CN109898850A CN201711285845.XA CN201711285845A CN109898850A CN 109898850 A CN109898850 A CN 109898850A CN 201711285845 A CN201711285845 A CN 201711285845A CN 109898850 A CN109898850 A CN 109898850A
Authority
CN
China
Prior art keywords
screw rod
outer framework
column
pouring
driving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711285845.XA
Other languages
Chinese (zh)
Other versions
CN109898850B (en
Inventor
陈建兰
吴平兰
赵小飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Hong Construction Group Co Ltd
Original Assignee
Guangzhou Hong Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Hong Construction Group Co Ltd filed Critical Guangzhou Hong Construction Group Co Ltd
Priority to CN201711285845.XA priority Critical patent/CN109898850B/en
Publication of CN109898850A publication Critical patent/CN109898850A/en
Application granted granted Critical
Publication of CN109898850B publication Critical patent/CN109898850B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明提供一种适用于装配式梁柱后浇段的模板及其使用方法。所述适用于装配式梁柱后浇段的模板及其使用方法包括固定结构;两个第一浇筑结构,两个所述第一浇筑结构均包括第一浇筑钢板和第一外框架,所述固定结构卡合于两个对称设置的所述第一外框架,所述第一外框架的对立面均设有所述第一钢板,两个所述第一外框架构成具有容纳空腔的矩形结构;两个第二浇筑结构,两个所述第二浇筑结构均包括第二浇筑钢板和第二外框架,两个所述第一外框架与两个所述第二外框架卡合,两个所述第二外框架对称设置。本发明提供的适用于装配式梁柱后浇段的模板及其使用方法安装安装拆卸方便,模板方便固定,可循环使用,工作效率高。

The invention provides a formwork suitable for post-casting sections of assembled beams and columns and a method of using the same. The formwork suitable for the post-casting section of prefabricated beams and columns and the method for using the same include a fixed structure; two first pouring structures, both of which include a first pouring steel plate and a first outer frame, the The fixing structure is engaged with two symmetrically arranged first outer frames, the first steel plates are provided on opposite surfaces of the first outer frames, and the two first outer frames form a rectangular structure with accommodating cavities ; Two second pouring structures, both of which include a second pouring steel plate and a second outer frame, the two first outer frames are engaged with the two second outer frames, and the two The second outer frame is symmetrically arranged. The template suitable for the post-casting section of the assembled beam and column and the use method thereof provided by the invention are convenient to install, install and disassemble, the template is convenient to fix, can be recycled, and has high work efficiency.

Description

A kind of template and its application method suitable for pouring section after assembled beam-column
Technical field
The present invention relates to technical field of buildings more particularly to a kind of template suitable for pouring section after assembled beam-column and its make Use method.
Background technique
With the high development of society, economic strength and its scientific and technological strength are gradually increased, and building trade rapid development is built Industry to be built gradually to develop to high efficiency direction, reinforced concrete precast member is gradually employed, such as: assembled beam-column, assembled Beam column is to use prefabrication, then be transported to construction site and carry out the fixed beam column of installation, assembled beam-column by design requirement position Use substantially reduce the duration, improve building efficiency.
However the template installation fixation that section is poured after traditional assembled beam-column is cumbersome, it is tight in the casting process of beam column post-cast strip Close property is insufficient, and low efficiency is recycled.
Therefore, it is necessary to provide in the new template and its application method solution suitable for pouring section after assembled beam-column of one kind State technical problem.
Summary of the invention
Easy for assemble or unload, template that the technical problem to be solved by the present invention is to provide one kind, which facilitates, fixes, can be recycled, work Make the high-efficient template and its application method suitable for pouring section after assembled beam-column.
In order to solve the above technical problems, the template provided by the invention suitable for pouring section after assembled beam-column, comprising: fixed Structure;Two the first pouring structures, the fixed structure are sticked in two symmetrically arranged first pouring structures, two institutes State the first pouring structure and include first and pour steel plate and the first outer framework, the fixed structure be sticked in two it is symmetrically arranged First outer framework, the opposite of first outer framework are equipped with first steel plate, two the first outline border frameworks At the rectangular configuration with accommodating cavity;Two the second pouring structures, two second pouring structures are respectively and described in two The engaging of first outer framework, two second pouring structures include second pouring steel plate and the second outer framework, and two described the One outer framework engages with two second outer frameworks, and two second outer frameworks are symmetrical arranged, two second outline borders Frame is equipped with described second away from the side of first outer framework and pours steel plate, first outer framework and one described the The interface of the opposite of two outer frameworks and another described first outer framework and another second outer framework is plane Structure.
Preferably, fastening structure, four institutes are equipped on two first outer frameworks and two second outer frameworks Stating fastening structure includes multiple idler wheels, multiple second screw rods and pressing plate, outside two first outer frameworks and two described second Lower portion is equipped with multiple second screw rods, and four pressing plates are connected to the institute on two first outer frameworks State the idler wheel on second screw rod on the idler wheel and two second outer frameworks on the second screw rod, described Two screw rods are connect with the press plate rotary.
Preferably, the fastening structure further includes multiple second driving heads, and second screw rod deviates from the one of the pressing plate End is equipped with second driving head, and second driving head is positive hexagonal structure.
Preferably, four pressing plates are rectangular configuration, and four pressing plates are set close to the side of second screw rod There is horizontal bead.
Preferably, the top surface of two first outer frameworks and two second outer frameworks is equipped with observation window, and four The observation window and four horizontal beads correspond.
Preferably, one end of second driving head and the fixed structure is equipped with driving structure, second screw rod It is rotatablely connected with the driving structure with the fixed structure.
Preferably, the driving structure is equipped with multiple, and multiple driving structures include sleeve, limited block, shaft, limit Position gear and drive rod, second driving head and the fixed structure are both secured to the position limited gear, the position limited gear It is rotatablely connected with the sleeve, the inside of the sleeve is equipped with the shaft, and the shaft and the limited block are rotatablely connected, institute It states limited block to engage with the position limited gear, one end of the sleeve is equipped with the drive rod.
Preferably, the fixed structure be equipped with it is multiple, multiple fixed structures include the first driving head, gag lever post, Connecting rod, the first screw rod, non-slip mat and two fixing sleeves, two fixing sleeves respectively with two the first outer framework cards It closes, two fixing sleeves are equipped with the non-slip mat close to one end of first outer framework, described in the gag lever post and one Fixing sleeve rotation connection, first screw rod is threadedly coupled with fixing sleeve described in another, the gag lever post and described first It is equipped with the connecting rod between bar, the gag lever post is equipped with first driving head away from one end of the connecting rod, and described the One driving head is equal in magnitude with second driving head, and first driving head engages with the position limited gear.
Preferably, the fixed structure is equipped with multiple, and multiple fixed structures include the first driving head, first Bar, non-slip mat and two fixing sleeves, two fixing sleeves engage with two first outer frameworks respectively, two fixations It covers and is equipped with the non-slip mat close to one end of first outer framework, first screw rod and two fixed external threadings connect It connects, one end of first screw rod is equipped with first driving head, the size of first driving head and second driving head Equal, first driving head engages with the position limited gear.
Preferably, the application method of the template suitable for pouring section after assembled beam-column, comprising the following steps:
Step 1: assembled formwork for placing first engages first outer framework with corresponding one second outer framework, It is described by second screw rod of the fastening structure through first outer framework and corresponding one second outer framework The bottom end of second screw rod is installed by the pressing plate;
Step 2: installation formwork for placing: the size of beam column is measured, will be turned by the driving structure according to the size of beam column Second screw rod adjusts the position limited gear and the second driving head engagement direction according to the operating habit of user, with Turning and driving the direction of the second screw rod rotation is positive direction, and the position limited gear and sleeve rotation are opposite direction, when When the drive rod positive direction rotates, the gag lever post limits the position limited gear, the position limited gear driving described second Screw rod rotation, when drive rod opposite direction rotation, the position limited gear and the sleeve are rotatablely connected, and make the drive rod It resets, the distance for adjusting the pressing plate apart from first outer framework bottom surface is slightly larger than the thickness of beam, turns described first Driving head makes the distance between two described fixing sleeves be slightly larger than the width of the beam, will first outer framework and described the Two outer frameworks, which respectively correspond, to be covered in the outside of beam column, drives the pressing plate and its fixing sleeve by beam column by the drive rod The outer framework of two sides engages;
Step 3: adjusting formwork for placing, adjusts first screw rod and second screw rod by the drive rod, makes opposition Two outer frameworks are in a vertical state, and first screw rod limits the pressing plate, observed by the horizontal bead The levelness of the pressing plate, adjusting template are horizontal;
Step 4: disassembly formwork for placing is removed the fastening structure and the fixed structure simultaneously by the drive rod one by one And cleaning oiling maintenance is carried out to the template after dismounting.
Compared with the relevant technologies, the template and its application method provided by the invention suitable for pouring section after assembled beam-column It has the following beneficial effects:
The present invention provides a kind of template and its application method suitable for pouring section after assembled beam-column, and two described first pour knot Described the first of structure pours steel plate and first outer framework surrounds the frame structure with rectangular channel, convenient for directly by casting beams It is fixed, first outer framework of two first pouring structures and second outline border of two second pouring structures Frame engages and structure is in 90 °, and two first outer frameworks are symmetrical arranged two-by-two with two second outer frameworks, convenient for straight It connects and beam column is fixed and pours band with intersecting for beam column and fits closely, poured convenient for the inside directly in template, improve beam Column pours the quality of band poured, and substantially increases formwork for placing installation speed, substantially increases the recycling of formwork for placing Efficiency has good Social benefit and economic benefit, is suitble to promote the use of.
Detailed description of the invention
Fig. 1 is a kind of preferable reality provided by the invention suitable for pouring the template and its application method of section after assembled beam-column Apply the structural schematic diagram of example;
Fig. 2 is the structural schematic diagram of driving structure shown in FIG. 1;
Fig. 3 is the fixation provided by the invention suitable for pouring the template of section and its embodiment one of application method after assembled beam-column The structural schematic diagram of structure;
Fig. 4 is the fixation provided by the invention suitable for pouring the template of section and its embodiment two of application method after assembled beam-column The structural schematic diagram of structure;
Fig. 5 is the application method flow chart provided by the invention suitable for pouring the template of section after assembled beam-column.
Figure label: 1, fixed structure, the 11, first driving head, 12, gag lever post, 13, connecting rod, the 14, first screw rod, 15, Non-slip mat, 16, fixing sleeve, the 2, first pouring structure, 21, first pours steel plate, the 22, first outer framework, 3, driving structure, 31, Sleeve, 32, limited block, 33, shaft, 34, position limited gear, 35, drive rod, 4, observation window, 5, horizontal bead, 6, fastening structure, 61, Second driving head, 62, idler wheel, the 63, second screw rod, 64, pressing plate, the 7, second pouring structure, 71, second pours steel plate, and 72, second Outer framework.
Specific embodiment
The invention will be further described with embodiment with reference to the accompanying drawing.
Embodiment one:
Please refer to Fig. 1, Fig. 2 and Fig. 3, wherein Fig. 1 is the template provided by the invention suitable for pouring section after assembled beam-column And its a kind of structural schematic diagram of preferred embodiment of application method;Fig. 2 is the structural schematic diagram of driving structure shown in FIG. 1; Fig. 3 is the fixed structure provided by the invention suitable for pouring the template of section and its embodiment one of application method after assembled beam-column Structural schematic diagram.Template suitable for pouring section after assembled beam-column includes: fixed structure 1;Two the first pouring structures 2, institute It states fixed structure 1 and is sticked in two symmetrically arranged first pouring structures 2, two first pouring structures 2 include First pours steel plate 21 and the first outer framework 22, and the fixed structure 1 is sticked in two symmetrically arranged first outer frameworks 22, the opposite of first outer framework 22 is equipped with first steel plate 21, and two compositions of the first outer framework 22 have The rectangular configuration of accommodating cavity;Two the second pouring structures 7, two second pouring structures 7 respectively with two described first Outer framework 22 engages, and two second pouring structures 7 pour steel plate 71 and the second outer framework 72 including second, described in two First outer framework 22 engages with two second outer frameworks 72, and two second outer frameworks 72 are symmetrical arranged, described in two Second outer framework 72 is equipped with described second away from the side of first outer framework 22 and pours steel plate 71, first outline border Frame 22 and second outer framework 72 and another described first outer framework 22 and another second outer framework 72 The interface of opposite is planar structure.
For the ease of pressing precast beam by the pressing plate, make first outer framework 22 and second outer framework 72 Bottom surface is horizontal, convenient for the decoration construction in later period, is all provided on two first outer frameworks 22 and two second outer frameworks 72 There is a fastening structure 6, four fastening structures 6 include multiple idler wheels 62, multiple second screw rods 63 and pressing plate 64, and two described the Multiple second screw rods 63 are equipped with inside one outer framework 22 and two second outer frameworks 72, four pressing plates 64 divide Outside the idler wheel 62 not being connected on second screw rod 63 on two first outer frameworks 22 and two described second The idler wheel 62 on second screw rod 63 on frame 72, second screw rod 63 are rotatablely connected with the pressing plate 64.
For the ease of driving second screw rod 63 by the driving structure 3, installation speed, the fastening structure are improved 6 further include multiple second driving heads 61, and second screw rod 63 is equipped with second driving head away from one end of the pressing plate 64 61, second driving head 61 is positive hexagonal structure.
For the ease of intuitively estimating the levelness of the pressing plate 64, working efficiency is improved, four pressing plates 64 are Rectangular configuration, four pressing plates 64 are equipped with horizontal bead 5 close to the side of second screw rod 63;Two first outer frameworks 22 and the top surfaces of two second outer frameworks 72 be equipped with observation window 4, four observation windows 4 and four horizontal beads 5 It corresponds.
For the ease of driving second screw rod 63 in the same direction by the drive rod 35, mentioning in high altitude operation One end of high construction safety performance, second driving head 61 and the fixed structure 1 is equipped with driving structure 3, and described second Screw rod 63 and the fixed structure 1 are rotatablely connected with the driving structure 3;The driving structure 3 be equipped with it is multiple, it is multiple described Driving structure 3 includes sleeve 31, limited block 32, shaft 33, position limited gear 34 and drive rod 35, second driving head 61 with The fixed structure 1 is both secured to the position limited gear 34, and the position limited gear 34 is rotatablely connected with the sleeve 31, the set The inside of cylinder 31 is equipped with the shaft 33, and the shaft 33 is rotatablely connected with the limited block 32, the limited block 32 with it is described Position limited gear 34 engages, and one end of the sleeve 31 is equipped with the drive rod 35.
For the ease of first outer framework 22 at the prefabricated beam column both ends of fixation, construction efficiency is improved, improves template circulation Service efficiency, the fixed structure 1 be equipped with it is multiple, multiple fixed structures 1 include the first driving head 11, gag lever post 12, Connecting rod 13, the first screw rod 14, non-slip mat 15 and two fixing sleeves 16, two fixing sleeves 16 respectively with two described first Outer framework 22 engages, and two fixing sleeves 16 are equipped with the non-slip mat 15 close to one end of first outer framework 22, described Gag lever post 12 and a fixing sleeve 16 are rotatablely connected, and first screw rod 14 connects with another described 16 screw thread of fixing sleeve It connects, the connecting rod 13 is equipped between the gag lever post 12 and first screw rod 14, the gag lever post 12 deviates from the connection One end of bar 13 is equipped with first driving head 11, and first driving head 11 is equal in magnitude with second driving head 61, First driving head 11 engages with the position limited gear 34.
Embodiment two:
Please refer to Fig. 1, Fig. 2 and Fig. 4, wherein Fig. 1 is the template provided by the invention suitable for pouring section after assembled beam-column And its a kind of structural schematic diagram of preferred embodiment of application method;Fig. 2 is the structural schematic diagram of driving structure shown in FIG. 1; Fig. 4 is the fixed structure provided by the invention suitable for pouring the template of section and its embodiment two of application method after assembled beam-column Structural schematic diagram.Template suitable for pouring section after assembled beam-column includes: fixed structure 1;Two the first pouring structures 2, institute It states fixed structure 1 and is sticked in two symmetrically arranged first pouring structures 2, two first pouring structures 2 include First pours steel plate 21 and the first outer framework 22, and the fixed structure 1 is sticked in two symmetrically arranged first outer frameworks 22, the opposite of first outer framework 22 is equipped with first steel plate 21, and two compositions of the first outer framework 22 have The rectangular configuration of accommodating cavity;Two the second pouring structures 7, two second pouring structures 7 respectively with two described first Outer framework 22 engages, and two second pouring structures 7 pour steel plate 71 and the second outer framework 72 including second, described in two First outer framework 22 engages with two second outer frameworks 72, and two second outer frameworks 72 are symmetrical arranged, described in two Second outer framework 72 is equipped with described second away from the side of first outer framework 22 and pours steel plate 71, first outline border Frame 22 and second outer framework 72 and another described first outer framework 22 and another second outer framework 72 The interface of opposite is planar structure.
For the ease of pressing precast beam by the pressing plate, make first outer framework 22 and second outer framework 72 Bottom surface is horizontal, convenient for the decoration construction in later period, is all provided on two first outer frameworks 22 and two second outer frameworks 72 There is a fastening structure 6, four fastening structures 6 include multiple idler wheels 62, multiple second screw rods 63 and pressing plate 64, and two described the Multiple second screw rods 63 are equipped with inside one outer framework 22 and two second outer frameworks 72, four pressing plates 64 divide Outside the idler wheel 62 not being connected on second screw rod 63 on two first outer frameworks 22 and two described second The idler wheel 62 on second screw rod 63 on frame 72, second screw rod 63 are rotatablely connected with the pressing plate 64.
For the ease of driving second screw rod 63 by the driving structure 3, installation speed, the fastening structure are improved 6 further include multiple second driving heads 61, and second screw rod 63 is equipped with second driving head away from one end of the pressing plate 64 61, second driving head 61 is positive hexagonal structure.
For the ease of intuitively estimating the levelness of the pressing plate 64, working efficiency is improved, four pressing plates 64 are Rectangular configuration, four pressing plates 64 are equipped with horizontal bead 5 close to the side of second screw rod 63;Two first outer frameworks 22 and the top surfaces of two second outer frameworks 72 be equipped with observation window 4, four observation windows 4 and four horizontal beads 5 It corresponds.
For the ease of driving second screw rod 63 in the same direction by the drive rod 35, mentioning in high altitude operation One end of high construction safety performance, second driving head 61 and the fixed structure 1 is equipped with driving structure 3, and described second Screw rod 63 and the fixed structure 1 are rotatablely connected with the driving structure 3;The driving structure 3 be equipped with it is multiple, it is multiple described Driving structure 3 includes sleeve 31, limited block 32, shaft 33, position limited gear 34 and drive rod 35, second driving head 61 with The fixed structure 1 is both secured to the position limited gear 34, and the position limited gear 34 is rotatablely connected with the sleeve 31, the set The inside of cylinder 31 is equipped with the shaft 33, and the shaft 33 is rotatablely connected with the limited block 32, the limited block 32 with it is described Position limited gear 34 engages, and one end of the sleeve 31 is equipped with the drive rod 35.
For the ease of first outer framework 22 at the prefabricated beam column both ends of fixation, construction efficiency is improved, improves template circulation Service efficiency, the fixed structure 1 be equipped with it is multiple, multiple fixed structures 11 include the first driving head 11, the first screw rod 14, non-slip mat 15 and two fixing sleeves 16, two fixing sleeves 16 engage with two first outer frameworks 22 respectively, and two The fixing sleeve 16 is equipped with the non-slip mat 15, first screw rod 14 and two institutes close to one end of first outer framework 22 The threaded connection of fixing sleeve 16 is stated, one end of first screw rod 14 is equipped with first driving head 11, first driving head 11 Equal in magnitude with second driving head 61, first driving head 11 engages with the position limited gear 34.
Fig. 5 is please referred to, Fig. 5 is the application method provided by the invention suitable for pouring the template of section after assembled beam-column Flow chart, suitable for poured after assembled beam-column the template of section application method the following steps are included:
Step 1: assembled formwork for placing, first by first outer framework 22 and corresponding one second outer framework 72 Engaging, by second screw rod 63 of the fastening structure 6 through first outer framework 22 and corresponding one described second The bottom end of outer framework 72, second screw rod 63 is installed by the pressing plate 64;
Step 2: installation formwork for placing: the size of beam column is measured, will be twisted by the driving structure 3 according to the size of beam column Second screw rod 63 is moved, the position limited gear 34 is adjusted according to the operating habit of user and is engaged with second driving head 61 Direction, to turn the direction for driving second screw rod 63 to rotate as positive direction, the position limited gear 34 with 31 turns of the sleeve It moves as opposite direction, when 35 positive direction of drive rod rotation, the gag lever post 12 limits the position limited gear 34, the limit Position gear 34 drives second screw rod 63 to rotate, when 35 opposite direction of drive rod rotation, the position limited gear 34 and institute The rotation connection of sleeve 31 is stated, the drive rod 35 is resetted, it is described to adjust the pressing plate 64 apart from 22 bottom of the first outer framework The distance in face is slightly larger than the thickness of beam, turns first driving head 11, keeps the distance between two described fixing sleeves 16 bigger In the width of the beam, first outer framework 22 is respectively corresponded with second outer framework 72 and is covered in the outside of beam column, is led to Crossing the drive rod 35 drives the pressing plate 64 and its fixing sleeve 16 to engage the outer framework of beam column two sides;
Step 3: formwork for placing is adjusted, first screw rod 14 and second screw rod 63 are adjusted by the drive rod 35, made Two outer frameworks of opposition are in a vertical state, and first screw rod 14 limits the pressing plate 64, by described Horizontal bead 5 observes the levelness of the pressing plate 64, and adjusting template is horizontal;
Step 4: disassembly formwork for placing is torn the fastening structure 6 and the fixed structure 1 open by the drive rod 35 one by one It removes and cleaning oiling maintenance is carried out to the template after dismounting.
The template suitable for pouring section after assembled beam-column of embodiment one and embodiment two makes 20 sets respectively, then will be real Apply template application method according to the invention that 20 sets of example one and embodiment two are suitable for pouring after assembled beam-column section and common 20 sets of templates suitable for pouring section after assembled beam-column for the identical high-building construction of architectural environment factor, through excessive The random experiments of second periodicity obtain, pass through the template and its application method for being suitable for pouring section after assembled beam-column of embodiment one Template it is higher by 10% than the installation speed of the common template for being suitable for pouring section after assembled beam-column, pass through being applicable in for embodiment one The template of section and its template of application method are poured after assembled beam-column than the common mould for being suitable for pouring section after assembled beam-column Plate stability is high by 13%, by embodiment one suitable for pouring the template of section and its template ratio of application method after assembled beam-column The common template flexibility ratio suitable for pouring section after assembled beam-column is high by 19%, is suitable for assembled beam-column by embodiment two Pour afterwards section template and its application method template than the common template for being suitable for pouring section after assembled beam-column installation speed It is high by 13%, it is fitted by the template for being suitable for pouring section after assembled beam-column of embodiment two and its template of application method than common Form stable high 14% for pouring section after assembled beam-column, by embodiment two suitable for pouring section after assembled beam-column The template of template and its application method is higher by 20% than the common template flexibility ratio for being suitable for pouring section after assembled beam-column.
Working principle provided by the invention suitable for pouring the template and its application method of section after assembled beam-column are as follows: first One first outer framework 22 is engaged with corresponding one second outer framework 72, by described the of the fastening structure 6 Two screw rods 63 are through first outer framework 22 and corresponding one second outer framework 72, the bottom end of second screw rod 63 The pressing plate 64 is installed;The size for measuring beam column, will turn described second by the driving structure 3 according to the size of beam column Screw rod 63 adjusts the position limited gear 34 and 61 engagement direction of the second driving head according to the operating habit of user, to twist The dynamic direction for driving second screw rod 63 to rotate is positive direction, and the position limited gear 34 is negative side with the sleeve 31 rotation To when 35 positive direction of drive rod rotation, the gag lever post 12 limits the position limited gear 34, the position limited gear 34 Second screw rod 63 is driven to rotate, when 35 opposite direction of drive rod rotation, the position limited gear 34 and the sleeve 31 Rotation connection resets the drive rod 35, the distance for adjusting the pressing plate 64 apart from 22 bottom surface of the first outer framework Slightly larger than the thickness of beam, first driving head 11 is turned, makes the distance between two described fixing sleeves 16 slightly larger than the beam Width, first outer framework 22 is respectively corresponded with second outer framework 72 and is covered in the outside of beam column, the drive is passed through Lever 35 drives the pressing plate 64 and its fixing sleeve 16 to engage the outer framework of beam column two sides;It is adjusted by the drive rod 35 First screw rod 14 and second screw rod 63 are saved, keeps two outer frameworks of opposition in a vertical state, described first Screw rod 14 limits the pressing plate 64, and the levelness of the pressing plate 64, adjusting template water are observed by the horizontal bead 5 It is flat;By the drive rod 35 by the fastening structure 6 removed one by one with the fixed structure 1 and to the template after dismounting into Row cleaning oiling maintenance.
Compared with the relevant technologies, the template and its application method provided by the invention suitable for pouring section after assembled beam-column It has the following beneficial effects:
The present invention provides a kind of template and its application method suitable for pouring section after assembled beam-column, and two described first pour knot Described the first of structure 2 pours steel plate 21 and first outer framework 22 surrounds the frame structure with rectangular channel, convenient for directly will Casting beams are fixed, first outer framework 22 of two first pouring structures 2 and the institute of two second pouring structures 7 It states the engaging of the second outer framework 72 and structure is in 90 °, two first outer frameworks 22 and two second outer frameworks 72 equal two Two are symmetrical arranged, convenient for directly fixing beam column and pouring band with intersecting for beam column and fit closely, convenient for directly in template Inside pours, and improves the quality poured that beam column pours band, substantially increases formwork for placing installation speed, substantially increase and pour The recycling efficiency of building mould;With good Social benefit and economic benefit, it is suitble to promote the use of.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (10)

1. a kind of template suitable for pouring section after assembled beam-column characterized by comprising
Fixed structure;
Two the first pouring structures, the fixed structure are sticked in two symmetrically arranged first pouring structures, two institutes State the first pouring structure and include first and pour steel plate and the first outer framework, the fixed structure be sticked in two it is symmetrically arranged First outer framework, the opposite of first outer framework are equipped with first steel plate, two the first outline border frameworks At the rectangular configuration with accommodating cavity;
Two the second pouring structures, two second pouring structures engage with two first outer frameworks respectively, two institutes It states the second pouring structure and includes second and pour steel plate and the second outer framework, two first outer frameworks and two described second Outer framework engaging, two second outer frameworks are symmetrical arranged, and two second outer frameworks are away from first outer framework Side is equipped with described second and pours steel plate, first outer framework and second outer framework and another described the The interface of the opposite of one outer framework and another second outer framework is planar structure.
2. the template according to claim 1 suitable for pouring section after assembled beam-column, which is characterized in that two described first It is equipped with fastening structure on outer framework and two second outer frameworks, four fastening structures include multiple idler wheels, multiple Multiple described second are equipped with inside second screw rod and pressing plate, two first outer frameworks and two second outer frameworks Bar, four pressing plates are connected to the idler wheel and two on second screw rod on two first outer frameworks The idler wheel on second screw rod on second outer framework, second screw rod are connect with the press plate rotary.
3. the template according to claim 2 suitable for pouring section after assembled beam-column, which is characterized in that the fastening structure It further include multiple second driving heads, second screw rod is equipped with second driving head away from one end of the pressing plate, and described the Two driving heads are positive hexagonal structure.
4. the template according to claim 2 suitable for pouring section after assembled beam-column, which is characterized in that four pressing plates It is rectangular configuration, four pressing plates are equipped with horizontal bead close to the side of second screw rod.
5. the template according to claim 4 suitable for pouring section after assembled beam-column, which is characterized in that two described first The top surface of outer framework and two second outer frameworks is equipped with observation window, four observation windows and four horizontal beads one One is corresponding.
6. the template according to claim 2 suitable for pouring section after assembled beam-column, which is characterized in that second driving One end of head and the fixed structure is equipped with driving structure, and second screw rod and the fixed structure are tied with the driving Structure rotation connection.
7. the template according to claim 6 suitable for pouring section after assembled beam-column, which is characterized in that the driving structure Equipped with multiple, multiple driving structures include sleeve, limited block, shaft, position limited gear and drive rod, second driving Head is both secured to the position limited gear with the fixed structure, and the position limited gear and the sleeve are rotatablely connected, the sleeve Inside be equipped with the shaft, the shaft and the limited block are rotatablely connected, and the limited block is engaged with the position limited gear, One end of the sleeve is equipped with the drive rod.
8. the template according to claim 7 suitable for pouring section after assembled beam-column, which is characterized in that the fixed structure Equipped with multiple, multiple fixed structures include the first driving head, gag lever post, connecting rod, the first screw rod, non-slip mat and two Fixing sleeve, two fixing sleeves engage with two first outer frameworks respectively, and two fixing sleeves are close to described first One end of outer framework is equipped with the non-slip mat, and the gag lever post is rotatablely connected with the fixing sleeve, first screw rod and Another described fixing sleeve is threadedly coupled, and the connecting rod, the limit are equipped between the gag lever post and first screw rod Bar is equipped with first driving head, the size of first driving head and second driving head away from one end of the connecting rod Equal, first driving head engages with the position limited gear.
9. the template according to claim 7 suitable for pouring section after assembled beam-column, which is characterized in that the fixed structure Equipped with multiple, multiple fixed structures include the first driving head, the first screw rod, non-slip mat and two fixing sleeves, two institutes It states fixing sleeve to engage with two first outer frameworks respectively, two fixing sleeves are set close to one end of first outer framework There is the non-slip mat, first screw rod is threadedly coupled with two fixing sleeves, and one end of first screw rod is equipped with described First driving head, first driving head is equal in magnitude with second driving head, first driving head and the limit Gear engaging.
10. -9 described in any item application methods suitable for pouring the template of section after assembled beam-column according to claim 1, special Sign is, comprising the following steps:
Step 1: assembled formwork for placing first engages first outer framework with corresponding one second outer framework, It is described by second screw rod of the fastening structure through first outer framework and corresponding one second outer framework The bottom end of second screw rod is installed by the pressing plate;
Step 2: installation formwork for placing: the size of beam column is measured, will be turned by the driving structure according to the size of beam column Second screw rod adjusts the position limited gear and the second driving head engagement direction according to the operating habit of user, with Turning and driving the direction of the second screw rod rotation is positive direction, and the position limited gear and sleeve rotation are opposite direction, when When the drive rod positive direction rotates, the gag lever post limits the position limited gear, the position limited gear driving described second Screw rod rotation, when drive rod opposite direction rotation, the position limited gear and the sleeve are rotatablely connected, and make the drive rod It resets, the distance for adjusting the pressing plate apart from first outer framework bottom surface is slightly larger than the thickness of beam, turns described first Driving head makes the distance between two described fixing sleeves be slightly larger than the width of the beam, will first outer framework and described the Two outer frameworks, which respectively correspond, to be covered in the outside of beam column, drives the pressing plate and its fixing sleeve by beam column by the drive rod The outer framework of two sides engages;
Step 3: adjusting formwork for placing, adjusts first screw rod and second screw rod by the drive rod, makes opposition Two outer frameworks are in a vertical state, and first screw rod limits the pressing plate, observed by the horizontal bead The levelness of the pressing plate, adjusting template are horizontal;
Step 4: disassembly formwork for placing is removed the fastening structure and the fixed structure simultaneously by the drive rod one by one And cleaning oiling maintenance is carried out to the template after dismounting.
CN201711285845.XA 2017-12-07 2017-12-07 A formwork suitable for post-casting section of prefabricated beams and columns and using method thereof Active CN109898850B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711285845.XA CN109898850B (en) 2017-12-07 2017-12-07 A formwork suitable for post-casting section of prefabricated beams and columns and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711285845.XA CN109898850B (en) 2017-12-07 2017-12-07 A formwork suitable for post-casting section of prefabricated beams and columns and using method thereof

Publications (2)

Publication Number Publication Date
CN109898850A true CN109898850A (en) 2019-06-18
CN109898850B CN109898850B (en) 2021-04-09

Family

ID=66939176

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711285845.XA Active CN109898850B (en) 2017-12-07 2017-12-07 A formwork suitable for post-casting section of prefabricated beams and columns and using method thereof

Country Status (1)

Country Link
CN (1) CN109898850B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB556806A (en) * 1942-03-06 1943-10-22 Dixon John Formwork or centering for moulded in situ beams columns and like members
WO2009055691A2 (en) * 2007-10-24 2009-04-30 Western Forms, Inc. Multiple dimension beam, deck and column system
CN202152543U (en) * 2011-07-19 2012-02-29 刘顺华 Exposed column template support combining structure
CN102691412A (en) * 2012-06-05 2012-09-26 中国十七冶集团有限公司 Prefabricated frame structure connection supporting template with adjustable vertical height
CN103225395A (en) * 2013-04-17 2013-07-31 中国十七冶集团有限公司 Floor post-cast strip template structure and use method
CN103866970A (en) * 2014-03-10 2014-06-18 中国一冶集团有限公司 Casting construction mold for water cooling columns and water cooling beams of heating furnaces
CN105464219A (en) * 2014-09-12 2016-04-06 中建四局第一建筑工程有限公司 Concrete pouring method for transfer story beam-column nodes and partitions used by method
CN107288218A (en) * 2017-08-15 2017-10-24 姚伟华 A kind of assembled steel tendon concrete frame structure bean column node and preparation method thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB556806A (en) * 1942-03-06 1943-10-22 Dixon John Formwork or centering for moulded in situ beams columns and like members
WO2009055691A2 (en) * 2007-10-24 2009-04-30 Western Forms, Inc. Multiple dimension beam, deck and column system
CN202152543U (en) * 2011-07-19 2012-02-29 刘顺华 Exposed column template support combining structure
CN102691412A (en) * 2012-06-05 2012-09-26 中国十七冶集团有限公司 Prefabricated frame structure connection supporting template with adjustable vertical height
CN103225395A (en) * 2013-04-17 2013-07-31 中国十七冶集团有限公司 Floor post-cast strip template structure and use method
CN103866970A (en) * 2014-03-10 2014-06-18 中国一冶集团有限公司 Casting construction mold for water cooling columns and water cooling beams of heating furnaces
CN105464219A (en) * 2014-09-12 2016-04-06 中建四局第一建筑工程有限公司 Concrete pouring method for transfer story beam-column nodes and partitions used by method
CN107288218A (en) * 2017-08-15 2017-10-24 姚伟华 A kind of assembled steel tendon concrete frame structure bean column node and preparation method thereof

Also Published As

Publication number Publication date
CN109898850B (en) 2021-04-09

Similar Documents

Publication Publication Date Title
CN107740572B (en) Double-shear wall template device in narrow space and template mounting and dismounting method
CN103290952B (en) Assembled integral concrete frame-shear wall syndeton and construction method thereof
CN110847050B (en) Large-span prefabricated corrugated steel web composite beam top and bottom plate synchronous pouring template and application method thereof
CN104790569A (en) Formwork-free shear wall and construction method thereof
CN103963146A (en) Construction method for column mold composed of concrete formworks
CN108678278A (en) A kind of assembly-type light partition
CN209799026U (en) A fully assembled concrete floor-prefabricated exterior wall panel dry connection device
CN205314559U (en) Shear force wall movement joint formwork support device
CN207828789U (en) It is a kind of readily removable except small space mould plate supporting device
CN109898850A (en) A kind of template and its application method suitable for pouring section after assembled beam-column
CN206737414U (en) A kind of spacing adjustable template system
CN204712243U (en) Enclosure wall concrete prefabricating coping mould
CN205325942U (en) Piping lane box culvert pouring mold
CN204676885U (en) A kind of steel concrete column template fast pacifies the system of tearing open
CN110259111A (en) A kind of transparent building template
CN205577401U (en) External rectangular cross section concrete column template fastener of pull rod
CN105908979B (en) For the positioning support structure and its construction method of prefabricated balcony lifting component
CN204570488U (en) High pier construction crawler type circulation template
CN220538957U (en) Wall post connection node device
CN202627485U (en) Aluminum-alloy-framed building formwork
CN202430993U (en) Concrete column pouring template
CN208294062U (en) A kind of concrete wall template and support combinations structure
CN209145279U (en) A kind of drawing and pulling type deformation joint formwork system
CN208415909U (en) A kind of plastic-steel composite construction engineering pattern plate
CN2903251Y (en) Steel bamboo shuttering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20260214