | 一种拼装型钢筋混凝土构件装配式悬壁挡土墙结构 | |
CN213867921U (zh) | 一种地下管廊叠合板现浇拼接结构 | |
CN217601487U (zh) | 一种疏干井封堵施工节点 | |
CN212656215U (zh) | 一种十字形预制钢砼桩与钢管柱组合的装配式管架 | |
CN214784063U (zh) | 一种组合围堰结构 | |
CN214460474U (zh) | 土岩组合地层基坑支护体系 | |
CN216973379U (zh) | 一种地下硐室拱脚梁下地基加固结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
TR01 | Transfer of patent right |
Effective date of registration: 20220208 Address after: 430048 No. 11 Jinyinhu Road, Dongxihu District, Wuhan City, Hubei Province Patentee after: CCCC SECOND HARBOR ENGINEERING Co.,Ltd. Patentee after: CCCC WUHAN HARBOUR ENGINEERING DESIGN AND RESEARCH Co.,Ltd. Address before: No.11, Dongxihu Road, Jinyinhu District, Wuhan City, Hubei Province Patentee before: CCCC SECOND HARBOR ENGINEERING Co.,Ltd. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20220907 Address after: Room 1311, 13th Floor, Building 7#8#, Zixin Yuhuwan, No. 199 Wenyuan East Road, Gaotangling Street, Wangcheng District, Changsha City, Hunan Province 410203 Patentee after: CCCC (Changsha) Construction Co.,Ltd. Address before: 430048 No. 11 Jinyinhu Road, Dongxihu District, Wuhan City, Hubei Province Patentee before: CCCC SECOND HARBOR ENGINEERING Co.,Ltd. Patentee before: CCCC WUHAN HARBOUR ENGINEERING DESIGN AND RESEARCH Co.,Ltd. |