CN109868704A - With draining to road engineering method and road drainage system - Google Patents

With draining to road engineering method and road drainage system Download PDF

Info

Publication number
CN109868704A
CN109868704A CN201711248440.9A CN201711248440A CN109868704A CN 109868704 A CN109868704 A CN 109868704A CN 201711248440 A CN201711248440 A CN 201711248440A CN 109868704 A CN109868704 A CN 109868704A
Authority
CN
China
Prior art keywords
road
network management
soil
soil layer
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711248440.9A
Other languages
Chinese (zh)
Inventor
蔡岱君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711248440.9A priority Critical patent/CN109868704A/en
Publication of CN109868704A publication Critical patent/CN109868704A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

A kind of road ground with draining engineering method and road drainage system.The road drainage system be suitable for being arranged by road, and can be for plant cultivating, and include pavement and at least one network management unit.The pavement includes soil layer.The soil layer is formed with can be for the plant cultivating and the plant pit space that can simultaneously supply water close to the road by the road or pavement inflow.The network management unit extends up and down and part exposes in the plant pit space and is inserted in the soil layer.Even if the surface soil of the soil layer becomes in a down-to-earth manner, the rainwash positioned at the road and the pavement remains to rapidly flow into the soil layer via the network management unit, achievees the effect that improve rainwash discharge rate.In addition, the network management unit will not interfere the plant growth, root system of plant can solve due to side growing space is limited the problem of up projection.

Description

With draining to road engineering method and road drainage system
Technical field
The tree case system and relevant construction method that the present invention relates to a kind of for planting shade tree and being arranged in by road, A kind of engineering method and road are drained more particularly to road drainage system.
Background technique
Refering to fig. 1, a kind of to be common in the previous tree case system in urban, suitable for being embedded in a pavement 11, and close to one By road 12.The pavement 11 is equipped with cement or floor tile, which is then equipped with pitch, thus the pavement 11 with should The water penetration of road 12 is usually come poor compared with soil.
The previous tree case system is included one and is made and is embedded in the pavement 11 with concrete and be located at the road 13, soil bodys 14 being arranged in the block 13 of block on 12 sides and one plant of plantation are in the plant 15 of the soil body 14.The case Seat 13 defines one and is arranged for the soil body 14 and can contain space 16 with what a drainage system (not shown) was connected to.
Due to the reason that the water penetration on the pavement 11 and the road 12 is poor, when rainfall, has little time the rainwater of infiltration often It can be in collecting the rainwash to be formed and be fled everywhere on the pavement 11 and the road 12.At this point, the tree case system can For rainwash inflow, and the soil body 14 is penetrated into down for rainwash and is that the soil body 14 absorbs, and the plant can be supplied by becoming The water source of object 15.
Although such previous tree case system has the advantages of absorbing rainwash and rainwater is delayed to enter drainage system, but should The soil body 14 will gradually become in a down-to-earth manner as time go on, therefore the efficiency that the soil body 14 absorbs rainwash will be deteriorated therewith.Furthermore The space grown due to 15 cross growth of plant and down is limited by the hard block 13, which often has root system The case where up projection and having causes the pavement 11, the road 12 and the soil body 14 to deform, harm Lu Anquan, quite It is dangerous.
Summary of the invention
The purpose of the present invention is with providing a kind of road of at least one disadvantage that can overcome background technique drainer Method.
Drain engineering method to road of the present invention, include step A: being formed in a pavement close to road makes the pavement Soil layer is exposed and can arrange to the road for plant cultivating and the plant pit space that can be supplied water by the road or pavement inflow Water conservancy project method also includes step B: at least one network management unit being extended up and down and part exposes to the plant pit and is spatially inserted in The soil layer flows into the soil layer after flowing at least one described network management unit for water energy.
Engineering method is drained to road of the present invention, the pavement includes that can walk for people and be located at the ground on the soil layer Face is the native face for making the pavement form the road surface lower than the ground and the road, Yi Jiyou in Yu Suoshu step A The wall surface that the soil face up extends, the soil face is matched with the wall surface defines the plant pit space.
Drain engineering method to road of the present invention, also include step C: setting recline the wall surface and be located at the native face and Retaining wall and step D between the ground: setting is spaced on above the native face and its height is suitable with the ground And the protecting cover set that energy is permeable.
It drains to road of the present invention engineering method, is to extend several network management units up and down in Yu Suoshu step B And part exposes to the plant pit space and is plugged in the soil layer on the pavement around the plant, for water inflow The soil layer is flowed into after the network management unit.
Draining to road of the present invention engineering method, in Yu Suoshu step B, used each network management unit includes network management, And the top cover on the network management is set, each network management, which has, is plugged in the soil layer and is located at plugging under the native face Section, and up extended and the nose section in the prominent native face by the section that plugs, each respective nose section of top closure Top.
The effect of draining engineering method to the road is: construction method is comparatively simple, it is only necessary to slightly site preparation and be inserted into this at least one A network management unit can quickly penetrate into the soil layer for rainwash, thus the road drain engineering method and have and be easy to apply and apply into This low advantage.
The second object of the present invention is to drain with providing a kind of road of at least one disadvantage that can overcome background technique System.
Ground drainage system in road of the present invention is suitable for being arranged by road, and can include pavement, the people for plant cultivating Trade includes soil layer, the soil layer be formed with can for the plant cultivating and close to the road and can supply water by the road or The plant pit space that the pavement flows into, the road drainage system also include at least one network management unit, it is described at least one Network management unit extends up and down and part exposes in the plant pit space and is inserted in the soil layer.
Road of the present invention ground drainage system, the pavement include that can walk for people and be located at the ground on the soil layer Face, lower than the native face on the ground and the road surface of the road, and the wall surface up extended by the native face, the soil face with The wall surface, which matches, defines the plant pit space.
Ground drainage system in road of the present invention also comprising the wall surface that the pavement is arranged in and is located at describedly Retaining wall between face and the native face, and be spaced apart and arranged in above the native face and its height with the ground quite and energy Permeable protecting cover set.
Road of the present invention ground drainage system, the road drainage system include several network management units, it is described Network management unit is plugged in the soil layer and with protruding the native face around the plant.
Road of the present invention drainage system, each network management unit include network management, and be arranged on the network management Top cover, each network management have a section that plugs being plugged in the soil layer and be located under the native face, and from it is described plug section toward The nose section in upper extension and the prominent native face, the top of each respective nose section of top closure.
The road drainage system the effect of be: even if the surface soil of the soil layer becomes in a down-to-earth manner, rainwash is remained to via this At least one network management unit rapidly flows into the soil layer, and has the advantages that improve rainwash expulsion efficiency.In addition, upper downward At least one network management unit for stretching setting will not seal the plant, also allow the root system of the plant down or side growth, To solve the problems, such as that root system of plant can up projection.
Detailed description of the invention
Others feature and effect of the invention, will clearly be presented in the embodiment referring to schema, in which:
Fig. 1 is an incomplete perspective view, illustrates that a previous tree case system is set to one close to a road Pavement;
Fig. 2 is the stereogram exploded view that do not decompose completely, and one embodiment of drainage system is set with illustrating road of the present invention It is placed in by a road, and supplies a plant cultivating;
Fig. 3 is an incomplete cross-sectional view, illustrates the operation situation of the embodiment;
Fig. 4 be a road for being used to form the embodiment drain a construction schematic diagram of engineering method, be illustrated in one A plant pit space is formed on pavement;
A construction schematic diagram for draining to the road Tu5Shi Gai engineering method, is illustrated in the plant pit space and a retaining wall is arranged;
A construction schematic diagram for draining to the road Tu6Shi Gai engineering method is illustrated in four network management lists of setting in the plant pit space Member;And
A construction schematic diagram for draining to the road Tu7Shi Gai engineering method is illustrated in the position of the plant pit Spatial Adjacency road One curb is set to form the drainage hole flowed by the road that supplies water.
Specific embodiment
Refering to Fig. 2 and Fig. 3, road of the present invention drainage system one embodiment, be suitable for being arranged by a road 21, and energy It is planted for a plant 22.The road 21 has a road surface 211 formed by asphalt pavement.The road drainage system include one Pavement 3 and four protecting cover sets 52, Yi Jiyi of retaining wall 51, one of the network management unit being arranged on the pavement 34, one A curb 53.
The pavement 3 includes a soil layer 31 and a paving layer 32 being located on the soil layer 31.The soil layer 31 has One level and lower than the paving layer 32 and the road surface 211 native face 311 and one up extended and opened by the soil face 311 Mouthful towards the road 21 and the wall surface 312 that is in U-shape.The soil face 311 matches with the wall surface 312 and defines one close to the road 21 plant pit space 313.The plant pit space 313 is upward and open towards the road 21, and the plant pit space 313 is along sectional horizontal Section is generally in rectangle, and the plant 22 can be supplied centrally located and be plugged in the soil layer 31 and be up protrusively provided.Paving layer 32 be cement paving or footway brick, and with one can for people walk and with the soil face 311 between the upper and lower every ground 321.
The network management unit 4 is located at four corners in the plant pit space 313 and cooperatively surrounds the plant 22.Often One network management unit 4 includes about one extension and part exposes to the network management that 313 ground of plant pit space is plugged in the soil layer 31 41 and a top cover 42 being arranged on the network management 41.Each network management 41 has one and is plugged in the soil layer 31 and is located at Plug section 411 and one under the soil face 311 plug section 411 by this and up extend the prominent soil face 311 and positioned at the plant pit Nose section 412 in space 313.Each top cover 42 is made with plastic cement and fluid-tight material, and can close the nose section 412 Top.
The cross section of the retaining wall 51, towards the U-shaped of the road 21, reclines in opening and is set to the wall surface 312, and top bottom side is high Degree is between the ground 321 and the soil face 311.The protecting cover set 52 is spaced apart and arranged in 311 top of soil face, and height and the ground The height in face 321 is suitable, is avoided that user makes a misstep and accidentally enters into the plant pit space 313, and the mesh that having can be permeable.The road It is spaced apart and arranged in above the soil face 311 along stone 53, and is matched with the soil face 311 and define one and be connected on the road surface 211 The drainage hole 54 of side space.
When rainfall, the rainwash being formed on the water penetration poor road surface 211 and the ground 321 can pass through the row Water hole 54 and the protecting cover set 52 flow into the plant pit space 313, and are penetrated into down via the soil face 311 into the soil layer 31.It should When the surface soil of soil layer 31 becomes sturdy and water penetration as passed at any time and is deteriorated, the rainwash then can be through each network management 41 nose section 412 flows into the network management 41, and this through each network management 41 plugs section 411 and efficiently and quickly penetrate into the soil layer In 31.The network management 41 is all as rainwash flows into the sundries 55 in the plant pit space 313 other than it can flow into for rainwater It such as leaf or stone, can also be blocked in outside the network management 41, and concentrate retention in the plant pit space 313.Cleanup crew As long as opening the protecting cover set 52, the sundries 55 that just can be will focus in the plant pit space 313 is once removed, and is arranged quite convenient.
The network management 41 is plugged in the soil layer 31, in addition to that can enter the soil layer 31 for rainwater, by water conservation in the soil 31 China and foreign countries of layer, can also enter in the soil layer 31 for air, improve the gas permeability of the soil layer 31, raw conducive to the root system of the plant 22 It is long, along with the network management 41 is intervally installed, the root system of the plant 22 will not be hindered to extend, in addition to facilitating the plant 22 Keep fit and can improve the plant 22 survival rate and survival during it is outer, the root system of the plant 22 is also less susceptible to produce because limited It is raw up high convex and the problem of destroy the road surface 211 and ground 321.The water source that the soil layer 31 is conserved, energy when not rainfall It evapotranspires for the plant 22, and absorbs environment thermal energy during evapotranspiring, reduce environment temperature, solve the problems, such as city fuel factor, Embody sponge urban concept.
In conclusion road of the present invention drainage system the effect of be: be inserted in 4 energy of the network management unit of the soil layer 31 Effectively rainwash is drained into the soil layer 31, so that the rainwater soil layer 31 is absorbed and is used effectively, and the plant can be conducive to Object 22 is grown, and is solved the problems, such as root system of plant harm road safety, and improve city superheating phenomenon simultaneously, is embodied sponge urban Concept.
Refering to Fig. 3, Fig. 4 and Fig. 5, ground drainage system in road above-mentioned can drain engineering method using a road and apply.It should Draining to road engineering method includes a site preparation step, an earth-retaining step, an intubation step and a protection step.
In the site preparation step, it is first slightly to excavate the pavement 3 down, exposes the soil layer 31, and form one The soil face 311 being laterally extended and the wall surface 312 extended up and down, and match the soil face 311 with the wall surface 312 and define The plant pit space 313, then plant the plant 22 and avoid the plant 22 impaired because constructing in 22 bottom of plant set upper jacket.Such as The pavement 3, which has been planted, is implanted with the plant 22, but and not set cement production systD block, also can directly be put in 22 bottom of plant After sheath, position of the pavement 3 around the plant 22 is excavated.
It is in the wall surface 312 setting of the soil layer 31 retaining wall 51, to avoid the soil layer 31 in the earth-retaining step Soil collapses into the plant pit space 313.
It is that about 4 network management unit is extended and is locally exposed in the intubation step refering to Fig. 3, Fig. 6 and Fig. 7 The plant pit space 313 is simultaneously inserted in the soil layer 31 around 22 ground of plant, and the top cover 42 is covered on each nose section 412, To close 412 top of nose section.It is that network management unit 4 described in four is plugged in the plant pit space 313 respectively in Fig. 6 Four corners.
It is that the curb 53 is set in the side of the adjacent road 21 in the plant pit space 313, with shape in the protection step At the drainage hole 54 for being connected to the road surface 211, and the protecting cover set 52 for being located at 313 top of plant pit space is set.
The effect for draining to the road engineering method is: easy construction, it is only necessary to which slightly site preparation plugs the network management unit 4 i.e. It can complete, it is really low-cost excellent with being easy to apply and apply compared to the engineering method that need in addition bury cement block in the past Point.
Only as described above, only a specific embodiment of the invention cannot limit the model that the present invention is implemented with this It encloses, it is all according to simple equivalent changes and modifications made by the claims in the present invention and description, all still belong to power of the present invention Benefit requires in the range of covering.

Claims (10)

1.一种路地排水工法,包含步骤A:于一条紧邻道路的人行道形成使所述人行道的土层外露而能供植物栽种且能供水由所述道路或所述人行道流入的树穴空间,其特征在于:所述路地排水工法还包含步骤B:将至少一个网管单元上下延伸且局部外露于所述树穴空间地插设于所述土层,以供水能流进所述至少一个网管单元后流入所述土层。1. A road drainage method, comprising step A: forming a tree hole space on a sidewalk adjacent to a road that exposes the soil layer of the sidewalk so that plants can be planted and water can flow in from the road or the sidewalk, wherein It is characterized in that: the road and ground drainage method further includes step B: inserting at least one network management unit in the soil layer extending up and down and partially exposed in the tree cavity space, so that water can flow into the at least one network management unit. into the soil layer. 2.根据权利要求1所述的路地排水工法,其特征在于:所述人行道包括能供人行走并位于所述土层上的地面,于所述步骤A中,是使所述人行道形成低于所述地面及所述道路的路面的土面,以及由所述土面往上延伸的壁面,所述土面与所述壁面相配合界定出所述树穴空间。2 . The road drainage construction method according to claim 1 , wherein the sidewalk includes a ground that can be walked on by people and is located on the soil layer, and in the step A, the sidewalk is formed to be lower than the ground. 3 . The ground and the soil surface of the road surface, and the wall surface extending upward from the soil surface, the soil surface and the wall surface cooperate to define the tree cavity space. 3.根据权利要求2所述的路地排水工法,其特征在于:该路地排水工法还包含步骤C:设置贴靠所述壁面并位于所述土面及所述地面间的挡土墙,以及步骤D:设置间隔地位于所述土面上方且其高度与所述地面相当并能透水的护盖组。3. The road drainage construction method according to claim 2, characterized in that: the road drainage construction method further comprises step C: setting a retaining wall against the wall surface and located between the soil surface and the ground, and the step D: Set up protective cover groups that are located above the soil surface at intervals and whose height is equivalent to the ground surface and are permeable to water. 4.根据权利要求1至3中任一权利要求所述的路地排水工法,其特征在于:于所述步骤B中,是将数个所述的网管单元上下延伸且局部外露于所述树穴空间并环绕所述植物地插设在所述人行道的所述土层,以供水流入所述网管单元后流入所述土层。4. The road drainage construction method according to any one of claims 1 to 3, wherein in the step B, a plurality of the network management units are extended up and down and partially exposed to the tree holes The space and surrounding the plants are inserted in the soil layer of the sidewalk, so that water flows into the network management unit and then flows into the soil layer. 5.根据权利要求4所述的路地排水工法,其特征在于:于所述步骤B中,所使用的每一网管单元包括网管,以及设置在所述网管上的顶盖,每一网管具有插设在所述土层中并位于所述土面下的插设段,以及由所述插设段往上延伸而突出所述土面的突出段,每一顶盖封闭各自的突出段的顶端。5. The road drainage construction method according to claim 4, characterized in that: in the step B, each network management unit used comprises a network management, and a top cover arranged on the network management, and each network management has a plug An insertion section disposed in the soil layer and located below the soil surface, and a protruding section extending upward from the insertion section to protrude from the soil surface, each top cover closing the top end of the respective protruding section . 6.一种路地排水系统,适于设置在道路旁,并能供植物栽种,包含人行道,所述人行道包括土层,所述土层形成有能供所述植物栽种且紧邻所述道路并能供水由所述道路或所述人行道流入的树穴空间,其特征在于:所述路地排水系统还包含至少一个网管单元,所述至少一个网管单元上下延伸且局部外露于所述树穴空间中地插设于所述土层。6. A road drainage system, suitable for being placed beside a road and capable of planting, comprising a sidewalk, the sidewalk comprising a soil layer formed with a space for the plant to be planted and adjacent to the road and capable of being planted. The tree cavity space into which water supply flows from the road or the sidewalk, characterized in that: the road and ground drainage system further includes at least one network management unit, the at least one network management unit extending up and down and partially exposed in the tree cavity space. inserted in the soil layer. 7.根据权利要求6所述的路地排水系统,其特征在于:所述人行道包括能供人行走且位于所述土层上的地面、低于所述地面与所述道路的路面的土面,以及由所述土面往上延伸的壁面,所述土面与所述壁面相配合界定出所述树穴空间。7 . The road drainage system according to claim 6 , wherein the sidewalk comprises a ground that can be walked on by people and is located on the soil layer, and a soil surface that is lower than the ground and the road surface. 8 . and a wall surface extending upward from the soil surface, the soil surface and the wall surface cooperate to define the tree cavity space. 8.根据权利要求7所述的路地排水系统,其特征在于:所述路地排水系统还包含设置在所述人行道的所述壁面且位于所述地面与所述土面间的挡土墙,以及间隔地设置在所述土面上方且其高度与所述地面相当并能透水的护盖组。8 . The road drainage system according to claim 7 , wherein the road drainage system further comprises a retaining wall arranged on the wall surface of the sidewalk and located between the ground and the soil surface, and A set of protective covers that are arranged above the soil surface at intervals and whose height is equivalent to the ground surface and are permeable to water. 9.根据权利要求6至8中任一权利要求所述的路地排水系统,其特征在于:所述路地排水系统包含数个所述的网管单元,所述网管单元插设在所述土层中并突出所述土面地围绕所述植物。9 . The road drainage system according to claim 6 , wherein the road drainage system comprises a plurality of the network management units, and the network management units are inserted in the soil layer. 10 . And protrude the soil surface to surround the plant. 10.根据权利要求9所述的路地排水系统,其特征在于:每一网管单元包括网管,以及设置在所述网管上的顶盖,每一网管具有插设在所述土层中并位于所述土面下的插设段,以及由所述插设段往上延伸而突出所述土面的突出段,每一顶盖封闭各自的突出段的顶端。10. The road drainage system according to claim 9, characterized in that: each network management unit comprises a network management, and a top cover arranged on the network management, and each network management has the function of being inserted in the soil layer and located at the An insertion section under the soil surface, and a protruding section extending upward from the insertion section to protrude from the soil surface, each top cover closes the top end of the respective protruding section.
CN201711248440.9A 2017-12-01 2017-12-01 With draining to road engineering method and road drainage system Pending CN109868704A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711248440.9A CN109868704A (en) 2017-12-01 2017-12-01 With draining to road engineering method and road drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711248440.9A CN109868704A (en) 2017-12-01 2017-12-01 With draining to road engineering method and road drainage system

Publications (1)

Publication Number Publication Date
CN109868704A true CN109868704A (en) 2019-06-11

Family

ID=66913527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711248440.9A Pending CN109868704A (en) 2017-12-01 2017-12-01 With draining to road engineering method and road drainage system

Country Status (1)

Country Link
CN (1) CN109868704A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576138A (en) * 2020-05-29 2020-08-25 上海园林绿化建设有限公司 Greening structure achieving water retention and drainage balance and construction method thereof
CN111576137A (en) * 2020-05-29 2020-08-25 上海园林绿化建设有限公司 Constitute street both sides afforestation system that sponge city was used
CN111608044A (en) * 2020-05-29 2020-09-01 上海新园林实业有限公司 A greening structure on both sides of the street that takes into account both drainage and road guidance

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100667248B1 (en) * 2006-09-27 2007-01-12 (주) 일신하이텍 Road block settlement prevention structure of road
KR20140110434A (en) * 2013-03-07 2014-09-17 주식회사디자인랜드 Drain type wooddeck plate fixing apparatus
CN205623602U (en) * 2015-12-07 2016-10-12 成都环美园林生态股份有限公司 Gardens multifunctional pipe
CN206043005U (en) * 2016-08-29 2017-03-29 北京市政路桥管理养护集团有限公司 It is a kind of to ooze pipe for green area irrigation
CN206289491U (en) * 2016-11-17 2017-06-30 辽宁工业大学 A kind of pavement, greenery patches harvest water system
CN206472556U (en) * 2017-01-10 2017-09-08 上海园林工程设计有限公司 A kind of multifunctional ecological tree pond for being used for pavement rainwater purification and utilizing

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100667248B1 (en) * 2006-09-27 2007-01-12 (주) 일신하이텍 Road block settlement prevention structure of road
KR20140110434A (en) * 2013-03-07 2014-09-17 주식회사디자인랜드 Drain type wooddeck plate fixing apparatus
CN205623602U (en) * 2015-12-07 2016-10-12 成都环美园林生态股份有限公司 Gardens multifunctional pipe
CN206043005U (en) * 2016-08-29 2017-03-29 北京市政路桥管理养护集团有限公司 It is a kind of to ooze pipe for green area irrigation
CN206289491U (en) * 2016-11-17 2017-06-30 辽宁工业大学 A kind of pavement, greenery patches harvest water system
CN206472556U (en) * 2017-01-10 2017-09-08 上海园林工程设计有限公司 A kind of multifunctional ecological tree pond for being used for pavement rainwater purification and utilizing

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576138A (en) * 2020-05-29 2020-08-25 上海园林绿化建设有限公司 Greening structure achieving water retention and drainage balance and construction method thereof
CN111576137A (en) * 2020-05-29 2020-08-25 上海园林绿化建设有限公司 Constitute street both sides afforestation system that sponge city was used
CN111608044A (en) * 2020-05-29 2020-09-01 上海新园林实业有限公司 A greening structure on both sides of the street that takes into account both drainage and road guidance

Similar Documents

Publication Publication Date Title
CN104429207B (en) Pitting field and hedgerow combined farming method and structure thereof
CN109868704A (en) With draining to road engineering method and road drainage system
CN204817451U (en) Saline soil reclamation system
CN109168385A (en) A kind of high precipitous rock slope Ecosystem restoration system and implementation method
CN106498952B (en) High steep spray in arid area mixes slope ecological protective slope structure
CN201627178U (en) Biological building block
KR101334266B1 (en) groundwater artificial recharge method of ditch type by considering geological properties
CN106688800B (en) A kind of land reclamation method for water conservation and fertilizer conservation in tailings pond
CN101548615A (en) Porous nest brick 3D green plant technology
CN113439593B (en) Filling construction area tree on-site protection structure and construction method
CN206821528U (en) A kind of photovoltaic water-saving irrigation system using highway afflux canal
AU2011100491A4 (en) Root Barrier
CN104452706A (en) Anti-seepage type assembly type ecological slope protection method for irrigation water conveying canal
KR100352143B1 (en) Planting belts construction method for street trees
CN206635717U (en) A kind of riverbank ecology retaining wall
CN106049226A (en) Waterproof seepage ditch with three slope surfaces being added with HDPE films
CN209489333U (en) An ecological breeding pond for wild Guizhou wart newts in karst areas
CN107401205A (en) A kind of karst depression rainfall utilizes system
CN207176863U (en) A kind of karst depression rainfall utilizes device
CN209538332U (en) Municipal rain penetration device
CN208128967U (en) The ecological tridimensional greening sound-proof wall of road
CN108589893B (en) A sponge-type vertical grate rainwater outlet for use in cities
CN205116188U (en) Waterproof sewer of triple domatic interpolation HDPE membranes
CN208300421U (en) A kind of environmental and ecological wall construction of hydraulic engineering
CN101769036B (en) Ecological building block

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190611

WD01 Invention patent application deemed withdrawn after publication