CN110055956A - A kind of tree root pile constructing process and its implementing device - Google Patents

A kind of tree root pile constructing process and its implementing device Download PDF

Info

Publication number
CN110055956A
CN110055956A CN201910382562.XA CN201910382562A CN110055956A CN 110055956 A CN110055956 A CN 110055956A CN 201910382562 A CN201910382562 A CN 201910382562A CN 110055956 A CN110055956 A CN 110055956A
Authority
CN
China
Prior art keywords
fixed
rotation
servo motor
drives
terminal pad
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910382562.XA
Other languages
Chinese (zh)
Other versions
CN110055956B (en
Inventor
徐泉
徐豫青
施沈杰
宋小峰
胡石
钱野
Original Assignee
徐泉
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 徐泉 filed Critical 徐泉
Priority to CN201910382562.XA priority Critical patent/CN110055956B/en
Publication of CN110055956A publication Critical patent/CN110055956A/en
Application granted granted Critical
Publication of CN110055956B publication Critical patent/CN110055956B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/08Sinking workpieces into water or soil inasmuch as not provided for elsewhere
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Abstract

The invention discloses a kind of tree root pile constructing process, including installing bucket, the inside of the installation bucket is fixed with first servo motor, the output shaft of the first servo motor is fixed with turntable, the outside of the turntable is equipped with teeth, the teeth are engaged with gear, screw rod is fixed on the gear, the both ends of the screw rod are rotatably connected to installs case, transmission nut is threaded on the screw rod, the transmission nut is embedded in the first link block, the upper end of first link block is fixed with mounting plate, the mounting plate is equipped with rotating mechanism, the side of the rotating mechanism is equipped with anchor pole by check valve, steel strand wires are equipped in the anchor pole, one end end of the anchor pole is fixed with drill bit, sunpender is provided with above the installation bucket, the sunpender is fixedly linked by the second connecting rod and the installation bucket, it is equipped in the sunpender Grouting Pipe, the Grouting Pipe are connected to rotating mechanism, greatly enhance the bearing capacity of bored concrete pile by above structure.

Description

A kind of tree root pile constructing process and its implementing device
Technical field
The invention belongs to tree root pile constructing process technical fields, and in particular to a kind of tree root pile constructing process, the present invention is also A kind of implementing device of tree root pile constructing process is provided.
Background technique
Bored concrete pile is a kind of cast-in-situ bored pile of diameter, and diameter is usually 500~1200mm, and foreign countries are in steel sleeve It is crept under guiding with rotary process, in use, the basis that often drill existing building enters in foundation soil in underpinning method Reinforcing bar (number of steel bars from one to several, depending on stake diameter) is transferred until designed elevation, after borehole cleaning, while being put into Grouting Pipe, Cement slurry or cement mortar are injected with pressure again;While filling, Bian Zhen, while tube drawing (rise slurry processes) and pile.Also steel reinforcement cage can be put into again Rubble is put, is then injected into cement slurry or cement mortar and pile.According to the design needs, root pile can be vertical or inclination 's;It is also possible to single or rows of, can be end-bearing pile, be also possible to friction pile.
Since bored concrete pile is circular, so the bearing capacity up and down of bored concrete pile is more weak, with the increase of the building scale of construction, Need that bearing capacity is bigger, adapts to the pile base model of Complex Soil mass-energy power.Existing construction process of bored concrete pile is unable to satisfy above-mentioned It is required that for this purpose, it is proposed that a kind of tree root pile constructing process solves problems of the prior art.
Summary of the invention
The purpose of the present invention is to provide a kind of tree root pile constructing process and its implementing devices, to solve above-mentioned background technique It is middle to propose the existing root pile more weak problem of bearing capacity up and down.
To achieve the above object, present invention employs following technical solutions:
A kind of tree root pile constructing process, comprising the following steps:
S1, hoisting ring on the second link block is hung first with lifting machine, then sling sunpender, and then sunpender drives peace The inner bottom of steel reinforcement cage is put into installation bucket in barrelling campaign, and installation bucket and steel reinforcement cage are sunk to simultaneously then and beaten in advance In good stake holes, until installation bucket and steel reinforcement cage sink to the bottom end of stake holes;
S2, then starting first servo motor, and then first servo motor drives turntable rotation, the rotation band movable tooth of turntable Tooth is rotated around the central axis of turntable, and the gear rotation that the rotation driving of teeth engages, the rotation of gear drives screw rod rotation Turn, the transmission nut that the rotation driving of screw rod is connect with its screw-driven travels forward along screw rod, and then drives the first link block Movement, and then the first link block drives mounting plate to travel forward along sliding rail, and then mounting plate drives anchor pole leading in rear anchor slab Set travels forward;
S3, start the second servo motor simultaneously, and then the second servo motor drives the first connection disc spins, the first terminal pad Rotation pass through first connecting rod and drive the second connection disc spins, the rotation of the second terminal pad drives check valve rotation, Jin Erdan Anchor pole is driven to rotate around the shaft core line of the second terminal pad to valve, and then anchor pole drives drill bit to rotate around the axial line of anchor pole, in turn Drill bit realization travels forward and own rotation, and then punches to the side wall of stake holes;
S4, drill bit open slip casting machine after reaching predetermined depth, and for slip casting machine by Grouting Pipe slip casting in storage vat, cement is mixed Solidifying soil enters after storage vat the exit that drill bit is flowed to by the hole among anchor pole, and then cement concrete is flowed into the hole accomplished fluently It is interior, realize grouting, while water and silt in cement concrete extrusion cavities;
S5, then opening check valve separates anchor pole with storage vat, while electromagnet being given to power off, and then rear anchor slab and electromagnetism Then iron separation stops the work of the second servo motor, and rotates backward first servo motor, and then mounting plate returns to backward Home position, and anchor pole and rear anchor slab stop in the position;
S6, then 90 degree of sunpender of rotation and then drive install bucket and rotate 90 degree, and then escape port is located at rear anchor slab Underface is recalled installation bucket upwards by lifting machine, steel reinforcement cage is stayed in stake holes, coagulating cement is then poured into stake holes Soil, entire work progress finish.
The present invention also provides a kind of implementing device of tree root pile constructing process, including installation bucket, the inside of the installation bucket First servo motor is fixed among bottom end, the output shaft end of the first servo motor is fixed with turntable, the turntable position Several teeth, the upper end engagement of the teeth are evenly provided on the outside of the outer upper end of the installation bucket, the turntable It is sequentially connected with gear, the gear is provided with two and waits and is symmetrically distributed on the turntable, fixed on the gear There is screw rod, the both ends of the screw rod are rotatably connected to installs case, and the installs case is fixed on the top of the installation bucket, the silk Screw-driven is connected with transmission nut on bar, and the transmission nut is embedded in the inside of the first link block, first link block Upper end end run through the installs case top, the upper end end of first link block is fixed with mounting plate, the installation The lower end two sides of plate are provided with sliding rail, and sliding block is slidably connected in the sliding rail, and the sliding block is fixed on the top of the installs case End;
The upper end of the mounting plate is provided with rotating mechanism, and the side of the rotating mechanism is provided with check valve, the list Anchor pole is fixed on valve, the anchor pole is internally provided with steel strand wires, one end end of the anchor pole far from the check valve It is fixed with drill bit, sunpender is provided with above the installation bucket, the sunpender is fixed by the second connecting rod and the installation bucket It is connected, through there is Grouting Pipe in the sunpender, the lower end of the Grouting Pipe is connected to rotating mechanism, is set on the outside of the installation bucket It is equipped with steel reinforcement cage.
Further, the rotating mechanism includes the second servo motor, and second servo motor is fixed on the installation The upper end side of plate, the output shaft end of second servo motor are fixed with the first terminal pad, and first terminal pad is separate The side of second servo motor is uniformly fixed with several first connecting rods, and the first connecting rod connects far from described first The one end for connecing disk is fixed with the second terminal pad, and second terminal pad is connected to the check valve, first terminal pad, first Connecting rod and the second terminal pad are located at the inside of storage vat, and the storage vat is fixed on the upper end of the mounting plate, and described second The output shaft of servo motor and the check valve are rotatablely connected with the side wall of the storage vat, the storage vat and the slip casting Pipe connection.
By using above-mentioned technical proposal, realize anchor pole travel forward and own rotation, and then drill bit is driven to transport forward Dynamic and own rotation, and then drill bit realizes in radial position to the side wall of stake holes and punches that operation is easy, and improves working efficiency.
Further, it is provided with protective cover on the outside of second servo motor and the storage vat, the protective cover is solid It is scheduled on the mounting plate.
By using above-mentioned technical proposal, external foreign matter is avoided to enter in the second servo motor or storage vat, play every From, protective effect.
Further, the installation bucket is provided at least two groups.
By using above-mentioned technical proposal, drilling while multiple rows of stake holes is may be implemented in the setting of multiple groups installation bucket, is improved Working efficiency.
Further, the anchor pole slides in guide sleeve far from one end of the storage vat, and the guide sleeve is embedded in rear anchor In plate, for the rear anchor slab magnetic on electromagnet, the electromagnet is fixed on the end of installs case.
By using above-mentioned technical proposal, rear anchor slab is fixed together by electromagnet and installs case, is powered off to electromagnet Anchor slab is separated with installs case afterwards, and anchor slab, which is left in place, after realization sets, and facilitates work.
Further, the upper end of the sunpender is fixed with support frame, and the lower end of support frame as described above is fixed with pedestal.
By using above-mentioned technical proposal, the installation of sunpender is fixed in realization, increases the fastness and stabilization of whole device Property.
Further, the upper end end of the sunpender is fixed with the second link block, among the upper end of second link block It is fixed with hoisting ring.
By using above-mentioned technical proposal, convenient lifting and carrying to installation bucket facilitates work
Further, the two sides of the installation bucket are provided with escape port.
By using above-mentioned technical proposal, when hanging out installation bucket, escape port plays the role of anchor slab after evacuation.
Technical effect and advantage of the invention: a kind of tree root pile constructing process proposed by the present invention and its implementing device, with The prior art is compared, and is had the advantage that
1, the present invention drives turntable rotation by first servo motor, and the rotation of turntable drives teeth around the central axis of turntable Line rotation, the gear rotation that the rotation driving of teeth engages, the rotation of gear drive screw rod rotation, the rotation driving of screw rod The transmission nut connecting with its screw-driven travels forward along screw rod, and then drives the movement of the first link block, and then the first connection Block drives mounting plate to travel forward along sliding rail, and then mounting plate drives anchor pole to travel forward, and then anchor pole drives drill bit to transport forward It is dynamic, and then drill bit is contacted with the side wall of stake holes, is prepared for the punching of lower step;
2, the present invention drives the first connection disc spins by the second servo motor, and the rotation of the first terminal pad connects by first Extension bar drives the second connection disc spins, and the rotation of the second terminal pad drives anchor pole to rotate around the shaft core line of the second terminal pad, in turn Anchor pole drives drill bit to rotate around the axial line of anchor pole, and then drill bit realization travels forward and own rotation, and then to stake holes Side wall is punched, and realizes that work efficiency is high in stake holes side wall radial position automatic punching;
3, drill bit of the present invention opens slip casting machine after reaching predetermined depth, and slip casting machine passes through Grouting Pipe slip casting in storage vat, Cement concrete enters after storage vat the exit that drill bit is flowed to by the hole among anchor pole, and then cement concrete is flowed into and beats In good hole, grouting, while water and silt in cement concrete extrusion cavities are realized, after the completion of grouting, opening check valve makes anchor Bar is separated with storage vat, while being powered off to electromagnet, and then rear anchor slab is separated with electromagnet, then makes first servo motor reversed Rotation, and then mounting plate returns to home position backward, and anchor pole and rear anchor slab stop in the position, realize automatic grouting, work Make high-efficient.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is of the invention positioned at state diagram in stake holes;
Fig. 3 is installation bucket upper end formation figure of the invention;
Fig. 4 is installation bucket internal structure chart of the invention;
Fig. 5 is installs case internal structure chart of the invention;
Fig. 6 is rotating mechanism structure chart of the invention;
Fig. 7 is anchor structure figure of the invention.
Appended drawing reference: 1, bucket is installed;2, first servo motor;3, turntable;4, teeth;5, gear;6, screw rod;7, it installs Case;8, transmission nut;9, the first link block;10, mounting plate;11, sliding rail;12, sliding block;13, rotating mechanism;131, the second servo Motor;132, the first terminal pad;133, first connecting rod;134, the second terminal pad;135, storage vat;136, protective cover;14, single To valve;15, anchor pole;16, steel strand wires;17, drill bit;18, rear anchor slab;19, electromagnet;20, guide sleeve;21, the second connecting rod;22, Sunpender;23, Grouting Pipe;24, steel reinforcement cage;25, support frame;26, pedestal;27, the second link block;28, hoisting ring;29, escape port.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Herein Described specific embodiment is only used to explain the present invention, is not intended to limit the present invention.Based on the embodiments of the present invention, Every other embodiment obtained by those of ordinary skill in the art without making creative efforts, belongs to this hair The range of bright protection.
A kind of tree root pile constructing process, comprising the following steps:
S1, hoisting ring 28 on the second link block 27 is hung first with lifting machine, then sling sunpender 22, and then sunpender 22 drive installation bucket 1 to move, and installation bucket 1 are put into the inner bottom of steel reinforcement cage 24, then that installation bucket 1 and steel reinforcement cage 24 is same When sink in the stake holes accomplished fluently in advance, until installation bucket 1 and steel reinforcement cage 24 sink to the bottom end of stake holes;
S2, then starting first servo motor 2, and then first servo motor 2 drives turntable 3 to rotate, the rotation band of turntable 3 Movable tooth tooth 4 is rotated around the central axis of turntable 3, and the gear 5 that the rotation driving of teeth 4 engages rotates, the rotation band of gear 5 Dynamic screw rod 6 rotates, and the transmission nut 8 that the rotation driving of screw rod 6 is connect with its screw-driven travels forward along screw rod 6, and then band Dynamic first link block 9 movement, and then the first link block 9 drives mounting plate 10 to travel forward along sliding rail 11, and then 10 band of mounting plate Dynamic guide sleeve 20 of the anchor pole 15 in rear anchor slab 18 travels forward;
S3, start the second servo motor 131 simultaneously, and then the second servo motor 131 drives the rotation of the first terminal pad 132, The rotation of first terminal pad 132 drives the rotation of the second terminal pad 134, the rotation of the second terminal pad 134 by first connecting rod 133 Check valve 14 is driven to rotate, and then check valve 14 drives anchor pole 15 to rotate around the shaft core line of the second terminal pad 134, and then anchor pole 15 Drill bit 17 is driven to rotate around the axial line of anchor pole 15, and then the realization of drill bit 17 travels forward and own rotation, and then to stake holes Side wall punched;
S4, drill bit 17 open slip casting machine after reaching predetermined depth, and slip casting machine is infused in storage vat 135 by Grouting Pipe 23 Slurry, cement concrete enter after storage vat 135 exit that drill bit 17 is flowed to by the hole among anchor pole 15, and then coagulating cement Soil is flowed into the hole accomplished fluently, and realizes grouting, while water and silt in cement concrete extrusion cavities;
S5, then opening check valve 14 separates anchor pole 15 with storage vat 135, while powering off to electromagnet 19, Jin Erhou Anchor slab 18 is separated with electromagnet 19, then stops the work of the second servo motor 131, and rotate backward first servo motor 2, into And mounting plate 10 returns to home position backward, and anchor pole 15 and rear anchor slab 18 stop in the position;
S6, then 22 90 degree of sunpender of rotation and then drive install bucket 1 and rotate 90 degree, and then escape port 29 is located at rear anchor The underface of plate 18 is recalled installation bucket 1 upwards by lifting machine, steel reinforcement cage 24 is stayed in stake holes, is then poured into stake holes Cement concrete, entire work progress finish.
The present invention provides shown in as shown in Figure 1, Figure 2, Fig. 4, Fig. 5 and Fig. 7, a kind of implementing device of tree root pile constructing process, Including installing bucket 1, installs and be fixed with first servo motor 2, the output shaft end of first servo motor 2 among the inner bottom of bucket 1 Portion is fixed with turntable 3, and turntable 3 is located at the outer upper end of installation bucket 1, and the outside of turntable 3 is evenly provided with several teeth 4, tooth The upper end of tooth 4, which is connected by meshing transmission, gear 5, and gear 5 is provided with two and waits and is symmetrically distributed on turntable 3, on gear 5 It is fixed with screw rod 6, the both ends of screw rod 6 are rotatably connected to installs case 7, and installs case 7 is fixed on the top of installation bucket 1, spiral shell on screw rod 6 Line is sequentially connected with transmission nut 8, and transmission nut 8 is embedded in the inside of the first link block 9, the upper end end of the first link block 9 Through the top of installs case 7, the upper end end of the first link block 9 is fixed with mounting plate 10, the lower end two sides setting of mounting plate 10 There is sliding rail 11, sliding block 12 is slidably connected in sliding rail 11, sliding block 12 is fixed on the top of installs case 7;
The upper end of mounting plate 10 is provided with rotating mechanism 13, and the side of rotating mechanism 13 is provided with check valve 14, check valve Anchor pole 15 is fixed on 14, anchor pole 15 is internally provided with steel strand wires 16, and steel strand wires 16 have stronger stretching resistance, and anchor pole 15 is remote One end end from check valve 14 is fixed with drill bit 17, and the top of installation bucket 1 is provided with sunpender 22, and sunpender 22 passes through the second connection Bar 21 and installation bucket 1 are fixedly linked, and through there is Grouting Pipe 23 in sunpender 22, the lower end of Grouting Pipe 23 is connected to rotating mechanism 13, The outside of installation bucket 1 is provided with steel reinforcement cage 24.
Preferably, as shown in Figure 5 and Figure 6, rotating mechanism 13 includes the second servo motor 131, the second servo motor 131 is solid It is scheduled on the upper end side of mounting plate 10, the output shaft end of the second servo motor 131 is fixed with the first terminal pad 132, and first connects It connects disk 132 and is uniformly fixed with several first connecting rods 133 far from the side of the second servo motor 131, first connecting rod 133 is remote One end from the first terminal pad 132 is fixed with the second terminal pad 134, and the second terminal pad 134 is connected to check valve 14, the first connection Disk 132, first connecting rod 133 and the second terminal pad 134 are located at the inside of storage vat 135, and storage vat 135 is fixed on mounting plate 10 Upper end, the output shaft and check valve 14 of the second servo motor 131 with the side wall of storage vat 135 be rotatablely connected, storage vat 135 It is connected to Grouting Pipe 23.
By using above-mentioned technical proposal, realize anchor pole 15 travel forward and own rotation, and then drive drill bit 17 to Preceding movement and own rotation, and then drill bit 17 realizes in radial position to the side wall of stake holes and punches that operation is easy, and improves work effect Rate.
Preferably, as shown in Figure 3, Figure 5 and Figure 6, the outside of the second servo motor 131 and storage vat 135 is provided with protection Cover 136, protective cover 136 is fixed on mounting plate 10.
By using above-mentioned technical proposal, external foreign matter is avoided to enter in the second servo motor 131 or storage vat 135, Play isolation, protective effect.
Preferably, as shown in Figure 1, installation bucket 1 is provided at least two groups.
By using above-mentioned technical proposal, drilling while multiple rows of stake holes is may be implemented in the setting of multiple groups installation bucket 1, is improved Working efficiency.
Preferably, as shown in Figure 4, Figure 5 and Figure 6, the one end of anchor pole 15 far from storage vat 135 is slided in guide sleeve 20, is led Set 20 is embedded in rear anchor slab 18, and for rear 18 magnetic of anchor slab on electromagnet 19, electromagnet 19 is fixed on the end of installs case 7.
By using above-mentioned technical proposal, rear anchor slab 18 is fixed together by electromagnet 19 and installs case 7, gives electromagnet Anchor slab 18 is separated with installs case 7 after 19 power-off, and anchor slab 18, which is left in place, after realization sets, and facilitates work.
Preferably, the lower end of support frame 25 is fixed with as shown in Fig. 2, the upper end of sunpender 22 is fixed with support frame 25 Pedestal 26.
By using above-mentioned technical proposal, the installation of sunpender 22 is fixed in realization, increases the fastness of whole device and steady It is qualitative.
Preferably, as shown in Fig. 2, the upper end end of sunpender 22 is fixed with the second link block 27, the second link block 27 it is upper End is intermediate to be fixed with hoisting ring 28.
By using above-mentioned technical proposal, convenient lifting and carrying to installation bucket 1 facilitates work
Preferably, as shown, the two sides of installation bucket 1 are provided with escape port 29.
By using above-mentioned technical proposal, when hanging out installation bucket 1, escape port 29 plays the role of anchor slab 18 after evacuation.
Working principle: hanging the hoisting ring 28 on the second link block 27 first with lifting machine, then sling sunpender 22, into And sunpender 22 drives installation bucket 1 to move, and installation bucket 1 is put into the inner bottom of steel reinforcement cage 24, then installation bucket 1 and reinforcing bar Cage 24 is sunk in the stake holes accomplished fluently in advance simultaneously, until installation bucket 1 and steel reinforcement cage 24 sink to the bottom end of stake holes;
Then start first servo motor 2, and then first servo motor 2 drives turntable 3 to rotate, the rotation of turntable 3 drives Teeth 4 are rotated around the central axis of turntable 3, and the gear 5 that the rotation driving of teeth 4 engages rotates, and the rotation of gear 5 drives Screw rod 6 rotates, and the transmission nut 8 that the rotation driving of screw rod 6 is connect with its screw-driven travels forward along screw rod 6, and then drives The movement of first link block 9, and then the first link block 9 drives mounting plate 10 to travel forward along sliding rail 11, and then mounting plate 10 drives Guide sleeve 20 of the anchor pole 15 in rear anchor slab 18 travels forward;
Start the second servo motor 131 simultaneously, and then the second servo motor 131 drives the first terminal pad 132 to rotate, first The rotation of terminal pad 132 drives the rotation of the second terminal pad 134 by first connecting rod 133, and the rotation of the second terminal pad 134 drives Check valve 14 rotates, and then check valve 14 drives anchor pole 15 to rotate around the shaft core line of the second terminal pad 134, and then anchor pole 15 drives Drill bit 17 is rotated around the axial line of anchor pole 15, and then the realization of drill bit 17 travels forward and own rotation, and then to the side of stake holes Wall is punched;
Drill bit 17 opens slip casting machine after reaching predetermined depth, and slip casting machine passes through the slip casting in storage vat 135 of Grouting Pipe 23, water Cement concrete enters after storage vat 135 exit that drill bit 17 is flowed to by the hole among anchor pole 15, and then coagulating cement soil flow Enter into the hole accomplished fluently, realizes grouting, while water and silt in cement concrete extrusion cavities;
Then opening check valve 14 separates anchor pole 15 with storage vat 135, while powering off to electromagnet 19, and then rear anchor slab 18 separate with electromagnet 19, then stop the work of the second servo motor 131, and rotate backward first servo motor 2, Jin Eran Loading board 10 returns to home position backward, and anchor pole 15 and rear anchor slab 18 stop in the position;
Then 90 degree of rotation of 22 90 degree of sunpender of rotation and then drive installation bucket 1, and then escape port 29 is located at rear anchor slab 18 underface is recalled installation bucket 1 upwards by lifting machine, steel reinforcement cage 24 is stayed in stake holes, water is then poured into stake holes Cement concrete, entire work progress finish.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features, All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention Within protection scope.

Claims (9)

1. a kind of tree root pile constructing process, which comprises the following steps:
S1, hoisting ring (28) on the second link block (27) is hung first with lifting machine, then sling sunpender (22), and then hang Bar (22) drives installation bucket (1) movement, installation bucket (1) is put into the inner bottom of steel reinforcement cage (24), then installation bucket (1) It is sunk in the stake holes accomplished fluently in advance simultaneously with steel reinforcement cage (24), until installation bucket (1) and steel reinforcement cage (24) sink to stake holes Bottom end;
S2, then starting first servo motor (2), and then first servo motor (2) drives turntable (3) rotation, the rotation of turntable (3) Turn that teeth (4) is driven to rotate around the central axis of turntable (3), gear (5) rotation that the rotation driving of teeth (4) engages, The rotation of gear (5) drives screw rod (6) rotation, transmission nut (8) edge that the rotation driving of screw rod (6) is connect with its screw-driven Screw rod (6) travels forward, and then drives the first link block (9) movement, and then the first link block (9) drives mounting plate (10) along cunning Rail (11) travels forward, and then mounting plate (10) drives the guide sleeve (20) of anchor pole (15) in rear anchor slab (18) to travel forward;
S3, simultaneously starting the second servo motor (131), and then the second servo motor (131) drives the first terminal pad (132) rotation Turn, the rotation of the first terminal pad (132) drives the second terminal pad (134) rotation, the second terminal pad by first connecting rod (133) (134) rotation drives check valve (14) rotation, and then check valve (14) drives anchor pole (15) around the axis of the second terminal pad (134) Core wire rotation, and then anchor pole (15) drives drill bit (17) to rotate around the axial line of anchor pole (15), and then drill bit (17) is realized forward Movement and own rotation, and then the side wall of stake holes is punched;
S4, drill bit (17) open slip casting machine, slip casting machine note in storage vat (135) by Grouting Pipe (23) after reaching predetermined depth Slurry, cement concrete enter after storage vat (135) exit that drill bit (17) are flowed to by the intermediate hole of anchor pole (15), Jin Ershui Cement concrete is flowed into the hole accomplished fluently, and realizes grouting, while water and silt in cement concrete extrusion cavities;
S5, then opening check valve (14) separates anchor pole (15) with storage vat (135), while powering off to electromagnet (19), into Then anchor slab (18) is separated with electromagnet (19), then stops the second servo motor (131) work, and make first servo motor (2) it rotates backward, and then mounting plate (10) returns to home position backward, and anchor pole (15) and rear anchor slab (18) rest on the position It sets;
After S6, then 90 degree of sunpender (22) of rotation and then drive install bucket (1) and rotate 90 degree, and then escape port (29) is located at The underface of anchor slab (18) is recalled installation bucket (1) upwards by lifting machine, steel reinforcement cage (24) is stayed in stake holes, then toward stake Cement concrete is poured into hole, entire work progress finishes.
2. a kind of implementing device of tree root pile constructing process according to claim 1, including installation bucket (1), the installation It is fixed with first servo motor (2) among the inner bottom of bucket (1), the output shaft end of the first servo motor (2) is fixed Have turntable (3), the turntable (3) is located at the outer upper end of installation bucket (1), and the outside of the turntable (3) is uniformly arranged Have several teeth (4), the upper end of the teeth (4) is connected by meshing transmission and has gear (5), and the gear (5) is provided with two And wait and be symmetrically distributed on the turntable (3), it is fixed with screw rod (6) on the gear (5), the both ends of the screw rod (6) turn Dynamic to be connected with installs case (7), the installs case (7) is fixed on the top of installation bucket (1), and screw thread passes on the screw rod (6) Dynamic to be connected with transmission nut (8), the transmission nut (8) is embedded in the inside of the first link block (9), first link block (9) top of the installs case (7) is run through in upper end end, and the upper end end of first link block (9) is fixed with mounting plate (10), the lower end two sides of the mounting plate (10) are provided with sliding rail (11), slidably connect sliding block (12) in the sliding rail (11), The sliding block (12) is fixed on the top of the installs case (7);
The upper end of the mounting plate (10) is provided with rotating mechanism (13), and the side of the rotating mechanism (13) is provided with check valve (14), it is fixed with anchor pole (15) on the check valve (14), the anchor pole (15) is internally provided with steel strand wires (16), the anchor Bar (15) is fixed with drill bit (17) far from one end end of the check valve (14), is provided with and is hung above the installation bucket (1) Bar (22), the sunpender (22) are fixedly linked by the second connecting rod (21) and the installation bucket (1), are passed through in the sunpender (22) It is installed with Grouting Pipe (23), the lower end of the Grouting Pipe (23) is connected to rotating mechanism (13), the outside setting of installation bucket (1) There are steel reinforcement cage (24).
3. a kind of implementing device of tree root pile constructing process according to claim 2, it is characterised in that: the rotating mechanism It (13) include the second servo motor (131) that second servo motor (131) is fixed on the upper end one of the mounting plate (10) The output shaft end of side, second servo motor (131) is fixed with the first terminal pad (132), first terminal pad (132) Side far from second servo motor (131) is uniformly fixed with several first connecting rods (133), the first connecting rod (133) be fixed with the second terminal pad (134) far from one end of first terminal pad (132), second terminal pad (134) with Check valve (14) connection, first terminal pad (132), first connecting rod (133) and the second terminal pad (134) are located at storage The inside of charging basket (135), the storage vat (135) are fixed on the upper end of the mounting plate (10), second servo motor (131) output shaft and the check valve (14) is rotatablely connected with the side wall of the storage vat (135), the storage vat (135) it is connected to the Grouting Pipe (23).
4. a kind of implementing device of tree root pile constructing process according to claim 3, it is characterised in that: second servo It is provided with protective cover (136) on the outside of motor (131) and the storage vat (135), the protective cover (136) is fixed on the peace In loading board (10).
5. a kind of implementing device of tree root pile constructing process according to claim 2, it is characterised in that: the installation bucket (1) at least two groups are provided with.
6. a kind of implementing device of tree root pile constructing process according to claim 3, it is characterised in that: the anchor pole (15) The sliding in guide sleeve (20) of one end far from the storage vat (135), the guide sleeve (20) is embedded in rear anchor slab (18), described For anchor slab (18) magnetic on electromagnet (19), the electromagnet (19) is fixed on the end of installs case (7) afterwards.
7. a kind of implementing device of tree root pile constructing process according to claim 2, it is characterised in that: the sunpender (22) Upper end be fixed with support frame (25), the lower end of support frame as described above (25) is fixed with pedestal (26).
8. a kind of implementing device of tree root pile constructing process according to claim 2, it is characterised in that: the sunpender (22) Upper end end be fixed with the second link block (27), be fixed with hoisting ring (28) among the upper end of second link block (27).
9. a kind of implementing device of tree root pile constructing process according to claim 2, it is characterised in that: the installation bucket (1) two sides are provided with escape port (29).
CN201910382562.XA 2019-05-09 2019-05-09 Tree root pile construction process and implementation device thereof Active CN110055956B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910382562.XA CN110055956B (en) 2019-05-09 2019-05-09 Tree root pile construction process and implementation device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910382562.XA CN110055956B (en) 2019-05-09 2019-05-09 Tree root pile construction process and implementation device thereof

Publications (2)

Publication Number Publication Date
CN110055956A true CN110055956A (en) 2019-07-26
CN110055956B CN110055956B (en) 2020-09-08

Family

ID=67322536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910382562.XA Active CN110055956B (en) 2019-05-09 2019-05-09 Tree root pile construction process and implementation device thereof

Country Status (1)

Country Link
CN (1) CN110055956B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004052383A (en) * 2002-07-22 2004-02-19 Yasuhiro Fujita Base-protruded protrusion anchor pile
CN1690316A (en) * 2004-04-28 2005-11-02 李振泽 Architectural feature of novel large diameter drill hole filling anchor pile and construction method thereof
CN1963043A (en) * 2005-11-11 2007-05-16 中国京冶建设工程承包公司 Construction method for mechanical hole reaming of anchor rod
CN101298771A (en) * 2008-07-02 2008-11-05 齐庆国 Static pressure sunken tube pedestal concrete pile construction method and static pile press thereof
CN104018534A (en) * 2014-05-14 2014-09-03 石午江 Motor-driven milling and slotting wall former

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004052383A (en) * 2002-07-22 2004-02-19 Yasuhiro Fujita Base-protruded protrusion anchor pile
CN1690316A (en) * 2004-04-28 2005-11-02 李振泽 Architectural feature of novel large diameter drill hole filling anchor pile and construction method thereof
CN1963043A (en) * 2005-11-11 2007-05-16 中国京冶建设工程承包公司 Construction method for mechanical hole reaming of anchor rod
CN101298771A (en) * 2008-07-02 2008-11-05 齐庆国 Static pressure sunken tube pedestal concrete pile construction method and static pile press thereof
CN104018534A (en) * 2014-05-14 2014-09-03 石午江 Motor-driven milling and slotting wall former

Also Published As

Publication number Publication date
CN110055956B (en) 2020-09-08

Similar Documents

Publication Publication Date Title
CN204199640U (en) A kind of Novel powder wall telephone
US3962879A (en) Reinforced pile in earth situs and method of producing same
CN102493437B (en) Grouting-type micro steel pipe pile and grouting reinforcement method
CN1312376C (en) Multifunctional drill machine and its construction method
CN101560765A (en) Underground continuous wall construction technique of multi-spindle long spiral drill pipe occluding pile
CN105887876B (en) A kind of construction method and its pile-forming apparatus of cast-in-place major diameter combination thin-walled screw thread pile tube
CN104763328A (en) Hydraulic reaming circulation drilling machine and reaming pile construction technology thereof
CN106894416A (en) A kind of rotary digging formula draws core light instrument and a construction method
CN104727323A (en) Self-drilling steel pipe pile continuous wall construction method and steel pipe pile continuous wall used in self-drilling steel pipe pile continuous wall construction method
US20110290564A1 (en) Kelly for the realization of bored piles
CN205530234U (en) Stir construction equipment who spouts hole enlargement reinforcing pile
CN106087999A (en) A kind of stir constructing device and the construction method thereof spraying expanding reinforcing pile
CN104763345A (en) Construction device and method for building foundation
CN101984191B (en) High pressure jet grouting pile driving machine
CN105178979A (en) Supporting structure of tunnel in bias salt cavity environment and construction method of supporting structure
CN203256735U (en) Multi-shaft mixing pile device capable of reducing soil-squeezing effect
CN105569560B (en) A full set of tubular type long auger stake machine and the method for utilizing the ram machine construction
CN105780761A (en) Extrusion soil mass full-thread cast-in-place pile machine and pile forming method thereof
CN206319896U (en) A kind of anchor pole of slip casting step by step
CN107217910A (en) Supply line's electric pole plants lever apparatus and its plants bar method
JP5753205B2 (en) Casting concrete pile construction method
CN110016920A (en) The construction method of interlocking pile of meat and vegetables collocation
KR100902083B1 (en) System of casting a wall contruction and descending the same into teh groudnd, and a driving apparatus for stepwise descending the wall construction into teh groudnd
CN109853524A (en) A kind of construction method of the composite special-shaped stake of enlarged footing stiffness soil cement
CN108360508B (en) Construction method of cast-in-situ concrete core cement mixing pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200716

Address after: No. 150, workers and peasants South Road, Nantong, Jiangsu Province

Applicant after: Qian Ye

Address before: 226000 Government Center 901, 150 Gongnong South Road, Nantong City, Jiangsu Province

Applicant before: Xu Quan

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant