CN109991159A - A kind of earth rock cofferdam bed course and geomembrane interfacial friction factor device for quick testing and method - Google Patents

A kind of earth rock cofferdam bed course and geomembrane interfacial friction factor device for quick testing and method Download PDF

Info

Publication number
CN109991159A
CN109991159A CN201910338705.7A CN201910338705A CN109991159A CN 109991159 A CN109991159 A CN 109991159A CN 201910338705 A CN201910338705 A CN 201910338705A CN 109991159 A CN109991159 A CN 109991159A
Authority
CN
China
Prior art keywords
bed course
geomembrane
bedding material
support frame
protective layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910338705.7A
Other languages
Chinese (zh)
Inventor
王永明
任金明
范华春
胡小禹
邬志
邓渊
邱亚锋
徐建荣
梁现培
郭晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201910338705.7A priority Critical patent/CN109991159A/en
Publication of CN109991159A publication Critical patent/CN109991159A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N19/00Investigating materials by mechanical methods
    • G01N19/02Measuring coefficient of friction between materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The present invention proposes a kind of earth rock cofferdam bed course interfacial friction factor device for quick testing and method, it is intended to which the quickly coefficient of friction between test cofferdam bedding material and geomembrane checks the reasonability of design phase coefficient of friction, it is ensured that impervious barrier is stablized.Described device includes including support plate, jack, bed course support frame, amesdial, protractor, baffle, bedding material, film top protective layer.The method is based on above-mentioned apparatus, and bedding material is arranged in the bed course support frame, and film top protective layer is arranged above padding layer, and geomembrane to be measured is arranged between bedding material and film top protective layer.Jack is slowly smoothly jacked, stops test when lasting variation occurs for amesdial and changing value reaches 1mm, reads protractor reading, as this is from steady angle of friction magnitude.

Description

A kind of earth rock cofferdam bed course and geomembrane interfacial friction factor device for quick testing and Method
Technical field
The present invention relates to a kind of earth rock cofferdam bed courses and geomembrane interfacial friction factor device for quick testing and method, mainly The similar engineerings such as earth rock cofferdam, earth and rockfill dam, dyke and refuse landfill suitable for water power hydraulic engineering.
Background technique
Geomembrane is the waterproof isolation-type material using a kind of high molecular polymer as base stock, due to its good antiseepage Performance, convenience for construction and economy obtain widespread adoption in China.Especially in China's hydraulic and hydroelectric engineering earth rock cofferdam item It is generally used in mesh, cofferdam height and scale increase year by year in recent years, and high earth rock cofferdam technical difficulty is also with cofferdam scale Increase and promoted, certain cofferdam using geomembrane anti-seepage lead to the case of geomembrane destruction repeatedly due to unreasonable structural design Occur, wherein geomembrane and the coefficient of friction at cofferdam bed course interface determine the upstream gradient in Inclined wall formula cofferdam, are cofferdam designs Important parameter, be related to the whole stress of geomembrane and the Against Sliding Stability of impervious body.In the past, bedding material and geotechnological membrane interface Coefficient of friction is often carried out in laboratory using direct shear test in the concept phase, often because of live bedding material in later period implementation process Gradation and geo-membrane material change and there are biggish differences with just the stage is set.
Summary of the invention
The present invention is directed to overcome the technical solution of the PVvalue testing of bedding material in the prior art and geotechnological membrane interface In place of above shortcomings, a kind of earth rock cofferdam bed course interfacial friction factor device for quick testing and method are proposed, it is intended to fast Coefficient of friction between speed test cofferdam bedding material and geomembrane, checks the reasonability of design phase coefficient of friction, it is ensured that impervious barrier Stablize.
To achieve the above object, the invention adopts the following technical scheme:
A kind of earth rock cofferdam bed course and geomembrane interfacial friction factor device for quick testing of the invention, including including support Plate, jack, bed course support frame, amesdial, protractor, baffle, bedding material, film top protective layer, bed course support frame one end Bottom and support plate setting hinge are hinged, and jack is arranged between the other end and support plate of bed course support frame;Bed course support frame Setting jack one end top surface amesdial is set, protractor is arranged in bed course support frame and the hinged one end of support plate;The pad Layer support frame in be arranged bedding material, film top protective layer be arranged above padding layer, between bedding material and film top protective layer setting to The geomembrane of survey.
Preferably, baffle is arranged in bed course support frame and the hinged one end top surface of support plate.
Preferably, the geomembrane is composite geo-membrane or Smooth-surface geomembrane.
Preferably, film top protective layer is using pneumatically placed concrete or precast slab or cast in place concrete plate.
Present invention simultaneously provides a kind of earth rock cofferdam bed course and geomembrane interfacial friction factor method for rapidly testing, the sides Method the following steps are included:
Step 1, the combination with installation of test device: combining support plate, bed course support frame by hinge, and group will install Device for quick testing is placed on horizontal, hard ground;
Step 2, bedding material is mated formation: according to by live material source situation, by bedding material screening, being weighed, it is ensured that bedding material gradation Meet design requirement, manually careful to vibrate to design dry density by bedding material point two layers of loadings bed course support frame, top is with scraping Plate strikes off;
Step 3, the installation of geomembrane: being cut to the rectangle with the same size of bed course support frame for geomembrane to be tested, Bedding material surface is laid on by geomembrane is smooth;
Step 4, the setting of film top protective layer: laying mould top protective layer on geomembrane, and whole stand is greater than or equal to 30 Minute, it is contacted to geomembrane with bedding material and compresses stabilization;
Step 5, the installation of amesdial: the gauge stand of amesdial is fixed on bed course support frame, by the testing needle crown by protection The upper edge of layer side adjusts the measuring staff axis of amesdial table perpendicular to protective layer side;
Step 6, the installation of jack: on the supporting plate by jack installation, jack withstands on bed course support frame far from hinge The middle part of chain side bottom surface, adjusts bed course support frame and support plate initial tilt is 10~20 °, and guarantees two sides uniform force;
Step 7, the jacking of jack: jack is slowly smoothly jacked, and guarantees that jacking rate is less than or equal to 1 °/min, Simultaneous observation amesdial stops test when lasting variation occurs for amesdial and changing value reaches 1mm, reads protractor reading, As this is from steady angle of friction magnitude;
Step 8, multiple groups test and average value are sought: carrying out no less than 5 groups of examination of the same race to every kind of bedding material and geomembrane It tests, using small value average value as final test result.
Preferably, the geomembrane is composite geo-membrane or Smooth-surface geomembrane.
Preferably, film top protective layer is using pneumatically placed concrete or precast slab or cast in place concrete plate.
Preferably, the step 2 further comprises
Step 21, waterproof film is laid in support frame before bedding material is mated formation;
Step 22, it according to by live material source situation, by bedding material screening, weighs, it is ensured that bedding material gradation meets design and wants It asks, it is manually careful to vibrate to setting during bedding material filling plus water saturation by bedding material point two layers of loadings bed course support frame Dry density is counted, top is struck off with scraper plate.
The beneficial effects of the present invention are: the present invention is that a kind of earth rock cofferdam bed course is quickly surveyed with geomembrane interfacial friction factor Device and method is tried, for the similar work such as earth rock cofferdam, earth and rockfill dam, dyke and refuse landfill suitable for water power hydraulic engineering The quick measurement of bedding material and geomembrane interfacial friction factor in journey, can directly measure practical bedding material used by practice of construction And the coefficient of friction of geo-membrane material, Preliminary design achievement is checked, guarantees that geomembrane anti-seepage structure is safe and reliable.
Detailed description of the invention
Fig. 1 is a kind of earth rock cofferdam bed course and geomembrane interfacial friction factor device for quick testing of the embodiment of the present invention one Structural schematic diagram.
In figure: support plate 1, jack 2, bed course support frame 3, amesdial 4, hinge 5, protractor 6, baffle 7, bedding material 8, Geomembrane 9, film top protective layer 10.
Specific embodiment
The present invention is described further with reference to the accompanying drawings of the specification.
Embodiment one
It is quickly surveyed as shown in Figure 1, the embodiment of the present invention provides a kind of earth rock cofferdam bed course with geomembrane interfacial friction factor Trial assembly is set, including including support plate 1, jack 2, bed course support frame 3, amesdial 4, protractor 6, baffle 7, bedding material 8, film top Protective layer 10, it is hinged that 3 one end bottom of bed course support frame and support plate 1 are arranged hinge 5, the other end of bed course support frame 3 and Jack 2 is set between support plate 1;Amesdial 4, bed course support frame is arranged in 2 one end top surface of setting jack of bed course support frame 3 3 and the hinged one end of support plate 1 protractor 6 is set;Bedding material 8 is set in the bed course support frame 3, and film top protective layer 10 is arranged Above padding layer, geomembrane 9 to be measured is set between bedding material 8 and film top protective layer 10.
The support backing plate is formed using angle steel and 1.5cm thickness precast slab, is welded into 2.2m*1.2m* by angle steel The precast slab of undersized is mated formation and is put into rectangle frame by the rectangle frame of 2cm specification, is provided for jack 2 smooth, firm Basal plane.
Bed course support frame 3 is welded into the rectangle frame of 2.0m*1.0m*7cm specification using angle steel.Separately on the long and short side of rectangle frame Middle part respectively uses 1 band steel 40mm*6mm (width * thickness) to be reinforced, and the 2cm solid wood of undersized is put into rectangle frame, Smooth, firm bottom surface, which is provided, for bedding material 8 closes basal plane.
Baffle 7 is arranged in bed course support frame 3 and the hinged one end top surface of support plate 1.The geomembrane 9 is composite geo-membrane 9 Or Smooth-surface geomembrane 9.Film top protective layer 10 is rectangle using pneumatically placed concrete or precast slab or cast in place concrete plate, shape Cube.
Embodiment two
The embodiment of the present invention provides a kind of earth rock cofferdam bed course and geomembrane interfacial friction factor method for rapidly testing, described Method the following steps are included:
Step 1, it the combination with installation of test device: combines support plate 1, bed course support frame 3 by hinge 5, group will dress In good device for quick testing placement and horizontal, hard ground.
Step 2, bedding material 8 is mated formation: according to by live material source situation, by the screening of bedding material 8, being weighed, it is ensured that 8 grades of bedding material With design requirement is met, bedding material 8 is divided in two layers of loading bed course support frame 3, it is manually careful to vibrate to design dry density, top It is struck off with scraper plate.
Step 3, geomembrane 9 to be tested the installation of geomembrane 9: is cut to the square with the same size of bed course support frame 3 Shape is laid on 8 surface of bedding material for geomembrane 9 is smooth.
Step 4, the setting of film top protective layer 10: laying mould top protective layer on geomembrane 9, and whole stand is greater than or equal to It 30 minutes, is contacted to geomembrane 9 with bedding material 8 and compresses stabilization.
Specifically, film top protective layer 10 is using pneumatically placed concrete or precast slab or cast in place concrete plate, shape For rectangular cubic.If need to be using pneumatically placed concrete or cast-in-place concrete Shi Zexu elsewhere first by geomembrane 9 and protective layer Spray or after the completion of pouring it is prefabricated be integrated after on lifting to bed course support frame 3.
Step 5, the installation of amesdial 4: the gauge stand of amesdial 4 is fixed on bed course support frame 3, by the testing needle crown by protecting The upper edge of sheath side adjusts the measuring staff axis of 4 table of amesdial perpendicular to protective layer side.
Step 6, the installation of jack 2: jack 2 is mounted in support plate 1, and it is remote that jack 2 withstands on bed course support frame 3 Middle part from 5 side bottom surface of hinge, adjusting bed course support frame 3 and 1 initial tilt of support plate is 10~20 °, and guarantee two sides by Power is uniform.
Step 7, the jacking of jack 2: by the slowly smooth jacking of jack 2, guarantee jacking rate be less than or equal to 1 °/ Min, simultaneous observation amesdial 4 stop test when amesdial 4 occurs persistently to change and changing value reaches 1mm, read protractor 6 readings, as this is from steady angle of friction magnitude.
Step 8, multiple groups test and average value are sought: carrying out no less than 5 groups of the same race to every kind of bedding material 8 and geomembrane 9 Test, using small value average value as final test result.
The geomembrane 9 is composite geo-membrane 9 or Smooth-surface geomembrane 9.The support backing plate is thick pre- using angle steel and 1.5cm Concrete slab composition processed, the rectangle frame of 2.2m*1.2m*2cm specification is welded by angle steel, by the precast slab of undersized Mat formation and be put into rectangle frame, provides smooth, firm basal plane for jack 2.
Bed course support frame 3 is welded into the rectangle frame of 2.0m*1.0m*7cm specification using angle steel.Separately on the long and short side of rectangle frame Middle part respectively uses 1 band steel 40mm*6mm (width * thickness) to be reinforced, and the 2cm solid wood of undersized is put into rectangle frame, Smooth, firm bottom surface, which is provided, for bedding material 8 closes basal plane.
The embodiment of the present invention is a kind of earth rock cofferdam bed course and 9 interfacial friction factor method for rapidly testing of geomembrane, is used for Bedding material 8 and geotechnique in the similar engineerings such as earth rock cofferdam, earth and rockfill dam, dyke and refuse landfill water power hydraulic engineering The quick measurement of 9 interfacial friction factor of film can directly measure 9 material of practical bedding material 8 and geomembrane used by practice of construction Coefficient of friction, check Preliminary design achievement, guarantee 9 leakage preventing structure of geomembrane it is safe and reliable.
Embodiment three
The present embodiment is a kind of earth rock cofferdam bed course and geomembrane provided embodiment one as a preferred solution Interfacial friction factor method for rapidly testing advanced optimizes improvement, and step 2 described in the present embodiment further comprises
Step 21, waterproof film is laid in support frame before bedding material 8 is mated formation;
Step 22, it according to by live material source situation, by the screening of bedding material 8, weighs, it is ensured that 8 gradation of bedding material meets design It is required that bedding material 8 is divided in two layers of loading bed course support frame 3, water saturation, artificial careful vibration are added during bedding material 8 loads It smashes to design dry density, top is struck off with scraper plate.
The scheme of the present embodiment can test the interfacial friction factor of saturation state underlay layered material 8 Yu geomembrane 9.

Claims (8)

1. a kind of earth rock cofferdam bed course and geomembrane interfacial friction factor device for quick testing, characterized in that including including support Plate, jack, bed course support frame, amesdial, protractor, baffle, bedding material, film top protective layer, bed course support frame one end Bottom and support plate setting hinge are hinged, and jack is arranged between the other end and support plate of bed course support frame;Bed course support frame Setting jack one end top surface amesdial is set, protractor is arranged in bed course support frame and the hinged one end of support plate;The pad Layer support frame in be arranged bedding material, film top protective layer be arranged above padding layer, between bedding material and film top protective layer setting to The geomembrane of survey.
2. a kind of earth rock cofferdam bed course according to claim 1 and geomembrane interfacial friction factor device for quick testing, It is characterized in, baffle is arranged in bed course support frame and the hinged one end top surface of support plate.
3. a kind of earth rock cofferdam bed course according to claim 1 and geomembrane interfacial friction factor device for quick testing, It is characterized in, the geomembrane is composite geo-membrane or Smooth-surface geomembrane.
4. a kind of earth rock cofferdam bed course according to claim 1 and geomembrane interfacial friction factor device for quick testing, It is characterized in, film top protective layer is using pneumatically placed concrete or precast slab or cast in place concrete plate.
5. a kind of earth rock cofferdam bed course and geomembrane interfacial friction factor method for rapidly testing, characterized in that the method includes Following steps:
Step 1, it the combination with installation of test device: combines support plate, bed course support frame by hinge, group is quick by what is installed Test device is placed on horizontal, hard ground;
Step 2, bedding material is mated formation: according to by live material source situation, by bedding material screening, being weighed, it is ensured that bedding material gradation meets Design requirement, by two layers of loading bed course support frame of bedding material point, manually careful to vibrate to design dry density, top is scraped with scraper plate It is flat;
Step 3, the installation of geomembrane: being cut to the rectangle with the same size of bed course support frame for geomembrane to be tested, will be native Work film is smooth to be laid on bedding material surface;
Step 4, the setting of film top protective layer: laying mould top protective layer on geomembrane, and whole stand is greater than or equal to 30 minutes, It is contacted to geomembrane with bedding material and compresses stabilization;
Step 5, the installation of amesdial: the gauge stand of amesdial is fixed on bed course support frame, and protective layer side is leaned on the testing needle crown The upper edge in face adjusts the measuring staff axis of amesdial table perpendicular to protective layer side;
Step 6, the installation of jack: on the supporting plate by jack installation, jack withstands on bed course support frame far from hinge one The middle part of side bottom surface, adjusts bed course support frame and support plate initial tilt is 10~20 °, and guarantees two sides uniform force;
Step 7, the jacking of jack: jack is slowly smoothly jacked, and guarantees that jacking rate is less than or equal to 1 °/min, synchronous Amesdial is observed, stops test when lasting variation occurs for amesdial and changing value reaches 1mm, reads protractor reading, as This is from steady angle of friction magnitude;
Step 8, multiple groups test and average value are sought: being carried out no less than 5 groups of Homogeneous assay to every kind of bedding material and geomembrane, adopted Use small value average value as final test result.
6. a kind of earth rock cofferdam bed course according to claim 5 and geomembrane interfacial friction factor method for rapidly testing, It is characterized in, the geomembrane is composite geo-membrane or Smooth-surface geomembrane.
7. a kind of earth rock cofferdam bed course according to claim 5 and geomembrane interfacial friction factor method for rapidly testing, It is characterized in, film top protective layer is using pneumatically placed concrete or precast slab or cast in place concrete plate.
8. a kind of earth rock cofferdam bed course according to claim 5 and geomembrane interfacial friction factor method for rapidly testing, It is characterized in, the step 2 further comprises
Step 21, waterproof film is laid in support frame before bedding material is mated formation;
Step 22, it according to by live material source situation, by bedding material screening, weighs, it is ensured that bedding material gradation meets design requirement, will Bedding material divides in two layers of loading bed course support frame, and during bedding material filling plus water saturation, artificial careful vibrate to design are done Density, top are struck off with scraper plate.
CN201910338705.7A 2019-04-25 2019-04-25 A kind of earth rock cofferdam bed course and geomembrane interfacial friction factor device for quick testing and method Pending CN109991159A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910338705.7A CN109991159A (en) 2019-04-25 2019-04-25 A kind of earth rock cofferdam bed course and geomembrane interfacial friction factor device for quick testing and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910338705.7A CN109991159A (en) 2019-04-25 2019-04-25 A kind of earth rock cofferdam bed course and geomembrane interfacial friction factor device for quick testing and method

Publications (1)

Publication Number Publication Date
CN109991159A true CN109991159A (en) 2019-07-09

Family

ID=67133066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910338705.7A Pending CN109991159A (en) 2019-04-25 2019-04-25 A kind of earth rock cofferdam bed course and geomembrane interfacial friction factor device for quick testing and method

Country Status (1)

Country Link
CN (1) CN109991159A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110470593A (en) * 2019-08-31 2019-11-19 四川大学 For quickly measuring the experimental rig and method of structural plane model material friction coefficient
CN110567871A (en) * 2019-07-23 2019-12-13 西南交通大学 Friction experiment device, bearing mechanism, loading mechanism and friction experiment method thereof
CN113686967A (en) * 2021-09-03 2021-11-23 中国电建集团华东勘测设计研究院有限公司 Method for reducing influence of boundary reflection effect on stress wave propagation test data

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030109811A1 (en) * 2001-12-12 2003-06-12 Kimberly-Clark Worldwide, Inc. Method, apparatus and simulated human tissue for evaluating coefficients of friction of materials on human skin
CN202814856U (en) * 2012-07-25 2013-03-20 北京市轨道交通建设管理有限公司 Experimental equipment for simulating friction coefficient of spiral unearthing device of earth pressure balance shield
EP2677298A1 (en) * 2012-06-20 2013-12-25 Institut National de Recherche en Sciences et Technologies pour l'Environnement et l'Agriculture (IRSTEA) Device and method for determination of a friction force at the interface between two surfaces
CN104849206A (en) * 2015-05-20 2015-08-19 东华大学 Friction coefficient detection device and method for pallet beams
CN205691474U (en) * 2016-06-16 2016-11-16 江苏伊诺尔新材料科技有限公司 A kind of protecting film surface slipperiness test device
CN206725406U (en) * 2017-02-28 2017-12-08 浩阳环境股份有限公司 A kind of swash plate instrument for determining coarse-surface geomembrane interface friction feature
CN206906222U (en) * 2017-07-01 2018-01-19 岭南师范学院 A kind of device for determining coefficient of friction
CN210005407U (en) * 2019-04-25 2020-01-31 中国电建集团华东勘测设计研究院有限公司 quick testing arrangement of earth-rock cofferdam bed course and geomembrane interfacial coefficient of friction

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030109811A1 (en) * 2001-12-12 2003-06-12 Kimberly-Clark Worldwide, Inc. Method, apparatus and simulated human tissue for evaluating coefficients of friction of materials on human skin
EP2677298A1 (en) * 2012-06-20 2013-12-25 Institut National de Recherche en Sciences et Technologies pour l'Environnement et l'Agriculture (IRSTEA) Device and method for determination of a friction force at the interface between two surfaces
CN202814856U (en) * 2012-07-25 2013-03-20 北京市轨道交通建设管理有限公司 Experimental equipment for simulating friction coefficient of spiral unearthing device of earth pressure balance shield
CN104849206A (en) * 2015-05-20 2015-08-19 东华大学 Friction coefficient detection device and method for pallet beams
CN205691474U (en) * 2016-06-16 2016-11-16 江苏伊诺尔新材料科技有限公司 A kind of protecting film surface slipperiness test device
CN206725406U (en) * 2017-02-28 2017-12-08 浩阳环境股份有限公司 A kind of swash plate instrument for determining coarse-surface geomembrane interface friction feature
CN206906222U (en) * 2017-07-01 2018-01-19 岭南师范学院 A kind of device for determining coefficient of friction
CN210005407U (en) * 2019-04-25 2020-01-31 中国电建集团华东勘测设计研究院有限公司 quick testing arrangement of earth-rock cofferdam bed course and geomembrane interfacial coefficient of friction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110567871A (en) * 2019-07-23 2019-12-13 西南交通大学 Friction experiment device, bearing mechanism, loading mechanism and friction experiment method thereof
CN110470593A (en) * 2019-08-31 2019-11-19 四川大学 For quickly measuring the experimental rig and method of structural plane model material friction coefficient
CN113686967A (en) * 2021-09-03 2021-11-23 中国电建集团华东勘测设计研究院有限公司 Method for reducing influence of boundary reflection effect on stress wave propagation test data
CN113686967B (en) * 2021-09-03 2024-02-27 中国电建集团华东勘测设计研究院有限公司 Method for reducing influence of boundary reflection effect on stress wave propagation test data

Similar Documents

Publication Publication Date Title
CN109991159A (en) A kind of earth rock cofferdam bed course and geomembrane interfacial friction factor device for quick testing and method
CN204439474U (en) The field direct shear test device of landslide rock mass shearing strength
Consoli et al. Behavior of plate load tests on soil layers improved with cement and fiber
Clayton et al. Stiffness of geomaterials at very small strains
Inagaki et al. Behavior of cement deep mixing columns under road embankment
CN108444813A (en) Multiple dimensioned soil-rock mixture-interface of basement rock shear property test device and method
CN108613885A (en) The laboratory testing rig and test method of a kind of simulation stake side grouting behind shaft or drift lining
CN103983490B (en) A kind of disturbed belt preparation method of sample reflecting initial stress state
Dong et al. Influence of sustained loading on fracture properties of concrete
CN205662958U (en) Concrete spread foundation test device
CN104020092B (en) One kind consolidation pore water pressure combined test device and method
CN108797660A (en) The experimental rig and test method of Collapsible Loess District Long-short Pile Group model
CN108828195A (en) It is a kind of to simulate the laboratory testing rig returned on pile-end post-grouting slurries and test method
CN106932250A (en) A kind of regeneration concrete shearing resistance beam
CN111021440A (en) CPT integrated geotechnical packaging granular pile indoor model test device and method
Wanatowski et al. Effect of specimen preparation method on the stress-strain behavior of sand in plane-strain compression tests
LU503300A1 (en) Method for predicting the anti-sliding stability of the shore retaining wall by high-pressure grouting
Sun et al. Mechanisms of interaction between an arch dam and abutment slope using physical model tests
LU et al. Study on the disturbance and recompression settlement of soft soil induced by foundation pit excavation
CN210005407U (en) quick testing arrangement of earth-rock cofferdam bed course and geomembrane interfacial coefficient of friction
Fernando et al. The experimental investigation of failure mechanism and bearing capacity of different types of shallow foundations
CN111289346A (en) Three-dimensional model test method for deformation and damage of tunnel surrounding rock containing fault fracture zone
CN105862943B (en) A kind of concrete spread foundation experimental rig and implementation method
CN115559222A (en) Method for preloading full arch center of cast-in-place arch bridge
CN114518292A (en) Model test device and test method for high-speed railway roadbed of inclined crossing karez

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination