CN110055946A CN201910284174.8A CN201910284174A CN110055946A CN 110055946 A CN110055946 A CN 110055946A CN 201910284174 A CN201910284174 A CN 201910284174A CN 110055946 A CN110055946 A CN 110055946A
Authority
CN
China
Prior art keywords
geotechnical grid
raddle
section
establishment formula
establishment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910284174.8A
Other languages
Chinese (zh)
Inventor
李丽华
李行
肖衡林
高萌
马强
刘永莉
陶高梁
胡智
陈智
田密
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei University of Technology
Original Assignee
Hubei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei University of Technology filed Critical Hubei University of Technology
Priority to CN201910284174.8A priority Critical patent/CN110055946A/en
Publication of CN110055946A publication Critical patent/CN110055946A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/005Soil-conditioning by mixing with fibrous materials, filaments, open mesh or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0084Geogrids

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The present invention relates to a kind of establishment formula geotechnical grids, it include: multiple shop bolts, multiple first raddles, multiple second raddles, shop bolt is arranged in matrix form, first raddle is rested against on shop bolt and is bent to form wavy, two raddles are fixed against on shop bolt and are bent to form wavy, and the first raddle and the second raddle go to upper and lower and be staggered and surround to form geotechnical grid.Raddle is constrained using shop bolt in the present invention and is staggered to form geotechnical grid, and aforesaid way can control cell compartment size according to pin location and raddle quantity, and to meet different construction site demands, and alternating expression structure drainage effect is good.

Description

A kind of establishment formula geotechnical grid
Technical field
The present invention relates to engineering construction technology field more particularly to a kind of establishment formula geotechnical grids.
Background technique
Geotechnical grid is the novel high-intensitive geosynthetics of one kind of more prevalence both at home and abroad at present, be can be used as Bed course, soft ground treatment increase the bearing capacity of ground, can also be laid on composition slope protection structure in slope surface, can also use To build retaining structure etc..Geotechnical grid is mainly used for firm highway, railway bed, for bearing the dyke and shallow water of carrying force River regulation can using geotechnical grid for preventing landslide and by the hybrid barricade of carrying force and when encountering subgrade Mitigate construction labor intensity significantly, reduces roadbed thickness speed of application, performance is good, substantially reduces project cost.
Existing geotechnical grid technology has the following problems: existing geotechnical grid have it is capable of expansion and contraction, transportation volume is small, Feature easy to connect, speed of application is fast, but some different effects, existing geotechnique's lattice are needed in some special places Most of room is all to be formed, and height is typically all fixation, and after height is fixed in this way, can not just fill more objects makes It is more secured to obtain geotechnical grid.
Summary of the invention
In view of the above-mentioned problems, now providing a kind of establishment formula geotechnical grid of using flexible.
Specific technical solution is as follows:
A kind of establishment formula geotechnical grid, has the feature that, comprising: multiple shop bolts, multiple first raddles, multiple Second raddle, shop bolt are arranged in matrix form, and the first raddle rests against on shop bolt and is bent to form wavy, two raddles It is fixed against on shop bolt and is bent to form wavy, and the first raddle and the second raddle go to upper and lower and be staggered and surround shape At geotechnical grid.
Above-mentioned establishment formula geotechnical grid, also has the feature that, left and right adjacent geotechnical grid is in close-packed arrays.
Above-mentioned establishment formula geotechnical grid also has the feature that, left and right adjacent geotechnical grid is distributed in distance.
Above-mentioned establishment formula geotechnical grid, also has the feature that, reinforcing is also embedded in geotechnical grid and compiles section, is reinforced It is in inclined point shape that section, which is compiled, in hollow form and its lower end.
Above-mentioned establishment formula geotechnical grid also has the feature that, the first raddle is identical with the second raddle structure, and It is formed by compiling section by fixture detachable connection.
Above-mentioned establishment formula geotechnical grid, also has the feature that, fixture includes two pieces and is set to two connections for compiling section Place and be relatively arranged on compile section two sides clamping plate, be arranged in it is adjacent two compile section on connection bolt and spiral be connected to connection spiral shell Fixture nut on bolt.
Above-mentioned establishment formula geotechnical grid, also has the feature that, reinforces volume section and is formed by the thick bamboo tube system of cutting, compiles section by bamboo The item system of cutting is formed.
The beneficial effect of above scheme is:
1) raddle, is constrained using shop bolt in the present invention and is staggered to form geotechnical grid, and aforesaid way can be according to pin Position and raddle quantity control cell compartment size, and to meet different construction site demands, and alternating expression structure drainage effect is good;
2), required bamboo cane and thick bamboo tube can gather materials on the spot in the present invention, and processing and fabricating is simply, conveniently, makes acquisition The stretching, extension of raddle structure is good with shrinkage, is readily transported and stores;
3), the establishment formula production of geotechnical grid can reach the practicability of economic utilization in the present invention, avoid the wave of material Take, configuration flexibility is high, has a wide range of application.
Detailed description of the invention
Fig. 1 is the schematic view of the front view of the establishment formula geotechnical grid provided in the embodiment of the present invention;;
Fig. 2 is the partial enlarged view in Fig. 1 at corresponding letter A;
Fig. 3 is the plan structure signal of the establishment formula geotechnical grid provided in the embodiment of the present invention
Fig. 4 is that the structural schematic diagram of section is compiled in the reinforcing provided in the embodiment of the present invention.
In attached drawing: 1, shop bolt;2, the first raddle;3, the second raddle;4, geotechnical grid;5, it reinforces and compiles section;6, section is compiled; 7, clamping plate;8, bolt is connected.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art without creative labor it is obtained it is all its His embodiment, shall fall within the protection scope of the present invention.
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.
The present invention will be further explained below with reference to the attached drawings and specific examples, but not as the limitation of the invention.
As Figure 1-Figure 4, the establishment formula geotechnical grid provided in the embodiment of the present invention, comprising: multiple shop bolts 1, multiple first raddles 2, multiple second raddles 3, the present invention in shop bolt 1 in matrix form arrange, the first raddle 2 rest against calmly On the pin 1 of position and it is bent to form wavy, two raddles are fixed against on shop bolt 1 and are bent to form wavy, and the first raddle 2 It is gone to upper and lower with the second raddle 3 and is staggered and surrounds to form geotechnical grid 4.
The size of geotechnical grid 4 can be controlled by the position of shop bolt 1 in the present invention, and the height of geotechnical grid 4 can be by The number of plies for the raddle being staggered controls, to meet the needs of different construction sites;Meanwhile alternating expression establishment form can also benefit Good drainage effect is realized with the interval staggeredly generated.
The adjacent geotechnical grid unit of every 4 middle left and right of row geotechnical grid that formation is worked out in the present invention can also be set in interval It sets.
The adjacent geotechnical grid unit of every 4 middle left and right of row geotechnical grid that formation is worked out in the present invention can also be in close row Column (specific as shown in Figure 1 and Figure 2), at this point, be enhancing structure stability, it can be after the positioning of shop bolt 1 first with the first raddle 2 woven extent bottoms, recycle the second raddle 3 and the gradually up superposition straggly of the first raddle 2, left and right under this preparation method Adjacent geotechnical grid unit can common sparing raddle.
It may optionally utilize iron wire 7 in the present invention in order to facilitate establishment and shop bolt be fixed at the head and the tail both ends of raddle On 1, and raddle middle part is fixed on shop bolt 1 using tied silk.
The first raddle 2 is identical with 3 structure of the second raddle in the present invention, and passes through folder by the volume section 6 that the bamboo cane system of cutting is formed Tool detachable connection is formed, and is set to the junction of two volume sections 6 specifically, fixture includes two pieces and is relatively arranged on volume section 6 The clamping plate 7 of two sides, the connection bolt 8 being arranged on adjacent two volumes section 6 and spiral are connected to the fixation spiral shell on connection bolt 8 Mother, using fixture to work out the raddle for obtaining and can meeting different construction sites and needing in the present invention.
On the basis of above-mentioned technical proposal, further, it is provided in this embodiment work out geotechnical grid it is red further include have by Thick bamboo tube cut system formed hollow form reinforce compile section 5, the present invention in by setting reinforce compile section 5 with enhance geotechnical grid 4 along by The bearing capacity in power direction, while left and right adjacent two raddle can be prevented to be formed by shear surface in stress, it is in the present invention Convenient for reinforcing the installation for compiling section 5, lower end is in inclined point shape, in wedging construction ground when in order to install.
The above is only preferred embodiments of the present invention, are not intended to limit the implementation manners and the protection scope of the present invention, right For those skilled in the art, it should can appreciate that and all replace with being equal made by description of the invention and diagramatic content It changes and obviously changes obtained scheme, should all be included within the scope of the present invention.

Claims (7)

1. a kind of establishment formula geotechnical grid characterized by comprising multiple shop bolts (1), multiple first raddles (2), multiple Second raddle (3), the shop bolt (1) are arranged in matrix form, and first raddle (2) rests against the shop bolt (1) Go up and be bent to form it is wavy, two raddle be fixed against on the shop bolt (1) and be bent to form it is wavy, and described One raddle (2) and second raddle (3), which are gone to upper and lower, to be staggered and surrounds to form geotechnical grid (4).
2. establishment formula geotechnical grid according to claim 1, which is characterized in that the left and right adjacent geotechnical grid (4) In close-packed arrays.
3. establishment formula geotechnical grid according to claim 1, which is characterized in that the left and right adjacent geotechnical grid (4) It is distributed in distance.
4. establishment formula geotechnical grid according to claim 1-3, which is characterized in that in the geotechnical grid (4) It is also embedded with reinforcing and compiles section (5), it is in inclined point shape that the reinforcing, which compiles section (5) in hollow form and its lower end,.
5. establishment formula geotechnical grid according to claim 4, which is characterized in that first raddle (2) and described second Raddle (3) structure is identical, and is formed by section (6) is compiled by fixture detachable connection.
6. establishment formula geotechnical grid according to claim 5, which is characterized in that the fixture includes two pieces and is set to two institutes It states the junction for compiling section (6) and is relatively arranged on the clamping plate (7) for compiling section (6) two sides, is arranged in adjacent two volume sections (6) connection bolt (8) and spiral on are connected to the fixture nut on connection bolt (8).
7. establishment formula geotechnical grid according to claim 5 or 6, which is characterized in that the reinforcing is compiled section (5) and cut by thick bamboo tube System is formed, and the volume section (6) is formed by the bamboo cane system of cutting.
CN201910284174.8A 2019-04-10 2019-04-10 A kind of establishment formula geotechnical grid Pending CN110055946A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910284174.8A CN110055946A (en) 2019-04-10 2019-04-10 A kind of establishment formula geotechnical grid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910284174.8A CN110055946A (en) 2019-04-10 2019-04-10 A kind of establishment formula geotechnical grid

Publications (1)

Publication Number Publication Date
CN110055946A true CN110055946A (en) 2019-07-26

Family

ID=67318636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910284174.8A Pending CN110055946A (en) 2019-04-10 2019-04-10 A kind of establishment formula geotechnical grid

Country Status (1)

Country Link
CN (1) CN110055946A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855756A (en) * 2022-05-17 2022-08-05 安徽徽风新型合成材料有限公司 Connecting node positioning device for geocell construction

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101302756A (en) * 2008-03-03 2008-11-12 张伯谦 Novel geogrid
CN201598629U (en) * 2010-03-12 2010-10-06 张振武 Integral geocell
KR100995800B1 (en) * 2010-07-30 2010-11-22 최귀봉 The method constructing a bamboo mat easily on the soft clay surface
CN102061689A (en) * 2009-11-13 2011-05-18 仪征市佳和土工材料有限公司 Geocell
CN204471262U (en) * 2015-02-03 2015-07-15 安徽徽风新型合成材料有限公司 A kind of geotechnical grid frock clamp
CN105064316A (en) * 2015-09-18 2015-11-18 张振武 Geocell
CN207498927U (en) * 2017-11-22 2018-06-15 扬州华诚土工材料有限公司 A kind of fixed geotechnical grid

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101302756A (en) * 2008-03-03 2008-11-12 张伯谦 Novel geogrid
CN102061689A (en) * 2009-11-13 2011-05-18 仪征市佳和土工材料有限公司 Geocell
CN201598629U (en) * 2010-03-12 2010-10-06 张振武 Integral geocell
KR100995800B1 (en) * 2010-07-30 2010-11-22 최귀봉 The method constructing a bamboo mat easily on the soft clay surface
CN204471262U (en) * 2015-02-03 2015-07-15 安徽徽风新型合成材料有限公司 A kind of geotechnical grid frock clamp
CN105064316A (en) * 2015-09-18 2015-11-18 张振武 Geocell
CN207498927U (en) * 2017-11-22 2018-06-15 扬州华诚土工材料有限公司 A kind of fixed geotechnical grid

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李志农,陈杰,王翠: "《风积沙路基公路设计施工与防沙》", 30 January 2018, 上海科学技术出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855756A (en) * 2022-05-17 2022-08-05 安徽徽风新型合成材料有限公司 Connecting node positioning device for geocell construction

Similar Documents

Publication Publication Date Title
CN205647362U (en) Large -span prestressing force cable photovoltaic support
CN108999099B (en) Method for transversely limiting and reinforcing middle part of steel trestle and reinforcing device thereof
CN110055946A (en) A kind of establishment formula geotechnical grid
RU181989U1 (en) REINFORCED CONSTRUCTION FROM GABIONS
CN203487487U (en) Anti-collision guardrail structure
CN208009463U (en) A kind of steel-pipe pile concrete bearing platform
CN103031792A (en) Method and device for lifting roadbed settlement of existing road
CN206607602U (en) A kind of new prefabricated section and new type of retaining system
DE102012021697B4 (en) Support system for the stabilization of at least one mast
CN208981043U (en) Municipal Road Engineering roadbed
CN202635219U (en) Assembly type sunlight greenhouse where photovoltaic panel is installed
CN210177523U (en) Ecological bank protection drainage structures of prefabricated assembled
CN107245995B (en) Sand fixation and greening method based on wind-solar hybrid power station
CN203307794U (en) Steel bar reinforced geocell
CN211047931U (en) Ecological vegetation ordered growth comprehensive treatment device
CN201982123U (en) Anchor mesh ladder and single body combined roadway support device for working face open-off cut of coal mine
CN205638493U (en) Mine tunnel prevents pucking and struts mode
CN212316830U (en) Hydraulic engineering is with ecological slope protection brick of concatenation formula
CN209636661U (en) A kind of band buffer system is huge-truss bars concrete protection hangar tunnel
CN210636556U (en) Quick assembly disassembly recycles interim escape canal
CN208309616U (en) A kind of assembled prefabricated house prefabricated foundation that piece is staggered
CN107227869B (en) Sand fixation and greening system based on wind-solar hybrid power station
CN206181913U (en) Grass -planting grid
CN211849283U (en) Vegetation protection slope reinforcing structure
CN220301254U (en) Ecological water conservancy bank protection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190726