CN110067895A - A kind of pipe fixing bracket of central air-conditioning - Google Patents
A kind of pipe fixing bracket of central air-conditioning Download PDFInfo
- Publication number
- CN110067895A CN110067895A CN201910408586.8A CN201910408586A CN110067895A CN 110067895 A CN110067895 A CN 110067895A CN 201910408586 A CN201910408586 A CN 201910408586A CN 110067895 A CN110067895 A CN 110067895A
- Authority
- CN
- China
- Prior art keywords
- wall
- fixing assembling
- connecting rod
- bottom end
- clamping plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004378 air conditioning Methods 0.000 title claims abstract description 42
- 239000005030 aluminium foil Substances 0.000 claims description 14
- 244000273618 Sphenoclea zeylanica Species 0.000 claims description 10
- 239000007787 solid Substances 0.000 claims description 4
- 238000007665 sagging Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 5
- 239000000203 mixture Substances 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- OSGAYBCDTDRGGQ-UHFFFAOYSA-L calcium sulfate Inorganic materials [Ca+2].[O-]S([O-])(=O)=O OSGAYBCDTDRGGQ-UHFFFAOYSA-L 0.000 description 3
- ZOMBKNNSYQHRCA-UHFFFAOYSA-J calcium sulfate hemihydrate Chemical compound O.[Ca+2].[Ca+2].[O-]S([O-])(=O)=O.[O-]S([O-])(=O)=O ZOMBKNNSYQHRCA-UHFFFAOYSA-J 0.000 description 3
- 239000011507 gypsum plaster Substances 0.000 description 3
- 235000008733 Citrus aurantifolia Nutrition 0.000 description 2
- 235000011941 Tilia x europaea Nutrition 0.000 description 2
- 230000005489 elastic deformation Effects 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 239000004571 lime Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000002309 gasification Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000005057 refrigeration Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/08—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
- F16L3/10—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two members engaging the pipe, cable or protective tubing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/16—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
- F16L3/20—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Supports For Pipes And Cables (AREA)
- Duct Arrangements (AREA)
Abstract
The invention discloses a kind of pipe fixing brackets of central air-conditioning, including air-conditioning duct, the outer wall of the air-conditioning duct is socketed with sleeve, the bottom end fixing assembling of the sleeve has lower pallet, the bottom end fixing assembling of the lower pallet has vertical bar, and the bottom end fixing assembling of the vertical bar has cross bar, and the lower surface front and rear sides of the cross bar are socketed with top plate, the outer wall of the top plate is socketed with first clamping plate, and the upper surface of the first clamping plate offers the first groove.Pass through the cooperation of first clamping plate and the first groove, pass through the cooperation of second clamping plate and the second groove, pass through the cooperation of top plate and first connecting rod, top plate is supported the bottom end of cross bar, when there is sagging situation far from the side of wall in air-conditioning duct, it is even closer that top plate by first connecting rod, the second connecting rod and third connecting rod clamps first clamping plate to cross bar, more firm to the support of air-conditioning duct, keeps air-conditioning duct more stable during use.
Description
Technical field
The present invention relates to pipe fixing bracket technical field, specific field is the pipe fixing bracket of central air-conditioning.
Background technique
Central air conditioner system is made of one or more cold and heat source systems and multiple air handling systems, which is different from
Traditional cryogen formula air-conditioning, air centralized processing is to reach comfort requirement, and the principle for using liquid gasification to freeze is air conditioning system
System provides institute's chilling requirement, and to offset the refrigeration duty of indoor environment, heating system provides institute's calorific requirement for air handling system, uses
To offset indoor environment thermic load, pipeline is needed to be transmitted during transmitting cooling capacity or heat, needed for central air-conditioning
Number of tubes it is more, and general diameter is larger, and fixed frame is needed to be supported and fix, and existing fixed frame is with the time
The effect that supports and fixes of passage it is more and more bad, the case where causing pipeline to be easy to appear offset.
Summary of the invention
The purpose of the present invention is to provide a kind of pipe fixing brackets of central air-conditioning, to solve to propose in above-mentioned background technique
The problem of.
To achieve the above object, the invention provides the following technical scheme: a kind of pipe fixing bracket of central air-conditioning, including sky
Pipeline is adjusted, the outer wall of the air-conditioning duct is socketed with sleeve, and the bottom end fixing assembling of the sleeve has lower pallet, the lower pallet
Bottom end fixing assembling have vertical bar, the bottom end fixing assembling of the vertical bar has cross bar, and the lower surface front and rear sides of the cross bar are equal
It is socketed with top plate, the outer wall of the top plate is socketed with first clamping plate, and the upper surface of the first clamping plate offers the first groove, and
Top plate is located in the first groove, and the bottom end fixing assembling of the top plate has first connecting rod, and the bottom end of the first connecting rod is sliding
Dynamic to run through first clamping plate, the inner end fixing assembling of the first connecting rod has the second connecting rod, second connecting rod it is outer
Wall has been slidably socketed hollow stem, and the outer wall fixing sleeve of the hollow stem is connected to inserted link, and the outboard end of inserted link and first clamping plate are solid
Fixed assembly, the side end of the inserted link offer through-hole, and the inner wall fixing assembling of the through-hole has aluminium foil, the inside of the inserted link
End outer wall fixing sleeve is connected to built-in pipe, and built-in pipe is fixed in wall, and the top of second connecting rod is fixed through having the
Three connecting rods, the outboard end fixing assembling of the third connecting rod have second clamping plate, and the lower surface of the second clamping plate offers
The top of second groove, the cross bar is located in the second groove, offers at left and right sides of the inner wall bottom end of second groove
Card slot, the inner wall of the card slot are connected with fixture block, the fixture block and top plate fixing assembling, and the inner end of the third connecting rod fills
Equipped with the pushing meanss being used cooperatively with inserted link, it is equipped with the reinforcing being used cooperatively with aluminium foil on the inside of the pushing meanss and fills
It sets.
Preferably, the pushing meanss include strip groove, and the strip groove is opened in the upper surface inner end of inserted link, and item
It is connected on the right side of the inner wall of shape slot with through-hole, the inner end fixing assembling of the third connecting rod has the first convex block, and first is convex
The bottom end of block extends in strip groove, and the inner wall sliding plug of the strip groove has push plate, the fixed dress in the left side of the push plate
Equipped with spring, the outboard end fixing assembling of the spring has the second convex block, and the second convex block is fitted closely with the first convex block.
Preferably, the bracing means includes annulus, the annulus fixing assembling in the inner wall of strip groove, the annulus
Inner wall fixing assembling has rubber ring, and the inner wall of the rubber ring is plugged with cylinder, and the upper and lower ends of the cylinder offer out
Mouthful, the opening is fitted closely with rubber ring, and the inner end of the outboard end and push plate fixing assembling of the cylinder, the cylinder is solid
Surely it is equipped with the jacking block being used cooperatively with aluminium foil.
Preferably, fixing assembling has upper pallet, the fixed dress of the medial surface of the upper pallet on the left of the upper surface of the sleeve
Equipped with connecting rod.
Preferably, the outer wall sliding sleeve of the cylinder is connected to lantern ring, and the bottom end fixing assembling of the lantern ring has strut, and props up
The inner wall fixing assembling of bar and strip groove.
Compared with prior art, the beneficial effects of the present invention are: a kind of pipe fixing bracket of central air-conditioning, by sleeve and
The cooperation of lower pallet, by the cooperation of vertical bar and cross bar, by the cooperation of inserted link and built-in pipe, in the position to fixed air-conditioning duct
The fixed inner wall for being plugged into built-in pipe of inserted link is made vertical bar pair by the fixation to cross bar by pre-buried upper built-in pipe on the wall set
Lower pallet is supported, and is achieved the effect that fix air-conditioning duct, by the cooperation of first clamping plate and the first groove, is passed through second
The cooperation of clamping plate and the second groove passes through the cooperation of top plate and first connecting rod, during being supported to cross bar, cross bar
Positioned at the inside of the first groove and the second groove, top plate is supported the bottom end of cross bar, snaps fit onto fixture block in card slot, reaches
The effect fixed to cross bar, when air-conditioning duct sagging situation occurs far from the side of wall, top plate passes through first connecting rod, the
It is even closer that two connecting rods and third connecting rod clamp first clamping plate to cross bar, passes through matching for bracing means and pushing meanss
Close, the first convex block when air-conditioning duct sagging situation occurs far from the side of wall in pushing meanss push the second convex block into
Row movement, to push cylinder in bracing means mobile, the water injected originally in cylinder is flowed out from opening, and is placed in bar shaped
The plaster of paris of slot inner wall contacts, and at the gap of mixture flow to inserted link and built-in pipe, object hardening to be mixed can reach reinforcing
Purpose, when maintenance, timely repair, and air-conditioning duct is avoided to fall, more firm to the support of air-conditioning duct, make air-conditioning duct
It is more stable during use.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the attachment structure schematic diagram of air-conditioning duct and sleeve of the invention;
Fig. 3 is the structure left view of the invention;
Fig. 4 is structural schematic diagram at the A in Fig. 1;
Fig. 5 is structural schematic diagram at the B in Fig. 1;
Fig. 6 is structural schematic diagram at the C in Fig. 5.
In figure: 1- air-conditioning duct, 2- sleeve, 3- lower pallet, 4- vertical bar, 5- cross bar, 6- top plate, 7- first clamping plate, 8-
One groove, 9- first connecting rod, the second connecting rod of 10-, 11- hollow stem, 12- inserted link, 13- third connecting rod, 14- second are pressed from both sides
Plate, the second groove of 15-, 16- card slot, 17- fixture block, 18- pushing meanss, the first convex block of 181-, 182- strip groove, 183- second are convex
Block, 184- spring, 185- push plate, 19- built-in pipe, 20- through-hole, 21- aluminium foil, 22- bracing means, 221- rubber ring, 222- circle
Ring, 223- opening, 224- cylinder, 225- jacking block, 23- lantern ring, 24- strut, 25- upper pallet, 26- connecting rod.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Fig. 1-6 is please referred to, the present invention provides a kind of technical solution: a kind of pipe fixing bracket of central air-conditioning, including air-conditioning
Pipeline 1, the outer wall of air-conditioning duct 1 are socketed with sleeve 2, and the bottom end fixing assembling of sleeve 2 has lower pallet 3, and the bottom end of lower pallet 3 is solid
Surely it is equipped with vertical bar 4, the bottom end fixing assembling of vertical bar 4 has cross bar 5, and the lower surface front and rear sides of cross bar 5 are socketed with top plate 6,
The outer wall of top plate 6 is socketed with first clamping plate 7, and the upper surface of first clamping plate 7 offers the first groove 8, and top plate 6 is recessed positioned at first
In slot 8, the bottom end fixing assembling of top plate 6 has first connecting rod 9, and the bottom end sliding of first connecting rod 9 runs through first clamping plate 7, the
The inner end fixing assembling of one connecting rod 9 has the second connecting rod 10, and the outer wall of the second connecting rod 10 has been slidably socketed hollow stem 11,
The outer wall fixing sleeve of hollow stem 11 is connected to inserted link 12, and the outboard end of inserted link 12 and 7 fixing assembling of first clamping plate, the side of inserted link 12
End end offers through-hole 20, and the inner wall fixing assembling of through-hole 20 has aluminium foil 21, and the inner end outer wall fixing sleeve of inserted link 12 is connected to pre-
Pipe laying 19, and built-in pipe 19 is fixed in wall, the top of the second connecting rod 10 is fixed through there is third connecting rod 13, and third connects
The outboard end fixing assembling of extension bar 13 has second clamping plate 14, and the lower surface of second clamping plate 14 offers the second groove 15, cross bar 5
Top is located in the second groove 15, offers card slot 16, the inner wall of card slot 16 at left and right sides of the inner wall bottom end of the second groove 15
It is connected with fixture block 17, fixture block 17 and 6 fixing assembling of top plate, the inner end of third connecting rod 13 is equipped with to be used cooperatively with inserted link 12
Pushing meanss 18, the inside of pushing meanss 18 is equipped with the bracing means 22 being used cooperatively with aluminium foil.
Side meeting of the air-conditioning duct 1 far from wall a bit of distance, outboard end of the sleeve 2 because gravity of itself sink
Cross bar 5 is pushed by vertical bar 4, cross bar 5 applies pressure to top plate 6, and the section of top plate 6 can preferably be bonded cross bar 5 at U-shaped,
Mandril 6 pushes first connecting rod 9 to move down in the inner wall of the first groove 8, and simultaneously first connecting rod 9 drives the second connection
Bar 10 moves together, and fixture block 17 snaps fit onto the inside of card slot 16, limits between second clamping plate 14 and top plate 6, and second connects
Extension bar 10 is moved down in the inner wall of hollow stem 11, and hollow stem 11 limits the second connecting rod 10, and the second connecting rod 10 is logical
Crossing third connecting rod 13 drives second clamping plate 14 to move down, and second clamping plate 14 is once mobile to first clamping plate 7, to cross bar 5 into
Row clamps.
Specifically, pushing meanss 18 include strip groove 182, strip groove 182 is opened in the upper surface inner end of inserted link 12,
And be connected on the right side of the inner wall of strip groove 182 with through-hole 20, the inner end fixing assembling of third connecting rod 13 has the first convex block
181, and the bottom end of the first convex block 181 extends in strip groove 182, the inner wall sliding plug of strip groove 182 has push plate 185, pushes away
The left side fixing assembling of plate 185 has spring 184, and the outboard end fixing assembling of spring 184 has the second convex block 183, and second is convex
Block 183 is fitted closely with the first convex block 181.
When the mobile a distance of second clamping plate 14, third connecting rod 13 drives the first convex block 181 to move down, and first is convex
The right side of block 181 is inclined-plane, identical as the bevel inclination angle in 183 left side of the second convex block, the mistake that the first convex block 181 moves down
The second convex block 183 is pushed to move inward in journey, the second convex block 183 applies pressure, bullet of the spring 184 because of itself to spring 184
Property performance elastic deformation occurs, spring 184 pushes push plate 185 to move inward, to push cylinder 224 mobile.
Specifically, bracing means 22 includes annulus 222,222 fixing assembling of annulus is in the inner wall of strip groove 182, annulus
222 inner wall fixing assembling has rubber ring 221, and the inner wall of rubber ring 221 is plugged with cylinder 224, and the upper and lower ends of cylinder 224 are equal
Opening 223 is offered, opening 223 is fitted closely with rubber ring 221, the outboard end and 185 fixing assembling of push plate of cylinder 224, cylinder
The inner end fixing assembling of body 224 has the jacking block 225 being used cooperatively with aluminium foil 21.
White lime will be contained on the right side of the inner wall of strip groove 182 during installation, bear is open at 223 in cylinder 224
Water is injected in portion, and water can react with white lime, can condense within two minutes or so, and push plate 185 pushes cylinder 224 mobile, cylinder 224
Mobile in the inner wall of rubber ring 221, annulus 222 is supported rubber ring 221, and opening 223, which is moved to, not to be connect with rubber ring 221
When touching, the water inside the cylinder 224 is along 223 inside for flowing to strip groove 182 that are open originally, and is contained in strip groove originally
The plaster of paris inside 182 is admixed together, and cylinder 224 is mobile to the side of aluminium foil 21 to same jacking block 225 in the process of moving,
Jacking block 225 damages aluminium foil, and the inner end diameter of jacking block 225 is greater than outboard end diameter, convenient for the outflow of mixture, mixing
Logistics can reinforce the fixed effect of inserted link 12 into the gap between 19 inner wall of inserted link 12 and built-in pipe after waiting mixture cures
Fruit.
Specifically, fixing assembling has upper pallet 25, the medial surface fixing assembling of upper pallet 25 on the left of the upper surface of sleeve 2
There is connecting rod 26.
The rectangular bending in the side of upper pallet 25 can more be bonded sleeve 2, and the other end of connecting rod 26 anchors to wall
In body, reinforce supporting and fixing to air-conditioning duct 1.
Specifically, the outer wall sliding sleeve of cylinder 224 is connected to lantern ring 23, the bottom end fixing assembling of lantern ring 23 has strut 24,
And the inner wall fixing assembling of strut 24 and strip groove 182.
Lantern ring 23 is supported and limits to cylinder 224, and 24 thorough fare of strut connects the connection of lantern ring 23, prevents cylinder 224
It shifts in the process of moving.
Working principle: when air-conditioning duct 1 is fixed, 2 sets of sleeve are connected to the outer wall of air-conditioning duct 1, lower pallet 3
Fixed to side of 2 bottom end of sleeve far from wall, upper built-in pipe 19 is fixed in the position corresponding to wall, and inserted link 12 is fixed slotting
It is connected in built-in pipe 19, cross bar 5 is fixed on top plate 6, is located at cross bar 5 in first groove 8 and the second groove 15, is made the first folder
Cross bar 5 is fixed in plate 7 and second clamping plate 14, and cross bar 5 is supported sleeve 2 by vertical bar 4, reaches to air-conditioning duct 1
It is supported fixed effect, after between one section, side of the air-conditioning duct 1 far from wall can be because under the gravity of itself
Fall into a bit of distance, the outboard end of sleeve 2 pushes cross bar 5 by vertical bar 4, and cross bar 5 applies pressure to top plate 6, and mandril 6 is the
The inner wall of one groove 8 pushes first connecting rod 9 to move down, and simultaneously first connecting rod 9 drives the second connecting rod 10 together
Mobile, the second connecting rod 10 is moved down in the inner wall of hollow stem 11, and hollow stem 11 limits the second connecting rod 10, and second
Connecting rod 10 drives second clamping plate 14 to move down by third connecting rod 13, and second clamping plate 14 is once mobile to first clamping plate 7,
Cross bar 5 is clamped, the pressure for being used to support 12 outboard end of inserted link of first clamping plate 7 at this time increases, when second clamping plate 14 is moved
When dynamic a distance, third connecting rod 13 drives the first convex block 181 to move down, during the first convex block 181 moves down
The second convex block 183 is pushed to move inward, the second convex block 183 applies pressure, elasticity of the spring 184 because of itself to spring 184
Elastic deformation can occur, spring 184 pushes push plate 185 to move inward, to push cylinder 224 mobile, cylinder 224 is in rubber
The inner wall of circle 221 is mobile, and annulus 222 is supported rubber ring 221, and opening 223 is moved to when not contacting with rubber ring 221,
Originally the water inside the cylinder 224 is along 223 inside for flowing to strip groove 182 that are open, and is contained in inside strip groove 182 originally
The plaster of paris it is admixed together, cylinder 224 in the process of moving to same jacking block 225 to the side of aluminium foil 21 mobile, jacking block 225
Aluminium foil is damaged, in the gap between 19 inner wall of mixture flow to inserted link 12 and built-in pipe, waits meeting after mixture cures
Reinforce the fixed effect of inserted link 12, to reinforce the support to air-conditioning duct 1.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (5)
1. a kind of pipe fixing bracket of central air-conditioning, including air-conditioning duct (1), it is characterised in that: outside the air-conditioning duct (1)
Wall is socketed with sleeve (2), and the bottom end fixing assembling of the sleeve (2) has lower pallet (3), and the bottom end of the lower pallet (3) is fixed
It is equipped with vertical bar (4), the bottom end fixing assembling of the vertical bar (4) has cross bar (5), the lower surface front and rear sides of the cross bar (5)
It is socketed with top plate (6), the outer wall of the top plate (6) is socketed with first clamping plate (7), and the upper surface of the first clamping plate (7) is opened
Equipped with the first groove (8), and top plate (6) is located in the first groove (8), and the bottom end fixing assembling of the top plate (6) has the first company
The bottom end sliding of extension bar (9), the first connecting rod (9) runs through first clamping plate (7), the inner end of the first connecting rod (9)
Fixing assembling has the second connecting rod (10), and the outer wall of second connecting rod (10) has been slidably socketed hollow stem (11), the sky
The outer wall fixing sleeve of core bar (11) is connected to inserted link (12), and the outboard end of inserted link (12) and first clamping plate (7) fixing assembling, described
The side end of inserted link (12) offers through-hole (20), and the inner wall fixing assembling of the through-hole (20) has aluminium foil (21), the inserted link
(12) inner end outer wall fixing sleeve is connected to built-in pipe (19), and built-in pipe (19) is fixed in wall, second connecting rod
(10) top is fixed through having third connecting rod (13), and the outboard end fixing assembling of the third connecting rod (13) has the second folder
The lower surface of plate (14), the second clamping plate (14) offers the second groove (15), and it is recessed that the top of the cross bar (5) is located at second
In slot (15), offered card slot (16) at left and right sides of the inner wall bottom end of second groove (15), the card slot (16) it is interior
Wall is connected with fixture block (17), the fixture block (17) and top plate (6) fixing assembling, and the inner end of the third connecting rod (13) is assembled
There are the pushing meanss (18) being used cooperatively with inserted link (12), is equipped on the inside of the pushing meanss (18) and is used cooperatively with aluminium foil
Bracing means (22).
2. a kind of pipe fixing bracket of central air-conditioning according to claim 1, it is characterised in that: the pushing meanss (18)
Including strip groove (182), the strip groove (182) is opened in the upper surface inner end of inserted link (12), and strip groove (182) is interior
It is connected on the right side of wall with through-hole (20), the inner end fixing assembling of the third connecting rod (13) has the first convex block (181), and the
The bottom end of one convex block (181) extends in strip groove (182), and the inner wall sliding plug of the strip groove (182) has push plate
(185), the left side fixing assembling of the push plate (185) has spring (184), the outboard end fixing assembling of the spring (184)
Have the second convex block (183), and the second convex block (183) is fitted closely with the first convex block (181).
3. a kind of pipe fixing bracket of central air-conditioning according to claim 2, it is characterised in that: the bracing means (22)
Including annulus (222), for annulus (222) fixing assembling in the inner wall of strip groove (182), the inner wall of the annulus (222) is solid
Surely it is equipped with rubber ring (221), the inner wall of the rubber ring (221) is plugged with cylinder (224), above and below the cylinder (224)
Both ends offer opening (223), and the opening (223) fits closely with rubber ring (221), the outside of the cylinder (224)
End and push plate (185) fixing assembling, the inner end fixing assembling of the cylinder (224) have the jacking block being used cooperatively with aluminium foil (21)
(225)。
4. a kind of pipe fixing bracket of central air-conditioning according to claim 1, it is characterised in that: the sleeve (2) it is upper
There is upper pallet (25) fixing assembling on the left of surface, the medial surface fixing assembling of the upper pallet (25) has connecting rod (26).
5. a kind of pipe fixing bracket of central air-conditioning according to claim 3, it is characterised in that: the cylinder (224)
Outer wall sliding sleeve is connected to lantern ring (23), and the bottom end fixing assembling of the lantern ring (23) has strut (24), and strut (24) and bar shaped
The inner wall fixing assembling of slot (182).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910408586.8A CN110067895B (en) | 2019-05-16 | 2019-05-16 | Pipeline fixing frame of central air conditioner |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910408586.8A CN110067895B (en) | 2019-05-16 | 2019-05-16 | Pipeline fixing frame of central air conditioner |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110067895A true CN110067895A (en) | 2019-07-30 |
| CN110067895B CN110067895B (en) | 2020-12-22 |
Family
ID=67371063
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910408586.8A Expired - Fee Related CN110067895B (en) | 2019-05-16 | 2019-05-16 | Pipeline fixing frame of central air conditioner |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110067895B (en) |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3221952A1 (en) * | 1981-07-07 | 1983-01-27 | V - Zug AG, 6301 Zug | Pipe clamp |
| JP2012007721A (en) * | 2010-06-24 | 2012-01-12 | Kawai:Kk | Piping support |
| CN202327522U (en) * | 2011-09-02 | 2012-07-11 | 北京航信伟业保温科技有限公司 | Composite magnesium silicate air duct heat-insulating system |
| CN103453226A (en) * | 2013-09-11 | 2013-12-18 | 无锡天鸿机械制造有限公司 | Self-bearing cable hook |
| CN205908873U (en) * | 2016-08-01 | 2017-01-25 | 中铁建电气化局集团南方工程有限公司 | Fire service pipe strutting arrangement |
| CN205939592U (en) * | 2016-08-11 | 2017-02-08 | 宁德动力源能源科技有限公司 | Take novel central air conditioning ventilation pipe of leakage detecting function |
| CN107956926A (en) * | 2017-12-07 | 2018-04-24 | 张立 | A kind of marine piping fixing bracket |
-
2019
- 2019-05-16 CN CN201910408586.8A patent/CN110067895B/en not_active Expired - Fee Related
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3221952A1 (en) * | 1981-07-07 | 1983-01-27 | V - Zug AG, 6301 Zug | Pipe clamp |
| JP2012007721A (en) * | 2010-06-24 | 2012-01-12 | Kawai:Kk | Piping support |
| CN202327522U (en) * | 2011-09-02 | 2012-07-11 | 北京航信伟业保温科技有限公司 | Composite magnesium silicate air duct heat-insulating system |
| CN103453226A (en) * | 2013-09-11 | 2013-12-18 | 无锡天鸿机械制造有限公司 | Self-bearing cable hook |
| CN205908873U (en) * | 2016-08-01 | 2017-01-25 | 中铁建电气化局集团南方工程有限公司 | Fire service pipe strutting arrangement |
| CN205939592U (en) * | 2016-08-11 | 2017-02-08 | 宁德动力源能源科技有限公司 | Take novel central air conditioning ventilation pipe of leakage detecting function |
| CN107956926A (en) * | 2017-12-07 | 2018-04-24 | 张立 | A kind of marine piping fixing bracket |
Also Published As
| Publication number | Publication date |
|---|---|
| CN110067895B (en) | 2020-12-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107830260B (en) | A kind of fixing device for pipe fitting | |
| CN110067895A (en) | A kind of pipe fixing bracket of central air-conditioning | |
| CN110863594A (en) | Point-hanging curtain wall system | |
| CN213778119U (en) | A pipeline docking mechanism for central air-conditioning installation | |
| CN218328414U (en) | Multi-split air conditioner outdoor unit and air conditioner | |
| CN211204371U (en) | Air conditioner external unit wind direction changing device and air conditioner external unit | |
| CN213334716U (en) | Central air conditioner with pipeline cleaning device | |
| CN222489023U (en) | Sewage treatment sedimentation tank | |
| CN222393114U (en) | Condensing device | |
| CN222815032U (en) | Three-dimensional soilless strawberry cultivation frame | |
| CN210689341U (en) | Heat exchange fin mounting and fastening device | |
| CN221744297U (en) | Suspension structure for central air conditioner pipeline installation | |
| CN220082306U (en) | Auxiliary splicing tool for warm ventilation pipes | |
| CN222046971U (en) | A HVAC pipe docking structure | |
| CN208221763U (en) | A harness pipe clamp for new energy vehicles | |
| CN219103779U (en) | Detachable plate heat exchanger | |
| CN217031569U (en) | High-strength non-deformable air conditioner side plate assembly | |
| CN221678464U (en) | Integrated crane vehicle-mounted air conditioner | |
| CN211649400U (en) | Coil pipe joint and graphite radiation ceiling | |
| CN219606330U (en) | Sealing structure for mouth of pipe of heating power pipeline | |
| CN216384682U (en) | Air-cooled magnetic suspension condenser mounting structure | |
| CN223662806U (en) | Integrated beaded silicon crystal air duct | |
| CN220169575U (en) | Auxiliary device for air conditioner installation | |
| CN222437330U (en) | Direct-buried prefabricated heat-insulating pipe | |
| CN218208167U (en) | A joint structure for indoor drainage in the reconstruction of old buildings |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201222 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |