CN110042819A - A kind of marine converter station for flexible HVDC transmission system - Google Patents

A kind of marine converter station for flexible HVDC transmission system Download PDF

Info

Publication number
CN110042819A
CN110042819A CN201910302415.7A CN201910302415A CN110042819A CN 110042819 A CN110042819 A CN 110042819A CN 201910302415 A CN201910302415 A CN 201910302415A CN 110042819 A CN110042819 A CN 110042819A
Authority
CN
China
Prior art keywords
room
floor
superstructure
equipment
converter station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910302415.7A
Other languages
Chinese (zh)
Other versions
CN110042819B (en
Inventor
俞华锋
杨建军
吕国儿
孙震洲
张栋梁
陶安
袁建平
杨文斌
陈晴
傅春翔
杨林刚
许峥
颜加明
於刚节
徐小龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201910302415.7A priority Critical patent/CN110042819B/en
Publication of CN110042819A publication Critical patent/CN110042819A/en
Application granted granted Critical
Publication of CN110042819B publication Critical patent/CN110042819B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0017Means for protecting offshore constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0017Means for protecting offshore constructions
    • E02B17/0026Means for protecting offshore constructions against corrosion
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/04Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
    • E02B17/06Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for immobilising, e.g. using wedges or clamping rings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • E04H5/04Transformer houses; Substations or switchgear houses
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M7/00Conversion of AC power input into DC power output; Conversion of DC power input into AC power output
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/20Modifications to facilitate cooling, ventilating, or heating

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
  • Gas-Insulated Switchgears (AREA)

Abstract

本发明提供了一种用于柔性直流输电系统的海上换流站,包括封闭式的上部结构和用于承托上部结构的基础结构;上部结构包括并排设置的大空间主厂房和小空间的副厂房;主厂房分为上下两层,其中上层设置有限流电抗器、直流场设备、换流变压器、高压开关设备、厂用电系统和应急柴油机,下层设置有换流阀和桥臂电抗器;副厂房共有六层,一层设有海水泵房和阀冷却设备,二层设有海水处理设备,三层设置阀控制室,四层设置消防设备,五层设置正压通风设备,六层设置站控制室;上部结构总体对称设置,基础结构为导管架且中间预留有供驳船进出的通道。该技术方案布置紧凑合理、运行安全可靠、适应海洋环境条件和海上施工特点。

The invention provides an offshore converter station for a flexible direct current transmission system, which includes a closed superstructure and a basic structure for supporting the superstructure; the superstructure includes a large-space main powerhouse and a small-space auxiliary structure arranged side by side. Factory building; the main factory building is divided into upper and lower layers, of which the upper layer is equipped with current limiting reactor, DC field equipment, converter transformer, high-voltage switchgear, power system and emergency diesel engine, and the lower layer is equipped with converter valve and bridge arm reactor; The auxiliary workshop has six floors. The first floor is equipped with seawater pump room and valve cooling equipment, the second floor is equipped with seawater treatment equipment, the third floor is equipped with valve control room, the fourth floor is equipped with fire fighting equipment, the fifth floor is equipped with positive pressure ventilation equipment, and the sixth floor is equipped with Station control room; the superstructure is generally symmetrically arranged, the basic structure is the jacket and the passage for the barge to enter and exit is reserved in the middle. The technical scheme is compact and reasonable in layout, safe and reliable in operation, and adapts to marine environmental conditions and offshore construction characteristics.

Description

一种用于柔性直流输电系统的海上换流站An offshore converter station for flexible DC transmission system

技术领域technical field

本发明涉及一种用于柔性直流输电系统的海上换流站。The invention relates to an offshore converter station for a flexible direct current transmission system.

背景技术Background technique

海上风力发电是一个新兴的产业,近几年发展迅速,但目前我国海上风电场离岸距离一般都在30km以内,所以目前我国海上风电的电能都是通过交流海缆输出。随着海上风电向更大规模、更远距离发展,一般情况下,当海上风电场离岸距离超过60km时,显然传统的交流输电方式已不经济,此时应考虑适用于大容量、远距离电能传输的直流输电的方式。随着传输距离需求越来越远、传输容量需求越来越大,直流输电将在海上风电场的开发利用中起到重要作用采用直流输电的海上风电场,就需要建设海上换流站,海上换流站是将海上风电场的电能用交流线路汇集、然后转换成直流输出的装置。Offshore wind power generation is an emerging industry, which has developed rapidly in recent years. However, the offshore wind farms in my country are generally within 30km of the coast. Therefore, the electrical energy of offshore wind power in my country is currently output through AC submarine cables. With the development of offshore wind power to a larger scale and a longer distance, in general, when the offshore wind farm is more than 60km away from the shore, it is obvious that the traditional AC transmission method is no longer economical. Direct current transmission method of electrical energy transmission. With the increasing demand for transmission distance and transmission capacity, DC transmission will play an important role in the development and utilization of offshore wind farms. Offshore wind farms using DC transmission need to build offshore converter stations. The converter station is a device that collects the electric energy of the offshore wind farm with an AC line and then converts it into a DC output.

我国陆上直流输电领域已发展多年,已建成有数座陆上换流站。常规的陆上换流站,一般按照交流变换直流的工艺流程,设置有换流变压器、高压开关、桥臂电抗器、换流阀、限流电抗器、直流场等设备,换流变压器一般布置在室外,其余设备则设置在一列单层厂房内。但由于海上换流站建造方法和所处环境有所差异,需要考虑比如海水海风的腐蚀、电器设备的冷却问题、换流站的占地面积以及承重能力、设备搬运维护的方便性、换流站安装方式等等问题,导致其布置方案、结构型式、冷却方式等都必不相同。因此,陆上换流站已无法提供借鉴启示。The field of onshore HVDC power transmission in my country has been developed for many years, and several onshore converter stations have been built. Conventional onshore converter stations are generally equipped with converter transformers, high-voltage switches, bridge arm reactors, converter valves, current limiting reactors, DC fields and other equipment according to the process flow of AC to DC. The converter transformers are generally arranged Outdoors, the rest of the equipment is set up in a row of single-storey workshops. However, due to the differences in the construction method and environment of the offshore converter station, it is necessary to consider such as the corrosion of seawater and sea breeze, the cooling problem of electrical equipment, the area and load-bearing capacity of the converter station, the convenience of equipment handling and maintenance, and the Problems such as the installation method of the station, etc., lead to different layout plans, structural types, cooling methods, etc. Therefore, the onshore converter station has been unable to provide inspiration.

现有的固定式海上换流站的技术方案中,有一些由于其空间设计和各设备放置形式的问题,使得换流变压器、高压开关等设备搬运难从而设置了大量的搬运通道,导致空间浪费、换流站整体占地面积大,而且换流变压器检修较为不便。同时,该技术是在最外侧的一排柱与基础连接,其连接刚度过小,结构跨度过大。也有一些,其虽然改进了设备的布置方式降低了成本,但是空间容纳的设备电器较少导致换流站功能性单一,一旦出现故障等问题无法应对、持续运行条件差。尤为关键的是,上述技术方案中均没有明确或妥善地考虑结构重量对称性的问题,各层结构在水平面呈矩形布置。在这两个方案中,如果对换流变压器、高压开关以及其他暖通和给排水设备等进行细化布置,将必然导致其结构仅能做到在水平面的短边方向上无偏心,而在长边方向上重心将严重偏向具有较多夹层或更高楼层的一侧(海上换流站上部组块总重量约2万吨,上述方案偏心至少可达5m,则在静力工况下的倾覆力矩就将达到10万吨米),进而增加桩基础、导管架以及上部组块框架在海洋环境荷载工况下的设计与施工难度,显著提升工程造价,无实际应用的可行性。In the existing technical solutions of fixed offshore converter stations, some problems in the space design and placement of various equipment make it difficult to transport converter transformers, high-voltage switches and other equipment, so a large number of transport channels are set up, resulting in a waste of space. , The overall area of the converter station is large, and the maintenance of the converter transformer is relatively inconvenient. At the same time, the technology is to connect the outermost row of columns with the foundation, the connection stiffness is too small, and the structural span is too large. There are also some, although the layout of the equipment has been improved to reduce the cost, but the space accommodates less equipment and electrical appliances, resulting in a single function of the converter station, which cannot be dealt with in the event of a failure, and the continuous operating conditions are poor. More importantly, none of the above-mentioned technical solutions explicitly or properly consider the problem of structural weight symmetry, and each layer structure is arranged in a rectangular shape on the horizontal plane. In these two schemes, if the converter transformers, high-voltage switches and other HVAC and water supply and drainage equipment are arranged in detail, it will inevitably lead to the structure that can only achieve no eccentricity in the direction of the short side of the horizontal plane. In the long-side direction, the center of gravity will be seriously deviated to the side with more interlayers or higher floors (the total weight of the upper block of the offshore converter station is about 20,000 tons, and the eccentricity of the above scheme can reach at least 5m, then under static conditions The overturning moment will reach 100,000 tons), which will increase the design and construction difficulty of the pile foundation, jacket and upper block frame under the load conditions of the marine environment, significantly increase the project cost, and have no feasibility of practical application.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于克服现有技术中存在的缺点,提供一种布置紧凑合理、运行安全可靠、适应海洋环境条件和海上施工特点的用于柔性直流输电系统的海上换流站。The purpose of the present invention is to overcome the shortcomings in the prior art, and to provide an offshore converter station for a flexible DC power transmission system that is compact and reasonable in arrangement, safe and reliable in operation, and adaptable to marine environmental conditions and offshore construction characteristics.

为了实现上述目的,本发明采用的技术方案如下:In order to achieve the above object, the technical scheme adopted in the present invention is as follows:

一种用于柔性直流输电系统的海上换流站,包括封闭式的上部结构和用于承托上部结构的基础结构;上部结构包括并排设置的大空间主厂房和小空间的副厂房;主厂房分为上下两层,其中上层设置有限流电抗器、直流场设备、换流变压器、高压开关设备、厂用电系统和应急柴油机,下层设置有换流阀和桥臂电抗器;副厂房共有六层,一层设有海水泵房和阀冷却设备,二层设有海水处理设备,三层设置阀控制室,四层设置消防设备,五层设置正压通风设备,六层设置站控制室;上部结构总体对称设置,基础结构为导管架且中间预留有供驳船进出的通道。An offshore converter station for a flexible direct current transmission system includes a closed superstructure and a base structure for supporting the superstructure; the superstructure includes a large-space main powerhouse and a small-space auxiliary powerhouse arranged side by side; the main powerhouse It is divided into upper and lower layers. The upper layer is equipped with current-limiting reactors, DC field equipment, converter transformers, high-voltage switchgear, plant power systems and emergency diesel engines, and the lower layer is equipped with converter valves and bridge arm reactors. There are six auxiliary workshops. The first floor is equipped with seawater pump room and valve cooling equipment, the second floor is equipped with seawater treatment equipment, the third floor is equipped with valve control room, the fourth floor is equipped with fire-fighting equipment, the fifth floor is equipped with positive pressure ventilation equipment, and the sixth floor is equipped with a station control room; The upper structure is generally symmetrically arranged, the base structure is a jacket and a passage for the barge to enter and exit is reserved in the middle.

本技术方案中的副厂房的布置综合考虑了使用性与结构性的统一,理由如下:(1)海水处理与冷却设备间设置在一、二层,便于在海上就近收取海水;(2)阀控制室布置在下层,可以保证与阀厅之间的线路最短,可有效减少线路损失;(3)消防设备间设置在整个换流站的中间甲板层,便于覆盖全站内的消防需要;(4)正压通风设备室设置在上层的中间层(五层),能最大程度地起到对变压器等主变电设备的散热效果;(5)体量最小、鲁棒性最好的站控制室设置在最高层,不致影响其他设备功能间;(6)特别的,根据本发明的布置方案,总体上副厂房的房间自下至上重量逐渐减轻,尤其利于结构抗震和减振。The layout of the auxiliary powerhouse in this technical scheme comprehensively considers the unification of usability and structure, and the reasons are as follows: (1) The seawater treatment and cooling equipment are arranged on the first and second floors, which is convenient for collecting seawater near the sea; (2) Valves The control room is arranged on the lower floor, which can ensure the shortest line with the valve hall and can effectively reduce the line loss; (3) The fire equipment room is arranged on the middle deck layer of the whole converter station, which is convenient to cover the fire protection needs of the whole station; (4) ) The positive pressure ventilation equipment room is set on the middle layer (five layers) of the upper layer, which can maximize the heat dissipation effect on the main substation equipment such as transformers; (5) The station control room with the smallest volume and the best robustness It is arranged on the highest floor and will not affect other equipment function rooms; (6) In particular, according to the layout scheme of the present invention, the weight of the rooms of the auxiliary factory building is gradually reduced from bottom to top, which is especially beneficial to structural earthquake resistance and vibration reduction.

并且,通过这种创新的空间布局划分,不仅保障了必要的结构刚度和重量的对称性,而且使得海上换流站功能最大化;其还能够实现海上换流站平面内两个水平方向维度的尽量接近正方形;并且将阀厅置于下层,可以大大有利于施工组织与基础、构件、节点等的设计,全方位提升了工程的经济性。Moreover, through this innovative space layout division, not only the necessary structural rigidity and weight symmetry are guaranteed, but also the function of the offshore converter station is maximized; it can also realize the two horizontal dimensions in the plane of the offshore converter station. It is as close as possible to the square; and the valve hall is placed on the lower level, which can greatly benefit the construction organization and the design of foundations, components, nodes, etc., and improve the economy of the project in an all-round way.

进一步的,上部结构的下层通过壁板间隔成两个对称且大跨度的阀厅以及两个对称的桥臂电抗器室,换流阀和桥臂电抗器分别放置在对应的室内,阀厅的上层设置钢杵架;其中,阀厅紧邻所述副厂房,阀厅和桥臂电抗器室的交界处还设有电缆接头室。Further, the lower layer of the superstructure is separated into two symmetrical and large-span valve halls and two symmetrical bridge arm reactor chambers through the wall plates. The converter valve and the bridge arm reactor are respectively placed in the corresponding chambers. A steel pestle frame is arranged on the upper layer; wherein, the valve hall is adjacent to the auxiliary workshop, and a cable joint room is also provided at the junction of the valve hall and the bridge arm reactor room.

进一步的,上部结构的上层通过壁板和T字过道分隔成紧邻副厂房的第一区域以及彼此间隔相对的第二区域和第三区域;第一区域呈十字型分隔为两间对称的限流电抗器室和两间对称的直流室;第二区域和第三区域格局相似,均划分为一侧一个面积较大的电气室和另一侧三个面积较小的隔间,中间的隔间均布置换流变压器;第二区域的电气室放置220V高压开关,其余两隔间分别放置应急柴油机和备用补偿电抗器;第三区域的电气室放置厂用电系统,其余两隔间分别放320V高压开关和临时设备。Further, the upper layer of the superstructure is divided into a first area adjacent to the auxiliary factory building and a second area and a third area opposite to each other by the wall plate and the T-shaped aisle; the first area is divided into two symmetrical current limiting in a cross shape. The reactor room and two symmetrical DC rooms; the second area and the third area are similar in pattern, and they are divided into an electrical room with a larger area on one side and three compartments with a smaller area on the other side. Converter transformers are arranged in all areas; 220V high-voltage switch is placed in the electrical room of the second area, and emergency diesel engines and backup compensation reactors are placed in the other two compartments respectively; the electrical room in the third area is placed with the factory power system, and the other two compartments are placed with 320V High voltage switches and temporary equipment.

这种优化的空间布局方式,可以保证平面布置方案在Y方向上基本对称,X方向上将重量更大的换流变压器室、电抗器室和直流室布置在了尽量靠近平面形心的位置,有效降低了结构偏心量;而且设备功能间及其配套房间按照从交流到直流转化的功能顺序布置,电缆和其他管路的路由最短。This optimized space layout method can ensure that the plane layout plan is basically symmetrical in the Y direction. In the X direction, the heavier converter transformer room, reactor room and DC room are arranged as close to the plane centroid as possible. The eccentricity of the structure is effectively reduced; and the equipment function rooms and their supporting rooms are arranged in the functional sequence from AC to DC conversion, and the routing of cables and other pipelines is the shortest.

进一步的,副厂房的一层和二层均划分为四个依次排列的隔间,一层中间的两个隔间为阀冷却室且其余端部两间为海水泵房,二层中间的两个隔间为冷却水池且其余两间为水处理室,使得换流阀拥有借助冷却液冷却的内冷系统和借助海水循环的外冷系统;三层划分为两个隔间,分别为阀控制室和通风机房;第四层依次并列划分为蓄电池室、二次设备室、消防水池和消防泵房;五层依次划分为柴油油罐室、泡沫灭火室和通风机房;六层划分为柴油发电机室、站控制室和其他设备室。Further, the first and second floors of the auxiliary powerhouse are divided into four compartments arranged in sequence, the two compartments in the middle of the first floor are valve cooling rooms, the other two end rooms are seawater pump rooms, and the two compartments in the middle of the second floor are the valve cooling rooms. One compartment is a cooling pool and the other two are water treatment chambers, so that the converter valve has an internal cooling system cooled by cooling liquid and an external cooling system relying on seawater circulation; the third floor is divided into two compartments, which are valve control. Room and ventilator room; the fourth floor is divided into battery room, secondary equipment room, fire pool and fire pump room in sequence; the fifth floor is divided into diesel oil tank room, foam fire extinguishing room and ventilator room; the sixth floor is divided into diesel power generation Engine room, station control room and other equipment room.

进一步的,主厂房的下层对应副厂房的一至三层,主厂房的上层对应副厂房的四至六层;主厂房的上层和下层的部分之间还设有电缆夹层。Further, the lower layer of the main factory building corresponds to the first to third floors of the auxiliary factory building, and the upper layer of the main factory building corresponds to the fourth to sixth floors of the auxiliary factory building; there is also a cable interlayer between the upper layer and the lower layer of the main factory building.

进一步的,上部结构采用空间桁架结构,其中纵向设置三道钢桁架,同时横向也设置多道钢桁架;弦杆采用强H型或箱型结构。Further, the upper structure adopts a space truss structure, in which three steel trusses are arranged longitudinally, and multiple steel trusses are also arranged horizontally; the chord adopts a strong H-shaped or box-shaped structure.

进一步的,上部结构的底部每榀纵向桁架设置有若干运行期支座,在运行期支座的内侧每榀纵向桁架设置有运输期支座;运行期支座和运输期支座内部均设置有橡胶或/和砂石。Further, each longitudinal truss at the bottom of the superstructure is provided with a number of supports during the operation period, and each longitudinal truss inside the support during the operation period is provided with a support during the transportation period; the supports during the operation period and inside the supports during the transportation period are provided with Rubber or/and gravel.

进一步的,上部结构的四周设有搬运通道,搬运通道的端头设有上下升降的重型电梯;高压开关设备以及换流变压器的屋顶设置吊物孔。Further, the upper structure is provided with a handling passage around the upper structure, and the end of the handling passage is provided with a heavy lift that lifts up and down; hanging objects are provided on the roof of the high-voltage switchgear and the converter transformer.

进一步的,上部结构的封闭材料采用钢板和防火棉的组合。Further, the closing material of the upper structure adopts the combination of steel plate and fireproof cotton.

本发明还解决了另一个问题,提供一种适用于该结构的安装方法,其安装步骤包括:The present invention also solves another problem, and provides an installation method suitable for the structure, the installation steps of which include:

首先,先在现场安装好海上换流站的基础结构,基础结构中间预留可供驳船进出的通道,基础结构的位置与海上换流站的运行期支座对应;其次,将海上换流站的上部结构作为整体在陆上加工制造,将高压开关和换流变压器吊运进上部结构中,其他设备通过搬运通道安装,最后用驳船运输至现场;再次,驳船负载海上换流站上部结构进入基础结构中间的通道,并使运行期支座与基础结构的位置一一对应;并利用落潮或给驳船注水下沉,将上部结构对接到基础结构上;再次,将运输驳船与上部结构分离,驳船驶出基础结构中间的通道,上部结构重量由支座完全转移到基础结构上;最后,将上部结构和基础结构焊接,完成整体的安装。First, install the basic structure of the offshore converter station on the site, and reserve a passage for the barge to enter and leave the middle of the basic structure. The position of the basic structure corresponds to the support during the operation period of the offshore converter station; The superstructure is processed and manufactured onshore as a whole, the high-voltage switch and converter transformer are hoisted into the superstructure, other equipment is installed through the handling channel, and finally transported to the site by barge; again, the superstructure of the barge-loaded offshore converter station enters the The channel in the middle of the base structure, and make the position of the support and the base structure correspond one-to-one during operation; and use the ebb tide or the barge to sink, connect the superstructure to the base structure; again, separate the transport barge from the superstructure, The barge goes out of the channel in the middle of the base structure, and the weight of the superstructure is completely transferred from the support to the base structure; finally, the superstructure and the base structure are welded to complete the overall installation.

本发明的有益效果:Beneficial effects of the present invention:

(1)通过空间分隔的优化和平面布置的合理化,使得本发明的海上换流站占用面积小的同时还能够容纳除基本设备以外的多种其他功能性设备,结构紧凑,为换流站适应海上环境长期维持稳定性和可靠性提供保证;并且,整体对称的设计有利于后续采用浮托法安装,不仅解决了海上换流站整体重量超过起重船的起重能力的问题,实现了海上换流站的整体安装,而且也保证了运输期和运行期的稳定。(1) Through the optimization of space separation and the rationalization of plane layout, the offshore converter station of the present invention occupies a small area and can also accommodate a variety of other functional equipment in addition to the basic equipment. The structure is compact and suitable for the converter station. The long-term stability and reliability of the offshore environment are guaranteed; and the overall symmetrical design is conducive to the subsequent installation by the float-over method, which not only solves the problem that the overall weight of the offshore converter station exceeds the lifting capacity of the crane vessel, but also realizes the offshore The overall installation of the converter station also ensures the stability of the transportation period and the operation period.

(2)采用封闭式布置,利用钢板和防火棉组合既可以隔绝外界的腐蚀性气体,防止电气设备被海洋环境腐蚀,又可以防火和隔热,辅助保证设备长期运行的可靠性和耐久性。(2) The closed layout is adopted, and the combination of steel plate and fireproof cotton can not only isolate the corrosive gas from the outside world, prevent the electrical equipment from being corroded by the marine environment, but also can prevent fire and heat insulation, and help ensure the reliability and durability of the long-term operation of the equipment.

(3)本技术方案充分利用海上换流站四周大量海水的有利环境,抽取海水作为换热媒介,结合传统的冷却液冷却技术,有效达到在封闭环境中高效冷却的目的,保证设备的正常工作。(3) This technical solution makes full use of the favorable environment of a large amount of seawater around the offshore converter station, extracts seawater as a heat exchange medium, and combines the traditional cooling liquid cooling technology to effectively achieve the purpose of efficient cooling in a closed environment and ensure the normal operation of the equipment. .

(4)采用屋顶起吊大件设备和普通设备运输通道搬运的结合方式,一方面解决了由于高压开关、换流变压器重量大、尺寸大,传统水平运输非常困难、所需的运输通道也大的问题,另一方面水平和竖向交通运输通道有利于设备日常维护和搬运的便捷性。(4) The combination of roof hoisting large equipment and common equipment transportation channel handling, on the one hand, solves the problem that due to the high weight and large size of high-voltage switches and converter transformers, traditional horizontal transportation is very difficult, and the required transportation channels are also large. On the other hand, horizontal and vertical transportation channels are conducive to the convenience of daily maintenance and transportation of equipment.

(5)本技术采用了空间桁架结构的技术方案,在海上换流站的外侧设置运行期支座,运行期支座采用双支座,在运行期支座的内侧,设置了运输期支座。海上换流由于中间预留了驳船通道,一般有50m左右的大跨越,这种技术可以有效的解决了结构大跨越问题。同时,运行期支座可以采用双支座,辅助保证了运行期结构刚度,使整体结构可以有效抵抗运行期风、浪、地震等水平作用力。(5) This technology adopts the technical scheme of the space truss structure, and the support during the operation period is set on the outside of the offshore converter station. The double support is used for the support during the operation period, and the support during the transportation period is set on the inner side of the support during the operation period. . Since the barge channel is reserved in the middle of the offshore converter, there is generally a large span of about 50m. This technology can effectively solve the problem of the large span of the structure. At the same time, the support during operation can be double-supported to help ensure the structural rigidity during operation, so that the overall structure can effectively resist horizontal forces such as wind, waves and earthquakes during operation.

(6)对称且空间紧凑占用小的特点配合浮托法安装技术,有效解决了海上换流站整体重量超过起重船的起重能力的问题,实现了海上换流站的整体安装。(6) The features of symmetry, compact space and small occupation are combined with the floating-over installation technology, which effectively solves the problem that the overall weight of the offshore converter station exceeds the lifting capacity of the crane vessel, and realizes the overall installation of the offshore converter station.

附图说明Description of drawings

图1为本发明的主厂房下层平面布置图。FIG. 1 is a plan view of the lower floor of the main factory building of the present invention.

图2为本发明的主厂房上层平面布置图。FIG. 2 is a plan view of the upper floor of the main factory building of the present invention.

图3为本发明纵剖面示意图。Figure 3 is a schematic diagram of a longitudinal section of the present invention.

图4为本发明主视图纵剖面示意图。4 is a schematic longitudinal cross-sectional view of the front view of the present invention.

图5为本发明上部结构第一层空间平面布置图。FIG. 5 is a spatial plan view of the first floor of the superstructure of the present invention.

图6为本发明副厂房第二层空间平面布置图。FIG. 6 is a plan view of the second floor space of the auxiliary factory building of the present invention.

图7为本发明副厂房第三层空间平面布置图。FIG. 7 is a spatial plan view of the third floor of the auxiliary factory building of the present invention.

图8为本发明上部结构第四层空间平面布置图。FIG. 8 is a spatial plan view of the fourth floor of the superstructure of the present invention.

图9为本发明上部结构第五层空间平面布置图。Fig. 9 is a spatial plan view of the fifth floor of the superstructure of the present invention.

图10为本发明上部结构第六层空间平面布置图。FIG. 10 is a spatial plan view of the sixth floor of the superstructure of the present invention.

图11为本发明的立面图。Figure 11 is an elevation view of the present invention.

具体实施方式Detailed ways

下面结合附图对本发明作进一步的描述。The present invention will be further described below in conjunction with the accompanying drawings.

参照附图。Refer to attached drawings.

本实施例为一个1200MW规模的海上换流站,其交流端连接了3个各400MW的海上风电场,这3个海上风电场分别通过2回220kV交流海缆汇集到交流高压开关室,通过换流后将220kV交流转换为±320kV直流,通过1回±320kV直流海缆送出。本实施例平面尺寸92m×72m,主厂房二层布置,总高度36m,整个换流站总重约1.9万吨。This example is an offshore converter station with a scale of 1200MW, and its AC end is connected to three offshore wind farms of 400MW each. After the flow, the 220kV AC is converted into ±320kV DC, and sent out through a ±320kV DC submarine cable. The plane size of this embodiment is 92m×72m, the main workshop is arranged on the second floor, the total height is 36m, and the total weight of the entire converter station is about 19,000 tons.

参照附图。本发明设有封闭式的上部结构1和用于承托上部结构的基础结构2。其中,上部结构1整体呈长方体形且整体格局和设备布置大体左右对称。上部结构1分为并排设置的大空间主厂房10和小空间的副厂房11。主厂房10分为上下两层,其中下层通过壁板间隔成两个左右对称且大跨度的阀厅100以及两个左右对称且紧邻阀厅的桥臂电抗器室101,换流阀20和桥臂电抗器21分别放置在对应的室内,阀厅的上层设置钢杵架200,以保证阀厅100的大跨度结构稳定。阀厅100紧邻所述副厂房11,阀厅100和桥臂电抗器室101的交界处还设有电缆接头室102。Refer to attached drawings. The present invention is provided with a closed superstructure 1 and a base structure 2 for supporting the superstructure. Wherein, the upper structure 1 is in the shape of a rectangular parallelepiped as a whole, and the overall pattern and equipment arrangement are generally left-right symmetrical. The superstructure 1 is divided into a large-space main plant 10 and a small-space sub-plant 11 arranged side by side. The main building 10 is divided into upper and lower layers, wherein the lower layer is separated into two left-right symmetrical and large-span valve halls 100 and two left-right symmetrical bridge arm reactor chambers 101 adjacent to the valve halls, the converter valve 20 and the bridge The arm reactors 21 are respectively placed in the corresponding rooms, and the upper layer of the valve hall is provided with a steel pestle frame 200 to ensure the large-span structure of the valve hall 100 is stable. The valve hall 100 is adjacent to the auxiliary workshop 11 , and a cable joint chamber 102 is also provided at the junction of the valve hall 100 and the bridge arm reactor chamber 101 .

上部结构1的上层则设置有限流电抗器28、直流场设备22、换流变压器23、高压开关设备、厂用电系统26和应急柴油机27。具体地,上层通过壁板和T字过道分隔成紧邻副厂房的第一区域以及彼此间隔相对的第二区域和第三区域。第一区域呈十字型分隔为两间左右对称的限流电抗器室103和两间左右对称的直流室104,因此,在平面上正负限流电抗器28分开且对称布置,一方面有利于减少彼此之间的干扰,另一方面有利于整体结构的对称性使得换流站运行长期稳定。第二区域和第三区域格局相似,均划分为一侧一个面积较大的电气室105和另一侧三个面积较小的隔间106,三个小隔间106临近直流室104。其中,在处于中间的隔间里均布置换流变压器;第二区域的电气室放置220V高压开关24,其余两隔间分别放置应急柴油机27和备用补偿电抗器;第三区域的电气室放置厂用电系统26,其余两隔间分别放320V高压开关25和临时设备。在第三区域的电气室和三个小隔间之间还设有搬运通道108。The upper layer of the superstructure 1 is provided with a current-limiting reactor 28 , a DC field device 22 , a converter transformer 23 , a high-voltage switchgear, a factory power system 26 and an emergency diesel engine 27 . Specifically, the upper floor is divided into a first area adjacent to the auxiliary factory building and a second area and a third area opposite to each other at intervals by the wall panels and the T-shaped aisle. The first area is divided into two symmetrical current limiting reactor chambers 103 and two left and right symmetrical DC chambers 104 in a cross shape. Therefore, the positive and negative current limiting reactors 28 are separated and symmetrically arranged on the plane. On the one hand, it is beneficial to Reducing the interference between each other, on the other hand, is beneficial to the symmetry of the overall structure, which makes the converter station run stably for a long time. The second area and the third area are similar in structure, and are divided into an electrical room 105 with a larger area on one side and three compartments 106 with a smaller area on the other side, and the three small compartments 106 are adjacent to the DC room 104 . Among them, converter transformers are arranged in the middle compartment; 220V high-voltage switch 24 is placed in the electrical room of the second area, and emergency diesel engines 27 and backup compensation reactors are placed in the other two compartments respectively; the electrical room of the third area is placed with factory The electricity system 26, and the other two compartments are respectively placed with 320V high-voltage switches 25 and temporary equipment. There is also a transport channel 108 between the electrical room in the third area and the three cubicles.

副厂房11共有六层,其中一至三层对应主厂房的一层,四至六层则对应主厂房的二层。副厂房的一层和二层均划分为四个依次排列的隔间,一层31中间的两个隔间为阀冷却室110且其余端部两间为海水泵房111,阀冷却室110内安装阀冷却设备,海水泵房111用于抽取海水作为换热媒介。二层32中间的两个隔间为冷却水池120且其余端头两间为水处理室121,水处理室121內设有海水处理设备,用于去除海水中的海生物、固体废弃物等杂质。由此,该设计可以利用海上换流站四周大量海水的有利环境,抽取海水作为换热媒介,以达到高效冷却的目的。结合冷却液冷却技术,形成内冷和外冷两套独立的系统。具体地,在内冷系统和外冷系统之间设置热交换器。内冷系统采用纯净的冷却液,进入阀体内部将阀体热量带出,输送到热交换装置。在换流阀一侧设置换热器,将换流阀的冷却液和换热海水都接入到换热器,在换热器内实现热交换后再将被加热后的海水排入大海。当然,站内其他的大型发热设备,如换流变压器也同样采用海水冷却的技术实现冷却,从而提高换流站内的散热效果且环保的同时还降低冷却成本。The auxiliary factory building 11 has six floors, of which the first to third floors correspond to the first floor of the main factory building, and the fourth to sixth floors correspond to the second floor of the main factory building. The first and second floors of the auxiliary powerhouse are divided into four compartments arranged in sequence. The two compartments in the middle of the first floor 31 are the valve cooling room 110 and the other two end rooms are the sea water pump room 111. Inside the valve cooling room 110 Valve cooling equipment is installed, and the seawater pump house 111 is used to extract seawater as a heat exchange medium. The two compartments in the middle of the second floor 32 are the cooling pools 120 and the other two are the water treatment chambers 121. The water treatment chambers 121 are provided with seawater treatment equipment for removing impurities such as marine organisms and solid wastes in the seawater. . Therefore, the design can take advantage of the favorable environment of a large amount of seawater around the offshore converter station, and extract seawater as a heat exchange medium to achieve the purpose of efficient cooling. Combined with coolant cooling technology, two independent systems of inner cooling and outer cooling are formed. Specifically, a heat exchanger is provided between the inner cooling system and the outer cooling system. The internal cooling system uses pure coolant, which enters the valve body to take the heat out of the valve body and transport it to the heat exchange device. A heat exchanger is set on one side of the exchange valve, and the cooling liquid of the exchange valve and the heat exchange seawater are connected to the heat exchanger. After the heat exchange is realized in the heat exchanger, the heated seawater is discharged into the sea. Of course, other large heating equipment in the station, such as converter transformers, are also cooled by seawater cooling technology, thereby improving the heat dissipation effect in the converter station and reducing the cooling cost while being environmentally friendly.

副厂房的三层33划分为大小一致的两个隔间,分别为阀控制室130和通风机房131,通风机房131采用正压通风系统通,保证封闭空间内空气的流通和空气的质量,正压通风系统可采用现有技术比如专利ZL201410553826.0中所公开的。第四层34则依次并列划分为蓄电池室140、二次设备室141、消防水池142和消防泵房143,为换流站出现火灾隐患时做好准备,提高运行安全性。五层35则依次划分为柴油油罐室150、泡沫灭火室151和通风机房152,多个通风机房的设置可以辅助提高换流站内的空气流动。六层36划分为柴油发电机室160、站控制室161和其他设备室162。蓄电池和发电机的设置,可以应急断电状况。The third floor 33 of the auxiliary factory building is divided into two compartments of the same size, namely the valve control room 130 and the ventilation machine room 131. The ventilation machine room 131 adopts a positive pressure ventilation system to ensure the air circulation and air quality in the enclosed space. The plenum system can adopt the prior art such as disclosed in patent ZL201410553826.0. The fourth floor 34 is divided into a battery room 140, a secondary equipment room 141, a fire pool 142 and a fire pump room 143 in parallel in order to prepare the converter station for potential fire hazards and improve operational safety. The fifth floor 35 is sequentially divided into a diesel oil tank room 150, a foam fire extinguishing room 151 and a ventilation machine room 152. The arrangement of multiple ventilation machine rooms can help improve the air flow in the converter station. Sixth floor 36 is divided into diesel generator room 160 , station control room 161 and other equipment room 162 . The battery and generator settings can be used for emergency power outages.

主厂房的上层和下层的部分之间还设有电缆夹层107。电缆夹层107主要设置在主厂房上层的第二区域和第三区域下方,以充分利用空间且不对大体积设备的放置造成空间拥挤。电缆夹层107可以和主厂房下层的电缆接头室102联通。A cable interlayer 107 is also provided between the upper and lower parts of the main building. The cable interlayer 107 is mainly arranged under the second area and the third area on the upper floor of the main building, so as to make full use of the space and not cause space crowding for the placement of large-volume equipment. The cable interlayer 107 can communicate with the cable joint room 102 on the lower floor of the main building.

为了减少海上环境对设备的腐蚀,需要将海上换流站四周封闭,封闭材料采用钢板和防火棉的组合材料,这样既可以隔绝外界的腐蚀性气体,又同时可以防火和隔热。In order to reduce the corrosion of the equipment in the offshore environment, it is necessary to seal the offshore converter station around, and the sealing material is a combination of steel plate and fireproof cotton, which can not only isolate the corrosive gas from the outside, but also prevent fire and heat insulation.

为了提高换流站的强度,上部结构1采用空间桁架结构,其中纵向设置三道钢桁架,同时横向也设置多道钢桁架;弦杆采用强H型或箱型结构,实现大跨度跨域。这种结构不仅建造方便,而且用料经济、造型美观、无困难,可以有效降低海上工程的成本。特别的,在上部结构的底部每榀纵向桁架设置有4个运行期支座41,对称设置,保证了运行期纵向结构刚度。在运行期支座的内侧每榀纵向桁架设置有2个运输期支座42,对称设置,保证运输期和运行期的整体稳定。运行期支座41和运输期支座42内部还均设置有橡胶或砂石等缓冲材料,用于安装对接时的缓冲与隔振。In order to improve the strength of the converter station, the upper structure 1 adopts a space truss structure, in which three steel trusses are arranged longitudinally, and multiple steel trusses are also arranged horizontally; the chord adopts a strong H-shaped or box-shaped structure to achieve large span span. This structure is not only convenient to construct, but also has economical materials, beautiful appearance and no difficulty, which can effectively reduce the cost of offshore engineering. In particular, each longitudinal truss at the bottom of the upper structure is provided with four supports 41 during operation, which are symmetrically arranged to ensure the rigidity of the longitudinal structure during operation. Each longitudinal truss on the inner side of the support during operation is provided with two supports 42 during transportation, which are symmetrically arranged to ensure overall stability during transportation and operation. The inside of the support 41 during operation and the support 42 during transportation are also provided with buffer materials such as rubber or sandstone, which are used for buffering and vibration isolation during installation and docking.

为了方便大型设备的运输和日常维护,上部结构的四周设有搬运通道108,搬运通道108的端头设有上下升降的重型电梯,形成水平和垂直结合的搬运通道108;而高压开关设备以及换流变压器的屋顶则设置吊物孔,这些设备可以用吊机直接从吊物孔起吊,节省了大件设备水平运输的难题。In order to facilitate the transportation and daily maintenance of large-scale equipment, a handling channel 108 is provided around the upper structure, and the end of the handling channel 108 is provided with a heavy lift that lifts up and down to form a horizontal and vertical combined handling channel 108; The roof of the current transformer is provided with hanging holes, and these devices can be lifted directly from the hanging holes with a hoist, saving the problem of horizontal transportation of large equipment.

由于本技术方案的上部结构整体对称且结构紧凑空间占用小,因此可以采用浮托法安装技术解决整体运输、安装的问题。其中,基础结构为导管架且中间预留有供驳船进出的通道。运输的具体方案为:①先在现场安装好海上换流站的基础结构2,基础结构2中间预留可供驳船进出的通道,基础结构2的位置与海上换流站的运行期支座对应。②将海上换流站的上部结构1作为整体在陆上加工制造,用驳船运输至现场。③驳船负载海上换流站上部结构进入基础结构中间的通道,并使运行期支座与基础结构的位置一一对应。④利用落潮或给驳船注水下沉,将上部结构对接到基础结构上。⑤将运输驳船与上部结构分离,驳船驶出基础结构中间的通道,上部结构1重量由支座完全转移到基础结构上。⑥将上部结构和基础结构焊接,完成了整体的安装。Since the upper structure of the technical solution is symmetrical as a whole, and the structure is compact and occupies less space, the float-over installation technology can be used to solve the problems of overall transportation and installation. Among them, the basic structure is a jacket and a passage for the barge to enter and exit is reserved in the middle. The specific transportation plan is as follows: ① First, install the base structure 2 of the offshore converter station on the site, and reserve a passage for the barge to enter and exit in the middle of the base structure 2. The position of the base structure 2 corresponds to the support during the operation period of the offshore converter station. . ②The superstructure 1 of the offshore converter station is processed and manufactured onshore as a whole and transported to the site by barge. ③ The upper structure of the barge-loaded offshore converter station enters the channel in the middle of the base structure, and the positions of the supports and the base structure are in one-to-one correspondence during operation. ④Using ebb tide or flooding the barge to sink, connect the superstructure to the base structure. ⑤Separate the transport barge from the superstructure, drive the barge out of the channel in the middle of the base structure, and the weight of the superstructure 1 is completely transferred from the support to the base structure. ⑥Weld the upper structure and the base structure to complete the overall installation.

由此,本发明的技术方案不仅有利于换流站对海上环境的适应而且整体占用空间小,且为浮托法安装提供优势条件,很好地解决了从设备搬运到换流站搭建再到换流站运行的整个过程出现的各种问题。Therefore, the technical solution of the present invention is not only conducive to the adaptation of the converter station to the offshore environment, but also occupies a small space as a whole, and provides advantageous conditions for the installation of the float-over method, which solves the problem from equipment transportation to converter station construction to Various problems occurred in the whole process of the operation of the converter station.

应当指出,上述描述了本发明的实施例。然而,本领域技术的技术人员应该理解,本发明不受上述实施例的限制,上述实施例中描述的只是说明本发明的原理,在不脱离本发明范围的前提下本发明还会有多种变化和改进,这些变化和改进都落入要求保护的本发明范围内。It should be noted that the foregoing describes embodiments of the present invention. However, those skilled in the art should understand that the present invention is not limited by the above-mentioned embodiments, and the descriptions in the above-mentioned embodiments are only to illustrate the principle of the present invention. Variations and improvements are intended to fall within the scope of the claimed invention.

Claims (10)

1.一种用于柔性直流输电系统的海上换流站,其特征在于包括封闭式的上部结构和用于承托所述上部结构的基础结构;所述上部结构包括并排设置的大空间主厂房和小空间的副厂房;所述主厂房分为上下两层,其中上层设置有限流电抗器、直流场设备、换流变压器、高压开关设备、厂用电系统和应急柴油机,下层设置有换流阀和桥臂电抗器;所述副厂房共有六层,一层设有海水泵房和阀冷却设备,二层设有海水处理设备,三层设置阀控制室,四层设置消防设备,五层设置正压通风设备,六层设置站控制室;所述上部结构总体对称设置,所述基础结构为导管架且中间预留有供驳船进出的通道。1. An offshore converter station for a flexible direct current transmission system, characterized in that it comprises a closed superstructure and a base structure for supporting the superstructure; the superstructure comprises a large-space main powerhouse arranged side by side The main building is divided into upper and lower layers, of which the upper layer is equipped with current limiting reactor, DC field equipment, converter transformer, high-voltage switchgear, factory power system and emergency diesel engine, and the lower layer is equipped with converters Valves and bridge arm reactors; the auxiliary workshop has six floors, the first floor is equipped with seawater pump room and valve cooling equipment, the second floor is equipped with seawater treatment equipment, the third floor is equipped with valve control room, the fourth floor is equipped with fire fighting equipment, and the fifth floor is equipped with Positive pressure ventilation equipment is set up, and a station control room is set on the sixth floor; the upper structure is generally symmetrically set, and the basic structure is a jacket with a channel reserved in the middle for the barge to enter and exit. 2.如权利要求1所述的一种用于柔性直流输电系统的海上换流站,其特征在于所述上部结构的下层通过壁板间隔成两个对称且大跨度的阀厅以及两个对称的桥臂电抗器室,所述换流阀和桥臂电抗器分别放置在对应的室内,所述阀厅的上层设置钢杵架;其中,所述阀厅紧邻所述副厂房,所述阀厅和所述桥臂电抗器室的交界处还设有电缆接头室。2. An offshore converter station for a flexible direct current transmission system as claimed in claim 1, characterized in that the lower layer of the superstructure is separated into two symmetrical and large-span valve halls and two symmetrical valve halls by means of wall plates The bridge arm reactor room is located in the bridge arm reactor room, the converter valve and the bridge arm reactor are respectively placed in the corresponding rooms, and a steel pestle frame is arranged on the upper layer of the valve hall; wherein, the valve hall is adjacent to the auxiliary workshop, the valve hall is A cable joint room is also provided at the junction of the hall and the bridge arm reactor room. 3.如权利要求1所述的一种用于柔性直流输电系统的海上换流站,其特征在于所述上部结构的上层通过壁板和T字过道分隔成紧邻副厂房的第一区域以及彼此间隔相对的第二区域和第三区域;所述第一区域呈十字型分隔为两间对称的限流电抗器室和两间对称的直流室;所述第二区域和第三区域格局相似,均划分为一侧一个面积较大的电气室和另一侧三个面积较小的隔间,中间的隔间均布置所述换流变压器;所述第二区域的所述电气室放置220V高压开关,其余两所述隔间分别放置所述应急柴油机和备用补偿电抗器;所述第三区域的所述电气室放置所述厂用电系统,其余两所述隔间分别放320V高压开关和临时设备。3. An offshore converter station for a flexible direct current transmission system as claimed in claim 1, characterized in that the upper layer of the superstructure is separated into a first area adjacent to the auxiliary powerhouse and each other through a wall plate and a T-shaped aisle The second area and the third area are opposite to each other; the first area is divided into two symmetrical current limiting reactor chambers and two symmetrical DC chambers in a cross shape; the second area and the third area are similar in pattern, It is divided into an electrical room with a larger area on one side and three compartments with a smaller area on the other side, and the converter transformers are arranged in the middle compartment; the electrical room in the second area is placed with 220V high voltage switch, the emergency diesel engine and backup compensation reactor are respectively placed in the other two compartments; the electrical room in the third area is placed with the factory power system, and the other two compartments are respectively placed with 320V high-voltage switches and Temporary equipment. 4.如权利要求1所述的一种用于柔性直流输电系统的海上换流站,其特征在于所述副厂房的一层和二层均划分为四个依次排列的隔间,所述一层中间的两个所述隔间为阀冷却室且其余两间为所述海水泵房,所述二层中间的两个所述隔间为冷却水池且其余两间为水处理室,使所述换流阀拥有借助冷却液冷却的内冷系统和借助海水循环的外冷系统;所述三层划分为两个隔间,分别为所述阀控制室和通风机房;第四层依次并列划分为蓄电池室、二次设备室、消防水池和消防泵房;所述五层依次划分为柴油油罐室、泡沫灭火室和通风机房;所述六层划分为柴油发电机室、所述站控制室和其他设备室。4. An offshore converter station for a flexible direct current transmission system according to claim 1, characterized in that the first and second floors of the auxiliary powerhouse are divided into four compartments arranged in sequence, and the first The two compartments in the middle of the second floor are the valve cooling chambers and the other two are the seawater pump rooms, the two compartments in the middle of the second floor are the cooling pools and the remaining two are the water treatment rooms, so that the The converter valve has an internal cooling system cooled by cooling liquid and an external cooling system by seawater circulation; the three layers are divided into two compartments, which are the valve control room and the ventilation room respectively; the fourth layer is divided in parallel in order It is a battery room, a secondary equipment room, a fire fighting pool and a fire pump room; the five floors are divided into a diesel oil tank room, a foam fire extinguishing room and a ventilator room in turn; the six floors are divided into a diesel generator room, the station control room room and other equipment rooms. 5.如权利要求1-4任一项所述的一种用于柔性直流输电系统的海上换流站,其特征在于所述主厂房的下层对应所述副厂房的一至三层,所述主厂房的上层对应所述副厂房的四至六层;所述主厂房的上层和下层的部分之间还设有电缆夹层。5. An offshore converter station for a flexible direct current transmission system according to any one of claims 1-4, characterized in that the lower layer of the main powerhouse corresponds to the first to third floors of the auxiliary powerhouse, and the main powerhouse The upper floor of the factory building corresponds to the fourth to sixth floors of the auxiliary factory building; a cable interlayer is also provided between the upper and lower floors of the main factory building. 6.如权利要求1所述的一种用于柔性直流输电系统的海上换流站,其特征在于所述上部结构采用空间桁架结构,其中纵向设置三道钢桁架,同时横向也设置多道钢桁架;弦杆采用强H型或箱型结构。6. An offshore converter station for a flexible direct current transmission system according to claim 1, characterized in that the upper structure adopts a space truss structure, wherein three steel trusses are arranged longitudinally, and multiple steel trusses are also arranged horizontally at the same time. Truss; chord adopts strong H-type or box-type structure. 7.如权利要求6所述的一种用于柔性直流输电系统的海上换流站,其特征在于所述上部结构的底部每榀纵向桁架设置有若干运行期支座,在所述运行期支座的内侧每榀纵向桁架设置有运输期支座;所述运行期支座和运输期支座内部均设置有橡胶或/和砂石。7. An offshore converter station for a flexible direct current transmission system according to claim 6, characterized in that each longitudinal truss at the bottom of the upper structure is provided with a number of supports during the operation period. Each longitudinal truss on the inner side of the seat is provided with a support during transportation; rubber or/and sand and gravel are provided inside the support during operation and during transportation. 8.如权利要求1所述的一种用于柔性直流输电系统的海上换流站,其特征在于所述上部结构的四周设有搬运通道,所述搬运通道的端头设有上下升降的重型电梯;所述高压开关设备以及换流变压器的屋顶设置吊物孔。8. An offshore converter station for a flexible direct current transmission system as claimed in claim 1, characterized in that a handling channel is provided around the upper structure, and an end of the handling channel is provided with a heavy duty lifting up and down Elevator; hanging object holes are arranged on the roof of the high-voltage switchgear and the converter transformer. 9.如权利要求1所述的一种用于柔性直流输电系统的海上换流站,其特征在于所述上部结构的封闭材料采用钢板和防火棉的组合。9. An offshore converter station for a flexible direct current transmission system according to claim 1, characterized in that the sealing material of the upper structure adopts a combination of steel plate and fireproof cotton. 10.一种如权利要求1所述的用于柔性直流输电系统的海上换流站的安装方法,其特征在于:10. An installation method for an offshore converter station of a flexible direct current transmission system as claimed in claim 1, characterized in that: 首先,先在现场安装好海上换流站的基础结构,基础结构中间预留可供驳船进出的通道,基础结构的位置与海上换流站的运行期支座对应;First of all, the basic structure of the offshore converter station is installed on the site, and the passage for the barge to enter and exit is reserved in the middle of the basic structure. The position of the basic structure corresponds to the support during the operation period of the offshore converter station; 其次,将海上换流站的上部结构作为整体在陆上加工制造,将高压开关和换流变压器吊运进上部结构中,其他设备通过搬运通道安装,最后用驳船运输至现场;Secondly, the superstructure of the offshore converter station is processed and manufactured onshore as a whole, the high-voltage switch and converter transformer are hoisted into the superstructure, other equipment is installed through the handling channel, and finally transported to the site by barge; 再次,驳船负载海上换流站上部结构进入基础结构中间的通道,并使运行期支座与基础结构的位置一一对应;并利用落潮或给驳船注水下沉,将上部结构对接到基础结构上;Thirdly, the superstructure of the barge-loaded offshore converter station enters the channel in the middle of the base structure, and the positions of the supports and the base structure are matched one-to-one during operation; ; 再次,将运输驳船与上部结构分离,驳船驶出基础结构中间的通道,上部结构重量由支座完全转移到基础结构上;Thirdly, the transport barge is separated from the superstructure, the barge is driven out of the channel in the middle of the base structure, and the weight of the superstructure is completely transferred from the support to the base structure; 最后,将上部结构和基础结构焊接,完成整体的安装。Finally, the superstructure and base structure are welded to complete the overall installation.
CN201910302415.7A 2019-04-16 2019-04-16 An offshore converter station for flexible DC transmission system Active CN110042819B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910302415.7A CN110042819B (en) 2019-04-16 2019-04-16 An offshore converter station for flexible DC transmission system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910302415.7A CN110042819B (en) 2019-04-16 2019-04-16 An offshore converter station for flexible DC transmission system

Publications (2)

Publication Number Publication Date
CN110042819A true CN110042819A (en) 2019-07-23
CN110042819B CN110042819B (en) 2021-06-01

Family

ID=67277282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910302415.7A Active CN110042819B (en) 2019-04-16 2019-04-16 An offshore converter station for flexible DC transmission system

Country Status (1)

Country Link
CN (1) CN110042819B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110844012A (en) * 2019-11-15 2020-02-28 中国电建集团华东勘测设计研究院有限公司 Deep draft semi-submersible type offshore converter station
CN111478598A (en) * 2020-04-30 2020-07-31 中国能源建设集团广东省电力设计研究院有限公司 High-capacity offshore flexible direct-current converter station arrangement system
CN111918522A (en) * 2020-06-19 2020-11-10 南方电网科学研究院有限责任公司 Converter station cooling system
CN112217403A (en) * 2020-10-13 2021-01-12 中国电力工程顾问集团中南电力设计院有限公司 Extra-high voltage flexible direct current conversion unit arrangement structure with bridge arm reactor on direct current side
CN113162103A (en) * 2021-04-27 2021-07-23 中国电建集团华东勘测设计研究院有限公司 Flexible direct current offshore converter station
CN113529677A (en) * 2020-04-22 2021-10-22 中国电建集团华东勘测设计研究院有限公司 Compact offshore converter station installed by floating-in-place method
CN113612248A (en) * 2021-08-26 2021-11-05 特变电工西安柔性输配电有限公司 A compact and lightweight offshore flexible HVDC converter station
CN114715360A (en) * 2021-01-05 2022-07-08 中国电建集团华东勘测设计研究院有限公司 Seabed big data center attached to large offshore substation and installation and maintenance process
CN115441494A (en) * 2022-09-21 2022-12-06 国网山东省电力公司电力科学研究院 Converter station capacity optimal configuration method and device based on flexible direct current interconnection system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000336626A (en) * 1999-06-01 2000-12-05 Kajima Corp Offshore structure construction method
CN104652864A (en) * 2015-02-13 2015-05-27 国家电网公司 Offshore platform for offshore wind power flexible direct current connecting-in system
CN107425736A (en) * 2017-07-17 2017-12-01 南京南瑞集团公司 Multi-end flexible direct current transmission system current conversion station control method based on model prediction
CN211113561U (en) * 2019-04-16 2020-07-28 中国电建集团华东勘测设计研究院有限公司 Offshore converter station for flexible direct current transmission system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000336626A (en) * 1999-06-01 2000-12-05 Kajima Corp Offshore structure construction method
CN104652864A (en) * 2015-02-13 2015-05-27 国家电网公司 Offshore platform for offshore wind power flexible direct current connecting-in system
CN107425736A (en) * 2017-07-17 2017-12-01 南京南瑞集团公司 Multi-end flexible direct current transmission system current conversion station control method based on model prediction
CN211113561U (en) * 2019-04-16 2020-07-28 中国电建集团华东勘测设计研究院有限公司 Offshore converter station for flexible direct current transmission system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨建军等: "海上风电场升压变电站设计基本要求的研究", 《中国电机工程学报》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110844012A (en) * 2019-11-15 2020-02-28 中国电建集团华东勘测设计研究院有限公司 Deep draft semi-submersible type offshore converter station
CN113529677A (en) * 2020-04-22 2021-10-22 中国电建集团华东勘测设计研究院有限公司 Compact offshore converter station installed by floating-in-place method
CN113529677B (en) * 2020-04-22 2025-07-18 中国电建集团华东勘测设计研究院有限公司 Compact offshore converter station installed by floating method
CN111478598A (en) * 2020-04-30 2020-07-31 中国能源建设集团广东省电力设计研究院有限公司 High-capacity offshore flexible direct-current converter station arrangement system
CN111918522A (en) * 2020-06-19 2020-11-10 南方电网科学研究院有限责任公司 Converter station cooling system
CN112217403A (en) * 2020-10-13 2021-01-12 中国电力工程顾问集团中南电力设计院有限公司 Extra-high voltage flexible direct current conversion unit arrangement structure with bridge arm reactor on direct current side
CN114715360A (en) * 2021-01-05 2022-07-08 中国电建集团华东勘测设计研究院有限公司 Seabed big data center attached to large offshore substation and installation and maintenance process
CN114715360B (en) * 2021-01-05 2023-02-24 中国电建集团华东勘测设计研究院有限公司 Seabed big data center attached to large offshore transformer substation and installation and maintenance process
CN113162103A (en) * 2021-04-27 2021-07-23 中国电建集团华东勘测设计研究院有限公司 Flexible direct current offshore converter station
CN113612248A (en) * 2021-08-26 2021-11-05 特变电工西安柔性输配电有限公司 A compact and lightweight offshore flexible HVDC converter station
CN115441494A (en) * 2022-09-21 2022-12-06 国网山东省电力公司电力科学研究院 Converter station capacity optimal configuration method and device based on flexible direct current interconnection system
CN115441494B (en) * 2022-09-21 2026-01-23 国网山东省电力公司电力科学研究院 Converter station capacity optimal configuration method and device based on flexible direct current interconnection system

Also Published As

Publication number Publication date
CN110042819B (en) 2021-06-01

Similar Documents

Publication Publication Date Title
CN110042819A (en) A kind of marine converter station for flexible HVDC transmission system
CN112510745B (en) Flexible direct current offshore converter station with 66kV current collection line access
CN111490485B (en) Construction method for upper assembly block of preassembled offshore booster station
CN112688221B (en) Double-layer offshore booster station
CN111799661B (en) Converter station of modular offshore flexible direct current transmission system
CN106685240A (en) Offshore wind power flexible direct current transmission converter station bridge arm valve tower layout and offshore platform
CN212026196U (en) Function cabin combined type offshore booster station
CN207559399U (en) For the fixed offshore current conversion station of marine wind electric field
CN211113561U (en) Offshore converter station for flexible direct current transmission system
CN111478598A (en) High-capacity offshore flexible direct-current converter station arrangement system
CN113529677B (en) Compact offshore converter station installed by floating method
CN202509477U (en) Jack-up offshore booster station used in offshore wind power plant
CN110137838A (en) A kind of modular sea change of current station structure
CN116706748A (en) A modular offshore booster station with dual main transformers and double high resistance suitable for far shore
CN218976150U (en) A compact large-scale offshore booster station with high resistance
CN218482576U (en) Compact double-main-transformer medium-sized offshore booster station
CN217307269U (en) Closed compact marine converter station
CN212305157U (en) High-capacity offshore flexible direct-current converter station arrangement system
CN202068113U (en) Fixed offshore booster station for offshore wind farm
CN212506191U (en) Compact offshore converter station installed by floating-in-place method
CN116960810A (en) A single main transformer offshore boost module suitable for 400-500MW capacity
CN219927935U (en) Integral marine booster station
CN202586106U (en) Integrated offshore booster station
CN210007231U (en) modular offshore converter station structure
CN218622153U (en) Sit at end formula marine high voltage direct current conversion platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant