A kind of prefabricated laminated board and its assembling method Download PDFInfo
- Publication number
- CN110094006A CN110094006A CN201910445089.5A CN201910445089A CN110094006A CN 110094006 A CN110094006 A CN 110094006A CN 201910445089 A CN201910445089 A CN 201910445089A CN 110094006 A CN110094006 A CN 110094006A
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- honeycomb
- honeycomb beam
- steel plate
- edge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
- E04B5/36—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
- E04B5/36—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
- E04B5/38—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
本发明提供一种装配式叠合板及装配方法,属于建筑结构技术领域,所述装配式叠合板包括蜂窝梁,两相互平行的蜂窝梁上侧焊接翼缘钢板,所述蜂窝梁与预制板预制在一起插接相连,所述翼缘钢板伸出搭在叠合梁上的箍筋间距中,并与箍筋平齐,预制板之间通过拼缝连接,接缝处设有板底连接纵筋,所述翼缘钢板上为现浇层。该装配式叠合板通过将蜂窝梁上焊接安装翼缘钢板,翼缘钢板与叠合梁搭接相连,并将蜂窝梁与与之形状位置相配合的预制板插接固定相连,取消了胡子筋,实现吊装过程中无需与钢筋相碰撞,更加方便了叠合板的安装,且具有良好的受力性能。
The invention provides an assembled laminated panel and an assembly method, which belong to the technical field of building structures. The assembled laminated panel includes honeycomb beams, two mutually parallel honeycomb beams are welded with flange steel plates on the upper side, and the honeycomb beams are prefabricated with prefabricated panels. Connected together by plugging, the flange steel plates protrude out of the stirrup spacing on the composite beam, and are flush with the stirrups. ribs, and the flange steel plate is a cast-in-place layer. The prefabricated laminated panel welds and installs the flange steel plate on the honeycomb beam, and the flange steel plate is connected to the laminated beam by overlapping, and the honeycomb beam is connected to the prefabricated plate matching its shape and position by plugging and fixing, so that the beard tendon is canceled , so that there is no need to collide with the steel bars during the hoisting process, which is more convenient for the installation of the laminated plate, and has good mechanical performance.
Description
技术领域technical field
本发明属于建筑结构技术领域,特别是涉及一种装配式叠合板及其装配方法。The invention belongs to the technical field of building structures, in particular to an assembled composite panel and an assembly method thereof.
背景技术Background technique
随着国家对预制装配式建筑愈发的重视,装配式建筑得到了不断的推广和应用,装配式建筑在我们国家的建筑中所占的比例越来越大。装配式建筑中对预制构件的大量使用改善了传统现浇结构的浪费局面,特别是对叠合板的大量使用,既节省了模板的使用,又提高了结构的刚度与整体性。然而,对于叠合板的吊装安装目前存在很大的问题。对于一般叠合板的吊装,需要考虑在安装叠合板的过程中与梁、墙上钢筋相碰,而不得不采取挪动钢筋的方法才能完成吊装安装这个问题。这种方法既费时又费力。As the country pays more and more attention to prefabricated buildings, prefabricated buildings have been continuously promoted and applied, and the proportion of prefabricated buildings in our country's buildings is increasing. The extensive use of prefabricated components in prefabricated buildings has improved the waste of traditional cast-in-place structures, especially the extensive use of laminated panels, which not only saves the use of formwork, but also improves the rigidity and integrity of the structure. However, there are currently big problems in the hoisting and installation of laminated panels. For the hoisting of general laminated slabs, it is necessary to consider the problem of collision with beams and steel bars on the wall during the installation of laminated slabs, and the problem of having to move the steel bars to complete the hoisting installation. This method is time-consuming and labor-intensive.
发明内容Contents of the invention
为了解决上述技术问题,本发明提供了一种装配式叠合板及其装配方法,该装配式叠合板通过将蜂窝梁上焊接安装翼缘钢板,翼缘钢板与叠合梁搭接相连,并将蜂窝梁与与之形状位置相配合的预制板插接固定相连,实现吊装过程中无需与钢筋相碰撞,更加方便了叠合板的安装,且具有良好的受力性能。In order to solve the above technical problems, the present invention provides a prefabricated laminated panel and its assembly method. The prefabricated laminated panel is welded on the honeycomb beam to install the flange steel plate, and the flange steel plate is connected to the laminated beam by overlapping. The honeycomb beam is plugged and fixedly connected with the prefabricated slab matching its shape and position, so that there is no need to collide with the steel bar during the hoisting process, which is more convenient for the installation of the laminated slab and has good mechanical performance.
本发明采用的技术方案为:The technical scheme adopted in the present invention is:
一种装配式叠合板,所述装配式叠合板包括预制层、现浇层,所述预制层内设有预制板,所述装配式叠合板还包括蜂窝梁,所述蜂窝梁为半蜂窝梁状,其上为梯形凸起与梯形凹槽交替布置,两相互平行的蜂窝梁上侧焊接翼缘钢板,所述蜂窝梁的梯形凸起中垂线上焊接有垂直于翼缘钢板的L形筋,所述预制板上设有钢筋,所述钢筋正对于蜂窝梁梯形凹槽中心位置,所述蜂窝梁与预制板预制在一起插接相连,所述翼缘钢板伸出搭在叠合梁上的箍筋间距中,并与箍筋平齐,两个预制板之间通过拼缝连接,接缝处设有板底连接纵筋,所述翼缘钢板上为现浇层。An assembled composite panel, the assembled composite panel includes a prefabricated layer and a cast-in-place layer, the prefabricated layer is provided with a prefabricated panel, the assembled composite panel also includes a honeycomb beam, and the honeycomb beam is a semi-cellular beam shape, on which trapezoidal protrusions and trapezoidal grooves are alternately arranged, and the upper side of two parallel honeycomb beams is welded with flange steel plates, and the trapezoidal protrusions of the honeycomb beams are welded with L-shaped The prefabricated plate is provided with a steel bar, the steel bar is facing the center of the trapezoidal groove of the honeycomb beam, the honeycomb beam and the prefabricated plate are prefabricated together and connected by plugging, and the flange steel plate protrudes and rests on the composite beam The stirrups on the upper part are in the middle of the distance and are flush with the stirrups. The two prefabricated panels are connected by joints, and the joints are provided with longitudinal ribs connected to the bottom of the panels. The flange steel plate is a cast-in-place layer.
所述的一种装配式叠合板,所述翼缘钢板的伸出长度为叠合梁宽度的三分之一。In the aforementioned fabricated laminated plate, the protruding length of the flange steel plate is one-third of the width of the laminated beam.
所述的一种装配式叠合板,所述的蜂窝梁高度65mm,宽80mm,每个梯形板片间隔140mm均匀布置。Said a prefabricated laminated plate, the height of the honeycomb beam is 65mm, the width is 80mm, and each trapezoidal plate is evenly arranged at an interval of 140mm.
所述的一种装配式叠合板,所述的蜂窝梁上设有翼缘钢板,其厚度6mm。As for the fabricated laminated panel, the honeycomb beam is provided with a flange steel plate with a thickness of 6mm.
所述的一种装配式叠合板,所述的蜂窝梁与预制板组合结构高度80mm,预制板高度30mm。Said a prefabricated composite panel, the combined structure height of the honeycomb beam and the prefabricated panel is 80mm, and the height of the prefabricated panel is 30mm.
所述的一种装配式叠合板,所述的预制板底部设有一层板底保护层,其厚度为15mm;所述蜂窝梁插入预制板内,蜂窝梁与板底保护层接触。As for the prefabricated laminated slab, a bottom protective layer is provided at the bottom of the prefabricated slab, the thickness of which is 15 mm; the honeycomb beams are inserted into the prefabricated slab, and the honeycomb beams are in contact with the bottom protective layer.
所述的一种装配式叠合板,所述叠合梁两端箍筋加密,箍筋加密区间距100mm,非加密区200mm。In the above-mentioned prefabricated laminated slab, the stirrups at both ends of the composite beam are dense, the distance between the denser areas of the stirrups is 100 mm, and the distance between the non-densified areas is 200 mm.
所述的一种装配式叠合板,所述钢筋间距为200mm。In the above-mentioned fabricated laminated slab, the spacing between the steel bars is 200mm.
一种装配式叠合板的装配方法,其特征在于:包括如下步骤:A method for assembling a prefabricated laminated panel, characterized in that it comprises the following steps:
a.制备半蜂窝梁状的蜂窝梁;a. Prepare a semi-cellular beam-like honeycomb beam;
b.将蜂窝梁外侧面梯形凸起中垂线焊接L形筋,将两平行的蜂窝梁上安装翼缘钢板;翼缘钢板预留搭接边;b. Weld the L-shaped rib to the vertical line of the trapezoidal protrusion on the outer side of the honeycomb beam, and install the flange steel plate on the two parallel honeycomb beams; the flange steel plates reserve lap edges;
c.在制作预制板的过程中在预制底板上预制与蜂窝梁位置对应的长方形凹槽,并把蜂窝梁与L形筋插入其中,预制板平面上平行于蜂窝梁梯形凹槽中心位置处设置钢筋,每个预制板上设置两个蜂窝梁;c. In the process of making the prefabricated slab, prefabricate the rectangular groove corresponding to the position of the honeycomb beam on the prefabricated bottom plate, and insert the honeycomb beam and L-shaped ribs into it, and set the prefabricated slab parallel to the center of the trapezoidal groove of the honeycomb beam on the plane Steel bars, two honeycomb beams are set on each prefabricated slab;
d.把翼缘钢板预留的搭接边搭接叠合梁上的箍筋间距中;d. Lap the reserved lap edge of the flange steel plate to the stirrup spacing on the laminated beam;
e.两个预制板之间通过拼缝连接,现浇上层混凝土,形成现浇层。e. The two prefabricated slabs are connected by joints, and the upper layer of concrete is poured in-situ to form a cast-in-place layer.
本发明的有益效果是:The beneficial effects of the present invention are:
本发明提供一种新型装配式叠合板及装配方法,通过把蜂窝梁与预制板安装在一起,蜂窝梁上面铺设一层翼缘钢板并伸出一段距离作为搭接端,再把搭接端搭接在梁上,最后进行现浇上层混凝土完成一个新型叠合板的安装。此方法设计新颖,便于叠合板的安装,取消了胡子筋,同时避免了叠合板在安装过程中与梁、墙等构件发生钢筋碰撞,而不得不采取改变钢筋位置的方法才能完成安装的问题。The invention provides a new type of assembled laminated panel and an assembly method. By installing the honeycomb beam and the prefabricated panel together, a layer of flange steel plate is laid on the honeycomb beam and protruded for a certain distance as the lap end, and then the lap end is lapped. Connected to the beam, and finally the upper layer of concrete is poured in place to complete the installation of a new laminated slab. This method is novel in design, convenient for the installation of the laminated slab, cancels the beard bars, and at the same time avoids the problem that the laminated slab collides with the steel bars on beams, walls and other components during the installation process, and the problem of having to change the position of the steel bars to complete the installation.
附图说明Description of drawings
图1是一种新型装配式叠合板及装配方法主视图;Fig. 1 is a front view of a novel assembled laminated panel and its assembly method;
图2是蜂窝梁结构示意图;Fig. 2 is a schematic diagram of a honeycomb beam structure;
图3是接缝拼合叠合板及钢筋布置示意图;Fig. 3 is a schematic diagram of seam spliced laminated slabs and reinforcing bars;
图4是一种新型装配式叠合板及装配方法结构示意图;Fig. 4 is a structural schematic diagram of a novel assembled laminated board and an assembly method;
图5是蜂窝梁与预制板连接示意图。Figure 5 is a schematic diagram of the connection between the honeycomb beam and the prefabricated panel.
图中部件:1为叠合梁,2为预制板,3为蜂窝梁,4为现浇层,5为钢筋,6为预制层,7为翼缘钢板,8为L形筋,9为板底连接纵筋,10为箍筋。Components in the picture: 1 is composite beam, 2 is prefabricated slab, 3 is honeycomb beam, 4 is cast-in-place layer, 5 is steel bar, 6 is prefabricated layer, 7 is flange steel plate, 8 is L-shaped bar, 9 is plate Bottom connects longitudinal reinforcement, and 10 is stirrup.
具体实施方式Detailed ways
为了进一步说明本发明,下面结合附图及实施例对本发明进行详细地描述:In order to further illustrate the present invention, the present invention is described in detail below in conjunction with accompanying drawing and embodiment:
一种新型叠合板及其装配方法,包括预制层6和现浇层4,预制层6内设有预制板2与预制板11,预制板2与预制板11上皆设有蜂窝梁3,其特征在于,所述预制板2上设有钢筋5,蜂窝梁3与预制板2通过焊接在蜂窝梁3上的L形筋8组合在一起,并保证蜂窝梁3插入在预制板2内。蜂窝梁3上面设有翼缘钢板7,伸出一定长度搭在叠合梁1上的箍筋10间距中,并与箍筋10平齐。两个预制板2之间通过拼缝连接,接缝处设板底连接纵筋9。A new type of composite panel and its assembly method, comprising a prefabricated layer 6 and a cast-in-place layer 4, the prefabricated layer 6 is provided with a prefabricated panel 2 and a prefabricated panel 11, and both the prefabricated panel 2 and the prefabricated panel 11 are provided with a honeycomb beam 3. The feature is that the prefabricated slab 2 is provided with steel bars 5 , and the honeycomb beam 3 and the prefabricated slab 2 are combined through the L-shaped rib 8 welded on the honeycomb beam 3 , and the honeycomb beam 3 is inserted into the prefabricated slab 2 . A flange steel plate 7 is arranged on the honeycomb beam 3 , which protrudes a certain length to fit in the distance between the stirrups 10 on the laminated beam 1 and is flush with the stirrups 10 . The two prefabricated panels 2 are connected by joints, and longitudinal ribs 9 connecting the bottom of the panels are arranged at the joints.
所述的蜂窝梁3高度65mm,宽80mm,每个梯形板片间隔140mm均匀布置。The honeycomb beam 3 has a height of 65mm and a width of 80mm, and each trapezoidal plate is evenly arranged at an interval of 140mm.
所述的蜂窝梁3上设有翼缘钢板7,其厚度6mm。The honeycomb beam 3 is provided with a flange steel plate 7 with a thickness of 6 mm.
所述的蜂窝梁3与预制板2组合结构高度80mm,预制板2高度30mm。The combined structure height of the honeycomb beam 3 and the prefabricated slab 2 is 80mm, and the height of the prefabricated slab 2 is 30mm.
所述的预制板2底部设有一层板底保护层,其厚度为15mm。The bottom of the prefabricated slab 2 is provided with a bottom protective layer with a thickness of 15mm.
所述的蜂窝梁3插入预制板2内,直到接触到板底保护层为止。The honeycomb beam 3 is inserted into the prefabricated slab 2 until it touches the protective layer at the bottom of the slab.
所述的梁两端箍筋10加密,箍筋10加密区间距100mm,非加密区200mm。The stirrups 10 at both ends of the beam are intensified, the distance between the intensified areas of the stirrups 10 is 100 mm, and the distance between the non-intensified areas is 200 mm.
所述的钢筋5间距200mm。Described steel bar 5 pitches 200mm.
所述的两个预制板2接缝处连接板底连接纵筋9。The joints of the two prefabricated panels 2 are connected to the longitudinal ribs 9 at the bottom of the panels.
一种新型装配式叠合板的装配方法,包括如下步骤:A method for assembling a novel prefabricated laminated panel comprises the following steps:
a.制备半蜂窝梁状的蜂窝梁3;a. Prepare a semi-cellular beam-shaped honeycomb beam 3;
b.将蜂窝梁3外侧面梯形凸起中垂线焊接L形筋8,将两平行的蜂窝梁3上安装翼缘钢板7;翼缘钢板7预留搭接边;b. Weld the L-shaped rib 8 to the vertical line of the trapezoidal protrusion on the outer surface of the honeycomb beam 3, and install the flange steel plate 7 on the two parallel honeycomb beams 3; the flange steel plate 7 reserves an overlapping edge;
c.在制作预制板2的过程中在预制底板上预制与蜂窝梁3位置对应的长方形凹槽,并把蜂窝梁3与L形筋8插入其中,预制板2平面上平行于蜂窝梁3梯形凹槽中心位置处设置钢筋5,每个预制板2上设置两个蜂窝梁3;c. In the process of making the prefabricated slab 2, prefabricate a rectangular groove corresponding to the position of the honeycomb beam 3 on the prefabricated bottom plate, and insert the honeycomb beam 3 and the L-shaped rib 8 into it, and the prefabricated slab 2 is parallel to the trapezoidal shape of the honeycomb beam 3 on the plane A steel bar 5 is set at the center of the groove, and two honeycomb beams 3 are set on each prefabricated panel 2;
d.把蜂窝梁3上的翼缘钢板7搭接叠合梁1上的箍筋10间距中,完成与叠合梁1的安装。d. Lap the flange steel plate 7 on the honeycomb beam 3 to the distance between the stirrups 10 on the composite beam 1 to complete the installation with the composite beam 1 .
e.两个预制板2之间通过拼缝连接,现浇上层混凝土,形成现浇层4。e. The two prefabricated panels 2 are connected by joints, and the upper layer of concrete is poured in-situ to form the cast-in-situ layer 4 .
f.完成整个叠合板系统的安装就位。f. Complete the installation of the entire laminated slab system.
实施例:Example:
如图1-图4,一种新型装配式叠合板及装配方法,一种新型叠合板及其装配方法,包括预制层6和现浇层4,预制层6内设有预制板2与预制板11,预制板2与预制板11上皆设有蜂窝梁3。所述蜂窝梁3通过在H型钢腹板上按一定折线切割后,取其中一部分制作形成,高65mm,宽80mm,板内梯形间隔140mm。预制板2长3m,放置两个蜂窝梁3,不可放置过多,以防止应力集中。其中梁两端箍筋10加密,加密区间距100mm,非加密区200mm。钢筋5间距200mm,L形筋8焊接在蜂窝梁3上,在把蜂窝梁3与L形筋8焊接起来安装在预制板2内,焊接的L形筋8保证蜂窝梁3牢固的固定在预制板2内。预制板2内设有板底保护层,厚度15mm,保证蜂窝梁3插入到板内的板底保护层上。蜂窝梁3上面设置翼缘钢板7,厚度6mm,用于与叠合梁1的搭接固定。翼缘钢板7伸出一定长度搭在叠合梁1上的箍筋10的间距中,把梁板连接固定起来。整个叠合板系统已经固定完成,完成现浇。两个预制板2之间采取拼缝连接,接缝处设板底连接纵筋9。As shown in Figures 1-4, a new type of prefabricated laminated panel and its assembly method, a new type of laminated panel and its assembly method, including a prefabricated layer 6 and a cast-in-place layer 4, the prefabricated layer 6 is provided with a prefabricated panel 2 and a prefabricated panel 11. Both the prefabricated slab 2 and the prefabricated slab 11 are provided with honeycomb beams 3 . The honeycomb beam 3 is formed by cutting a part of the H-shaped steel web according to a certain broken line, with a height of 65 mm, a width of 80 mm, and a trapezoidal interval of 140 mm in the plate. The prefabricated slab 2 is 3m long, and two honeycomb beams 3 are placed. Do not place too many to prevent stress concentration. Among them, the stirrups at both ends of the beam are 10 densified, the distance between densified areas is 100mm, and the distance between non-encrypted areas is 200 mm. The distance between the steel bars 5 is 200mm, and the L-shaped bars 8 are welded on the honeycomb beam 3. After the honeycomb beam 3 and the L-shaped bars 8 are welded and installed in the prefabricated panel 2, the welded L-shaped bars 8 ensure that the honeycomb beam 3 is firmly fixed on the prefabricated panel. Inside plate 2. The prefabricated slab 2 is provided with a slab bottom protective layer with a thickness of 15 mm to ensure that the honeycomb beam 3 is inserted into the slab bottom protective layer in the slab. A flange steel plate 7 with a thickness of 6 mm is arranged on the honeycomb beam 3 for overlapping and fixing with the composite beam 1 . The flange steel plate 7 stretches out a certain length and rides in the spacing of the stirrups 10 on the laminated beam 1, and the beam plate is connected and fixed. The entire laminated slab system has been fixed and cast in place. The two prefabricated panels 2 are connected by joints, and longitudinal ribs 9 are provided at the joints.
如图5,首先生产预制底板,并预留有宽120mm,高8mm的长方形凹槽,蜂窝梁3与L形筋8组合放置在凹槽内,再浇筑混凝土底板,完成预制板的制作。As shown in Figure 5, the prefabricated floor is first produced, and a rectangular groove with a width of 120mm and a height of 8mm is reserved. The honeycomb beam 3 and the L-shaped rib 8 are combined in the groove, and then the concrete floor is poured to complete the production of the prefabricated slab.
一种新型装配式叠合板及装配方法包括如下步骤:A novel assembled laminated board and an assembly method include the following steps:
(1)在H型钢腹板上按一定折线切割后,取其中一部分作为用于吊装的半蜂窝梁状的蜂窝梁3;(1) After cutting the H-shaped steel web according to a certain broken line, take a part of it as a semi-cellular beam-shaped honeycomb beam 3 for hoisting;
(2)将蜂窝梁3外侧面梯形凸起中垂线焊接L形筋8,将两平行的蜂窝梁3上安装翼缘钢板7;翼缘钢板7预留搭接边;(2) Weld the L-shaped rib 8 to the vertical line of the trapezoidal protrusion on the outer surface of the honeycomb beam 3, and install the flange steel plate 7 on the two parallel honeycomb beams 3; the flange steel plate 7 reserves an overlapping edge;
(3)在制作预制板2的过程中在预制底板上预制与蜂窝梁3位置对应的长方形凹槽,并把蜂窝梁3与L形筋8插入其中,预制板2平面上平行于蜂窝梁3梯形凹槽中心位置处设置钢筋5,每个预制板2上设置两个蜂窝梁3;(3) In the process of making the prefabricated slab 2, prefabricate a rectangular groove corresponding to the position of the honeycomb beam 3 on the prefabricated bottom plate, and insert the honeycomb beam 3 and the L-shaped rib 8 into it, and the prefabricated slab 2 is parallel to the honeycomb beam 3 on the plane A steel bar 5 is set at the center of the trapezoidal groove, and two honeycomb beams 3 are set on each prefabricated panel 2;
(4)把蜂窝梁3上的翼缘钢板7搭接叠合梁1上的箍筋10间距中,完成与叠合梁1的安装;(4) The flange steel plate 7 on the honeycomb beam 3 is overlapped with the stirrup 10 on the composite beam 1 to complete the installation with the composite beam 1;
(5)两个预制板2之间通过拼缝连接,现浇上层混凝土,形成现浇层4;(5) The two prefabricated slabs 2 are connected by joints, and the upper layer of concrete is poured in-situ to form the cast-in-place layer 4;
(6)完成整个叠合板系统的安装就位。(6) Complete the installation of the entire laminated panel system.
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above is only a preferred embodiment of the present invention, it should be pointed out that, for those of ordinary skill in the art, without departing from the principle of the present invention, some improvements and modifications can also be made, and these improvements and modifications can also be made. It should be regarded as the protection scope of the present invention.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910445089.5A CN110094006A (en) | 2019-05-27 | 2019-05-27 | A kind of prefabricated laminated board and its assembling method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910445089.5A CN110094006A (en) | 2019-05-27 | 2019-05-27 | A kind of prefabricated laminated board and its assembling method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110094006A true CN110094006A (en) | 2019-08-06 |
Family
ID=67449172
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910445089.5A Pending CN110094006A (en) | 2019-05-27 | 2019-05-27 | A kind of prefabricated laminated board and its assembling method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110094006A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107700728A (en) * | 2017-09-30 | 2018-02-16 | 沈阳建筑大学 | Easy connect band shear key reinforced concrete slab structure and connection method |
| CN111719885A (en) * | 2020-03-21 | 2020-09-29 | 东莞市大乘建筑工程技术有限公司 | Superimposed concrete reinforcement and reinforcement floor and construction technology |
| CN115573508A (en) * | 2022-09-20 | 2023-01-06 | 长沙巨星轻质建材股份有限公司 | Prefabricated self-supporting prestressed slab |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2010216187A (en) * | 2009-03-18 | 2010-09-30 | Ihi Infrastructure Systems Co Ltd | Composite floor slab |
| CN203440990U (en) * | 2013-06-28 | 2014-02-19 | 湖北弘毅建筑装饰工程有限公司 | Toothed web box-type steel and concrete composite flat beam |
| CN203499084U (en) * | 2013-08-30 | 2014-03-26 | 湖北弘毅建筑装饰工程有限公司 | T-shaped longitudinal rib frame honeycomb composite floor slab |
| CN104727475A (en) * | 2015-03-09 | 2015-06-24 | 沈阳建筑大学 | Modified concrete superposition board floor structure with shear keys and connection method |
| US20190017287A1 (en) * | 2016-09-01 | 2019-01-17 | Tepui Outdoors, Inc. | Inflatable Rooftop Tent System for Vehicles |
| CN210507978U (en) * | 2019-05-27 | 2020-05-12 | 沈阳建筑大学 | Assembled superimposed sheet |
-
2019
- 2019-05-27 CN CN201910445089.5A patent/CN110094006A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2010216187A (en) * | 2009-03-18 | 2010-09-30 | Ihi Infrastructure Systems Co Ltd | Composite floor slab |
| CN203440990U (en) * | 2013-06-28 | 2014-02-19 | 湖北弘毅建筑装饰工程有限公司 | Toothed web box-type steel and concrete composite flat beam |
| CN203499084U (en) * | 2013-08-30 | 2014-03-26 | 湖北弘毅建筑装饰工程有限公司 | T-shaped longitudinal rib frame honeycomb composite floor slab |
| CN104727475A (en) * | 2015-03-09 | 2015-06-24 | 沈阳建筑大学 | Modified concrete superposition board floor structure with shear keys and connection method |
| US20190017287A1 (en) * | 2016-09-01 | 2019-01-17 | Tepui Outdoors, Inc. | Inflatable Rooftop Tent System for Vehicles |
| CN210507978U (en) * | 2019-05-27 | 2020-05-12 | 沈阳建筑大学 | Assembled superimposed sheet |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107700728A (en) * | 2017-09-30 | 2018-02-16 | 沈阳建筑大学 | Easy connect band shear key reinforced concrete slab structure and connection method |
| CN111719885A (en) * | 2020-03-21 | 2020-09-29 | 东莞市大乘建筑工程技术有限公司 | Superimposed concrete reinforcement and reinforcement floor and construction technology |
| CN115573508A (en) * | 2022-09-20 | 2023-01-06 | 长沙巨星轻质建材股份有限公司 | Prefabricated self-supporting prestressed slab |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110094006A (en) | A kind of prefabricated laminated board and its assembling method | |
| JP2001081720A (en) | Joint structure between concrete slab and steel web in composite box girder | |
| CN107740522B (en) | Connection structure and construction method of prefabricated recycled block concrete slab and composite beam | |
| CN211114235U (en) | Superimposed shear wall | |
| CN113152663B (en) | Assembled building frame system | |
| CN210507981U (en) | A kind of in-line honeycomb beam laminated board | |
| CN212358789U (en) | A Prefabricated Composite Floor Concrete Laminated Slab Connection Structure Based on Tongue and Mouth Form | |
| CN207405842U (en) | An integral fully prefabricated floor slab unsupported connection structure | |
| CN115961719A (en) | Prefabricated shear wall system and construction method thereof | |
| WO2024016411A1 (en) | Composite floor system for boxboard prefabricated building, and mounting method therefor | |
| CN111395145A (en) | Novel prefabricated T-beam structure convenient for later-stage widening and transformation and widening method thereof | |
| CN107246105B (en) | Cancel the construction and construction method of beard muscle in a kind of concrete prefabricated board plate end | |
| CN210507978U (en) | Assembled superimposed sheet | |
| CN212103633U (en) | A steel-concrete composite beam | |
| CN210216852U (en) | Zigzag honeycomb beam laminated plate | |
| CN209703805U (en) | A new type of composite floor suitable for H-shaped steel beams in steel structures | |
| CN112575946A (en) | Prefabricated coincide floor of assembled | |
| CN207363074U (en) | A kind of connection structure of prefabricated regeneration monolith plate and composite beam | |
| CN212000568U (en) | A precast concrete box girder bridge | |
| CN110983940B (en) | Prefabricated concrete box girder bridge and construction method thereof | |
| CN110080445B (en) | Sawtooth type honeycomb beam laminated slab and preparation and connection methods thereof | |
| CN118207992A (en) | Two-way atress close-spliced laminated slab connection structure | |
| CN114320349B (en) | A kind of initial supporting structure and construction method of highway tunnel | |
| CN110080446A (en) | A kind of direct plugging-in Honeycomb Beam superimposed sheet and preparation method thereof and installation method | |
| CN222614652U (en) | Two-way atress close-spliced laminated slab connection structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190806 |