Summary of the invention
Blockwork floor slab equipment is used the purpose of the present invention is to provide a kind of, the above-mentioned of the prior art can be overcome
Defect, to improve the practicability of equipment.
The technical solution adopted by the present invention to solve the technical problems is: of the invention is a kind of with blockwork floor slab
Equipment is provided with column on the operating cavity bottom wall including the operating cavity being open to the left being arranged in fuselage and the fuselage,
It is rotatably provided with cursor on the column roof, is fixedly installed on the cursor for placing holding for blockwork
It carries and sets, the pallet being arranged in the bogey can rotate automatically, facilitate the stacking of blockwork, the operating cavity right side
It is provided with rotation chamber in end wall, the rotation is intracavitary to be provided with thrustor, and the thrustor includes that the rotation is intracavitary can
The thread bush rotation of the setting of rotation drives the threaded rod cooperated with the thread bush mobile, to push the operating cavity
The push plate of interior sliding setting is mobile, thus pushing tow blockwork, the thrustor work first half term is able to drive the carrying
Device rotation;
It is provided with cam chamber in the operating cavity bottom wall, first rotating shaft, the cam are rotatably provided in the cam chamber
Intracavitary setting blanking device, the blanking device include the blanking hole in the fuselage bottom wall outside connection, the blanking device
The cam rotation being fixedly installed by the first rotating shaft surfaces externally and internally is by blockwork pushing tow to blanking hole, to realize pre-
The laying of building block processed, when the cam not pushing tow blockwork, the first rotating shaft, which drives, to be arranged on the fuselage bottom wall
Mobile device movement, to drive the fuselage mobile;
It is provided with switching chamber between the cam chamber and the operating cavity, the switching is intracavitary to be provided with power device, described dynamic
Power device is controlled described in power source timesharing driving by detecting clout situation in the blanking channel being arranged in the operating cavity bottom wall
Thrustor and the blanking device.
Further, the bogey further includes the drive cavity being arranged in the operating cavity roof, the drive cavity with
Rotation is provided with the second shaft between the operating cavity, and the cursor is fixedly installed on described second turn in the operating cavity
Axis outer surface, second shaft end in the drive cavity are fixedly installed first bevel gear, the cursor with it is described
It is fixedly connected with connecting plate between pallet, is provided with the guide runner of opening to the right, the slide guide on the right side of the connecting plate in end wall
Support plate is slidably provided in slot, elasticity is provided with multiple groups press bullet between end wall on the left of the support plate and the guide runner
Spring is provided with the through slot being aligned with the blanking channel in the slide guide groove bottom wall.
Further, the threaded hole of left and right perforation, the screw thread are provided in the thread bush being arranged in the thrustor
Bar is threadedly connected in the thread bush and left distal end is fixedly connected with the push plate, and is fixedly installed on the push plate roof
First rack gear, the intracavitary thread bush outer surface of the rotation are fixedly installed second bevel gear, the rotation chamber with it is described
Rotation is provided with third shaft between switching chamber, and the intracavitary third shaft end of the rotation is fixedly installed and described the
The third hand tap gear of two bevel gears engagement, the intracavitary third shaft end of the switching are fixedly installed first gear.
Further, belt chamber is provided on the right side of the rotation chamber in end wall, outside the intracavitary thread bush of the belt
Surface is fixedly installed first pulley, and connecting cavity is provided between the belt chamber and the drive cavity, can in the connecting cavity
Sliding is provided with link block, and the second rack gear is fixedly installed on the link block bottom wall, is rotatably set in the link block
It is equipped with spline housing, the splined hole of left and right perforation is provided in the spline housing, the splined hole internal spline is connected with the first spline
The drive cavity and end are protruded into axis and the second splined shaft on the right side of first splined shaft, the first splined shaft left side
End is fixedly installed the 4th bevel gear engaged with the first bevel gear, protrudes into the belt chamber on the right side of second splined shaft
And end is fixedly installed the second belt wheel, is sequentially connected between the first pulley and second belt wheel by belt, the company
It connects and is provided with first gear chamber in the wall of bottom of chamber, intracavitary be rotatably provided with of the first gear is engaged with second rack gear
Second gear.
Further, the blanking device includes being arranged in end wall on the left of the cam chamber through the blanking channel
Sliding slot is slidably provided with slide plate in the sliding slot, and elasticity is provided with extension spring between the slide plate and the sliding slot end wall,
The first rotating shaft bottom end protrudes into that the sheave being arranged in the cam chamber bottom wall is intracavitary and end is fixedly installed thumb wheel, institute
It states and protrudes into the switching chamber at the top of first rotating shaft and end is fixedly installed third gear.
Further, the mobile device includes the mobile cavity being arranged in end wall on the right side of the sheave chamber, the mobile cavity
Rotation is provided with the 4th shaft between the sheave chamber, intracavitary the 4th shaft end of the sheave be fixedly installed with
The sheave of thumb wheel cooperation, the 4th shaft end in the mobile cavity are fixedly installed the 5th bevel gear, the shifting
Move it is intracavitary be rotatably provided with the 5th shaft, the external fuselage is stretched out through the fuselage in the 5th shaft front and rear sides
And end is fixedly installed the first idler wheel, the 5th shaft outer surface in the mobile cavity is fixedly installed and the described 5th
6th bevel gear of bevel gear engagement, the fuselage front and rear sides rotation are provided with the second rolling on the left of first idler wheel
Wheel.
Further, the power device includes the sliding cavity being arranged in the switching chamber roof, can in the sliding cavity
Sliding is provided with sliding shoe, and the power source is fixedly installed in the sliding shoe bottom wall, and the power source exports shaft end
It is fixedly installed the 4th gear engaged with the first gear, is provided with the first sliding eye in end wall on the left of the sliding cavity,
The third rack gear being fixedly connected with the sliding shoe, the third rack gear and institute are slidably provided in first sliding eye
Elasticity is provided with resetting apparatus between stating the first sliding eye roof, is provided with the second sliding eye in end wall on the right side of the blanking channel,
It is slidably provided with the 4th rack gear in second sliding eye, is connected between second sliding eye and first sliding eye
It is provided with second gear chamber, intracavitary be rotatably provided with of the second gear is engaged with the third rack gear and the 4th rack gear
The 5th gear.
Further, the blanking hole is oblique light sliding slot, can guarantee that the blockwork steadily slides to mating formation ground
Face.
Beneficial effects of the present invention: a kind of blockwork floor slab equipment provided by the invention can be realized prefabricated
The automatic packing of building block, the degree of automation is higher, while equipment is able to drive the prefabricated brick pallet of placement and rotates out device external,
Facilitate the placement of brick, more efficient, setting of the invention realizes that brick is mated formation simultaneously using single power source, moreover it is possible to drive institute
It is mobile to state equipment, road pavement is successively mated formation, and easy to operate, functional, stability is good, popularization and use easy to produce.
Specific embodiment
Below with reference to Fig. 1-5, the present invention is described in detail, wherein for sake of convenience, now to hereafter described orientation
Provide as follows: hereafter described front-rear direction up and down is consistent with the front-rear direction up and down of Fig. 1 projection relation itself.
It is a kind of in conjunction with described in attached drawing 1-5 to use blockwork floor slab equipment, including fuselage 10 and the fuselage 10
The opening operating cavity 11 to the left of interior setting is provided with column 19 on 11 bottom wall of operating cavity, can on 19 roof of column
Rotation is provided with cursor 17, and the bogey 200 for placing blockwork, institute are fixedly installed on the cursor 17
Stating the pallet 23 being arranged in bogey 200 can rotate automatically, facilitate the stacking of blockwork, 11 right-hand end of operating cavity
It is provided with rotation chamber 38 in wall, thrustor 300 is provided in the rotation chamber 38, the thrustor 300 includes described turns
The rotation of thread bush 43 being rotatably arranged in dynamic chamber 39 drives and the threaded rod 41 of the thread bush 43 cooperation is mobile, from
And push the push plate 36 of sliding setting in the operating cavity 11 mobile, thus pushing tow blockwork, the thrustor 300 works
First half term is able to drive the bogey 200 and rotates;
It is provided with cam chamber 65 in 11 bottom wall of operating cavity, is rotatably provided with first rotating shaft 67 in the cam chamber 65,
Blanking device 400 is set in the cam chamber 65, the blanking device 400 include in 10 bottom wall of fuselage outside connection under
Expect hole 25, the blanking device 400 is rotated by the cam 64 that 67 surfaces externally and internally of first rotating shaft is fixedly installed by prefabricated block
In block pushing tow to blanking hole 25, thus realize the laying of blockwork, when the not pushing tow blockwork of cam 64, described
One shaft 67 drives the mobile device 500 being arranged on 10 bottom wall of fuselage to act, to drive the fuselage 10 mobile;
It is provided with switching chamber 54 between the cam chamber 65 and the operating cavity 11, is provided with power device in the switching chamber 54
600, the power device 600 is dynamic by detecting clout situation control in the blanking channel 27 being arranged in 10 bottom wall of operating cavity
51 timesharing of power source drives the thrustor 300 and the blanking device 400.
Valuably, the bogey 200 further includes the drive cavity 15 being arranged in 10 roof of operating cavity, the transmission
Rotation is provided with the second shaft 16 between chamber 15 and the operating cavity 10, and the cursor 17 is fixedly installed on the operating cavity 10
Interior 16 outer surface of the second shaft, 16 end of the second shaft in the drive cavity 15 are fixedly installed the first cone tooth
Wheel 14, is fixedly connected with connecting plate 18, sets in the 18 right side end wall of connecting plate between the cursor 17 and the pallet 23
It is equipped with the guide runner 20 of opening to the right, is slidably provided with support plate 21, the support plate 21 and institute in the guide runner 20
Elasticity is provided with multiple groups top pressure spring 22 between stating 20 left side end wall of guide runner, is provided in 20 bottom wall of guide runner and falls with described
Expect the through slot 24 that channel 27 is aligned.
Valuably, the threaded hole 42 of left and right perforation is provided in the thread bush 43 being arranged in the thrustor 300, it is described
Threaded rod 41 is threadedly connected in the thread bush 43 and left distal end is fixedly connected with the push plate 36,36 roof of push plate
On be fixedly installed the first rack gear 49,43 outer surface of the thread bush in the rotation chamber 38 is fixedly installed second bevel gear
44, rotation is provided with third shaft 37 between the rotation chamber 38 and the switching chamber 54, and described the in the rotation chamber 38
Three shafts, 37 end is fixedly installed the third hand tap gear 39 engaged with the second bevel gear 44, the institute in the switching chamber 54
It states 37 end of third shaft and is fixedly installed first gear 55.
Valuably, belt chamber 47, the screw thread in the belt chamber 47 are provided in the 38 right side end wall of rotation chamber
It covers 43 outer surfaces and is fixedly installed first pulley 40, be provided with connecting cavity 75 between the belt chamber 47 and the drive cavity 15,
It is slidably provided with link block 74 in the connecting cavity 75, is fixedly installed the second rack gear 72 on 74 bottom wall of link block,
It is rotatably provided with spline housing 76 in the link block 74, the splined hole 73 of left and right perforation is provided in the spline housing 76,
73 internal spline of splined hole is connected with the first splined shaft 12 and the second splined shaft positioned at 12 right side of the first splined shaft
48, the drive cavity 15 is protruded on the left of first splined shaft 12 and end is fixedly installed and engages with the first bevel gear 14
The 4th bevel gear 13, protrude into the belt chamber 47 on the right side of second splined shaft 48 and end be fixedly installed the second belt wheel
45, it is sequentially connected between the first pulley 40 and second belt wheel 45 by belt 46, setting in 75 bottom wall of connecting cavity
There is first gear chamber 77, the second gear engaged with second rack gear 72 is rotatably provided in the first gear chamber 77
71。
Valuably, the blanking device 400 includes that the blanking that runs through being arranged in the 65 left side end wall of cam chamber leads to
The sliding slot 26 in road 27 is slidably provided with slide plate 66, bullet between 26 end wall of the slide plate 66 and the sliding slot in the sliding slot 26
Property be provided with extension spring 80,67 bottom end of first rotating shaft protrudes into the sheave chamber 62 being arranged in 65 bottom wall of cam chamber
Interior and end is fixedly installed thumb wheel 63, and the switching chamber 54 is protruded at the top of the first rotating shaft 67 and end is fixedly installed
Three gears 68.
Valuably, the mobile device 500 includes the mobile cavity 59 being arranged in the 62 right side end wall of sheave chamber, the shifting
Rotation is provided with the 4th shaft 60 between dynamic chamber 59 and the sheave chamber 62,60 end of the 4th shaft in the sheave chamber 62
End is fixedly installed the sheave 61 with the thumb wheel 63 cooperation, and 60 end of the 4th shaft fixation in the mobile cavity 59 is set
It is equipped with the 5th bevel gear 56, the 5th shaft 57,57 front and back two of the 5th shaft are rotatably provided in the mobile cavity 59
10 outside of the fuselage through the fuselage 10 is stretched out in side and end is fixedly installed the first idler wheel 79, in the mobile cavity 59
5th shaft, 57 outer surface is fixedly installed the 6th bevel gear 58 engaged with the 5th bevel gear 56, the fuselage 10
Front and rear sides rotation is provided with the second idler wheel 29 positioned at 79 left side of the first idler wheel.
Valuably, the power device 600 includes the sliding cavity 50 being arranged in switching 54 roof of chamber, the sliding cavity
Sliding shoe 52 is slidably provided in 50, the power source 51 is fixedly installed in 52 bottom wall of sliding shoe, the power
Source 51 exports shaft end and is fixedly installed the 4th gear 53 engaged with the first gear 55, the 50 left side end wall of sliding cavity
It is inside provided with the first sliding eye 69, is slidably provided in first sliding eye 69 and is fixedly connected with the sliding shoe 52
Third rack gear 70, elasticity is provided with resetting apparatus 34 between the third rack gear 70 and 69 roof of the first sliding eye, described to fall
It is provided with the second sliding eye 28 in material 27 right side end wall of channel, is slidably provided with the 4th rack gear in second sliding eye 28
30, second gear chamber 31, the second gear are provided with and communicated between second sliding eye 28 and first sliding eye 69
The 5th gear 32 engaged with the third rack gear 70 and the 4th rack gear 30 is rotatably provided in chamber 31.
Valuably, the blanking hole 25 is oblique light sliding slot, can guarantee that the blockwork steadily slides to mating formation ground
Face.
Fixed connection method described in the present embodiment includes but is not limited to that bolt the methods of is fixed, welded.
The sequence of the mechanical action of whole device:
1, equipment of the invention is moved to and is needed on the road surface mated formation, started the reversion of power source 51 at this time and drive described the
Four gears 53 rotation, to drive the first gear 55 to rotate, to drive the third hand tap gear 39 and the second cone tooth
39 rotation of wheel, so that the thread bush 43 is driven to rotate backward, so that the threaded rod 41 is driven to move to right, it is concurrently, described
The rotation of thread bush 43 drives the first pulley 40 to rotate, so that second belt wheel 45 be driven to rotate, to drive described the
Two splined shafts 48 rotation, to drive the spline housing 76 to rotate, to drive first splined shaft 12 to rotate, to drive
4th bevel gear 13 rotation, to drive the first bevel gear 16 to rotate, to drive the rotation of cursor 17 half
Week at this time uniformly stacks blockwork so that the pallet 23 be driven to turn to 10 front side of fuselage to the pallet 23
Top;
2, start the power source 51 at this time to rotate forward, to drive the thread bush 43 to rotate forward, to drive the pallet
23 rotations reset, and the thread bush 43, which rotates forward, at this time drives the threaded rod 43 to move to left, to drive the push plate 36 left
It moves, to drive first rack gear 49 to rotate with the second gear 71, to drive the link block 74 to move to right, thus band
It moves the spline housing 76 to move to right, when the spline housing 76 is separated with first splined shaft 12, the pallet 23 is just rotated
It resets, the power source 51 continues to rotate at this time, and the push plate 36 continues to move to left at this time, when the push plate 36 and the prefabricated block
When block abuts, the blockwork is moved to left, when the blockwork is moved to left to when being aligned with the through slot 24, the blockwork
It falls to the blanking channel 27, the blockwork, which moves down, drives the 4th rack gear 30 to move to right, to drive described the
Five gears 32 rotation, to drive the third rack gear 70 to move to left, to drive the sliding shoe 52 to move to left, thus described in driving
4th gear 53 is engaged with the third gear 68;
3, the 4th gear 53 rotates the cam 64 at this time and thumb wheel 63 rotates, so that the slide plate 66 is driven to move to left,
The slide plate 66, which moves to left, drives the blockwork to be moved to the blanking hole 25, is then displaced downwardly to ground by the blanking hole 25
Face, to complete to mat formation, the cam 64 is continued to rotate, and the slide plate 66 moves to right reset at this time, and the thumb wheel 63 rotates at this time
It stirs the sheave 61 to rotate, to drive the 5th bevel gear 56 to rotate, described in the 5th bevel gear 56 rotation drive
The rotation of 6th bevel gear 58, so that first idler wheel 79 be driven to rotate, the rotation of the first idler wheel 79 drives the fuselage 10
A mobile unit, circuits sequentially;
4, after prefabricated brick is all mated formation in the blanking channel 27, the 4th rack gear 30 loses abutting and moves to left, thus
Drive the third rack gear 70 to move to right, so that the sliding shoe 52 be driven to move to right, thus drive the 4th gear 53 with it is described
First gear 55 engages, and the rotation of first gear 55 drives the thread bush 43 to rotate at this time, and the thread bush 43 rotates band
It moves the push plate 36 and is moved to the left a lattice, so that blockwork be moved to left, fallen into the blanking channel again, it is described at this time to set
Standby to repeat step 2 and step 3, paved road, is all mated formation until all prefabricated bricks and is finished again.
The above embodiments merely illustrate the technical concept and features of the present invention, and its object is to allow be familiar with this field technology
Personage can understand the content of present invention and be implemented, and it is not intended to limit the scope of the present invention.It is all according to the present invention
Equivalent change or modification made by Spirit Essence, should be covered by the scope of protection of the present invention.