CN109826218A - A kind of open caisson end heavy stage hydraulic lifting deviation-rectifying system - Google Patents

A kind of open caisson end heavy stage hydraulic lifting deviation-rectifying system Download PDF

Info

Publication number
CN109826218A
CN109826218A CN201910226629.0A CN201910226629A CN109826218A CN 109826218 A CN109826218 A CN 109826218A CN 201910226629 A CN201910226629 A CN 201910226629A CN 109826218 A CN109826218 A CN 109826218A
Authority
CN
China
Prior art keywords
open caisson
hydraulic
lattice column
steel
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910226629.0A
Other languages
Chinese (zh)
Inventor
水龙飞
余同德
刘伟
伍志远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201910226629.0A priority Critical patent/CN109826218A/en
Publication of CN109826218A publication Critical patent/CN109826218A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of open caisson end heavy stage hydraulic lifting deviation-rectifying systems, mainly by well bore, bored concrete pile, steel lattice column, hydraulic jack, displacement sensor, force sensor, hydraulic oil pump, sense line, hydraulic oil pipe, steel plate for sealing water, dial framework, steel pipe frame, the part such as bracket forms, by way of by the way that bracket is arranged in open caisson bottom and to have the bored concrete pile of steel lattice column at the top of the construction of excavation pit bottom symmetrical, so that in open caisson, the heavy stage can use hydraulic jack to well bore progress deviation adjusting eventually, it can effectively solve the problem that and not carry out the super heavy equal series of problems of back cover construction generation open caisson in the heavy stage deviation inclination of soft layer open caisson construction end or for some reason long-term, and then improve construction quality, reduce the construction period, reduce construction cost.

Description

A kind of open caisson end heavy stage hydraulic lifting deviation-rectifying system
Technical field
The invention belongs to Open caisson construction technology fields, and in particular to a kind of open caisson end heavy stage hydraulic lifting deviation-rectifying system.
Background technique
Open caisson construction is the stack shell that opening armored concrete is first made on ground or melt pit, after reaching some strength, In pit shaft layering cut the earth, muck haulage, as native face gradually decreases in well, open caisson stack shell overcomes and Tu Bi by its own gravity Between frictional resistance, constantly sink and a kind of deep base in place or underground engineering construction technique.
The advantages of open caisson construction technique are as follows: can construct deeper underground engineering in narrow space, and to ring around Border influences smaller;It can construct in geology, hydrologic condition complex area, and be not necessarily to complex mechanical equipment.Open caisson construction technique lacks Point are as follows: construction technical requirement is high, and quality control is difficult;Super heavy phenomenon easily occurs for heavy stage well bore eventually, and correction difficulty is big.Open caisson is super heavy Refer to that well sinking has been more than open caisson heavy absolute altitude eventually, and has been more than tolerance range.Since open caisson is from starting to sink to back cover Before completion, entire work progress all in the unstable state of movement among, and motion-affecting factor is sufficiently complex, both There are size, the weight, construction feature factor of open caisson itself, and with having the topography and geomorphology of external environment, engineering geology, the hydrology Matter condition element, there are also the method and measure of construction operation, operational procedure, control means etc., usually will appear in open caisson construction super Heavy phenomenon affects construction quality and uses function.
Summary of the invention
To solve the above problems, the present invention provides a kind of open caisson end heavy stage hydraulic lifting deviation-rectifying system, it can be effective It solves in soft layer open caisson construction heavy stage deviation inclination or for some reason long-term does not carry out back cover construction to generate open caisson super heavy eventually Equal series of problems.
The specific technical proposal of the invention is:
A kind of open caisson end heavy stage hydraulic lifting deviation-rectifying system, characterized in that construction procedure are as follows:
1) before well bore is prefabricated, first in four inside surface construction bored concrete piles of the borehole wall, control stake top absolute altitude to heavy bottom hole location eventually Lower 0.5 meter, it is inserted into steel lattice column, wherein 2 meters, exposed 1 meter in steel lattice column insertion bored concrete pile;
2) it is segmented prefabricated open caisson, head section well bore inside bottom is arranged a cast-in-place bracket, wants to lower part bored concrete pile intensity satisfaction It is excavated when asking, implements open caisson operation;
3) when well bore sinks down into nearly heavy absolute altitude eventually first by steel lattice column and pressure-bearing steel platform firm welding, bottom sealing position It sets and welds steel plate for sealing water with steel lattice column handover position,
4) hydraulic system and sensor are installed, hydraulic jack is placed on the pressure-bearing platform at the top of steel lattice column, liquid Pressure jack is connect by hydraulic oil pipe with hydraulic oil pump;Institute's displacement sensors are fixed on bracket by dial framework and steel pipe frame Portion, the force sensor are arranged in hydraulic jack top side face;The hydraulic oil pump by sensing line and displacement sensor and by Force snesor connection;
5) hydraulic system, displacement sensor and force sensor complete parameter is then arranged, when under well bore 1 in correction adjustment When being sink to pre-set parameter, hydraulic system stops working, and system is in the steady state of disk, and in open caisson, heavy bottom position is poured eventually at this time It builds bed course, assembling reinforcement, pour bottom concrete;
6) exposed steel lattice column, open caisson end heavy stage hydraulic lifting are finally cut off after bottom concrete intensity is met the requirements Deviation-rectifying system work is completed.
Further, when the step 5) correction adjustment, if well bore need to rectify a deviation, the height difference of adjustment is more than hydraulic jack When stroke, hydraulic jack can be unloaded, cut off part steel lattice column, pressure-bearing steel platform is soldered to again at the top of steel lattice column, The operation of step 5) is carried out again.
Compared with prior art, the present invention can be by applying in open caisson bottom setting bracket and to excavation pit bottom symmetrical The mode of bored concrete pile at the top of work with steel lattice column so that open caisson eventually the heavy stage can use hydraulic jack to well bore into Row deviation adjusting can effectively solve the problem that heavy stage deviation tilts eventually or long-term is not sealed for some reason in soft layer open caisson construction The super heavy equal series of problems of bottom application work generation open caisson, and then construction quality is improved, the construction period is reduced, construction cost is reduced.
Detailed description of the invention
Fig. 1 is a kind of open caisson of the present invention heavy stage hydraulic lifting deviation-rectifying system cross-section diagram eventually;
Fig. 2 is a kind of open caisson of the present invention heavy stage hydraulic lifting deviation-rectifying system top view eventually;
In figure: 1, well bore, 2, bored concrete pile, 3, steel lattice column, 4, hydraulic jack, 5, displacement sensor, 6, stress sensing Device, 7, hydraulic oil pump, 8, sensing line, 9, hydraulic oil pipe, 10, steel plate for sealing water, 11, dial framework, 12, steel pipe frame, 13, bracket.
Specific embodiment
The present invention is described in further detail with embodiment with reference to the accompanying drawings of the specification.
Embodiment 1
As shown in Fig.1 and Fig.2, a kind of open caisson end heavy stage hydraulic lifting deviation-rectifying system, construction procedure are as follows:
1) before well bore 1 is prefabricated, first in four inside surface construction bored concrete piles 2 of the borehole wall, control stake top absolute altitude to whole open caisson bottom position Lower 0.5 meter is set, steel lattice column 3 is inserted into, wherein steel lattice column 3 is inserted into bored concrete pile 22 meters, exposed 1 meter;
2) it is segmented prefabricated open caisson, a cast-in-place bracket 13 is arranged in head section 1 inside bottom of well bore, full to 2 intensity of lower part bored concrete pile Foot is excavated when requiring, and implements open caisson operation;
3) when well bore 1 sinks down into nearly heavy absolute altitude eventually first by steel lattice column 3 and 14 firm welding of pressure-bearing steel platform, open caisson envelope Bottom position and steel lattice column 3 join position and weld steel plate for sealing water 10;
4) hydraulic system and sensor are installed
Hydraulic system includes hydraulic jack 4 and hydraulic oil pump 7, and hydraulic jack 4 is placed on 3 top of steel lattice column On pressure-bearing platform 14, hydraulic jack 4 is connect by hydraulic oil pipe 9 with hydraulic oil pump 7;Institute's displacement sensors 5 pass through dial framework 11 and steel pipe frame 12 be fixed on 13 top of bracket, force sensor 6 is arranged in 4 side of hydraulic jack;Hydraulic oil pump 7 passes through biography Sense line 8 is connect with displacement sensor 5 and force sensor 6;
5) hydraulic system, 6 complete parameter of displacement sensor 5 and force sensor is then arranged, when well bore 1 in correction adjustment When sinking down into pre-set parameter, hydraulic system stops working, and system is in the steady state of disk, at this time in open caisson end heavy bottom position It pours bed course, assembling reinforcement, pour bottom concrete;
6) exposed steel lattice column 3, open caisson end heavy stage hydraulic top are finally cut off after bottom concrete intensity is met the requirements Deviation-rectifying system work is risen to complete.
Embodiment 2
As shown in Figure 1 and Figure 2, a kind of open caisson end heavy stage hydraulic lifting deviation-rectifying system, construction procedure are as follows:
1) before well bore 1 is prefabricated, first in four inside surface construction bored concrete piles 2 of the borehole wall, control stake top absolute altitude to whole open caisson bottom position Lower 0.5 meter is set, steel lattice column 3 is inserted into, wherein steel lattice column 3 is inserted into bored concrete pile 22 meters, exposed 1 meter;
2) it is segmented prefabricated open caisson, a cast-in-place bracket 13 is arranged in head section 1 inside bottom of well bore, full to 2 intensity of lower part bored concrete pile Foot is excavated when requiring, and implements open caisson operation;
3) when well bore 1 sinks down into nearly heavy absolute altitude eventually first by steel lattice column 3 and 14 firm welding of pressure-bearing steel platform, open caisson envelope Bottom position and steel lattice column 3 join position and weld steel plate for sealing water 10;
4) hydraulic system and sensor are installed
Hydraulic system includes hydraulic jack 4 and hydraulic oil pump 7, and hydraulic jack 4 is placed on 3 top of steel lattice column On pressure-bearing platform 14, hydraulic jack 4 is connect by hydraulic oil pipe 9 with hydraulic oil pump 7;Institute's displacement sensors 5 pass through dial framework 11 and steel pipe frame 12 be fixed on 13 top of bracket, force sensor 6 is arranged in 4 side of hydraulic jack;Hydraulic oil pump 7 passes through biography Sense line 8 is connect with displacement sensor 5 and force sensor 6;
5) correction adjustment can be by hydraulic jack when if well bore 1 need to rectify a deviation, the height difference of adjustment is more than 4 stroke of hydraulic jack Top 4 is unloaded, and part steel lattice column 3 is cut off, and pressure-bearing steel platform 14 is soldered to 3 top of steel lattice column again.
Then setting hydraulic system, 6 complete parameter of displacement sensor 5 and force sensor, sets when well bore 1 sinks down into parameter When definite value, hydraulic system stops working, and system be in the steady state of disk, sinks bottom position eventually in open caisson at this time and pours bed course, ties up It wire-ties, pour bottom concrete;
6) exposed steel lattice column 3, open caisson end heavy stage hydraulic top are finally cut off after bottom concrete intensity is met the requirements Deviation-rectifying system work is risen to complete.
The invention enables carry out deviation to well bore using hydraulic rectifying system in open caisson eventually heavy construction actual application Adjustment is possibly realized, and meets the open caisson construction end heavy accuracy requirements under bad condition condition or soft layer geological condition.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (2)

1. a kind of open caisson end heavy stage hydraulic lifting deviation-rectifying system, characterized in that construction procedure are as follows:
1) before well bore (1) is prefabricated, first in four inside surface construction bored concrete piles (2) of the borehole wall, control stake top absolute altitude to whole open caisson bottom position Lower 0.5 meter is set, is inserted into steel lattice column (3), wherein two meters, exposed one meter in steel lattice column (3) insertion bored concrete pile (2);
2) it is segmented prefabricated open caisson, a cast-in-place bracket (13) is arranged in head section well bore (1) inside bottom, to lower part bored concrete pile (2) intensity It is excavated when meeting the requirements, implements open caisson operation;
3) when well bore (1) sinks down into nearly heavy absolute altitude eventually first by steel lattice column (3) and pressure-bearing steel platform (14) firm welding, open caisson Back cover position and steel lattice column (3) handover position welding steel plate for sealing water (10);
4) hydraulic system and sensor, the pressure-bearing platform (14) hydraulic jack (4) being placed at the top of steel lattice column (3) are installed On, hydraulic jack (4) is connect by hydraulic oil pipe (9) with hydraulic oil pump (7);Institute's displacement sensors (5) pass through dial framework (11) and steel pipe frame (12) is fixed on bracket (13) top, and the force sensor (6) is arranged in hydraulic jack (4) side; The hydraulic oil pump (7) is connect by sensing line (8) with displacement sensor (5) and force sensor (6);
5) correction adjustment is then arranged hydraulic system, displacement sensor (5) and force sensor (6) complete parameter, works as well bore (1) when sinking down into pre-set parameter, hydraulic system stops working, and system is in the steady state of disk, sinks to the bottom portion eventually in open caisson at this time Position pours bed course, assembling reinforcement, pours bottom concrete;
6) exposed steel lattice column (3) are finally cut off after bottom concrete intensity is met the requirements, open caisson end heavy stage hydraulic lifting Deviation-rectifying system work is completed.
2. a kind of open caisson end heavy stage hydraulic lifting deviation-rectifying system according to claim 1, characterized in that the step It 5), can be by hydraulic jack when if well bore (1) need to rectify a deviation, the height difference of adjustment is more than hydraulic jack (4) stroke when correction adjustment (4) it unloads, cuts off part steel lattice column (3), pressure-bearing steel platform (14) is soldered to again at the top of steel lattice column (3), then is walked Rapid operation 5).
CN201910226629.0A 2019-03-25 2019-03-25 A kind of open caisson end heavy stage hydraulic lifting deviation-rectifying system Pending CN109826218A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910226629.0A CN109826218A (en) 2019-03-25 2019-03-25 A kind of open caisson end heavy stage hydraulic lifting deviation-rectifying system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910226629.0A CN109826218A (en) 2019-03-25 2019-03-25 A kind of open caisson end heavy stage hydraulic lifting deviation-rectifying system

Publications (1)

Publication Number Publication Date
CN109826218A true CN109826218A (en) 2019-05-31

Family

ID=66871958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910226629.0A Pending CN109826218A (en) 2019-03-25 2019-03-25 A kind of open caisson end heavy stage hydraulic lifting deviation-rectifying system

Country Status (1)

Country Link
CN (1) CN109826218A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610530A (en) * 2018-12-14 2019-04-12 宝钢集团新疆八钢铁有限公司 A kind of method of large equipment base correction
CN110541427A (en) * 2019-09-05 2019-12-06 中交第二公路工程局有限公司 Open caisson shaft deviation rectifying device and deviation rectifying method
CN110747876A (en) * 2019-09-11 2020-02-04 中铁上海工程局集团有限公司 Auxiliary device for sinking in open caisson construction and operation method thereof
CN113529771A (en) * 2021-07-23 2021-10-22 湖北工业大学 Method for blasting and excavating open caisson by using rock foundation of jack and constructing shaft
CN113737833A (en) * 2021-09-09 2021-12-03 中建七局交通建设有限公司 Open caisson construction formwork and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004156205A (en) * 2002-11-01 2004-06-03 Yamaha Kako Kensetsu Kk Underground construction and construction method therefor
CN101418573A (en) * 2008-01-24 2009-04-29 丁慈鑫 Caisson structure and method for smoothly and accurately sinking caisson structure into earth surface
CN204112351U (en) * 2014-07-22 2015-01-21 中国市政工程华北设计研究总院有限公司 The sinking servicing unit of open caisson
CN108086340A (en) * 2017-12-29 2018-05-29 上海建工二建集团有限公司 Open caisson construction structure and its construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004156205A (en) * 2002-11-01 2004-06-03 Yamaha Kako Kensetsu Kk Underground construction and construction method therefor
CN101418573A (en) * 2008-01-24 2009-04-29 丁慈鑫 Caisson structure and method for smoothly and accurately sinking caisson structure into earth surface
CN204112351U (en) * 2014-07-22 2015-01-21 中国市政工程华北设计研究总院有限公司 The sinking servicing unit of open caisson
CN108086340A (en) * 2017-12-29 2018-05-29 上海建工二建集团有限公司 Open caisson construction structure and its construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610530A (en) * 2018-12-14 2019-04-12 宝钢集团新疆八钢铁有限公司 A kind of method of large equipment base correction
CN110541427A (en) * 2019-09-05 2019-12-06 中交第二公路工程局有限公司 Open caisson shaft deviation rectifying device and deviation rectifying method
CN110747876A (en) * 2019-09-11 2020-02-04 中铁上海工程局集团有限公司 Auxiliary device for sinking in open caisson construction and operation method thereof
CN113529771A (en) * 2021-07-23 2021-10-22 湖北工业大学 Method for blasting and excavating open caisson by using rock foundation of jack and constructing shaft
CN113737833A (en) * 2021-09-09 2021-12-03 中建七局交通建设有限公司 Open caisson construction formwork and construction method thereof
CN113737833B (en) * 2021-09-09 2022-09-09 中建七局交通建设有限公司 Open caisson construction formwork and construction method thereof

Similar Documents

Publication Publication Date Title
CN109826218A (en) A kind of open caisson end heavy stage hydraulic lifting deviation-rectifying system
CN108086340B (en) Open caisson construction structure and construction method thereof
CN108589718B (en) Piles in Karst Region base construction method
CN107975375B (en) A kind of miniature steel pipe pile reinforced soft foundation construction method of city tunnel
CN108343102A (en) Jacking leveling structure and its construction method are reinforced in a kind of sedimentation of pile foundation
US20160376762A1 (en) Construction method for planting hollow columns in a seabed of a marine environment for supporting waterborne structures thereon
CN110185044B (en) Foundation pit side wall stress adjustment system for deep unstable stratum
CN109898520A (en) A kind of heavy wall construction method
CN108149678A (en) A kind of loess retaining wall does the construction method of operation pore-creating filling pile
CN102767180A (en) Construction method for strengthening base of static-pressure anchor rod pile
CN105019485B (en) A kind of excavation of foundation pit dead load test on pile foundation detection method
CN104018512A (en) Open caisson sinking construction method slightly disturbing environment
CN102505702A (en) Double-wall concrete open caisson and construction method thereof
AU2020100838A4 (en) A kind of stress adjustment system for side walls of foundation pit in deep and unstable strata
CN205748469U (en) Many Information Field monitoring systems of a kind of reservoir landslide
CN105133641A (en) Thin-wall continuous-wall-type foundation reinforcing structure and method
CN102979102B (en) Open-excavation sequential-operation deformation-control design method for deep and large circular foundation ditch in soft soil areas
CN207113887U (en) Dismountable pit displacement monitoring device
CN113668564A (en) Construction method for supporting and reinforcing open-cut underground passage adjacent to subway station
CN110258580B (en) Construction method of foundation pit enclosure structure serving as permanent underground structure
CN211113714U (en) Thin-wall full-surrounding embedded foundation suitable for rock foundation
CN111749247A (en) Construction method for pipeline deep foundation pit support
CN105220719A (en) Deep Thick Soft Ground Area bridge struction pile method for correcting error
CN207828995U (en) Open caisson construction structure
CN110067205A (en) A kind of permanent protecting tube embedding construction method of bridge pier column outsourcing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190531