- stirrup
- concrete
- steel
- steel pipe
- stud
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
The present invention provides a kind of concrete steel structural uprights, belong to construction engineering technical field, including steel reinforcement cage, steel pipe and concrete, the steel reinforcement cage includes more studs and multiple stirrups, multiple stirrup parallel interval settings, the stud passes through all stirrups and connect with the stirrup, circumferential direction setting of the more studs around the stirrup, the steel pipe is set in the steel reinforcement cage, the axis direction of the steel pipe is consistent with the axis direction of the stud, the Concrete Filled in the steel pipe outside and envelope the steel reinforcement cage.Its structure is simple, easy to make, and intensity is good, and anti-seismic performance is good, and concrete is not easy loose, collapsing, and centre is filled using steel pipe, and the inside of steel pipe does not need fill concrete, greatly reduces the usage amount of concrete, saved cost.
Description
Technical field
The present invention relates to construction engineering technical fields, in particular to a kind of concrete steel structural upright.
Background technique
With the fast development of urban construction, there is house being built daily, needed in house building course using
To a large amount of concrete steel structural upright, current concrete steel structural upright be all it is solid, this structure is needed using big
The concrete of amount is poured, this causes higher cost, in addition, there is also concrete pines for current concrete steel structural upright
The phenomenon that dissipating, collapsing, greatly reduces the safety used.
Summary of the invention
Embodiment of the present invention is designed to provide a kind of concrete steel structural upright, and easy to make, intensity is good, can
It is pre-formed, it can preferably improve the above problem.
Embodiments of the present invention are achieved in that
Embodiments of the present invention provide a kind of concrete steel structural upright, it is characterised in that: including steel reinforcement cage, steel pipe
And concrete, the steel reinforcement cage include more studs and multiple stirrups, multiple stirrup parallel intervals are arranged, and the stud is worn
It crosses all stirrups and is connect with the stirrup, circumferential direction setting of the more studs around the stirrup, the steel pipe setting
In in the steel reinforcement cage, the axis direction of the steel pipe is consistent with the axis direction of the stud, and the Concrete Filled is in institute
It states the outside of steel pipe and envelopes the steel reinforcement cage.
Further, steel wire, the steel wire interlaced arrangement are also embedded in the concrete.
Further, the steel wire is fixed on the steel reinforcement cage by supporting element.
Further, it is connected between the steel pipe and the stud and/or the stirrup by connector.
Further, the steel pipe is round steel pipe or rectangular steel tube.
Further, the stirrup is rectangle ring structure, is respectively equipped with a stud at the corner location of the stirrup.
Further, the stirrup is cirque structure, and the quantity of the stud is four, and four studs are described in
The circumferential direction of stirrup is uniformly arranged.
Further, it is connected between the stirrup and the stud by binding piece.
Further, it is welded to connect between the stirrup and the stud.
Further, the spacing between the two neighboring stirrup is 160-200mm.
Embodiments of the present invention have the advantages that
The concrete steel structural upright that embodiment of the present invention provides, structure is simple, and easy to make, intensity is good, antidetonation
Performance is good, and concrete is not easy loose, collapsing, and centre is filled using steel pipe, and the inside of steel pipe does not need fill concrete, subtracts significantly
The usage amount for having lacked concrete has saved cost, the weight of the column also mitigated, and the inside of steel pipe can also be used to wear electricity
Cable etc., in this way it is avoided that cable is exposed to external destroyed.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of embodiment of the present invention
Attached drawing be briefly described, it should be understood that the following drawings illustrates only certain embodiments of the invention, therefore should not be seen
Work is the restriction to range, for those of ordinary skill in the art, without creative efforts, can be with
Other relevant attached drawings are obtained according to these attached drawings.
Fig. 1 is the structural schematic diagram of the concrete steel structural upright of embodiment of the present invention one;
Fig. 2 is the structural schematic diagram of the concrete steel structural upright of embodiment of the present invention two.
Icon: 11- steel reinforcement cage;111- stud;112- stirrup;12- steel pipe;13- concrete;14- connector;15- steel
Silk.
Specific embodiment
To keep the purposes, technical schemes and advantages of embodiment of the present invention clearer, implement below in conjunction with the present invention
The technical solution in embodiment of the present invention is clearly and completely described in attached drawing in mode, it is clear that described reality
The mode of applying is some embodiments of the invention, rather than whole embodiments.Usually it is described and illustrated herein in the accompanying drawings
The component of embodiment of the present invention can arrange and design with a variety of different configurations.
Therefore, requirement is not intended to limit to the detailed description of the embodiments of the present invention provided in the accompanying drawings below to protect
The scope of the present invention of shield, but it is merely representative of selected embodiment of the invention.Based on the embodiment in the present invention, ability
Domain those of ordinary skill every other embodiment obtained without creative efforts, belongs to the present invention
The range of protection.
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can
To be combined with each other.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that term " on ", "lower", "horizontal", " parallel ", "inner", "outside" etc.
The orientation or positional relationship of instruction be based on the orientation or positional relationship shown in the drawings or the invention product use when it is usual
The orientation or positional relationship or the hair that the orientation or positional relationship those skilled in the art put usually understand
Bright product using when the orientation or positional relationship usually put, be merely for convenience of description of the present invention and simplification of the description, rather than
The device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot
It is interpreted as limitation of the present invention.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ",
" installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one
Connect to body;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be indirect by intermediary
It is connected, can be the connection inside two elements.For the ordinary skill in the art, on being understood with concrete condition
State the concrete meaning of term in the present invention.
Embodiment 1
Refering to what is shown in Fig. 1, embodiment of the present invention one provides a kind of 13 steel structural upright column of concrete, including steel reinforcement cage
11, steel pipe 12 and concrete 13.
Steel reinforcement cage 11 includes more studs 111 and multiple stirrups 112.
Stud 111 is made of existing reinforcing bar, and the diameter of reinforcing bar is selected as needed, for example, can choose 8mm,
The reinforcing bar of 10mm, 12mm, 14mm, 16mm, 18mm, 20mm, 22mm equal-specification model;The length dimension of reinforcing bar adds as needed
Work, for example 3m, 4m or 5m can be processed into etc..
Stirrup 112 is made of existing reinforcing bar, and the diameter of reinforcing bar is selected as needed, for example, can choose 8mm,
The reinforcing bar of 10mm, 12mm, 14mm, 16mm, 18mm, 20mm, 22mm equal-specification model.Rectangle ring structure can be made in stirrup 112,
Cirque structure can also be made, it is of course also possible to regular hexagon, octagon or ellipsoidal structure etc..
Multiple 112 parallel intervals of stirrup are arranged, and the spacing between two neighboring stirrup 112 is 160-200mm.Adjacent two
The distance between a stirrup 112 is essentially identical, can preferably guarantee 11 uniform force of steel reinforcement cage in this way, and intensity is good, certain phase
Distance between adjacent two stirrups 112 can also be different.
Stud 111 passes through whole stirrups 112, and the axis of stud 111 is parallel with the axis of stirrup 112.In present embodiment,
The quantity of stud 111 is four, and circumferentially around stirrup 112, certainly, the quantity of stud 111 may be four studs 111
Five or five or more, the both ends of four studs 111 flush.It can be fixed by binding piece between stud 111 and stirrup 112,
For example banded together stud 111 and stirrup 112 using tied silk or clip, it is fixed conveniently using tied silk, but also conveniently
Adjust the position of stirrup 112;Can also be welded together between certain stud 111 and stirrup 112, in this way, stud 111 with
It is connected firmly between stirrup 112, stability is good.
When stirrup 112 is rectangle ring structure, four studs 111 are distributed at the corner location of stirrup 112.Certainly, four
Root stud 111 can also be distributed in the intermediate position on four sides of stirrup 112.
When stirrup 112 is cirque structure, four studs 111 are uniformly arranged along the circumferential direction of stirrup 112.
Steel pipe 12 is made of the steel pipe 12 of existing specification, and steel pipe 12 can select round steel pipe 12, can also the side of selection
Shape steel pipe 12.The length dimension of steel pipe 12 is identical as the length dimension of stud 111.
Steel pipe 12 is arranged in steel reinforcement cage 11, and the axis direction of steel pipe 12 is consistent with the axis direction of stud 111, this implementation
In mode, the axis of steel pipe 12 is overlapped with the axis of stirrup 112, and the both ends of steel pipe 12 are flushed with the both ends of stud 111.
It is connected between steel pipe 12 and stud 111 or stirrup 112 by connector 14, one end of connector 14 and steel pipe
12 welding, other end stud 111 or stirrup 112 weld, certainly, between connector 14 and stud 111 or stirrup 112
It can be and tie up connection.Steel pipe 12 can also be connect between stud 111 and stirrup 112 by connector 14 simultaneously.
Concrete 13 is filled in the outside of steel pipe 12 and envelopes steel reinforcement cage 11, and it is vertical that concrete steel structure is thus made
Column.
The 13 steel structural upright column structural strength of concrete of present embodiment is good, and anti-seismic performance is good, and intermediate using steel pipe
12 fillings, the inside of steel pipe 12 do not need fill concrete 13, greatly reduce the usage amount of concrete 13, saved cost,
Also the weight of the column mitigated, and the inside of steel pipe 12 can also be used to wear cable etc., in this way it is avoided that cable is exposed to outside
Portion is destroyed.
Embodiment 2
Refering to what is shown in Fig. 2, embodiment of the present invention two provides a kind of 13 steel structural upright column of concrete, including steel reinforcement cage
11, steel pipe 12, concrete 13 and steel wire 15.
Steel reinforcement cage 11 includes more studs 111 and multiple stirrups 112.
Stud 111 is made of existing reinforcing bar, and the diameter of reinforcing bar is selected as needed, for example, can choose 8mm,
The reinforcing bar of 10mm, 12mm, 14mm, 16mm, 18mm, 20mm, 22mm equal-specification model;The length dimension of reinforcing bar adds as needed
Work, for example 3m, 4m or 5m can be processed into etc..
Stirrup 112 is made of existing reinforcing bar, and the diameter of reinforcing bar is selected as needed, for example, can choose 8mm,
The reinforcing bar of 10mm, 12mm, 14mm, 16mm, 18mm, 20mm, 22mm equal-specification model.Rectangle ring structure can be made in stirrup 112,
Cirque structure can also be made, it is of course also possible to regular hexagon, octagon or ellipsoidal structure etc..
Multiple 112 parallel intervals of stirrup are arranged, and the spacing between two neighboring stirrup 112 is 160-200mm.Adjacent two
The distance between a stirrup 112 is essentially identical, can preferably guarantee 11 uniform force of steel reinforcement cage in this way, and intensity is good, certain phase
Distance between adjacent two stirrups 112 can also be different.
Stud 111 passes through whole stirrups 112, and the axis of stud 111 is parallel with the axis of stirrup 112.In present embodiment,
The quantity of stud 111 is four, and circumferentially around stirrup 112, certainly, the quantity of stud 111 may be four studs 111
Five or five or more, the both ends of four studs 111 flush.It can be fixed by binding piece between stud 111 and stirrup 112,
For example banded together stud 111 and stirrup 112 using tied silk or clip, it is fixed conveniently using tied silk, but also conveniently
Adjust the position of stirrup 112;Can also be welded together between certain stud 111 and stirrup 112, in this way, stud 111 with
It is connected firmly between stirrup 112, stability is good.
When stirrup 112 is rectangle ring structure, four studs 111 are distributed at the corner location of stirrup 112.Certainly, four
Root stud 111 can also be distributed in the intermediate position on four sides of stirrup 112.
When stirrup 112 is cirque structure, four studs 111 are uniformly arranged along the circumferential direction of stirrup 112.
Steel pipe 12 is made of the steel pipe 12 of existing specification, and steel pipe 12 can select round steel pipe 12, can also the side of selection
Shape steel pipe 12.The length dimension of steel pipe 12 is identical as the length dimension of stud 111.
Steel pipe 12 is arranged in steel reinforcement cage 11, and the axis direction of steel pipe 12 is consistent with the axis direction of stud 111, this implementation
In mode, the axis of steel pipe 12 is overlapped with the axis of stirrup 112, and the both ends of steel pipe 12 are flushed with the both ends of stud 111.
It is welded between steel pipe 12 and stud 111 or stirrup 112 by connection connection, one end of connector 14 and steel pipe 12
It connects, other end stud 111 or stirrup 112 weld, certainly, between connector 14 and stud 111 or stirrup 112 can also be with
It is to tie up connection.Steel pipe 12 can also be connect between stud 111 and stirrup 112 by connector 14 simultaneously.
Concrete 13 is filled in the outside of steel pipe 12 and envelopes steel reinforcement cage 11.
Steel wire 15 is embedded in concrete 13, and steel wire 15 can be the interlaced arrangement of rule, is also possible to irregular friendship
Mistake arrangement, the setting of steel wire 15 so that concrete 13 be not easy it is loose, collapse, substantially increase the intensity and anti-seismic performance of column.
It is arranged on steel reinforcement cage 11 it should be noted that steel wire 15 can first pass through supporting element in advance.
The concrete steel structural upright structural strength of present embodiment is good, and anti-seismic performance is good, concrete 13 be not easy it is loose,
It collapses, centre is filled using steel pipe 12, and the inside of steel pipe 12 does not need fill concrete 13, greatly reduces making for concrete 13
Dosage has saved cost, the weight of the column also mitigated, and the inside of steel pipe 12 can also be used to wear cable etc., thus
Cable is avoided to be exposed to external destroyed.
Embodiment 3
Embodiment of the present invention three provides a kind of production method of concrete steel structural upright, comprising the following steps:
Frock making step: mounting hole, the height gauge of mounting hole spacing from the ground are first opened up on 13 wall of armored concrete
Very little is 500-1200mm, and different height can be set according to different users, and one end of support rod is implanted into mounting hole simultaneously
Fixed, the other end of support rod is hanging.
It should be noted that support rod can also be fixed on other pedestals, for example, can first be arranged on the ground mostly with vertical
Column, more root posts are located along the same line, and then support rod is arranged on column, and a lateral edge of the separate support rod of column is vertical
Scale can be set in the arragement direction of column.
The quantity of support rod is at least two, in present embodiment, and the quantity of support rod is three, and three support rods are side by side
It is arranged and between same level height, adjacent two support rods there are certain spacing, this spacing is set as needed.When
So, the quantity of support rod may be three or more.
It portrays mark line step: portraying mark line on wall with marking pen, mark line is set along the arragement direction of support rod
There is a plurality of, the level height of the mark line and level height of support rod is essentially identical or the level height of mark line is slightly above
The level height of support rod, the spacing between adjacent two mark lines are 160mm, 180mm or 200mm.
First time stud 111 places step: two studs 111 being placed on the upside of support rod and pass through they sup-port
Firmly, stud 111 is arranged side by side along the axial direction of support rod and the both ends of two studs 111 are substantially flush.
In order to guarantee that the stud 111 for the upside for being placed on support rod will not slide, limit can be set on support rod
Position part, locating part can fix stud 111, so that the distance between two studs 111 of the upside of support rod
It will not change.
Stirrup 112 wears step: multiple stirrups 112 is sheathed on stud 111 from one end of stud 111 and/or both ends,
Mobile stirrup 112 to be equipped with a stirrup 112 at the corresponding position of each mark line.Certainly, two neighboring stirrup
The distance between 112 also can be adjusted according to the needs.
Second of stud 111 wears step: two studs 111 are penetrated to the lower section in stirrup 112 and being located at support rod again
And it is supported by stirrup 112, the stud positioned at the both ends and the upside for being located at support rod of the stud 111 of the lower section of support rod
111 both ends are substantially flush.
112 fixing step of stirrup: stirrup 112 is fixedly connected with stud 111.In the portion that stirrup 112 is contacted with stud 111
Stirrup 112 is fixed on stud 111 by position using binding piece, and binding piece can be solid using binding piece using tied silk or clip etc.
The mode for determining stirrup 112 is convenient for disassembly and assembly, work efficiency is high.Certainly, it can also connect with welding, weld between stud 111 and stirrup 112
Connect firm and reliable connection.
Whole stirrups 112 complete the production of steel reinforcement cage 11 after fixing.
Steel pipe 12 wears step: steel pipe 12 is passed through into stirrup 112, the both ends of steel pipe 12 are flushed with the both ends of stud 111,
Steel pipe 12 is supported in steel reinforcement cage 11 using connector 14.
Concrete 13 pours step: concrete 13 being poured to the outside for being filled in steel pipe 12, and guarantees concrete 13 by reinforcing bar
Cage 11 all wraps.
It should be noted that concrete 13 pours before step after steel pipe 12 wears step, it can be on steel reinforcement cage 11
Interlaced arrangement steel wire 15.
The production method for the concrete steel structural upright that present embodiment provides, easy to operate, producing efficiency is high, produces
Good product quality, manufacturing cost is low, have preferable marketing application value.
The foregoing is merely the preferred embodiment of the present invention, are not intended to restrict the invention, for this field
For technical staff, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any
Modification, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of concrete steel structural upright, it is characterised in that: including steel reinforcement cage, steel pipe and concrete, the steel reinforcement cage includes
More studs and multiple stirrups, multiple stirrup parallel intervals settings, the stud pass through all stirrups and with it is described
Stirrup connection, the more studs are arranged around the circumferential direction of the stirrup, and the steel pipe is set in the steel reinforcement cage, the steel pipe
Axis direction it is consistent with the axis direction of the stud, the Concrete Filled in the steel pipe outside and envelope described
Steel reinforcement cage.
2. concrete steel structural upright according to claim 1, it is characterised in that: be also embedded with steel in the concrete
Silk, the steel wire interlaced arrangement.
3. concrete steel structural upright according to claim 2, it is characterised in that: the steel wire is fixed on by supporting element
On the steel reinforcement cage.
4. concrete steel structural upright according to claim 1, it is characterised in that: the steel pipe and the stud and/or
It is connected between the stirrup by connector.
5. concrete steel structural upright according to claim 1, it is characterised in that: the steel pipe is round steel pipe or rectangular
Steel pipe.
6. concrete steel structural upright according to claim 1, it is characterised in that: the stirrup is rectangle ring structure, institute
It states and is respectively equipped with a stud at the corner location of stirrup.
7. concrete steel structural upright according to claim 1, it is characterised in that: the stirrup is cirque structure, institute
The quantity for stating stud is four, and four studs are uniformly arranged along the circumferential direction of the stirrup.
8. concrete steel structural upright according to claim 1, it is characterised in that: lead between the stirrup and the stud
Cross binding piece connection.
9. concrete steel structural upright according to claim 1, it is characterised in that: welded between the stirrup and the stud
It connects in succession.
10. concrete steel structural upright according to claim 1, it is characterised in that: between the two neighboring stirrup
Spacing is 160-200mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910349904.8A CN110016993A (en) | 2019-04-28 | 2019-04-28 | A kind of concrete steel structural upright |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910349904.8A CN110016993A (en) | 2019-04-28 | 2019-04-28 | A kind of concrete steel structural upright |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110016993A true CN110016993A (en) | 2019-07-16 |
Family
ID=67192681
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910349904.8A Pending CN110016993A (en) | 2019-04-28 | 2019-04-28 | A kind of concrete steel structural upright |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110016993A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20230139840A1 (en) * | 2021-10-29 | 2023-05-04 | Zhengzhou University | FRP Composite Spiral Stirrup Confined Concrete Column And Compression Design Method Thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102296753A (en) * | 2011-06-20 | 2011-12-28 | 北京工业大学 | Hollow column member with built-in high tensile steel bars and pipes for confinement of ultra high performance concrete |
CN102587578A (en) * | 2012-03-21 | 2012-07-18 | 河南理工大学 | High-strength steel bar enhanced engineered cementitious composites (ECC)-hollow steel pipe ultra high performance concrete (UHPC) combination column member and manufacturing method thereof |
CN202500078U (en) * | 2012-02-14 | 2012-10-24 | 长安大学 | A hollow steel tube cylindrical structure based on externally-installed stiffeners and externally-wrapped concrete |
CN204059759U (en) * | 2014-09-03 | 2014-12-31 | 德州市公路工程总公司 | A kind of concrete-filled steel tubular hollow column |
CN206360212U (en) * | 2017-01-09 | 2017-07-28 | 浙江华越设计股份有限公司 | A kind of resistance to compression factory building concrete filled steel tube column |
CN208533868U (en) * | 2018-07-02 | 2019-02-22 | 沈阳建筑大学 | A kind of novel arrangement of reinforcement hollow steel pipe high-strength concrete column |
-
2019
- 2019-04-28 CN CN201910349904.8A patent/CN110016993A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102296753A (en) * | 2011-06-20 | 2011-12-28 | 北京工业大学 | Hollow column member with built-in high tensile steel bars and pipes for confinement of ultra high performance concrete |
CN202500078U (en) * | 2012-02-14 | 2012-10-24 | 长安大学 | A hollow steel tube cylindrical structure based on externally-installed stiffeners and externally-wrapped concrete |
CN102587578A (en) * | 2012-03-21 | 2012-07-18 | 河南理工大学 | High-strength steel bar enhanced engineered cementitious composites (ECC)-hollow steel pipe ultra high performance concrete (UHPC) combination column member and manufacturing method thereof |
CN204059759U (en) * | 2014-09-03 | 2014-12-31 | 德州市公路工程总公司 | A kind of concrete-filled steel tubular hollow column |
CN206360212U (en) * | 2017-01-09 | 2017-07-28 | 浙江华越设计股份有限公司 | A kind of resistance to compression factory building concrete filled steel tube column |
CN208533868U (en) * | 2018-07-02 | 2019-02-22 | 沈阳建筑大学 | A kind of novel arrangement of reinforcement hollow steel pipe high-strength concrete column |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20230139840A1 (en) * | 2021-10-29 | 2023-05-04 | Zhengzhou University | FRP Composite Spiral Stirrup Confined Concrete Column And Compression Design Method Thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104831818B (en) | The connecting node of precast reinforced concrete beam and superposed column | |
CN203066356U (en) | Reinforced concrete column with local buckling constraint of longitudinal bars | |
CN110016993A (en) | A kind of concrete steel structural upright | |
CN204753836U (en) | Connected node of precast reinforced concrete roof beam and coincide post | |
CN205577260U (en) | Concrete column | |
CN111593933A (en) | Steel reinforcement framework of electric power transmission equal-diameter cement telegraph pole | |
CN103628408A (en) | Construction method for splay supporting frame of bridge cast-in-place concrete formwork | |
CN213390159U (en) | Foundation pit construction supports reinforced structure | |
CN103741685B (en) | Comprise the pre-stressed steel pipe concrete truss support structure of pre-stressed steel pipe concrete | |
CN215907200U (en) | Positioning device for column reinforcing steel bar | |
KR102152387B1 (en) | The apparatus to disperse the load inflicted in reinforcement ULBON of prestressed concrete structure and increase bearing capacity | |
CN210086845U (en) | Circular reinforcing bar beam processing frame | |
CN209083286U (en) | A kind of device for reinforcing vertical shaft inner wall | |
CN209144852U (en) | Pile foundation structure with high bearing capacity | |
KR101300022B1 (en) | Reinforcement structure for head of steel tube pile | |
CN210563696U (en) | Novel cement wire pole | |
CN204491832U (en) | A kind of post and beam structure | |
CN211500005U (en) | Distribution network construction is with strutting bearing diagonal structure | |
CN114908675B (en) | Hollow thin-wall high pier construction method | |
CN220814552U (en) | Anti-slide pile steel bar arrangement structure | |
CN215485045U (en) | Multi-section steel structure lightning tower | |
CN210032357U (en) | Lower hanging type hanger device for installing reinforcing steel bars | |
CN211473079U (en) | Prefabricated stirrup cage structure | |
CN107182622B (en) | Steel construction big-arch shelter | |
JP7370784B2 (en) | Formwork structure and cover spacer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |