CN109837948A CN201910122851.6A CN201910122851A CN109837948A CN 109837948 A CN109837948 A CN 109837948A CN 201910122851 A CN201910122851 A CN 201910122851A CN 109837948 A CN109837948 A CN 109837948A
Authority
CN
China
Prior art keywords
pipeline
stopper
casing
foundation pit
springboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910122851.6A
Other languages
Chinese (zh)
Inventor
张俊忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering Third Construction Co Ltd
Original Assignee
China National Chemical Engineering Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering Third Construction Co Ltd filed Critical China National Chemical Engineering Third Construction Co Ltd
Priority to CN201910122851.6A priority Critical patent/CN109837948A/en
Publication of CN109837948A publication Critical patent/CN109837948A/en
Pending legal-status Critical Current

Links

Landscapes

  • Pipe Accessories (AREA)

Abstract

The method of buried underground piping repairing with pressure of the invention includes: first to excavate soil layer at pipeline leakage point to form foundation pit, is fully exposed pipeline leakage point, and the ponding in water storage tank is extracted out;Springboard, vertical scaffold tube and horizontal scaffold tube are laid in foundation pit;Stopper is filled in pipeline leakage point by repair personnel, then percussion stopper is carried out with hammer, the casing with valve flanges and gate valve is entangled into stopper and pipeline leakage point above stopper again, stopper is set to pass through valve flanges, then the lower end of casing and tube contacts carry out welding at the contact point of casing and pipeline with welding machine and form weld seam, after the completion of welding, repair personnel extracts stopper, and closing gate valve from valve flanges;The recirculated water in water storage tank is drained completely finally, after weld seam and casing dry, according to former pipeline corrosion protection requirement and anti-corrosion grade, preservative treatment is carried out to weld seam and casing, pipeline leakage point repairing is completed.

Description

The method of buried underground piping repairing with pressure
Technical field
The invention patent belongs to the method that the buried pipeline leakage in underground of industrial cycle water installations carries out repairing with pressure, more Specifically, it is related to a kind of buried underground piping emergency repair method with pressure, and it is different straight that this method is suitable for water class underground, ground Diameter, wall thickness 8mm or more, the defect elimination with pressure work that design pressure 0.6MPa pipeline below is revealed by defect.
Background technique
In the commercial plants such as chemical industry, chemical fertilizer, petroleum the industrial waters such as recirculated water, fire water, desalted water, life water be can not Lack, water is transmitted by pipeline, and pipeline uses for a long time, is opened because the reasons such as burn into washes away, external force will cause pipeline The defects of splitting, perforating reveals water from fault location, can be to rob by cracking block of leak source in the case where not parking The technical problem repaired, it is especially buried more difficult by force in underground piping, it generallys use and stops in pipe first-aid leak source Vehicle replaces the methods of leak source repair welding, fast hardening concrete pouring, but influences production using parking leak source repair welding, and Large Scale Industrial Process is every Parking drives once lose members up to a million, feasible for small defect using fast hardening concrete pouring, if big perforation is adopted It is poured with fast hardening concrete, is easy to pour into concrete inside pipeline, causes the equipment, valve blockage or damage in downstream.It adopts The deficiency of the above method can effectively be made up by carrying out repairing pipeline leakage point with a kind of buried underground piping emergency repair method with pressure.
Summary of the invention
The purpose of present invention is the shortcomings that overcoming existing method for maintaining, and provides that a kind of buried underground piping is with pressure to be robbed The method repaired.
In order to complete present invention purpose, the application uses following technical scheme:
The method of buried underground piping repairing with pressure of the invention, this method be to by the buried pipeline in underground of soil layer into It robs the method repaired, the recirculated water with certain pressure is flowed in the pipeline, this method needs following tool: casing, lock Valve, valve flanges, stopper, welding machine, immersible pump, vertical scaffold tube, horizontal scaffold tube, life line, springboard, fire hose and hammer, This method needs repair personnel and care provider, in which: method includes the following steps:
(a), it excavates soil layer at pipeline leakage point to form foundation pit first, is fully exposed pipeline leakage point, in pipeline one A water storage tank is dug on side again, so that the water revealed in pipeline flows into water storage tank, one end of fire hose is connected immersible pump, then The immersible pump for connecting fire hose is put into water storage tank, the fire hose other end is put into gutter, starts immersible pump for water storage tank Interior ponding is extracted into gutter;
(b), at least two pieces of springboards are laid in the foundation pit surrounding excavated, vertical scaffold tube and cross is laid on every piece of springboard Scaffold tube prevents slope collapse for springboard to be fixed, it is ensured that the safety of repair personnel in foundation pit;
(c), according to the shapes and sizes of pipeline leakage point make stopper, by one end of stopper be whittled into point, it is flat, rectangular or Circle, to squeeze into stopper in pipeline leakage point;
(d), casing is made according to the shapes and sizes of pipeline leakage point steel pipe, the wall thickness of casing should be greater than or be equal to pipeline Wall thickness, be connected with valve flanges and gate valve in the upper end of the casing, and in advance open gate valve;
(e), repair personnel enter foundation pit before, put on articles for labour protection and fasten life line, repair personnel slowly into Enter in foundation pit and repaired, care provider holds life line outside foundation pit, if care provider has found that the water in foundation pit increases, increases When will mostly occur with the dangerous situation on one of foundation pit landslide, repair personnel is pulled out foundation pit with life line in time by care provider;
(f), stopper is filled in pipeline leakage point by repair personnel, then carries out percussion stopper with hammer, and pipeline leakage point plug is real It is urgent, prevent stopper from being washed out by recirculated water;
(g), the casing with valve flanges and gate valve is entangled into above stopper stopper and pipeline leakage point, wears stopper Cross valve flanges, the lower end of casing and tube contacts, because stopper cannot completely shut pipeline leakage point, have part recirculated water from It flows out, is flowed into casing at stopper, and sprayed from valve flanges mouth, flowed into water storage tank;Or between casing and pipeline It flows into water storage tank;
(h), repair personnel carries out welding at the contact point of casing and pipeline with welding machine and forms weld seam, after the completion of welding, Repair personnel extracts stopper, and closing gate valve from valve flanges;
(i), repair personnel drains the recirculated water in water storage tank completely, takes out immersible pump, after weld seam and casing dry, According to former pipeline corrosion protection requirement and anti-corrosion grade, preservative treatment is carried out to weld seam and casing, then, care provider will with life line Repair personnel pulls out foundation pit, removes horizontal scaffold tube, vertical scaffold tube and springboard, backfills foundation pit, restore greenbelt, pipeline leakage point Repairing is completed;
The method of buried underground piping repairing with pressure of the invention, in which: the springboard is the wooden springboard or steel springboard;
The method of buried underground piping repairing with pressure of the invention, in which: the articles for labour protection include: safety cap, Rubber overshoes, raincoat and safety belt;
The method of buried underground piping repairing with pressure of the invention, in which: the springboard is block, and one piece of springboard is laid on product On foundation pit between sink and gutter, another piece is laid on the foundation pit near at pipeline leakage point in springboard.
The method of buried underground piping repairing with pressure of the invention and existing use replace leak source repair welding, fast hardening concrete The methods of pouring is compared, it has the advantage that
1, the pipeline, valve of repairing are conventional material, are not necessarily to external processing, economical and practical, save the cost.
2, parking is not had to using the invention, can saved because of economic loss caused by opening, stopping.
3, easy for installation, swift to operate, this repairing work can be completed in a plumber, a welder and a general work.
4, although this method is restricted clearance operation, but method is proper, appropriate measures, securely and reliably.
5, primary repairing, uses throughout one's life, no longer needs to processing of selecting a good opportunity.
Detailed description of the invention
Fig. 1 is the positive schematic diagram of buried underground piping emergency repair method with pressure of the invention;
Fig. 2 is bowing to amplification profile schematic diagram at the A-A of Fig. 1.
In fig. 1 and 2, label 1 is recirculated water;Label 2 is pipeline;Label 3 is soil layer;Label 4 is casing;Label 5 For gate valve;Label 6 is valve flanges;Label 7 is stopper;Label 8 is;Label 9 is leak source;Label 10 is immersible pump;Label 11 To indulge scaffold tube;Label 12 is horizontal scaffold tube;Label 13 is springboard;Label 14 is fire hose;Label 15 is gutter;Mark Numbers 16 be water storage tank;Label 17 is repair personnel;Label 18 is life line;Label 19 is care provider.
Specific embodiment
The invention patent uses Mr. Yu's Fertilizer Company synthesis ammonia/urea plant maintenance technological service project underground circulation for the first time The pipeline of water system DN900, which is bored to break by geological prospecting drilling machine, causes recirculated water largely to leak repairing, successfully by the pipe of the DN900 Leak source repairing leak stopping with pressure in road finishes.
The present invention is described further below with reference to Fig. 1 and Fig. 2.
The method of buried underground piping repairing with pressure of the invention, this method are to by the buried pipeline 2 in underground of soil layer 3 The method repaired, flows the recirculated water 1 with certain pressure in the pipeline 2, and this method needs following tool: casing 4, gate valve 5, valve flanges 6, stopper 7, welding machine, immersible pump 10, vertical scaffold tube 11, horizontal scaffold tube 12, life line 18, springboard 13, fire hose 14 and hammer, this method need repair personnel 17 and fire hose 19, method includes the following steps:
(a), it excavates soil layer 3 at 2 leak source 9 of pipeline to form foundation pit first, is fully exposed 2 leak source 9 of pipeline, in pipe Road 2 digs a water storage tank 16 on one side again, so that the water revealed in pipeline 2 flows into water storage tank 16, by a termination of fire hose 14 Then the immersible pump 10 for connecting fire hose 14 is put into water storage tank 16 by upper immersible pump 10,14 other end of fire hose is put into draining In ditch 15, the ponding in water storage tank 16 is extracted into gutter 15 by starting immersible pump 10;
(b), two pieces of springboards 13 are laid in the foundation pit surrounding excavated, springboard 13 is the wooden springboard or steel springboard, one piece of springboard 13 It is laid on the foundation pit between water storage tank 16 and gutter 15, another piece of base being laid in springboard 13 near at 2 leak source 9 of pipeline On hole, vertical scaffold tube 11 and horizontal scaffold tube 12 are laid on every piece of springboard 13 to be prevented for springboard 13 to be fixed Slope collapse, it is ensured that the safety of repair personnel 17 in foundation pit;
(c), stopper 7 is made according to the shapes and sizes of pipeline leakage point 9, one end of stopper 7 is whittled into point, flat, side Shape or circle, to squeeze into stopper 7 in pipeline leakage point 9;
(d), casing 4 is made according to the shapes and sizes of pipeline leakage point 9 steel pipe, the wall thickness of casing 4 should be greater than or be equal to The wall thickness of pipeline 2 is connected with valve flanges 6 and gate valve 5 in the upper end of the casing 4, and in advance opens gate valve 5;
(e), repair personnel 17 puts on articles for labour protection and fastens life line 18 before entering foundation pit, and labour protection is used Product include: safety cap, rubber overshoes, raincoat and safety belt etc., and repair personnel 17, which slowly enters in foundation pit, to repair, and care provider 19 Outside foundation pit hold life line 18, if care provider 19 find foundation pit in water increase, increase with foundation pit landslide one of danger When dangerous situation condition will occur, repair personnel 17 is pulled out foundation pit with life line 18 in time by care provider 19;
(f), stopper 7 is filled in pipeline leakage point 9 by repair personnel 17, is then carried out tapping stopper 7 with hammer, by pipeline leakage point 9 plugs are real urgent, prevent stopper 7 from being washed out by recirculated water 1;
(g), the casing 4 with valve flanges 6 and gate valve 5 is entangled into stopper 7 and pipeline leakage point 9 from the top of stopper 7, made Stopper 7 passes through valve flanges 6, and the lower end of casing 4 contacts with pipeline 2, because stopper 7 cannot completely shut pipeline leakage point 9, has Part recirculated water 1 flows out from stopper 7, flows into casing 4, and sprays from valve flanges mouth 6, flows into water storage tank 16;Or Person flows into water storage tank 16 between casing 4 and pipeline 2;
(h), repair personnel 17 carries out welding at the contact point of casing 4 and pipeline 2 with welding machine and forms weld seam 8, has welded Cheng Hou, repair personnel 17 extract stopper 7, and closing gate valve 5 from valve flanges 6;
(i), repair personnel 17 drains the recirculated water 1 in water storage tank 16 completely, takes out immersible pump 10, to weld seam 8 and set After pipe 4 dries, according to former 2 requirement for anticorrosion of pipeline and anti-corrosion grade, preservative treatment is carried out to weld seam 8 and casing 4, then, monitoring Repair personnel 17 is pulled out foundation pit with life line 18 by personnel 19, is removed horizontal scaffold tube 12, vertical scaffold tube 11 and springboard 13, is returned Foundation pit is filled out, greenbelt is restored, the repairing of pipeline leakage point 9 is completed.
Embodiment described above only describe the preferred embodiments of the invention, not to model of the invention It encloses and is defined, without departing from the spirit of the design of the present invention, those of ordinary skill in the art are to technical side of the invention The various changes and improvements that case is made should all be fallen into the protection scope that claims of the present invention determines.

Claims (4)

1. a kind of method of buried underground piping repairing with pressure, this method be to by the buried pipeline (2) in underground of soil layer (3) into It robs the method repaired, the recirculated water (1) with certain pressure is flowed in the pipeline (2), this method needs following tool: set Manage (4), gate valve (5), valve flanges (6), stopper (7), welding machine, immersible pump (10), vertical scaffold tube (11), horizontal scaffold tube (12), life line (18), springboard (13), fire hose (14) and hammer, this method need repair personnel (17) and care provider (19), it is characterised in that: method includes the following steps:
(a), it excavates soil layer (3) at pipeline (2) leak source (9) to form foundation pit first, completely reveals pipeline (2) leak source (9) Come, digs a water storage tank (16) again on one side in pipeline (2), so that the water revealed in pipeline (2) flows into water storage tank (16), will disappear One end of anti-band (14) connects immersible pump (10), and the immersible pump (10) for connecting fire hose (14) is then put into water storage tank (16) Interior, fire hose (14) other end is put into gutter (15), is started immersible pump (10) for the ponding in water storage tank (16) and is extracted into row In ditch (15);
(b), at least two pieces of springboards (13) are laid in the foundation pit surrounding excavated, are laid with vertical scaffold tube above in every piece of springboard (13) (11) and horizontal scaffold tube (12), for springboard (13) to be fixed, slope collapse is prevented, it is ensured that repair personnel in foundation pit (17) safety;
(c), according to the shapes and sizes of pipeline leakage point (9) make stopper (7), by one end of stopper (7) be whittled into point, it is flat, It is rectangular or round, so that stopper (7) is squeezed into pipeline leakage point (9);
(d), casing (4) are made according to the shapes and sizes of pipeline leakage point (9) steel pipe, the wall thickness of casing (4) should be greater than or wait Wall thickness in pipeline (2) is connected with valve flanges (6) and gate valve (5) in the upper end of the casing (4), and in advance beats gate valve (5) It opens;
(e), repair personnel (17) puts on articles for labour protection and fastens life line (18), repair personnel before entering foundation pit (17) slowly enter in foundation pit and repaired, care provider (19) holds life line (18) outside foundation pit, care provider (19) if It was found that the water in foundation pit increases, increases when will occur with the dangerous situation on one of foundation pit landslide, care provider (19) is timely Repair personnel (17) are pulled out into foundation pit with life line (18);
(f), stopper (7) is filled in pipeline leakage point (9) by repair personnel (17), then percussion stopper (7) is carried out with hammer, by pipeline Leak source (9) plug is real urgent, prevents stopper (7) from being washed out by recirculated water (1);
(g), the casing (4) with valve flanges (6) and gate valve (5) is entangled into above stopper (7) stopper (7) and pipeline leaks Point (9) makes stopper (7) to pass through valve flanges (6), and the lower end of casing (4) contacts with pipeline (2), because stopper (7) cannot completely by Pipeline leakage point (9) is shut, and is had part recirculated water (1) and is flowed out at stopper (7), is flowed into casing (4), and from valve flanges mouth (6) it sprays, is flowed into water storage tank (16) at;Or it is flowed into water storage tank (16) between casing (4) and pipeline (2);
(h), repair personnel (17) is carried out welding at the contact point of casing (4) and pipeline (2) with welding machine and be formed weld seam (8), is welded After the completion of connecing, repair personnel (17) extracts stopper (7), and closing gate valve (5) at valve flanges (6);
(i), repair personnel (17) drains the recirculated water (1) in water storage tank (16) completely, takes out immersible pump (10), to weld seam (8) and after casing (4) dries according to (2) requirement for anticorrosion of former pipeline and anti-corrosion grade, anti-corrosion, is carried out to weld seam (8) and casing (4) Processing, then, care provider (19) with life line (18) by repair personnel (17) pull out foundation pit, remove horizontal scaffold tube (12), Vertical scaffold tube (11) and springboard (13), backfill foundation pit, restore greenbelt, and pipeline leakage point (9) repairing is completed.
2. the method for buried underground piping repairing with pressure as described in claim 1, it is characterised in that: the springboard (13) is wood Springboard or steel springboard.
3. the method for buried underground piping repairing with pressure as claimed in claim 2, it is characterised in that: the articles for labour protection It include: safety cap, rubber overshoes, raincoat and safety belt.
4. the method for buried underground piping repairing with pressure as claimed in claim 3, it is characterised in that: the springboard (13) is 2 Block, one piece of springboard (13) are laid on the foundation pit between water storage tank (16) and gutter (15), and another piece is laid in springboard (13) On foundation pit near at pipeline (2) leak source (9).
CN201910122851.6A 2019-02-18 2019-02-18 The method of buried underground piping repairing with pressure Pending CN109837948A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910122851.6A CN109837948A (en) 2019-02-18 2019-02-18 The method of buried underground piping repairing with pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910122851.6A CN109837948A (en) 2019-02-18 2019-02-18 The method of buried underground piping repairing with pressure

Publications (1)

Publication Number Publication Date
CN109837948A true CN109837948A (en) 2019-06-04

Family

ID=66884707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910122851.6A Pending CN109837948A (en) 2019-02-18 2019-02-18 The method of buried underground piping repairing with pressure

Country Status (1)

Country Link
CN (1) CN109837948A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110388530A (en) * 2019-06-13 2019-10-29 泉州市燃气有限公司 Drainage device is used in a kind of repairing of gas pipeline
CN111535425A (en) * 2020-05-12 2020-08-14 广东明龙建设有限公司 Underground drainage pipe leakage repairing construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105953020A (en) * 2016-06-30 2016-09-21 合肥天沃能源科技有限公司 Method for treating leakage point of industrial pipeline under pressure
CN106195517A (en) * 2016-09-21 2016-12-07 钦州学院 A kind of quick blocking pipeline leakage point device
CN108561672A (en) * 2018-05-29 2018-09-21 重庆克那维环保科技有限公司 A kind of underground piping prosthetic device and its restorative procedure
CN108644526A (en) * 2018-04-30 2018-10-12 华电潍坊发电有限公司 The online leak-stopping technique of pipeline

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105953020A (en) * 2016-06-30 2016-09-21 合肥天沃能源科技有限公司 Method for treating leakage point of industrial pipeline under pressure
CN106195517A (en) * 2016-09-21 2016-12-07 钦州学院 A kind of quick blocking pipeline leakage point device
CN108644526A (en) * 2018-04-30 2018-10-12 华电潍坊发电有限公司 The online leak-stopping technique of pipeline
CN108561672A (en) * 2018-05-29 2018-09-21 重庆克那维环保科技有限公司 A kind of underground piping prosthetic device and its restorative procedure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110388530A (en) * 2019-06-13 2019-10-29 泉州市燃气有限公司 Drainage device is used in a kind of repairing of gas pipeline
CN111535425A (en) * 2020-05-12 2020-08-14 广东明龙建设有限公司 Underground drainage pipe leakage repairing construction method

Similar Documents

Publication Publication Date Title
CN107152264B (en) Coiled tubing string device and brine-discharging capacity-expanding method thereof in salt cavern underground gas storage
CN101798939B (en) Maintainable tunnel drainage system
CN103542226B (en) A kind of method of repairing large-diameter concrete water supply line
CN201650362U (en) Maintainable tunnel drainage system
CN104696664A (en) High-polymer composite grouting method for leakage and sand inrush blocking of underground pipeline
CN203924137U (en) Serious seepage block structure of underground continuous wall
CN109837948A (en) The method of buried underground piping repairing with pressure
Damvergis Sewer systems: Failures and rehabilitation
CN204491645U (en) A kind of deep foundation pit precipitation well-sealing device
CN103629474B (en) For repairing the restorative procedure connecting aqueduct of impaired cast iron fire protection pipeline
CN107975127A (en) The outer antipriming of vertical jacking
CN201554005U (en) Large-flow and high-speed jet sealing drilling and pouring orifice safety control device under high pressure water
CN105569162A (en) Method for blocking bilge wells
CN105735938A (en) Method and device for hydrostatic sandglass based bore water bursting blockage
CN201843543U (en) Device for preventing wellhead drilling fluid from splashing
CN205560116U (en) Non - digging type underground large diameter pipe restores structure
CN205839681U (en) Floss hole temporary plugging structure
KR20050101069A (en) A water turning method of powerless drain pipe and apparatus thereof
CN208687371U (en) A kind of Gas Exploitation And Transmission station underground piping leak detection window
CN105485468A (en) In-situ repair construction technology for seabed PE pipeline
CN203527525U (en) Underwater dry type cutting cabin
CN110560467B (en) Harmless treatment method for waste and old pipelines
CN201241691Y (en) Pressure logging construction device capable of preventing cable brittle failure
KR960041573A (en) Pipe leak internal recovery method
CN112982462B (en) Construction method for large-aperture pressurized water blocking of concrete member

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190604