CN109944617A - A kind of coal seam lane side drill site frame canopy method - Google Patents

A kind of coal seam lane side drill site frame canopy method Download PDF

Info

Publication number
CN109944617A
CN109944617A CN201910231326.8A CN201910231326A CN109944617A CN 109944617 A CN109944617 A CN 109944617A CN 201910231326 A CN201910231326 A CN 201910231326A CN 109944617 A CN109944617 A CN 109944617A
Authority
CN
China
Prior art keywords
canopy
drill site
lane side
coal seam
capplce
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910231326.8A
Other languages
Chinese (zh)
Inventor
贺虎
张龙
葛毓柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaibei Mining Co Ltd
Original Assignee
Huaibei Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaibei Mining Co Ltd filed Critical Huaibei Mining Co Ltd
Priority to CN201910231326.8A priority Critical patent/CN109944617A/en
Publication of CN109944617A publication Critical patent/CN109944617A/en
Pending legal-status Critical Current

Links

Abstract

The present invention is suitable for coal seam lane side drill site technical field of construction, provide a kind of coal seam lane side drill site frame canopy method, canopy body is set up to dialling at door position along lane side first, at least one reinforcement is installed being located at the side shoulder nest for dialling the canopy body at door position, then proceedes to set up canopy body along lane side;Drill site construction is carried out at door position dialling, excavates duct along the inclination angle of roof, and anchor net is installed in the duct to support the inner wall in duct;Installation drill site bottom plate on the bottom wall in duct, by when setting up canopy body, first canopy body is inserted into and dials gate segment, then it is being located at installation reinforcement at the top for dialling the canopy body of gate segment and shoulder nest, then when carrying out drill site construction, the inclination angle along roof is excavated, and supporting is carried out by anchor net, finally drill site bottom plate is arranged in the bottom of drill site in stable structure, and the present invention has the characteristics that working procedure is simple, the construction period is short, construction is safer.

Description

A kind of coal seam lane side drill site frame canopy method
Technical field
The invention belongs to coal seam lane side drill site construction field more particularly to a kind of coal seam lane side drill site frame canopy methods.
Background technique
Shed shoring is mainly used when lane side drill site is constructed in coal seam, working procedure is cumbersome, is especially dialling door underthrust beam mistake Easily causing top plate leakage to emit in journey leads to gas accident, while can generate during blowing out and destroy to tunnel surrounding rock body, Later period easily causes the problem of U-shaped canopy deforms in tunnel when pressing, construction risk is big, long construction period, and safety is insufficient.
Summary of the invention
The present invention provides a kind of coal seam lane side drill site frame canopy method, it is intended to solve the problems, such as that construction is unsafe.
The invention is realized in this way a kind of coal seam lane side drill site frame canopy method, comprising the following steps:
Along lane side erection canopy body to dialling at door position, installed at least being located at the side shoulder nest for dialling the canopy body at door position One reinforcement then proceedes to set up canopy body along lane side;
Drill site construction is carried out at door position dialling, and excavates duct along the inclination angle of roof, anchor is installed in the duct Net is to support the inner wall in duct;
Installation drill site bottom plate on the bottom wall in duct.
The present invention also provides preferred, the canopy body includes along the spaced multiple support components of the lane side, each Support component includes a capplce of two canopy legs of two canopy legs and connection, and two canopy legs are symmetrical set.
The present invention also provides preferred, it is described be located at dial a canopy leg of the side of the support component at door position and exist It is not installed when construction.
The present invention also provides preferred, the canopy leg has a straight-bar and a curved bar, and one end of the curved bar connects One end of the straight-bar, the other end of the curved bar connect one end of the capplce.
The present invention also provides preferred, the both ends of the capplce pass through a limiting card cable respectively and are fixedly connected described in one The upper end of canopy leg.
The present invention also provides preferred, there are two the reinforcement settings, and the first reinforcement is located in the capplce At side wall medium position, the second reinforcement is located at the side close to the drill site of second reinforcement.
The present invention also provides preferred, the capplce is arcuate structure, and the capplce and the canopy leg constitute U-shaped structure.
The present invention also provides preferred, the section of the reinforcement is v-shaped structure, and the reinforcement is by being welded and fixed On the capplce.
The present invention also provides preferred, the drill site bottom plate is in horizontally disposed.
The present invention also provides preferred, before the canopy body is installed in lane side, preparatory trial assembly canopy body on the ground.
Compared with prior art, the beneficial effects of the present invention are: a kind of coal seam lane side drill site frame canopy method of the invention, leads to It crosses when setting up canopy body, first canopy body is inserted into and dials gate segment, be then located at installation at the top for dialling the canopy body of gate segment and shoulder nest Reinforcement, then when carrying out drill site construction, the inclination angle along roof is excavated, and carries out supporting, structure by anchor net Stablize, drill site bottom plate finally is set in the bottom of drill site, the present invention is with working procedure is simple, the construction period is short, construction is more pacified Full feature.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of canopy body of the invention.
Fig. 2 is the structural schematic diagram of canopy leg of the invention.
Fig. 3 is the structural schematic diagram of capplce of the invention.
Fig. 4 is the structural schematic diagram of canopy body and drill site of the invention.
In figure: 1- canopy leg, 2- capplce, 3- roof, 4- rock, 5- drill site, 6- anchor pole, 7- limiting card cable, 8- reinforcement.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
Fig. 1-4 is please referred to, the present invention provides a kind of technical solution: a kind of coal seam lane side drill site frame canopy method.
Wherein, the canopy body set up of the invention includes along the spaced multiple support components of the lane side, Mei Gezhi Support component includes a capplce 2 of two canopy legs 1 of two canopy legs 1 and connection, and canopy body is cut into three sections using 36U shape steel, and divides Not Wei two canopy legs 1 and a capplce, U-shaped steel can be matched with the lane side inner wall of U-shaped structure, and be close to the interior of lane side Wall, support effect is good, stabilized structure, and the length of the U-shaped steel and wide ratio are 200:150, and two canopy legs 1 are symmetrical set, and canopy leg 1 has There are a straight-bar and a curved bar, one end of one end connection straight-bar of curved bar, the other end of curved bar connects one end of capplce 2, directly Bar and curved bar are integrally formed, and capplce 2 is arcuate structure, and capplce 2 and canopy leg 1 constitute U-shaped structure, and the both ends of capplce 2 pass through respectively One limiting card cable 7 is fixedly connected with the upper end of a canopy leg 1, limiting card cable 7 by the interior inner hole with accommodating capplce 2 and canopy leg 1, And limiting card cable 7 is fixed by fixing bolt, drill site 5 is located at the side of canopy body, and is provided with and dials between drill site 5 and canopy body Door, being located on the capplce 2 for dialling door section for canopy body are welded with reinforcement 8, and there are two the settings of reinforcement 8, and the first reinforcement 8 is located at At capplce inner sidewall medium position, the second reinforcement 8 is located at the side of the close drill site 5 of the second reinforcement 8.
The section of reinforcement 8 is v-shaped structure, and reinforcement 8 is fixed by welding on capplce 2, and door is dialled in being located at for canopy body The canopy leg 1 of side at position is not installed in construction, so that drilling machine be facilitated to enter, reinforcement 8 is V-arrangement girder steel, and reinforcement 8 Upper surface tool there are two contact surface, and two contact surfaces are tightly attached on capplce 2, and by being welded and fixed, to solve Lack side canopy leg 1 and the insufficient problem of the stability that generates, so that canopy body keeps firm dialling the structure at door position.
The tilt angle of the roof of drill site 5 and the tilt angle of roof are identical, and the bottom of drill site 5 is provided with drill site bottom Plate, and drill site bottom plate, in being horizontally disposed with, the lower section of drill site bottom plate is the rock positioned at bottom, and drill site bottom plate passes through coal seam bottom The rock support in portion is provided with anchor net on the inner wall of drill site 5, and the anchor pole 6 in insertion coal seam is provided on the roof of drill site 5 with fixation Anchor net.
A kind of coal seam lane side drill site frame canopy method of the invention the following steps are included:
Preparatory trial assembly canopy body on the ground fixes all capplces 2 and the installation of canopy leg 1, after ensuring the installation of canopy body Structural stability, so that canopy body energy normal mounting in lane side, and using safe.
Canopy body is set up along lane side, first canopy leg 1 is buried in the bottom of the two sidewalls of lane side, the lower end of canopy leg 1 is inserted into lane Below ground in side, then the both ends of capplce 2 are separately connected to the upper end of two canopy legs 1, and capplce 2 and canopy leg have coincidence part Point, it is no less than 400mm using the length that limiting card cable binds intersection and intersection, is then tightened by fixing bolt solid It is fixed, it is only embedded far from the canopy leg 1 for dialling door side when canopy body, which is inserted into, to be dialled at door position, it is not buried positioned at the canopy leg 1 for dialling door side If two reinforcements 8, which are respectively welded, is fixed on capplce 2 being located at two reinforcements 8 of installation for dialling the capplce 2 at door position At middle part and right side half position, thus by 8 reinforced shed body of reinforcement, thus what supplement lacked because lacking canopy leg 1 Stability then proceedes to set up canopy body along lane side, and two canopy legs 1 of normal mounting and a capplce 2.
Dial door position at carry out drill site construction, along roof inclination angle excavate duct, in duct install anchor net with The inner wall in duct is supported, then the anchor pole 6 of insertion roof is installed on the roof in duct, the lower end of anchor pole 6 is welded and fixed At the top of anchor net, thus fixed anchor net, the bottom wall in duct is the rock along the bottom in coal seam.
The horizontally disposed drill site bottom plate of installation on the bottom wall in duct, horizontally disposed drill site bottom plate can facilitate the later period Drilling machine construction, enable drilling machine even running on drill site bottom plate, to carry out safe bore operation.
A kind of coal seam lane side drill site frame canopy method of the invention, by being first inserted into canopy body and dialling door when setting up canopy body Then section is being located at the top for dialling the capplce 2 of canopy body of gate segment and is installing reinforcement 8 at shoulder nest, and dialling when canopy body is inserted into It is only embedded not buried far from the canopy leg 1 for dialling door side positioned at the canopy leg 1 for dialling door side when at door position, then carrying out drill site When 5 construction, the inclination angle along roof is excavated, and carries out supporting, stable structure, finally at the bottom of drill site 5 by anchor net Drill site bottom plate is arranged in portion, and the present invention has the characteristics that working procedure is simple, the construction period is short, construction is safer.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of coal seam lane side drill site frame canopy method, it is characterised in that: the following steps are included:
Canopy body is set up to dialling at door position along lane side, at least one is installed being located at the side shoulder nest for dialling the canopy body at door position Reinforcement then proceedes to set up canopy body along lane side;
Dial door position at carry out drill site construction, along roof inclination angle excavate duct, in the duct install anchor net with Support the inner wall in duct;
Installation drill site bottom plate on the bottom wall in duct.
2. a kind of coal seam lane side drill site frame canopy method as described in claim 1, it is characterised in that: the canopy body includes along described The spaced multiple support components of lane side, each support component include a capplce of two canopy legs of two canopy legs and connection, Two canopy legs are symmetrical set.
3. a kind of coal seam lane side drill site frame canopy method as claimed in claim 2, it is characterised in that: described to be located at group door position Support component side a canopy leg construction when do not install.
4. a kind of coal seam lane side drill site frame canopy method as claimed in claim 2, it is characterised in that: the canopy leg is straight with one Bar and a curved bar, one end of the curved bar connect one end of the straight-bar, and the other end of the curved bar connects the capplce One end.
5. a kind of coal seam lane side drill site frame canopy method as claimed in claim 2, it is characterised in that: distinguish at the both ends of the capplce The upper end of a canopy leg is fixedly connected with by a limiting card cable.
6. a kind of coal seam lane side drill site frame canopy method as claimed in claim 2, it is characterised in that: the reinforcement is provided with two A, the first reinforcement is located at the capplce inner sidewall medium position, and the second reinforcement is located at described second and reinforces The side close to the drill site of beam.
7. a kind of coal seam lane side drill site frame canopy method as claimed in claim 2, it is characterised in that: the capplce is arc knot Structure, the capplce and the canopy leg constitute U-shaped structure.
8. a kind of coal seam lane side drill site frame canopy method as claimed in claim 6, it is characterised in that: the section of the reinforcement is V-shaped structure, and the reinforcement is fixed by welding on the capplce.
9. a kind of coal seam lane side drill site frame canopy method as described in claim 1, it is characterised in that: the drill site bottom plate is in level Setting.
10. a kind of coal seam lane side drill site frame canopy method as described in claim 1, it is characterised in that: in lane side described in installation Before canopy body, preparatory trial assembly canopy body on the ground.
CN201910231326.8A 2019-03-26 2019-03-26 A kind of coal seam lane side drill site frame canopy method Pending CN109944617A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910231326.8A CN109944617A (en) 2019-03-26 2019-03-26 A kind of coal seam lane side drill site frame canopy method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910231326.8A CN109944617A (en) 2019-03-26 2019-03-26 A kind of coal seam lane side drill site frame canopy method

Publications (1)

Publication Number Publication Date
CN109944617A true CN109944617A (en) 2019-06-28

Family

ID=67011722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910231326.8A Pending CN109944617A (en) 2019-03-26 2019-03-26 A kind of coal seam lane side drill site frame canopy method

Country Status (1)

Country Link
CN (1) CN109944617A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU626216A1 (en) * 1976-11-22 1978-09-30 Сибирский Государственный Проектно-Конструкторский И Экспериментальный Институт Горного Машиностроения "Сибгипрогормаш" Powered roof support
CN106014458A (en) * 2016-06-29 2016-10-12 河南理工大学 Large-dip extremely-soft coal seam mining roadway anchor net special-shaped shed graded supporting technique
CN106930779A (en) * 2017-03-15 2017-07-07 河南理工大学 A kind of special-shaped canopy method for protecting support of micro- arch of high-dipping three soft coal layer re-exploration laneway battered leg
CN107269220A (en) * 2017-08-04 2017-10-20 四川省华蓥山煤业股份有限公司绿水洞煤矿 The method that a kind of outstanding top of high-dipping fully-mechanized mining working upper corner is administered
CN208203317U (en) * 2017-12-19 2018-12-07 淮北矿业股份有限公司 A kind of shed roof apparatus in tunnel
CN108979638A (en) * 2018-09-10 2018-12-11 四川达竹煤电(集团)有限责任公司金刚煤矿 Coal cutting roadway wedge shape regenerates wall and the compound gob-side entry retaining method of one-leg shed beam
CN109281687A (en) * 2018-10-23 2019-01-29 河南理工大学 A method of about the quick tuning construction of coal mine development machine

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU626216A1 (en) * 1976-11-22 1978-09-30 Сибирский Государственный Проектно-Конструкторский И Экспериментальный Институт Горного Машиностроения "Сибгипрогормаш" Powered roof support
CN106014458A (en) * 2016-06-29 2016-10-12 河南理工大学 Large-dip extremely-soft coal seam mining roadway anchor net special-shaped shed graded supporting technique
CN106930779A (en) * 2017-03-15 2017-07-07 河南理工大学 A kind of special-shaped canopy method for protecting support of micro- arch of high-dipping three soft coal layer re-exploration laneway battered leg
CN107269220A (en) * 2017-08-04 2017-10-20 四川省华蓥山煤业股份有限公司绿水洞煤矿 The method that a kind of outstanding top of high-dipping fully-mechanized mining working upper corner is administered
CN208203317U (en) * 2017-12-19 2018-12-07 淮北矿业股份有限公司 A kind of shed roof apparatus in tunnel
CN108979638A (en) * 2018-09-10 2018-12-11 四川达竹煤电(集团)有限责任公司金刚煤矿 Coal cutting roadway wedge shape regenerates wall and the compound gob-side entry retaining method of one-leg shed beam
CN109281687A (en) * 2018-10-23 2019-01-29 河南理工大学 A method of about the quick tuning construction of coal mine development machine

Similar Documents

Publication Publication Date Title
CN103603679B (en) For arch crown steel frame and the method for tunnel construction of arch, supporting tunnel
CN110017144B (en) Loess tunnel three-step construction method considering substrate reinforcement treatment
CN108915728B (en) Tunnel arch wall preliminary bracing based on gantry type support invades limit and changes arch construction method
CN110080296A (en) A kind of unilateral glass muscle-reinforcement cage structure for tunnel shielding portal ground-connecting-wall
CN110306592A (en) It is a kind of elder generation shield after well underground pipe gallery construction method
CN105822329B (en) A kind of construction method of support bracket, supporting construction and supporting construction
CN110242305A (en) A kind of inclined shaft applies the construction technique in main hole into single side heading method
CN205689216U (en) A kind of reinforced combined retaining structure of pipe-plate lining
CN209277895U (en) A kind of tunnel portal anchor pile and pipe canopy are oriented to wall connection structure
CN109944617A (en) A kind of coal seam lane side drill site frame canopy method
CN107313790A (en) A kind of symmetrical trouble hole supporting construction and its construction method
CN209742920U (en) coal mining excavation passageway reinforcing facility
CN109680805A (en) Groove type embedded part installation method
CN217150667U (en) Fixing structure of H-shaped temporary steel beam
CN103184738B (en) Grouting guide pipe restraint ring mounting structure and method for mounting grouting guide pipes by using restraint rings
CN213116355U (en) Steel arch frame lock foot stock angle positioning support
CN213597994U (en) Accurate positioning and connecting device for locking anchor pipe of weak surrounding rock tunnel
CN208473889U (en) For underground engineering ledge method anchor grid one arch springing reinforcement system
CN211113201U (en) Self-stabilizing lattice type supporting system
CN209040174U (en) The fixed device of pile body of indoor pile-soil model test
CN105507909A (en) Section steel arch frame supporting method of tunnel
CN211773691U (en) Steel bar welding fixing device for foundation pit support
CN216304635U (en) Stock or anchor rope steel waist rail connection structure convenient to installation
CN109138010A (en) A kind of fixed device of pile body of interior pile-soil model test
JP2992915B2 (en) Supporting method for underground continuous wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190628

RJ01 Rejection of invention patent application after publication