CN109881707A - A kind of assembled piping lane foundation pit structure and its construction method - Google Patents

A kind of assembled piping lane foundation pit structure and its construction method Download PDF

Info

Publication number
CN109881707A
CN109881707A CN201910212873.1A CN201910212873A CN109881707A CN 109881707 A CN109881707 A CN 109881707A CN 201910212873 A CN201910212873 A CN 201910212873A CN 109881707 A CN109881707 A CN 109881707A
Authority
CN
China
Prior art keywords
foundation pit
piping lane
cast
assembled
situ bored
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910212873.1A
Other languages
Chinese (zh)
Inventor
林涛
张家波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201910212873.1A priority Critical patent/CN109881707A/en
Publication of CN109881707A publication Critical patent/CN109881707A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The invention belongs to underground pipe gallery foundation pit construction technical fields, and in particular to a kind of assembled piping lane foundation pit structure and its construction method.The structure includes foundation pit, prefabricated piping lane, anchor pole and gantry crane, and prefabricated piping lane is set to bottom of foundation ditch middle;The external symmetry of foundation pit two sides is provided with several cast-in-situ bored piles;Each cast-in-situ bored pile upper end is equipped with crown beam, is fixedly connected between crown beam by coupling beam;Anchor pole is perpendicularly fixed at foundation pit slope, and foundation pit slope surface is formed with shotcrete with steel bar nets layer;Gantry crane is symmetrically disposed on the road surface of foundation pit top two sides, and in-between place is provided with suspender compatible with prefabricated piping lane;Road surfacing has concrete.Assembled piping lane foundation pit structure of the present invention is simple, and construction method is easy;The stability that shotcrete with steel bar nets keeps foundation pit is carried out on the foundation pit of slope;The coupling beam for being set to the crown beam of cast-in-situ bored pile upper end and being connected in one with crown beam prevents foundation pit top edge from generating collapsing, stability is further strengthened, to improve the safety of construction.

Description

A kind of assembled piping lane foundation pit structure and its construction method
Technical field:
Invention belongs to underground pipe gallery foundation pit construction technical field, and in particular to a kind of assembled piping lane base Cheat structure and its construction method.
Background technique:
China's underground pipe gallery is gradually got over obtaining fast development, the importance of underground pipe gallery in recent years Carry out the approval in more cities, underground pipe gallery has become the indispensable mating urban operating mechanism in city.Currently, underground pipe gallery Construction mostly uses cast-in-place method, and cast-in-place method is affected by construction weather, execution conditions, is built as country widelys popularize assembled It builds, assembled piping lane construction technology also starts to start to walk in China, invents a kind of assembled piping lane foundation pit structure and its construction method.
Summary of the invention:
To solve above-mentioned technical problem, the present invention provides a kind of assembled piping lane foundation pit structure and its construction party Method, the foundation pit structure is simple, scientific construction and easy to operate, efficiently solves asking for the pattern foundation pit supporting structure under the conditions of top of the slope heavy burden Topic.
The technical solution that the present invention solves technical problem is as follows:
A kind of assembled piping lane foundation pit structure, including foundation pit, prefabricated piping lane, anchor pole and gantry crane, the prefabricated piping lane are set It is placed in the bottom of foundation ditch middle;Foundation pit two sides external symmetry is provided with several cast-in-situ bored piles;Each drilling fills It infuses stake upper end and is equipped with crown beam, be fixedly connected between the crown beam by coupling beam;The anchor pole is perpendicularly fixed at the foundation pit slope Place, foundation pit slope surface is formed with shotcrete with steel bar nets layer;The gantry crane is symmetrically disposed on the road surface of foundation pit top two sides, In-between place is provided with suspender compatible with the prefabricated piping lane;The road surfacing has concrete.
Further, spaced set has the double cast-in-situ bored pile outside the every side of the foundation pit.
Further, the shotcrete with steel bar nets layer includes the concrete of the steel mesh that paving is hung and injection.
Further, the crown beam size is consistent with the coupling beam size.
A kind of construction method of assembled piping lane foundation pit structure, specifically comprises the following steps:
Step 1: concrete pavement construction is carried out, and it is conserved;
Step 2: slope excavation pit;
Step 3: after the completion of excavation of foundation pit, anchor pole fixation and the laying of suspended net shotcrete layer, sprayed construction are successively carried out;
Step 4: double bored pile construction is symmetrically carried out in bottom of foundation ditch two sides;
Step 5: abolishing cast-in-situ bored pile stake top concrete, successively carries out crown beam and coupling beam construction;
Step 6: continuing excavation pit up to designed elevation, and installs gantry crane in concrete road surface upper end simultaneously;
Step 7: pouring piping lane foundation pit foot mat, slings prefabricated piping lane by gantry crane and is transferred and installed.
Compared with the prior art, the invention has the following beneficial effects: assembled piping lane foundation pit structure of the invention is simple, Construction method is easy;The stability that shotcrete with steel bar nets keeps foundation pit is carried out on the foundation pit of slope;It is set to cast-in-situ bored pile upper end Crown beam and the coupling beam that is connected in one with crown beam prevent foundation pit top edge from generating collapsing, further strengthen stability, from And improve the safety of construction.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and specific embodiments:
Fig. 1 is foundation pit structure schematic diagram in the present invention.
Figure label is as follows: the prefabricated piping lane of 1-;2- cast-in-situ bored pile;3- crown beam;4- coupling beam;5- anchor pole;6- suspended net shotcrete Layer;7- gantry crane;The concrete road surface 8-.
Specific embodiment
Embodiment 1
As shown in Figure 1, a kind of assembled piping lane foundation pit structure, including foundation pit, prefabricated piping lane 1, anchor pole 5 and gantry crane 7, institute It states prefabricated piping lane 1 and is set to the bottom of foundation ditch middle;Foundation pit two sides external symmetry is provided with several drill-pourings Stake 2;Each 2 upper end of cast-in-situ bored pile is equipped with crown beam 3, is fixedly connected between the crown beam 3 by coupling beam 4;The anchor pole 5 is vertical It is fixed at the foundation pit slope, foundation pit slope surface is formed with shotcrete with steel bar nets layer 6;The gantry crane 7 is symmetrically disposed on On the road surface of foundation pit top two sides, in-between place is provided with suspender compatible with the prefabricated piping lane 1;The road surfacing has Concrete.
In the present embodiment, spaced set has the double cast-in-situ bored pile 2, the cast-in-situ bored pile outside the every side of foundation pit 2 diameters are 1m, and two rows of 2 spacing of cast-in-situ bored pile are 2m.
In the present embodiment, the 6 thickness 80mm of shotcrete with steel bar nets layer comprising the steel mesh of extension and the concrete of injection are spread, it should Each reinforced mesh in steel mesh is 6.5mm, and concrete uses C20 pea gravel concreten.
In the present embodiment, 3 size of crown beam is consistent with 4 size of coupling beam, and length is 1200mm, and wide is 800mm.
In the present embodiment, the anchor pole 5 uses diameter for the reinforcing bar of 16mm, and the length is 2m, anchor pole is fixed at slope Prevent slope face slack.
In the present embodiment, width of roadway 1m, the C30 armored concrete for being laid with 20cm thickness thereon forms concrete road surface 8, Increase the stability that it is maintained to the support force of gantry crane 7 in the construction process.
Embodiment 2
As shown in Figure 1, a kind of a kind of construction method of assembled piping lane foundation pit structure of assembled, specifically includes following step It is rapid:
Step 1: it carries out concrete road surface 8 and constructs, and it is conserved;
Step 2: slope excavation pit;
Step 3: after the completion of excavation of foundation pit, the fixation of anchor pole 5 and the laying of suspended net shotcrete layer 6, sprayed construction are successively carried out;
Step 4: double cast-in-situ bored pile 2 is symmetrically carried out in bottom of foundation ditch two sides and is constructed;
Step 5: abolishing 2 stake top concrete of cast-in-situ bored pile, successively carries out crown beam 3 and coupling beam 4 is constructed;
Step 6: continuing excavation pit up to designed elevation, and installs gantry crane 7 in 8 upper end of concrete road surface simultaneously;
Step 7: pouring piping lane foundation pit foot mat, slings prefabricated piping lane 1 by gantry crane 7 and is transferred and installed.
Above-mentioned scientific construction is simple, can effectively solve the problems, such as that the pattern foundation pit supporting structure under the conditions of top of the slope heavy burden is difficult.
The foregoing is merely a prefered embodiment of the invention, but scope of protection of the present invention is not limited thereto, any to be familiar with sheet In the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of by those skilled in the art, should all cover Within protection scope of the present invention.Therefore, the scope of protection of the present invention shall be subject to the scope of protection defined by the claims.
Place is not described in detail by the present invention, is the well-known technique of those skilled in the art of the present technique.

Claims (5)

1. a kind of a kind of assembled piping lane foundation pit structure of assembled, including foundation pit, which is characterized in that further include prefabricated piping lane (1), Anchor pole (5) and gantry crane (7), the prefabricated piping lane (1) are set to the bottom of foundation ditch middle;Foundation pit two sides external symmetry It is provided with several cast-in-situ bored piles (2);Each cast-in-situ bored pile (2) upper end is equipped with crown beam (3), between the crown beam (3) It is fixedly connected by coupling beam (4);The anchor pole (5) is perpendicularly fixed at the foundation pit slope, and foundation pit slope surface is formed There are shotcrete with steel bar nets layer (6);The gantry crane (7) is symmetrically disposed on the road surface of foundation pit top two sides, in-between place be provided with The compatible suspender of the prefabricated piping lane (1);The road surfacing has concrete.
2. a kind of assembled piping lane foundation pit structure according to claim 1, which is characterized in that between equal outside the every side of foundation pit Away from being provided with the double cast-in-situ bored pile (2).
3. a kind of assembled piping lane foundation pit structure according to claim 1, which is characterized in that the shotcrete with steel bar nets layer (6) The concrete of the steel mesh and injection hung including paving.
4. a kind of assembled piping lane foundation pit structure according to claim 1, which is characterized in that crown beam (3) size with Coupling beam (4) size is consistent.
5. a kind of a kind of construction method of assembled piping lane foundation pit structure of assembled, which is characterized in that specifically comprise the following steps:
Step 1: concrete road surface (8) construction is carried out, and it is conserved;
Step 2: slope excavation pit;
Step 3: after the completion of excavation of foundation pit, anchor pole (5) fixation and suspended net shotcrete layer (6) laying, sprayed construction are successively carried out;
Step 4: double cast-in-situ bored pile (2) are symmetrically carried out in bottom of foundation ditch two sides and are constructed;
Step 5: abolishing cast-in-situ bored pile (2) stake top concrete, successively carries out crown beam (3) and coupling beam (4) construction;
Step 6: continuing excavation pit up to designed elevation, and installs gantry crane (7) in concrete road surface (8) upper end simultaneously;
Step 7: pouring piping lane foundation pit foot mat, slings prefabricated piping lane (1) by gantry crane (7) and is transferred and installed.
CN201910212873.1A 2019-03-20 2019-03-20 A kind of assembled piping lane foundation pit structure and its construction method Pending CN109881707A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910212873.1A CN109881707A (en) 2019-03-20 2019-03-20 A kind of assembled piping lane foundation pit structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910212873.1A CN109881707A (en) 2019-03-20 2019-03-20 A kind of assembled piping lane foundation pit structure and its construction method

Publications (1)

Publication Number Publication Date
CN109881707A true CN109881707A (en) 2019-06-14

Family

ID=66933132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910212873.1A Pending CN109881707A (en) 2019-03-20 2019-03-20 A kind of assembled piping lane foundation pit structure and its construction method

Country Status (1)

Country Link
CN (1) CN109881707A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482045A (en) * 2021-07-21 2021-10-08 中交二公局第六工程有限公司 Traction type pipe gallery installation method
CN113737670A (en) * 2021-09-18 2021-12-03 杭州交投建设工程有限公司 Deformation control structure of pipe culvert and construction method
CN114525808A (en) * 2022-02-25 2022-05-24 北京住总集团有限责任公司 Construction method for ground beam of edge portal crane of deep foundation pit
CN116122305A (en) * 2023-03-20 2023-05-16 中冶成都勘察研究总院有限公司 A construction method for retaining large-diameter double-row piles in deep foundation pits adjacent to subways

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110081475A (en) * 2010-01-08 2011-07-14 (주)어쌤이앤씨 Flow Control Culvert Block
CN103758132A (en) * 2014-01-08 2014-04-30 湖北中南勘察基础工程有限公司 Construction technology of cantilever piling and supporting structure combined with sloping
CN205024717U (en) * 2015-09-20 2016-02-10 海南大学 Construction equipment of city utility tunnel immersed tube section
CN105544606A (en) * 2016-02-06 2016-05-04 青岛润国生态科技发展有限公司 Construction method for assembled prefabricated comprehensive pipe rack
CN108643191A (en) * 2018-04-18 2018-10-12 中国十七冶集团有限公司 A kind of supporting construction and its construction method of ultra-deep piping lane foundation pit

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110081475A (en) * 2010-01-08 2011-07-14 (주)어쌤이앤씨 Flow Control Culvert Block
CN103758132A (en) * 2014-01-08 2014-04-30 湖北中南勘察基础工程有限公司 Construction technology of cantilever piling and supporting structure combined with sloping
CN205024717U (en) * 2015-09-20 2016-02-10 海南大学 Construction equipment of city utility tunnel immersed tube section
CN105544606A (en) * 2016-02-06 2016-05-04 青岛润国生态科技发展有限公司 Construction method for assembled prefabricated comprehensive pipe rack
CN108643191A (en) * 2018-04-18 2018-10-12 中国十七冶集团有限公司 A kind of supporting construction and its construction method of ultra-deep piping lane foundation pit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
彭芳乐等: "《地下综合管廊规划与建设导论》", 31 March 2018, 同济大学出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482045A (en) * 2021-07-21 2021-10-08 中交二公局第六工程有限公司 Traction type pipe gallery installation method
CN113737670A (en) * 2021-09-18 2021-12-03 杭州交投建设工程有限公司 Deformation control structure of pipe culvert and construction method
CN114525808A (en) * 2022-02-25 2022-05-24 北京住总集团有限责任公司 Construction method for ground beam of edge portal crane of deep foundation pit
CN114525808B (en) * 2022-02-25 2024-04-16 北京住总集团有限责任公司 Deep foundation pit edge gantry crane ground beam construction method
CN116122305A (en) * 2023-03-20 2023-05-16 中冶成都勘察研究总院有限公司 A construction method for retaining large-diameter double-row piles in deep foundation pits adjacent to subways

Similar Documents

Publication Publication Date Title
CN109881707A (en) A kind of assembled piping lane foundation pit structure and its construction method
CN100585094C (en) Construction method of circular deep foundation pit support
CN107142856B (en) Abutment reconstruction method, abutment reconstruction pier and jacking reconstruction bridge
CN204419195U (en) A kind of supporting and protection structure pattern being applicable to tunnel portal section
CN104389320B (en) Construction method of pile foundation anchor rope prestress high retaining wall
CN103821060B (en) A kind of construction method of existing highway soft foundation Treating technology
CN108487256B (en) Reinforced structure and method for deepening and super-digging foundation pit
CN104594372A (en) Fan pile pier foundation and construction method thereof
CN210712863U (en) Foundation pit support structure
CN201358456Y (en) Plastic sleeve concrete pile
CN105937196A (en) Subgrade pile-plank type widening structure and construction method thereof
CN109162289A (en) The prefabricated carrying pier structure of one kind and its construction method
CN102162258A (en) Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof
CN103452120A (en) Pile top crown beam structure of high-strength prestress pipe pile for supporting foundation pit and construction method thereof
CN109898556A (en) A kind of underground pipe gallery structure and sunk type construction method
CN103866766A (en) Steel anchor pier for landslide emergency treatment and construction method thereof
CN108824097A (en) Prefabricated GFRP pipe concrete stake and armoured concrete slab overhead type roadbed pile slab structure
CN204825867U (en) As composite pile structure of secretly digging garage stand
CN110820756A (en) Shield well and vertical shaft deep foundation pit excavation safety construction method
CN208803305U (en) Prefabricated GFRP tubular concrete pile and concrete slab top-mounted subgrade pile-slab structure
CN204491649U (en) A kind of blower fan pile pier basis
CN204238239U (en) Pile foundation prestressd anchor cable height wall-retaining structure
CN204125850U (en) A kind of cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable
CN110004938A (en) A kind of foundation pit side wall structure reinforcement support device
CN211947887U (en) a water-filled bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190614

RJ01 Rejection of invention patent application after publication