CN110058106A - A kind of spare core line monitoring system based on NBIoT Internet of Things - Google Patents
A kind of spare core line monitoring system based on NBIoT Internet of Things Download PDFInfo
- Publication number
- CN110058106A CN110058106A CN201910157998.9A CN201910157998A CN110058106A CN 110058106 A CN110058106 A CN 110058106A CN 201910157998 A CN201910157998 A CN 201910157998A CN 110058106 A CN110058106 A CN 110058106A
- Authority
- CN
- China
- Prior art keywords
- core wire
- spare core
- nbiot
- system based
- spare
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 58
- 238000001514 detection method Methods 0.000 claims abstract description 22
- 238000009413 insulation Methods 0.000 claims abstract description 13
- 238000004891 communication Methods 0.000 claims description 15
- 238000005516 engineering process Methods 0.000 claims description 6
- 238000013024 troubleshooting Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R27/00—Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
- G01R27/02—Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
- G01R27/025—Measuring very high resistances, e.g. isolation resistances, i.e. megohm-meters
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Monitoring And Testing Of Transmission In General (AREA)
Abstract
本发明公开了一种基于NBIoT物联网的备用芯线监测系统,它包括备用芯线监测主机、双联开关、备用芯线和监测分机;备用芯线通过双联开关连接到备用芯线监测主机,监测分机连接于备用芯线分支末端;备用芯线监测主机实现了对备用芯线的通断状态、回路电阻、线间绝缘、对地绝缘等进行检测功能,使备用芯线处于监测状态,最终达到快速处理故障的目的。The invention discloses a backup core wire monitoring system based on the NBIoT Internet of Things, which comprises a backup core wire monitoring host, a double switch, a backup core wire and a monitoring extension; the backup core wire is connected to the backup core wire monitoring host through the double switch. , the monitoring extension is connected to the branch end of the spare core wire; the spare core wire monitoring host realizes the detection function of the on-off state, loop resistance, inter-line insulation, and ground insulation of the spare core wire, so that the spare core wire is in the monitoring state. Ultimately achieve the purpose of fast troubleshooting.
Description
技术领域technical field
本发明涉及铁路信号设备监测技术领域,尤其是一种基于NBIoT物联网的备用芯线监测系统。The invention relates to the technical field of railway signal equipment monitoring, in particular to a backup core wire monitoring system based on the NBIoT Internet of Things.
背景技术Background technique
为了确保在铁路信号设备的电缆芯线出现故障时,及时地用合格的备用芯线来进行替换,这就需要对备用芯线进行实时在线监测。目前对于备用芯线监测的主要有两种方案:一是在电缆的每一个分支末端接一个负载电阻,通过测量电阻值来判断芯线状态,这种方案主要存在的问题是当需要替换到备用芯线时就得拆除所有的负载电阻,使替换工作进度缓慢。二是在电缆的每一个分支末端接一个监测分机,通过有线通信方式使分机短路两根芯线来进行芯线通断判断,目前这种方案存在的问题有:A、分机的电源往往需要额外电缆来提供,照成电缆浪费;B、主机与分机的通信一般采用电力线载波通信方式,这种方式受到线路阻抗影响比较大,特别在一些比较复杂的线路中,通信误码率比较高;C、对于备用芯线的检测仅限于通断检测,没有绝缘相关项检测。In order to ensure that when the cable core wire of the railway signal equipment fails, it can be replaced with a qualified spare core wire in time, which requires real-time online monitoring of the spare core wire. At present, there are mainly two schemes for monitoring the spare core wire: one is to connect a load resistor at the end of each branch of the cable, and judge the status of the core wire by measuring the resistance value. The main problem of this scheme is when it needs to be replaced to the spare wire All load resistors must be removed when the core wire is removed, making the replacement work slow. The second is to connect a monitoring extension at the end of each branch of the cable, and make the extension short-circuit two core wires through wired communication to judge whether the core wire is on or off. At present, the problems of this scheme are: A. The power supply of the extension often requires additional B. The communication between the host and the extension generally adopts the power line carrier communication method, which is greatly affected by the line impedance, especially in some more complex lines, the communication bit error rate is relatively high; C , The detection of the spare core wire is limited to the on-off detection, and there is no insulation related item detection.
随着NBIoT物联网技术的应用,以往的技术已经不能满足应用的要求,本发明是采用这一基于NBIoT物联网技术的备用芯线监测系统,由于NBIoT物联网模块具有功耗低特点,监测分机无需额外电缆供电,直接采用电池供电就能满足要求;由于NBIoT物联网信号覆盖范围广,监测分机采用这一通信方式解决了监测分机分布广、通信困难问题。本系统不仅限于具有对备用芯线的通断判断检测,还具有回路电阻、线间绝缘和对地绝缘等检测,丰富了检测内容。随着本系统的推广应用,使备用芯线处于实时在线监测状态,减轻维护人员的工作压力,最终达到快速处理故障的目的。With the application of the NBIoT Internet of Things technology, the previous technology can no longer meet the application requirements. The present invention adopts this backup core wire monitoring system based on the NBIoT Internet of Things technology. Because the NBIoT Internet of Things module has the characteristics of low power consumption, the monitoring extension There is no need for additional cable power supply, and battery power supply can directly meet the requirements; due to the wide coverage of NBIoT IoT signals, the monitoring extension adopts this communication method to solve the problems of wide distribution of monitoring extensions and difficult communication. The system is not limited to the on-off judgment detection of the spare core wire, but also has the detection of loop resistance, wire insulation and ground insulation, which enriches the detection content. With the popularization and application of this system, the spare core wire is in a real-time online monitoring state, which reduces the work pressure of maintenance personnel, and finally achieves the purpose of fast troubleshooting.
发明内容SUMMARY OF THE INVENTION
本发明的目的是提供一种基于NBIoT物联网的备用芯线监测系统,本发明采用NBloT物联网技术,对备用芯线的通断判断、回路电阻、线间绝缘和对地绝缘进行在线监测,以确保备用芯线应急使用时可用。The purpose of the present invention is to provide a backup core wire monitoring system based on the NBIoT Internet of Things. The present invention adopts the NBIoT Internet of Things technology to perform online monitoring on the on-off judgment, loop resistance, line-to-line insulation and ground insulation of the backup core wire, To ensure that the spare core wire is available for emergency use.
为了解决上述问题,本发明采用系统的一个技术方案是:这一种基于NBIoT物联网的备用芯线监测系统,包括备用芯线监测主机、双联开关、备用芯线和监测分机;所述备用芯线监测主机包括主控板、电源单元、芯线检测模块、通道选择继电器阵列、显示单元、NBIoT通信模块。所述监测分机包括主控制器、电池、输出继电器单元、全球定位模块、NBIoT通信模块、显示单元。In order to solve the above problems, a technical solution of the system adopted in the present invention is: this kind of backup core wire monitoring system based on the NBIoT Internet of Things includes a backup core wire monitoring host, a double switch, a backup core wire and a monitoring extension; The core wire monitoring host includes a main control board, a power supply unit, a core wire detection module, a channel selection relay array, a display unit, and an NBIoT communication module. The monitoring extension includes a main controller, a battery, an output relay unit, a global positioning module, an NBIoT communication module, and a display unit.
在本系统中,所述备用芯线监测主机通过所述通道选择继电器阵列选择要检测的备用芯线通道,然后进行对地绝缘、线间绝缘检测;通过NBIoT物联网网络给所述监测分机发送指令使连接于所述输出继电器单元常开节点的两根备用芯线短路,然后利用所述芯线检测模块对两根备用芯线进行通断判断、回路电阻检测,待检测完成后再发送指令使节点断开,使备用芯线恢复到开路状态;当需要替换备用芯线,只需断开双联开关就可以让备用芯线立即可用。In this system, the standby core wire monitoring host selects the standby core wire channel to be detected through the channel selection relay array, and then performs ground insulation and wire insulation detection; sends the monitoring extension to the monitoring extension through the NBIoT Internet of Things network. The instruction short-circuits the two spare core wires connected to the normally open node of the output relay unit, and then uses the core wire detection module to perform on-off judgment and loop resistance detection on the two spare core wires, and sends the instruction after the detection is completed. Disconnect the node and restore the spare core to the open circuit state; when the spare core needs to be replaced, simply open the double switch to make the spare core immediately available.
本发明优点在于:The advantages of the present invention are:
本发明提供一种基于NBIoT物联网的备用芯线监测系统,该系统包括:备 用芯线监测主机、双联开关、备用芯线和监测分机。其一:实现了备用芯线的 在线监测;其二:实现了备用芯线的快速替换;其三:由于采用了NBIoT物联 网技术,监测分机电源直接采用电池供电就能满足应用要求而无需额外的电缆 供电;解决现有电力线载波通信受线路阻抗影响问题。The invention provides a backup core wire monitoring system based on the NBIoT Internet of Things, the system includes: a backup core wire monitoring host, a double switch, a backup core wire and a monitoring extension. One: realizes the online monitoring of the spare core wire; second: realizes the rapid replacement of the spare core wire; third: due to the adoption of the NBIoT Internet of Things technology, the power supply of the monitoring extension can be directly powered by the battery to meet the application requirements without additional It can solve the problem that the existing power line carrier communication is affected by the line impedance.
具体实施方式Detailed ways
下面结合实施例对本发明作进一步详述:Below in conjunction with embodiment, the present invention is described in further detail:
本发明提供一种基于NBIoT物联网的备用芯线监测系统,该系统包括:备 用芯线监测主机、双联开关、备用芯线和监测分机。其中用芯线监测主机主要 由主控板、电源单元、芯线检测模块、通道选择继电器阵列、显示单元、NBIoT 通信模块组成。监测分机主要由主控制器、电池、输出继电器单元、全球定位 模块、NBIoT通信模块、显示单元构成。The invention provides a backup core wire monitoring system based on the NBIoT Internet of Things, the system includes: a backup core wire monitoring host, a double switch, a backup core wire and a monitoring extension. The core monitoring host is mainly composed of the main control board, the power supply unit, the core detection module, the channel selection relay array, the display unit, and the NBIoT communication module. The monitoring extension is mainly composed of the main controller, battery, output relay unit, global positioning module, NBIoT communication module, and display unit.
所述备用芯线监测主机通过所述双联开关连接到备用芯线,所述监测分机通过所述输出继电器单元的两个常开节点连接到两根备用芯线。所述备用芯线监测主机中,主控板与电源单元、芯线检测模块、通道选择继电器阵列、显示单元、NBIoT通信模块连接;所述监测分机中,主控制器与电池、输出继电器单元、全球定位模块、NBIoT通信模块、显示单元连接。The spare core wire monitoring host is connected to the spare core wire through the double switch, and the monitoring extension is connected to the two spare core wires through the two normally open nodes of the output relay unit. In the standby core wire monitoring host, the main control board is connected with the power supply unit, the core wire detection module, the channel selection relay array, the display unit, and the NBIoT communication module; in the monitoring extension, the main controller is connected with the battery, the output relay unit, Global positioning module, NBIoT communication module, display unit connection.
当需要对某一对备用芯线检测时,备用芯线监测主机通过通道选择继电器阵列对备用芯线进行选择,然后利用芯线检测模块对备用芯线进行线间绝缘、对地绝缘检测;对于备用芯线的通断判断和回路电阻检测,则需要备用芯线监测主机通过NBIoT物联网网络给监测分机发送指令使连接于输出继电器单元常开节点的两根备用芯线短路,然后利用芯线检测模块对两根备用芯线进行检测,待检测完成后再发送指令节点断开,使备用芯线恢复到开路状态;当需要替换备用芯线时,只需要断开双联开关就可以立即可用。When it is necessary to detect a pair of spare core wires, the spare core wire monitoring host selects the spare core wires through the channel selection relay array, and then uses the core wire detection module to perform wire-to-line insulation and ground insulation detection on the spare core wires; For on-off judgment and loop resistance detection of the spare core wire, the spare core wire monitoring host needs to send an instruction to the monitoring extension through the NBIoT Internet of Things network to short-circuit the two spare core wires connected to the normally open node of the output relay unit, and then use the core wire The detection module detects the two spare core wires. After the detection is completed, it sends an instruction to disconnect the node, so that the spare core wire returns to the open state; when the spare core wire needs to be replaced, it is only necessary to disconnect the double switch and it can be used immediately. .
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910157998.9A CN110058106A (en) | 2019-03-05 | 2019-03-05 | A kind of spare core line monitoring system based on NBIoT Internet of Things |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910157998.9A CN110058106A (en) | 2019-03-05 | 2019-03-05 | A kind of spare core line monitoring system based on NBIoT Internet of Things |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110058106A true CN110058106A (en) | 2019-07-26 |
Family
ID=67316056
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910157998.9A Pending CN110058106A (en) | 2019-03-05 | 2019-03-05 | A kind of spare core line monitoring system based on NBIoT Internet of Things |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110058106A (en) |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1504757A (en) * | 2002-11-30 | 2004-06-16 | 张跃武 | Intelligent multiple port system for cable test |
| CN101937042A (en) * | 2010-08-23 | 2011-01-05 | 中国科学院声学研究所 | A system and method for detecting the connectivity performance of multi-core cables |
| CN206620125U (en) * | 2017-03-10 | 2017-11-07 | 中铁第一勘察设计院集团有限公司 | A kind of standby insertion cored wire on-line monitoring system of signal cable |
| CN107367665A (en) * | 2017-09-15 | 2017-11-21 | 广州市厚德物联科技有限公司 | Power supply cable disconnection monitoring and alarming device based on NB-IoT technology |
| CN207232307U (en) * | 2017-09-04 | 2018-04-13 | 湖南长高思瑞自动化有限公司 | A kind of cable-type fault location system |
| CN210376645U (en) * | 2019-03-05 | 2020-04-21 | 柳州和利时科技有限责任公司 | Standby core wire monitoring system based on NBIoT internet of things |
-
2019
- 2019-03-05 CN CN201910157998.9A patent/CN110058106A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1504757A (en) * | 2002-11-30 | 2004-06-16 | 张跃武 | Intelligent multiple port system for cable test |
| CN101937042A (en) * | 2010-08-23 | 2011-01-05 | 中国科学院声学研究所 | A system and method for detecting the connectivity performance of multi-core cables |
| CN206620125U (en) * | 2017-03-10 | 2017-11-07 | 中铁第一勘察设计院集团有限公司 | A kind of standby insertion cored wire on-line monitoring system of signal cable |
| CN207232307U (en) * | 2017-09-04 | 2018-04-13 | 湖南长高思瑞自动化有限公司 | A kind of cable-type fault location system |
| CN107367665A (en) * | 2017-09-15 | 2017-11-21 | 广州市厚德物联科技有限公司 | Power supply cable disconnection monitoring and alarming device based on NB-IoT technology |
| CN210376645U (en) * | 2019-03-05 | 2020-04-21 | 柳州和利时科技有限责任公司 | Standby core wire monitoring system based on NBIoT internet of things |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104237645B (en) | A kind of transformer station direct current system state of insulation on-line monitoring system and method | |
| CN110769446B (en) | Intelligent monitoring system and method for 5G communication base station | |
| CN108318787B (en) | Method and system for switching multi-section parallel operation of DC bus | |
| CN103441875A (en) | Method for achieving redundant communication of signal centralized monitoring system | |
| CN106707101A (en) | Distribution network operating state monitoring device with four-remote function | |
| CN105044575A (en) | High-voltage direct-current power distribution insulation-against-ground monitoring device | |
| CN110350969A (en) | The localization method of submarine observation network and the sea cable short trouble based on optical fiber biography energy | |
| CN209280818U (en) | A kind of electric heater On-line Fault monitoring device | |
| CN207440228U (en) | A kind of feeder line fault on-line monitoring system | |
| CN104198857B (en) | Fault detector distant communication terminal | |
| CN203645671U (en) | Fiber switching protection system | |
| CN105891679A (en) | Fault detection system and method for electric power grid | |
| CN117792873A (en) | HPLC (high Performance liquid chromatography) and HRF (high performance liquid chromatography) based dual-mode communication fault processing method and device | |
| CN210376645U (en) | Standby core wire monitoring system based on NBIoT internet of things | |
| CN204945313U (en) | A kind of high voltage direct current distribution insulation against ground supervisory device | |
| CN104202191A (en) | Switching method of communication working modes of fault indicator remote transmission communication terminal and master station | |
| CN105675062A (en) | Electric power tower pole fault remote monitoring scheme and device | |
| CN219609458U (en) | Data acquisition and monitoring control equipment with main and standby switching function | |
| CN206620125U (en) | A kind of standby insertion cored wire on-line monitoring system of signal cable | |
| CN111308266A (en) | Power transmission line fault detection system and method | |
| CN207320948U (en) | A kind of distribution network automated terminal | |
| CN206986969U (en) | Secondary water-supply dual control system | |
| CN206807149U (en) | A kind of Electrical Safety control system based on broadband power line carrier | |
| CN204789872U (en) | Distribution system trouble on -line monitoring system | |
| CN102568179A (en) | Two-channel wireless transmission power monitoring system and monitoring method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190726 |