CN109932616A - 10kV distribution lacks judgement and the localization method of a phase fault - Google Patents

10kV distribution lacks judgement and the localization method of a phase fault Download PDF

Info

Publication number
CN109932616A
CN109932616A CN201910259532.XA CN201910259532A CN109932616A CN 109932616 A CN109932616 A CN 109932616A CN 201910259532 A CN201910259532 A CN 201910259532A CN 109932616 A CN109932616 A CN 109932616A
Authority
CN
China
Prior art keywords
phase
transformer
voltage
electroscope
shortage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910259532.XA
Other languages
Chinese (zh)
Other versions
CN109932616B (en
Inventor
刘玉峰
常永杰
申政
耿亮
苑波
戎士敏
刘保安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Shijiazhuang Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Shijiazhuang Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Shijiazhuang Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201910259532.XA priority Critical patent/CN109932616B/en
Publication of CN109932616A publication Critical patent/CN109932616A/en
Application granted granted Critical
Publication of CN109932616B publication Critical patent/CN109932616B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Abstract

The invention discloses judgement and localization methods that a kind of 10kV distribution lacks a phase fault, and use following steps: step 1, the starting voltage for adjusting electroscope are allowed to the voltage higher than high voltage side of transformer phase shortage phase;Survey or in-site measurement distribution line step down side three-phase phase voltage value are called together by remote information acquisition system, when a phase voltage value is normal, when the sum of another two-phase voltage value is less than 3V with the absolute value of the difference of the voltage value of normal phase simultaneously, then determine that fault type lacks a phase for transformer, and this transformer is in the load side of phase shortage point;Step 2, using each phase voltage of high voltage side of transformer in electroscope detecting step 1 adjusted in step 1, when only measuring a phase, the acousto-optic instruction device of electroscope is failure to actuate, then determine that this is mutually phase shortage, and fault coverage is contracted in this phase of the transformer, and indicate phase shortage point in the source side of the high pressure access point of this transformer.The present invention just can determine that abort situation without seeing phenomenon of the failure.

Description

10kV distribution lacks judgement and the localization method of a phase fault
Technical field
The present invention relates to judgement and localization methods that a kind of 10kV distribution lacks a phase fault, belong to power fault analysis neck Domain.
Background technique
10kV distribution lack a phase when, will lead to motor can not start, phase shortage reason be for example break, switch close a floodgate less than Position etc..Generally judge the method for failure it has to be observed that phenomenon of the failure, just can determine that abort situation, directly results in make an inspection tour and not be directed toward Property, and can not find hidden failure.This is the major drawbacks for judging fault method at present.Analysis for failure is handled first It is the judgement to fault type, followed by the judgement of abort situation.For example, 16 divide on September 7,17 2018, it is fine, it is calm, After phase no-voltage reaches scene in the green offline East Zhongshan Road 14# bar transformer low voltage of Chang'an repairing class report 942 people of people's livelihood station, measure Voltage value at low voltage knife switch are as follows: A phase 175V, B phase voltage shakiness about 64V, C phase 239V.Low voltage three-phase disconnecting link is pulled open at this time, is found Low pressure B phase voltage is still unstable, excludes low voltage failure;Low voltage three-phase fusion tube is removed, the installation of phase fuse is not firm in discovery, place Low pressure B phase voltage value, which is stablized, after reason asks 64V, excludes high pressure fusion tube failure;It only disconnects A, B, C phase respectively to insure, in transformer height Pressure exit electrical appliance, which measures three-phase, voltage, excludes high-voltage insurance failure;In view of the previous day, this becomes at platform insurance and occurs Short trouble is crossed, therefore, it is determined that being transformer problem.00 divides completion transformer more to change jobs when about 22, measures Three-Phase Transformer electricity Pressure value is still abnormal, then make an inspection tour again in learn, neighbouring one Xiang Wu electricity of high voltage customer report low pressure, Chang'an repairing class report closes on change platform Middle Xiang Wu electricity has found that the street Cong Qingyuan to East Zhongshan Road B phase wire jumper is under strain clamp when 23 after the lookup of high power camera 5 centimeters of mouth are blown, but insulated hull does not break.
Why break mutually can still test out and have electricity? because the rodlike concertina type high voltage electroscope of usually used 10kV belongs to Condensing type electroscope, it flows through the electric current in the stray capacitance over the ground of electroscope by detection, detects high voltage electric equipment, route Whether charge.It is provided according to People's Republic of China (PRC) power industry standard DL740-2000, its starting voltage is 0.1~0.45 Voltage rating again, i.e. starting voltage is about 1kV~4.5kV.Such as: it is 2kV with the starting voltage of 10kV electroscope now, goes Testing phase electrification is 3kV route, then electroscope also will call the police.
Summary of the invention
Technical problem to be solved by the invention is to provide one kind can gradually reduce fault point range that may be present 10kV distribution lack a phase fault judgement and localization method.
The present invention adopts the following technical scheme:
A kind of 10kV distribution lacks judgement and the localization method of a phase fault, using following steps:
Step 1, the starting voltage for adjusting electroscope are allowed to the voltage higher than high voltage side of transformer phase shortage phase;
Survey or in-site measurement distribution line step down side three-phase phase voltage value are called together by remote information acquisition system, when One phase voltage value is normal, while when the sum of another two-phase voltage value and the absolute value of the difference of the voltage value of normal phase are less than 3V, then sentencing Determining fault type is that transformer lacks a phase, and this transformer is in the load side of phase shortage point;
Step 2, using each phase voltage of high voltage side of transformer in electroscope detecting step 1 adjusted in step 1, when only surveying The acousto-optic instruction device of electroscope is failure to actuate when measuring a phase, then determines that this is mutually phase shortage, and fault coverage is contracted to the transformation In this phase of device, and indicate phase shortage point in the source side of the high pressure access point of this transformer.
Further, the distribution line transformer is Dyn11 type transformer.
Further, the normal range of a phase voltage value is 198V~235.4V in the step 1.
Further, the equipment of detection is used for as electroscope in the step 1 and step 2.
Further, the starting voltage that electroscope is adjusted in the step 1 is allowed to higher than high voltage side of transformer phase shortage phase Voltage, the specific method is as follows: prepare an a certain phase phase shortage transformer, phase shortage phase it is known that constantly adjustment electroscope in contact Connected divider resistance R1 and the R2 size of electrode, and the high voltage side of transformer phase shortage phase is measured using electroscope adjusted, directly Do not start and the electroscope starting of when normal phase in measuring transformer high-pressure side to electroscope when measuring the phase shortage phase, at this time Divider resistance R1 and R2 no longer adjust, electroscope starting voltage be higher than high voltage side of transformer phase shortage phase voltage, complete adjust It is whole.
Beneficial effects of the present invention are as follows:
The present invention can effectively overcome the deficiencies of existing technologies, and without seeing phenomenon of the failure, just can determine that abort situation.Pass through This method detects twice, gradually reduces fault point range that may be present, has more directive property so that making an inspection tour, and be conducive to find Hidden failure.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the detection schematic diagram for detecting the low-pressure side of transformer.
Fig. 2 is the on high-tension side detection schematic diagram for detecting transformer.
Fig. 3 is the circuit diagram of electroscope.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, 1- Fig. 3 and specific embodiment with reference to the accompanying drawing Clear, complete description is carried out to invention.
A kind of 10kV distribution lacks judgement and the localization method of a phase fault, utilizes the low pressure of common Dyn11 type transformer The relationship of three-phase voltage value carries out the judgement of fault type, utilizes improved 10kV high voltage electroscope (hereinafter referred to as electrical verification Device) carry out fault type judgement and failure more accurately position, detected twice by this method, gradually reduce fault point can Range existing for energy has more directive property so that making an inspection tour, and is conducive to find hidden failure, can effectively overcome lacking for the prior art It falls into, without seeing phenomenon of the failure, just can determine that abort situation.Specifically use following steps:
Step 1, the starting voltage for adjusting electroscope are allowed to the voltage higher than high voltage side of transformer phase shortage phase;
Survey or in-site measurement distribution line step down side three-phase phase voltage value are called together by remote information acquisition system, when One phase voltage value is normal, while when the sum of another two-phase voltage value and the absolute value of the difference of the voltage value of normal phase are less than 3V, then sentencing Determining fault type is that transformer lacks a phase, and this transformer is in the load side of phase shortage point;When principle is a phase scarce because of transformer, One phase voltage of low pressure is normal, and this phase voltage value is equal to the sum of another two-phase voltage value.
Step 2, using each phase voltage of high voltage side of transformer in electroscope detecting step 1 adjusted in step 1, when only surveying The acousto-optic instruction device of electroscope is failure to actuate when measuring a phase, then determines that this is mutually phase shortage, and fault coverage is contracted to the transformation In this phase of device, and indicate phase shortage point in the source side of the high pressure access point of this transformer;Principle is because only phase shortage is mutually electric It forces down in normal rating voltage.
Further, the distribution line transformer is Dyn11 type transformer.
Further, the normal range of a phase voltage value is 198V~235.4V in the step 1.
Further, the equipment of detection is used for as electroscope in the step 1 and step 2.
Further, the starting voltage that electroscope is adjusted in the step 1 is allowed to higher than high voltage side of transformer phase shortage phase Voltage, the specific method is as follows: prepare an a certain phase phase shortage transformer, phase shortage phase it is known that constantly adjustment electroscope in contact Connected divider resistance R1 and the R2 size of electrode, and the high voltage side of transformer phase shortage phase is measured using electroscope adjusted, directly Do not start and the electroscope starting of when normal phase in measuring transformer high-pressure side to electroscope when measuring the phase shortage phase, at this time Divider resistance R1 and R2 no longer adjust, electroscope starting voltage be higher than high voltage side of transformer phase shortage phase voltage, complete adjust It is whole.
The reason of step 1 is set up is discussed below, as shown in Figure 1, the simplification of the three-phase high-low pressure winding of Dyn11 type transformer Figure, it is assumed that high-pressure side A phase phase shortage has at this timeWithSame phase, and be apparent fromFurther according to transformer The no-load voltage ratio of wiring group and transformer can derive that low-pressure side hasThat is Ua+Ub=Uc, it is possible thereby to prove The correctness of step 1.
The reason of step 2 is set up is discussed below, because high-voltage coil and low-voltage coil is coupled by iron core, therefore step down side phase voltage It is directly proportional to high-pressure side line voltage.Again by Dyn11 transformer in B phase phase shortage, low pressure a phase 175V, the b phase 64V of actual measurement, C phase 239V data and Uac=10kV are known:
Obtain UAB=7.32kV, UBC=2.68kV
Again because high-pressure side A, C phase-to-ground voltage are normally 5.77kV, and angle is 120 °, can obtain Fig. 2, according to fig. 2 OB=3.68kV < 5.77kV can be obtained by solving triangle.
It follows that high-pressure side B phase-to-ground voltage is lower than voltage rating.
Low pressure side data when similarly, by high-pressure side A phase phase shortage: a phase 137.1V, b phase 235.2V, c phase 100.4V can be obtained High-pressure side A phase-to-ground voltage is 2.34kV.
It is similar when gained voltage results are to A phase phase shortage since circulation is symmetrical when the C phase phase shortage of high-pressure side.
The rodlike concertina type high voltage electroscope of usually used 10kV belongs to condensing type electroscope, it flows through electrical verification by detection Whether the electric current in the stray capacitance over the ground of device, detection high voltage electric equipment, route charge.According to People's Republic of China's electric power Professional standard DL740-2000 regulation, the voltage rating that its starting voltage is 0.1~0.45 times, i.e. starting voltage is about 1kV ~4.5kV.But existing electroscope starting voltage is obviously relatively low, and when measuring phase shortage phase, electroscope remains to start, therefore can not be used to area Divide phase shortage phase and normal phase.Electroscope circuit diagram with contact electrode the resistance R1 that is connected and resistance R2 as shown in figure 3, mainly rise point Pressure effect, is converted into voltage signal for the capacitance current signal of acquisition, then does subsequent processing.It therefore can be by increasing R1 or subtracting The method of small R2, Lai Tigao are filled with the voltage of subsequent process circuit, so as to improve the starting voltage of electroscope.For example, finding one Model electroscope is disassembled, and measures R1=R2=330 kilo-ohms.The numerical value of resistance R2 is constantly adjusted in the case where B phase phase shortage And testing high voltage side B phase (i.e. phase shortage phase) and A phase (i.e. normal phase), following table can be obtained:
As seen from the above table, phase shortage phase and normal phase can be distinguished with this electroscope when 190 kilo-ohms≤R2≤0.32 megaohm, R2 might as well be enabled to take 255 kilo-ohms of intermediate value.Thus the feasibility of provable step 2.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used To modify to technical solution documented by previous embodiment or equivalent replacement of some of the technical features;And These are modified or replaceed, the spirit and model of technical solution of the embodiment of the present invention that it does not separate the essence of the corresponding technical solution It encloses.

Claims (5)

1. judgement and localization method that a kind of 10kV distribution lacks a phase fault, which is characterized in that use following steps:
Step 1, the starting voltage for adjusting electroscope are allowed to the voltage higher than high voltage side of transformer phase shortage phase;
Survey or in-site measurement distribution line step down side three-phase phase voltage value are called together by remote information acquisition system, when a phase Voltage value is normal, while when the sum of another two-phase voltage value and the absolute value of the difference of the voltage value of normal phase are less than 3V, then determine therefore Hindering type is that transformer lacks a phase, and this transformer is in the load side of phase shortage point;
Step 2, using each phase voltage of high voltage side of transformer in electroscope detecting step 1 adjusted in step 1, when only measuring one The acousto-optic instruction device of electroscope is failure to actuate when phase, then determines that this is mutually phase shortage, and fault coverage is contracted to the transformer In this phase, and indicate phase shortage point in the source side of the high pressure access point of this transformer.
2. judgement and localization method that 10kV distribution according to claim 1 lacks a phase fault, it is characterised in that: described to match Electric line transformer is Dyn11 type transformer.
3. judgement and localization method that 10kV distribution according to claim 2 lacks a phase fault, it is characterised in that: the step The normal range of a phase voltage value is 198V ~ 235.4V in rapid 1.
4. judgement and localization method that 10kV distribution according to claim 1 lacks a phase fault, it is characterised in that: the step Rapid 1 and step 2 in for detection equipment be electroscope.
5. judgement and localization method that 10kV distribution according to claim 1 lacks a phase fault, it is characterised in that: the step The starting voltage that electroscope is adjusted in rapid 1 is allowed to be higher than the voltage of high voltage side of transformer phase shortage phase, and the specific method is as follows: preparing one The transformer of a certain phase phase shortage, phase shortage phase is it is known that the divider resistance R1 and R2 being constantly connected in adjustment electroscope with contact electrode Size, and the high voltage side of transformer phase shortage phase is measured using electroscope adjusted, until measuring the electrical verification when phase shortage phase Device does not start and the electroscope starting of when normal phase in measuring transformer high-pressure side, and divider resistance R1 and R2 at this time is no longer adjusted Whole, the starting voltage of electroscope is higher than the voltage of high voltage side of transformer phase shortage phase, completes adjustment.
CN201910259532.XA 2019-04-02 2019-04-02 Method for judging and positioning one-phase-lack fault of 10kV distribution network Active CN109932616B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910259532.XA CN109932616B (en) 2019-04-02 2019-04-02 Method for judging and positioning one-phase-lack fault of 10kV distribution network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910259532.XA CN109932616B (en) 2019-04-02 2019-04-02 Method for judging and positioning one-phase-lack fault of 10kV distribution network

Publications (2)

Publication Number Publication Date
CN109932616A true CN109932616A (en) 2019-06-25
CN109932616B CN109932616B (en) 2021-01-08

Family

ID=66989029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910259532.XA Active CN109932616B (en) 2019-04-02 2019-04-02 Method for judging and positioning one-phase-lack fault of 10kV distribution network

Country Status (1)

Country Link
CN (1) CN109932616B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110609181A (en) * 2019-10-08 2019-12-24 云南电力技术有限责任公司 Phase-missing judgment method and device for distribution transformer
CN110794226A (en) * 2019-10-08 2020-02-14 云南电力技术有限责任公司 Method and device for judging fused phase in three-phase three-column type distribution transformer

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3860866A (en) * 1973-05-04 1975-01-14 Western Electric Co Methods and apparatus for locating an open section in a conductor
WO1996010189A1 (en) * 1994-09-29 1996-04-04 Pacific Gas And Electric Company Fault sensor device with radio transceiver
CN2358458Y (en) * 1998-09-08 2000-01-12 薄江峰 Double test pencil
CN2476821Y (en) * 2001-04-20 2002-02-13 杨志金 Power detector
CN203644978U (en) * 2013-12-20 2014-06-11 重庆渝电防雷技术股份有限公司 Multifunctional ground wire operating rod
CN105891680A (en) * 2016-06-16 2016-08-24 国网山东省电力公司滨州供电公司 10kV distribution line multiphase disconnection fault determination method based on three-phase voltage and current
CN107340455A (en) * 2016-04-28 2017-11-10 王金泽 A kind of power distribution network high-tension line single-phase wire break fault recognition method and application
CN207281185U (en) * 2017-09-27 2018-04-27 西安易珀电气技术有限公司 A kind of lack detection circuit of three-phase voltage system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3860866A (en) * 1973-05-04 1975-01-14 Western Electric Co Methods and apparatus for locating an open section in a conductor
WO1996010189A1 (en) * 1994-09-29 1996-04-04 Pacific Gas And Electric Company Fault sensor device with radio transceiver
CN2358458Y (en) * 1998-09-08 2000-01-12 薄江峰 Double test pencil
CN2476821Y (en) * 2001-04-20 2002-02-13 杨志金 Power detector
CN203644978U (en) * 2013-12-20 2014-06-11 重庆渝电防雷技术股份有限公司 Multifunctional ground wire operating rod
CN107340455A (en) * 2016-04-28 2017-11-10 王金泽 A kind of power distribution network high-tension line single-phase wire break fault recognition method and application
CN105891680A (en) * 2016-06-16 2016-08-24 国网山东省电力公司滨州供电公司 10kV distribution line multiphase disconnection fault determination method based on three-phase voltage and current
CN207281185U (en) * 2017-09-27 2018-04-27 西安易珀电气技术有限公司 A kind of lack detection circuit of three-phase voltage system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110609181A (en) * 2019-10-08 2019-12-24 云南电力技术有限责任公司 Phase-missing judgment method and device for distribution transformer
CN110794226A (en) * 2019-10-08 2020-02-14 云南电力技术有限责任公司 Method and device for judging fused phase in three-phase three-column type distribution transformer

Also Published As

Publication number Publication date
CN109932616B (en) 2021-01-08

Similar Documents

Publication Publication Date Title
CN102095954A (en) Preventive test method for capacitance voltage transformer free from dismounting lead
CN110031718B (en) Method for verifying integrity of alternating current circuit by pressurizing low-voltage side of railway traction station
CN109932616A (en) 10kV distribution lacks judgement and the localization method of a phase fault
CN102540001A (en) Method of checking alternating current loop of a 500kV transformer substation through carrying out simulated through-type three-phase short circuit
CN108254658A (en) A kind of distribution earth fault searches instrument and lookup method
CN109188057A (en) A kind of phase sequence zero sequence integration voltage sensor
CN103969548A (en) Grounding line selecting and ground fault section positioning method for arc suppression coil
CN109581168A (en) A kind of converter power transformer In situ DC partial discharge test system and method
CN103983895B (en) The online N line multipoint earth faults detection method of PT secondary circuit
CN105093058A (en) Method for determining whether secondary circuit of current transformer is left open-circuited and corresponding determining apparatus
CN104122526A (en) High voltage electric energy meter with metering unit capable of being charged to replace
CN103163419B (en) Indicator and method for cable core correction and transformer tripping outlet correction
CN104505863B (en) A method for determining and adjusting wireless phase detection
CN207798935U (en) Current transformer calibration device in integrated GIS pipelines
CN105911391B (en) A kind of RPLDECT rails potential limiting device opering characteristic of electric apparatus tester
CN106199164B (en) A kind of measurement method of transformer iron core grounding current
CN106461737A (en) Method of testing a transformer, electrical testing system, short-circuiting circuit and anodizing assembly
CN105182173B (en) Novel composite mutual inductor polarity tester
CN103743994A (en) Low-voltage load test method and device
CN107831378A (en) A kind of device and method for examining arc suppression coil compensation effect
CN103941146B (en) A kind of apparatus and method detecting and distinguish each Secondary Winding accuracy rating of 10kV current transformer that do not have a power failure
CN106119856A (en) A kind of Intelligent region cathodic protection monitoring system and control method thereof
CN110703039A (en) Rapid positioning method for distribution network line fault
CN204789785U (en) Portable intelligent substation relay protection testing arrangement
CN107957568A (en) Secondary Circuit of Potential Transformer multipoint earthing Quick positioning instrument and lookup method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant