CN109885899A - The extracting method of spacecraft heat-control multilayer graph data - Google Patents

The extracting method of spacecraft heat-control multilayer graph data Download PDF

Info

Publication number
CN109885899A
CN109885899A CN201910080354.4A CN201910080354A CN109885899A CN 109885899 A CN109885899 A CN 109885899A CN 201910080354 A CN201910080354 A CN 201910080354A CN 109885899 A CN109885899 A CN 109885899A
Authority
CN
China
Prior art keywords
heat
control multilayer
multilayer
calculated
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910080354.4A
Other languages
Chinese (zh)
Inventor
王哲
傅浩
赵璐
冯伟
范子琦
彭鹤
刘峰
刘涛
陶力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Institute of Spacecraft Environment Engineering
Original Assignee
Beijing Institute of Spacecraft Environment Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Institute of Spacecraft Environment Engineering filed Critical Beijing Institute of Spacecraft Environment Engineering
Priority to CN201910080354.4A priority Critical patent/CN109885899A/en
Publication of CN109885899A publication Critical patent/CN109885899A/en
Pending legal-status Critical Current

Links

Abstract

The present invention relates to a kind of spacecraft heat-control multilayer extracting graphics data methods, this method realizes the rapidly extracting of heat-control multilayer graph data based on the drafting systems secondary development such as AutoCAD, mainly comprise the steps that a. calculates the length of all line segments, including curve and straight line;B. the quantity of all points of multilayer contoured interior is calculated;C. adjust automatically longest straight flange is horizontal, measures the overall length and beam overall of figure under the state;D. all 20mm × 20mm are calculated and by the square quantity of filling processing.The present invention solves the problems, such as spacecraft heat-control multilayer graph data rapidly extracting, is not necessarily to personnel's manual measurement and calculating, improves work efficiency, and makes man-hour calculation for heat-control multilayer and provides data.

Description

The extracting method of spacecraft heat-control multilayer graph data
Technical field
The present invention relates to a kind of spacecraft heat-control multilayer extracting graphics data method, this method may be directly applied to spacecraft Heat-control multilayer production field.
Background technique
Spacecraft develops task and increases sharply in recent years, also increasingly increases the demand of heat-control multilayer, the life to heat-control multilayer It produces efficiency and production capacity is proposed challenge.In order to more accurately carry out technique adjustment, design efficiency promotes target, rational meter Draw and provide operator and examine reference standard etc., need it is more acurrate heat-control multilayer processing time matrix is effectively performed, calculating work When need the basic data of heat-control multilayer figure, to guarantee the normal development of subsequent man-hour calculation.Due to carrying out basis by hand The measurement and calculating of data are excessively cumbersome, and the extraction of data is rapidly completed by the method for area of computer aided graphics process, can have Effect improves working efficiency.
Summary of the invention
The purpose of the present invention is to provide a kind of spacecraft heat-control multilayer extracting graphics data method, this method is directly applied In heat-control multilayer processing time matrix.
Spacecraft heat-control multilayer extracting graphics data method, including the following contents:
1) length of all line segments is calculated
Line segment length all on figure is measured, including curve and straight line, closing or non-close line segment, and to institute There is the length of line segment to sum;
2) quantity of all points of multilayer contoured interior is calculated
In heat-control multilayer figure, the position for the pin hole being arranged in corresponding multilayer is put, is calculated all in graph outline The quantity of point obtains the pin hole number for needing to process;
3) overall length and beam overall of multi-layer graphical are measured
The longest straight flange of adjust automatically figure is horizontal, measures the overall length and beam overall of figure under the state;
4) all 20mm × 20mm are calculated and by the square quantity of filling processing
In heat-control multilayer figure, 20mm × 20mm simultaneously represents grounding assembly by the square that filling is handled, and calculates the party The quantity of block obtains grounding assembly quantity.
Method operating procedure of the invention is simple, processing time matrix side when can be made by the extraction of data for multilayer The basis of method.
Detailed description of the invention
Fig. 1 is the graphical examples for the spacecraft heat-control multilayer being applicable in the method for the present invention.
Specific embodiment
Spacecraft heat-control multilayer extracting graphics data method is further described with reference to the accompanying drawing.The present invention passes through Following steps are realized:
1) length of all line segments is calculated
Line segment length all on figure is measured, including curve and straight line, straightway AB, BC as shown in figure 1, The length of DE, EF, FA, HI, JK, the length of circular arc C D and the perimeter of circle G, and sum;Such as straightway AB long 100mm, BC long 50mm, DE long 20mm, EF long 100mm, FA long 150mm, JK long 30mm, HI long 30mm, circular arc C D long 160mm, circle G perimeter 60mm.So multilayer line segment total length is AB+BC+CD+DE+EF+FA+JK+HI+G=700mm.
2) quantity of all points of multilayer contoured interior is calculated
In heat-control multilayer figure, point represents pin hole, and the quantity for calculating point all in graph outline obtains needing to add The pin hole number of work, pin quantity 25, all the points as shown in figure 1;
3) overall length and beam overall of measurement pattern
The longest straight flange of adjust automatically figure is horizontal, measures the overall length and beam overall of figure under the state, and AF is most as shown in figure 1 Long straight line adjusts its level, i.e. the length of line segment AB is beam overall, and line segment AC is overall length;
4) all 20mm × 20mm are calculated and by the square quantity of filling processing
In heat-control multilayer figure, 20mm × 20mm simultaneously represents grounding assembly by the square that filling is handled, and calculates the party The quantity of block obtains grounding assembly quantity, and grounding assembly quantity is 3 as shown in figure 1.
Although the detailed description and description of the specific embodiments of the present invention are given above, it should be noted that We can carry out various equivalent changes and modification to above embodiment according to the concept of the present invention, and generated function is made It, should all be within protection scope of the present invention when with the spirit still covered without departing from specification and attached drawing.

Claims (1)

1. spacecraft heat-control multilayer extracting graphics data method, comprising the following steps:
1) length of all line segments is calculated
Line segment length all on figure is measured, including curve and straight line, closing or non-close line segment, and summed;
2) quantity of all points of multilayer contoured interior is calculated
In heat-control multilayer figure, point represents pin hole, and the quantity for calculating point all in graph outline obtains what needs were processed Pin hole number;
3) overall length and beam overall of measurement pattern
The longest straight flange of adjust automatically figure is horizontal, measures the overall length and beam overall of figure under the state;
4) all 20mm × 20mm are calculated and by the square quantity of filling processing
In heat-control multilayer figure, 20mm × 20mm simultaneously represents grounding assembly by the square that filling is handled, and calculates the square Quantity obtains grounding assembly quantity.
CN201910080354.4A 2019-01-28 2019-01-28 The extracting method of spacecraft heat-control multilayer graph data Pending CN109885899A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910080354.4A CN109885899A (en) 2019-01-28 2019-01-28 The extracting method of spacecraft heat-control multilayer graph data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910080354.4A CN109885899A (en) 2019-01-28 2019-01-28 The extracting method of spacecraft heat-control multilayer graph data

Publications (1)

Publication Number Publication Date
CN109885899A true CN109885899A (en) 2019-06-14

Family

ID=66927083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910080354.4A Pending CN109885899A (en) 2019-01-28 2019-01-28 The extracting method of spacecraft heat-control multilayer graph data

Country Status (1)

Country Link
CN (1) CN109885899A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112015139A (en) * 2020-09-01 2020-12-01 北京卫星环境工程研究所 Method, device, equipment and storage medium for automatically manufacturing thermal control multilayer of spacecraft

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04267484A (en) * 1991-02-22 1992-09-24 Nec Corp Cost calculator of sheet metal product
JPH07224534A (en) * 1994-02-14 1995-08-22 Sekisui House Ltd Manhour estimation device
JP2009282803A (en) * 2008-05-23 2009-12-03 Murata Mach Ltd Plate processing time estimator and device for generating nesting order
JP2010231632A (en) * 2009-03-27 2010-10-14 Fujitsu Ltd Man-hour estimation support program, man-hour estimation support device, and man-hour estimation support method
US20150127480A1 (en) * 2013-10-17 2015-05-07 Plethora Corporation Method for quoting part production

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04267484A (en) * 1991-02-22 1992-09-24 Nec Corp Cost calculator of sheet metal product
JPH07224534A (en) * 1994-02-14 1995-08-22 Sekisui House Ltd Manhour estimation device
JP2009282803A (en) * 2008-05-23 2009-12-03 Murata Mach Ltd Plate processing time estimator and device for generating nesting order
JP2010231632A (en) * 2009-03-27 2010-10-14 Fujitsu Ltd Man-hour estimation support program, man-hour estimation support device, and man-hour estimation support method
US20150127480A1 (en) * 2013-10-17 2015-05-07 Plethora Corporation Method for quoting part production

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112015139A (en) * 2020-09-01 2020-12-01 北京卫星环境工程研究所 Method, device, equipment and storage medium for automatically manufacturing thermal control multilayer of spacecraft

Similar Documents

Publication Publication Date Title
CN108225184B (en) A kind of shield tunnel Point Cloud Data from Three Dimension Laser Scanning removes the method made an uproar
JP6866081B2 (en) Inspection of virtual turbomachinery blade contact gaps
CN105448359A (en) System and method for monitoring fatigue of nuclear power plant
CN108871268B (en) Tunnel under-excavation numerical calculation method based on laser point cloud
CN103322931A (en) System and method for measuring gap and offset of point cloud
CN109885899A (en) The extracting method of spacecraft heat-control multilayer graph data
CN104385640A (en) High-precision repairing method for three-dimensional printed product
CN105808880A (en) Relay protection setting method and system based on graphical power distribution network
CN108765565A (en) A kind of tri-dimensional entity modelling method of FOD damages
CN104460429A (en) CAN signal analyzing method and device
AU2022316516A1 (en) Method for establishing feature point mapping model of tower body damage states of tower crane and method for quickly distinguishing damage
CN106020024A (en) Mechanical arm tail end motion compensation device and compensation method thereof
CN102632456A (en) Plane scraping method based on flatness measurement
CN114663672B (en) Method and system for detecting corrosion of steel member of power transmission line tower
CN115238331A (en) CAD graph processing method, device, equipment and storage medium
CN108894120A (en) Arch ring transformation safe judgment method in spandrel construction disassembly process
CN110490846B (en) Method and device for testing geometric dimension of optical fiber image
CN102375901A (en) Cloud processing system for mold design process
CN111159944B (en) Method for determining fatigue crack propagation track of airplane structure
EP2871459B1 (en) Turbomachine airfoil erosion determination
CN204408010U (en) The integrated on the spot Gernral Check-up management devices of power station equipment
CN104998929B (en) Automatic reforming device
CN103196679B (en) Wheel alignment meter's long-range control method and system
CN110907135A (en) Control method and device of manufacturing equipment
CN109033576A (en) A kind of particulate composite Fatigue Propagation of Cracks analysis method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination