CN110158467B - Sectional installation method for composite guy cable hanging basket in narrow region - Google Patents
Sectional installation method for composite guy cable hanging basket in narrow region Download PDFInfo
- Publication number
- CN110158467B CN110158467B CN201810186978.XA CN201810186978A CN110158467B CN 110158467 B CN110158467 B CN 110158467B CN 201810186978 A CN201810186978 A CN 201810186978A CN 110158467 B CN110158467 B CN 110158467B
- Authority
- CN
- China
- Prior art keywords
- installing
- truss
- bracket
- main truss
- longitudinal beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 20
- 239000002131 composite material Substances 0.000 title description 4
- IVBHGBMCVLDMKU-GXNBUGAJSA-N Piperacillin Chemical compound O=C1C(=O)N(CC)CCN1C(=O)N[C@H](C=1C=CC=CC=1)C(=O)N[C@@H]1C(=O)N2[C@@H](C(O)=O)C(C)(C)S[C@@H]21 IVBHGBMCVLDMKU-GXNBUGAJSA-N 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 4
- 239000010959 steel Substances 0.000 claims abstract description 4
- 239000002023 wood Substances 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 claims description 13
- 238000004873 anchoring Methods 0.000 claims description 6
- 238000010586 diagram Methods 0.000 description 4
- 239000002965 rope Substances 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810186978.XA CN110158467B (en) | 2018-03-07 | 2018-03-07 | Sectional installation method for composite guy cable hanging basket in narrow region |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810186978.XA CN110158467B (en) | 2018-03-07 | 2018-03-07 | Sectional installation method for composite guy cable hanging basket in narrow region |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110158467A CN110158467A (en) | 2019-08-23 |
CN110158467B true CN110158467B (en) | 2020-12-15 |
Family
ID=67635901
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810186978.XA Active CN110158467B (en) | 2018-03-07 | 2018-03-07 | Sectional installation method for composite guy cable hanging basket in narrow region |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110158467B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1123861A (en) * | 1995-08-28 | 1996-06-05 | 铁道部大桥工程局 | Construction of prestressed concrete stayed cable bridge |
CN201952737U (en) * | 2011-01-30 | 2011-08-31 | 中交三航局第三工程有限公司 | Stay rope hanging basket suitable for wide double plane cable stayed bridge |
CN103243658A (en) * | 2013-05-16 | 2013-08-14 | 中交路桥华南工程有限公司 | Guyed traveler for cable-stayed bridge and assembly method for guyed traveler |
CN105421246A (en) * | 2015-12-23 | 2016-03-23 | 中铁大桥局集团第五工程有限公司 | Installation method of towing cable hanging baskets |
RU2612050C1 (en) * | 2015-10-22 | 2017-03-02 | Федеральное бюджетное образовательное учреждение высшего профессионального образования "Морской государственный университет имени адмирала Г.И. Невельского" | Construction method of cable-stayed bridge above sea navigable strait |
CN207073074U (en) * | 2017-06-29 | 2018-03-06 | 中国铁建大桥工程局集团有限公司 | A kind of box-like bracket of Hanging Basket assisted group |
-
2018
- 2018-03-07 CN CN201810186978.XA patent/CN110158467B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1123861A (en) * | 1995-08-28 | 1996-06-05 | 铁道部大桥工程局 | Construction of prestressed concrete stayed cable bridge |
CN201952737U (en) * | 2011-01-30 | 2011-08-31 | 中交三航局第三工程有限公司 | Stay rope hanging basket suitable for wide double plane cable stayed bridge |
CN103243658A (en) * | 2013-05-16 | 2013-08-14 | 中交路桥华南工程有限公司 | Guyed traveler for cable-stayed bridge and assembly method for guyed traveler |
RU2612050C1 (en) * | 2015-10-22 | 2017-03-02 | Федеральное бюджетное образовательное учреждение высшего профессионального образования "Морской государственный университет имени адмирала Г.И. Невельского" | Construction method of cable-stayed bridge above sea navigable strait |
CN105421246A (en) * | 2015-12-23 | 2016-03-23 | 中铁大桥局集团第五工程有限公司 | Installation method of towing cable hanging baskets |
CN207073074U (en) * | 2017-06-29 | 2018-03-06 | 中国铁建大桥工程局集团有限公司 | A kind of box-like bracket of Hanging Basket assisted group |
Non-Patent Citations (1)
Title |
---|
梅溪河特大桥牵索挂蓝高空拼装技术;张会昌等;《桥隧工程》;20101231;第134-136页 * |
Also Published As
Publication number | Publication date |
---|---|
CN110158467A (en) | 2019-08-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104612058B (en) | A kind of construction method of buckstay flexible arch bridge | |
CN202936736U (en) | Cable-stayed bridge composite beam construction bridge floor crane | |
CN106545172A (en) | A kind of installation method of high-altitude long-span steel truss | |
CN101139821A (en) | Method and system for erecting steel trusses by stay cable auxiliary complete cantilever | |
CN109750600B (en) | Construction method of asymmetric cable crane | |
CN104790297A (en) | Flexible arch splicing method for steel trussed beams | |
CN211775667U (en) | Power transmission line crossing tower assembly high-altitude construction platform | |
CN211736290U (en) | Shell cross-section large-span cornice high-altitude formwork erecting operation platform | |
CN110158467B (en) | Sectional installation method for composite guy cable hanging basket in narrow region | |
CN208932821U (en) | A kind of erecting beam construction height leg gantry crane | |
CN104775363A (en) | Assembling method of upper tower column reinforcing steel bar segment | |
CN111622126B (en) | Construction method of high-altitude vertical manned channel in high mountain rock area | |
CN210315233U (en) | Double-working-face integrated bridge girder erection machine without front supporting legs | |
CN210766431U (en) | Steel arch rib pushing system | |
CN203923923U (en) | High pier steel truss girder sets up gate-type lifting station | |
CN102561192A (en) | Building method for mound-free suspension bridge | |
CN110725208A (en) | Construction method for erecting pier top superposed beam without support | |
CN209873587U (en) | Simply supported steel truss four-point supporting and pushing system | |
CN103243927A (en) | Double pole reverse operation combined hoisting construction method and double pole | |
CN205369229U (en) | But walking hoisting frame suitable for manual hole digging pile steel reinforcement cage is laid | |
CN214456325U (en) | Gantry crane beam lifting machine with high legs and low legs | |
CN110055894A (en) | A kind of flow type bridge erecting machine and its heavy grade erecting beam construction method | |
CN209169891U (en) | Seperated self-supporting angle steel steel pipe combination cable termination platform | |
CN216764103U (en) | Hoisting portal frame for roller type combined cable saddle | |
CN214362922U (en) | Two-stage-only large-telescopic-amount supporting leg for supporting bridge girder erection machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Xiaoyong Inventor after: Chen Chuanyou Inventor after: Lei Mingshen Inventor after: Tang Cheng Inventor after: Li Jian Inventor after: Li Chao Inventor after: Wei Yong Inventor after: Zhao Xianxun Inventor after: Zeng Jin Inventor after: Wu Jun Inventor before: Lei Mingshen Inventor before: Chen Chuanyou Inventor before: Tang Cheng Inventor before: Li Jian Inventor before: Li Chao Inventor before: Wei Yong Inventor before: Zhao Xianxun Inventor before: Li Xiaoyong Inventor before: Zeng Jin Inventor before: Wu Jun |
|
CB03 | Change of inventor or designer information |