CN109823871A - A kind of dual-purpose harbour facilities of handling - Google Patents

A kind of dual-purpose harbour facilities of handling Download PDF

Info

Publication number
CN109823871A
CN109823871A CN201910163132.9A CN201910163132A CN109823871A CN 109823871 A CN109823871 A CN 109823871A CN 201910163132 A CN201910163132 A CN 201910163132A CN 109823871 A CN109823871 A CN 109823871A
Authority
CN
China
Prior art keywords
door frame
turntable
upper beam
cantilever crane
ship
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910163132.9A
Other languages
Chinese (zh)
Inventor
王龙
李波
许芳芳
孟凡雷
娄苹苹
杨树龙
秦英杰
王明义
葛咏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN CRANE CO Ltd
Original Assignee
HENAN CRANE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN CRANE CO Ltd filed Critical HENAN CRANE CO Ltd
Priority to CN201910163132.9A priority Critical patent/CN109823871A/en
Publication of CN109823871A publication Critical patent/CN109823871A/en
Pending legal-status Critical Current

Links

Landscapes

  • Ship Loading And Unloading (AREA)

Abstract

The invention discloses a kind of ports handling machines, including loading bulk goods in ship system and break bulk cargo ship-loading system, two systems share a public door frame front leg strut and a public door frame rear support leg, cylinder Ι and cylinder II are welded on the inside of upper beam Ι, pass through supporting leg Ι between upper beam Ι and lower beam and contact bar welding, big mechanism of car Ι is symmetrically fixed by cart equalizer bar and flange support with lower beam both ends;The both ends upper beam Ι and one end of supporting leg II are by being formed by welding door frame, the other end of supporting leg II symmetrically passes through bolt and connect with big mechanism of car II, door frame girder truss front end is connect with the upper beam Ι on front leg strut door frame, and door frame girder truss rear end is hinged on the lower part of upper beam II by pin shaft support, pin shaft, lifting lug support.The equipment can complete loading bulk goods in ship task and complete the handling ship task of break bulk cargo, and save pier facilities occupied space, while can also save equipment purchase cost for owner, reduce civil engineering manufacturing cost.

Description

A kind of dual-purpose harbour facilities of handling
Technical field
The present invention relates to a kind of harbour facilities, make especially suitable for loading bulk goods in ship and the harbour of break bulk cargo loading, unloading ship ability With.
Background technique
In existing harbour facilities, the shipment of bulk cargo and the handling of break bulk cargo are usually to arrange two on harbour to set Standby, a ship loader is used to carry out the shipment of bulk cargo, and a gate seat machine is used to carry out the handling of break bulk cargo, this is for large pier For be it is very favorable, the handling of two ships can be carried out simultaneously, improve the utilization rate in shipping dock.But for some For personal shipping dock, factory, harbour is shorter, and can only once berth a ship, since loading bulk material on board machine and break bulk cargo fill Unloading gate seat machine lower part all has walking door frame, and has certain width, and in this case two equipment can not be simutaneously arranged in ship Preceding completion handling task.Simultaneously as the structure of ship loader constructs demand, door frame span can be very big, if spread again for gate seat machine One track or the door frame span of use and ship loader, it will harbour infrastructure and equipment purchase cost is caused substantially to increase Add, in order to meet these harbours cargo peculiar to vessel handling demand, need to design and a kind of load and unload dual-purpose harbour facilities to complete Handling task, meanwhile, it not can increase the harbour infrastructure expense and equipment purchase cost of owner.
Summary of the invention
The task of the present invention is proposing a kind of saving pier facilities occupied space, and handling task can be completed simultaneously, reduce A kind of dual-purpose harbour facilities of handling of Wharf Construction cost.
The task of the present invention is what is completed in this way, including loading bulk goods in ship system and break bulk cargo ship-loading system, it is characterised in that: Two systems share a public door frame front leg strut and a public door frame rear support leg, and the public door frame front leg strut includes cylinder Body Ι, cylinder II, upper beam Ι, supporting leg Ι, flange support, cart equalizer bar, big mechanism of car Ι, connection bar and lower beam, it is described Cylinder Ι and cylinder II are welded on the inside of upper beam Ι, pass through supporting leg Ι between the upper beam Ι and lower beam and contact bar Welding, the big mechanism of car Ι are symmetrically fixed by cart equalizer bar and flange support with lower beam both ends;
The public door frame rear support leg include upper beam II, supporting leg II, pin shaft support, door frame girder truss, pin shaft, lifting lug support and One end of big mechanism of car II, the both ends the upper beam Ι and supporting leg II is by being formed by welding door frame, the other end pair of the supporting leg II Claim to connect by bolt with big mechanism of car II, door frame girder truss front end is connect with the upper beam Ι on front leg strut door frame, the door frame Girder truss rear end is hinged on the lower part of upper beam II by pin shaft support, pin shaft, lifting lug support.
The loading bulk goods in ship system includes throwing machine chute, chute lifting mechanism, cantilever crane, steel cable winding system, pitching Mechanism, pull rod, upper turntable, door frame belt conveyor, belt door frame, rear support leg, swing mechanism Ι, floating bearing Ι, public door frame Front leg strut, column turntable, cantilever crane belt conveyor, bulk cargo are used to complete by the door frame belt conveyor installed on truss door frame The material of rear portion batcher conveys, and material is passed to cantilever crane belt conveyor, then bulk cargo is packed into cabin by material-throwing sliding drum, Material-throwing sliding drum is bolted in cantilever crane lower part, and the stretching motion of throwing machine chute is completed by chute lifting mechanism, adjusts Material-throwing sliding drum lower part discharge port can carry out pitching tune to cantilever crane by steel cable winding system in the position of cabin, luffing mechanism Section, cantilever crane on column turntable, are equipped with pull rod and upper turntable, are equipped with and bow on upper turntable by stud connection on column turntable Mechanism is faced upward, column turntable passes through all structures that floating bearing Ι and swing mechanism Ι can make column turntable and be mounted above Rotary motion is done, entire loading bulk goods in ship system is mounted on public door frame front leg strut, is equipped with cart on public door frame front leg strut Mechanism Ι and cart anchoring.
The break bulk cargo handling boat system includes floating bearing II, turntable, lifting mechanism, column, rack gear jib lubbing mechanism, puts down Balance beam, cantilever crane, suspension hook, swing mechanism II, break bulk cargo load and unload boat system and are mounted on public door by bolt by floating bearing II On frame front leg strut, turntable is mounted on cylinder II by floating bearing II, and drives upper turntable by swing mechanism II, upper to turn Lifting mechanism is installed on platform, the lifting of cargo is carried out by lifting mechanism and suspension hook, rack gear jib lubbing mechanism is installed on column And equalizer bar, it is acted by the swing that the coordinated of rack gear jib lubbing mechanism and equalizer bar can complete cantilever crane, described Rise the handling that mechanism, rack gear jib lubbing mechanism, swing mechanism II complete break bulk cargo.
The present invention has the effect that the handling task that can be completed at the same time, and saves pier facilities occupied space, while may be used also Think that owner saves equipment purchase cost, reduces equipment acquisition cost.
Detailed description of the invention
Fig. 1 is loading bulk goods in ship system structure schematic front view of the invention;Fig. 2 is that break bulk cargo handling system of the invention shows It is intended to;Fig. 3 is side view of the invention;Fig. 4 is the structure chart of public door frame front leg strut;Fig. 5 is public door frame rear support leg and purlin The structure chart of frame connection
Fig. 1 explanation: 1, material-throwing sliding drum, 2, chute lifting mechanism, 3, cantilever crane, 4, steel cable winding system, 5, luffing mechanism, 6, drawing Bar, 7, upper turntable, 8, door frame belt conveyor, 9, truss door frame, 10, rear support leg, 11, swing mechanism Ι, 12, floating bearing Ι, 13, public door frame front leg strut, 14, column turntable, 15, cantilever crane belt conveyor.
Fig. 2 explanation: 16, floating bearing II, 17, turntable, 18, lifting mechanism, 19, column, 20, rack gear jib lubbing mechanism, 21, equalizer bar, 22, cantilever crane, 23, suspension hook, 24, swing mechanism II,
Fig. 3 explanation: 25, big mechanism of car Ι, 13, public door frame front leg strut 2,26, cart anchoring,
Fig. 4 explanation: 27, cylinder Ι, 28, cylinder II, 29, upper beam Ι, 30, supporting leg Ι, 31, flange support, 32, cart it is flat Balance beam, 25, big mechanism of car Ι, 33, connection bar, 34, lower beam.
Fig. 5 explanation: 35, upper beam II, 36, supporting leg II, 37, pin shaft support, 38, door frame girder truss, 39, pin shaft, 40, hang Auricular branch seat, 41, big mechanism of car II.
Specific embodiment
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, it is intended to is used to explain the present invention, and is not considered as limiting the invention.
Specific embodiment is as shown in Figure 4, Figure 5, and loading and unloading dual-purpose harbour facilities includes that loading bulk goods in ship system and break bulk cargo are loaded onto ship System, and two systems share a public door frame front leg strut 13 and a public door frame rear support leg 10, before the public door frame Supporting leg includes 27 Ι of cylinder, cylinder 28 II, 29 Ι of upper beam, 30 Ι of supporting leg, flange support 31, cart equalizer bar 32, big vehicle device 25 Ι of structure, connection bar 33 and lower beam 34, the cylinder Ι and cylinder II are welded on the inside of 29 Ι of upper beam, the upper cross Pass through 30 Ι of supporting leg between beam Ι and lower beam 34 and contact the welding of bar 33, big 25 Ι of mechanism of car passes through 32 He of cart equalizer bar Flange support 31 and 34 both ends of lower beam are symmetrically fixed (as shown in Figure 4).
The public door frame rear support leg includes upper beam 35 II, supporting leg 36 II, pin shaft support 37, door frame girder truss 38, pin One end of axis 39, lifting lug support 40 and big mechanism of car 41 II, the both ends the upper beam Ι and supporting leg II by the way that door frame is formed by welding, The other end of the supporting leg II symmetrically passes through bolt and connect with big mechanism of car 41 II, 38 front end of door frame girder truss and front leg strut door frame On upper beam Ι connection, door frame girder truss rear end is hinged on cross by pin shaft support 37, pin shaft 39, lifting lug support 40 The lower part of beam 35 II.
The loading bulk goods in ship system includes, throwing machine chute 1, chute lifting mechanism 2, cantilever crane 3, steel cable winding system 4, Luffing mechanism 5, pull rod 6, upper turntable 7, door frame belt conveyor 8, belt door frame 9, rear support leg 10,11 Ι of swing mechanism, rotating shaft Hold 12 Ι, public door frame front leg strut 13, column turntable 14, cantilever crane belt conveyor 15, bulk cargo is by installing on truss door frame 9 Door frame belt conveyor 8 is used to complete the material conveying of rear portion batcher, material is passed to cantilever crane belt conveyor 15, then lead to It crosses material-throwing sliding drum 1 and bulk cargo is packed into cabin.Material-throwing sliding drum is bolted in 3 lower part of cantilever crane, complete by chute lifting mechanism 2 At the stretching motion of throwing machine chute, material-throwing sliding drum lower part discharge port is adjusted in the position of cabin, luffing mechanism 5 passes through wirerope Winding system 4 can carry out pitch regulation to cantilever crane.Cantilever crane on column turntable 14, is installed by stud connection on column turntable There are pull rod 6 and upper turntable 7, luffing mechanism 5 is installed on upper turntable.Column turntable 14 passes through 12 Ι of floating bearing and swing mechanism All structures that 11 Ι can make column turntable 14 and be mounted above do rotary motion, and entire loading bulk goods in ship system is mounted on On public door frame front leg strut 13, big 25 Ι of mechanism of car is installed on public door frame front leg strut and cart anchoring 26(is as shown in Figure 1). And 11 Ι of swing mechanism and swing mechanism 24 II are the prior arts, structure is no longer described in detail.
The break bulk cargo handling boat system is as shown in Fig. 2, including, floating bearing 16 II, turntable 17, lifting mechanism 18, standing Column 19, rack gear jib lubbing mechanism 20, equalizer bar 21, cantilever crane 22, suspension hook 23, swing mechanism 24 II, break bulk cargo handling boat system pass through, Floating bearing 16 II is mounted on public door frame front leg strut 13 by bolt, and turntable is mounted on cylinder by floating bearing 16 II On 28 II, and the upper all of above mechanism of turntable 17, structure is driven to do rotary motion by swing mechanism 24 II.It is installed on upper turntable There is lifting mechanism 18, the lifting of cargo is carried out by lifting mechanism and suspension hook 23.Rack gear jib lubbing mechanism 20 is installed on column 19 With equalizer bar 21, acted by the swing that the coordinated of rack gear jib lubbing mechanism and equalizer bar can complete cantilever crane 22.It is logical The handling that lifting mechanism 18, rack gear jib lubbing mechanism 20, swing mechanism 24 II complete break bulk cargo are crossed, and swing mechanism 24 II is existing Technology, structure are no longer described in detail.
In the loading, unloading double-duty plant, loading bulk goods in ship system is connected on common support door frame front leg strut by revolving support Ι Portion, the system mainly by material-throwing sliding drum, chute lifting mechanism, cantilever crane, cantilever crane conveyer system, column turntable, luffing mechanism, return Rotation mechanism Ι, door frame, door frame conveyer system, upper turntable, pull rod composition are shared.Bulk material is defeated on door frame by being mounted on Machine system is sent to charge material into ship by Bulk material to the conveyer system being mounted in cantilever crane, then by high speed material-throwing sliding drum In cabin.When shipment, chute discharge port can be completed in ship by luffing mechanism, chute hoisting mechanism Ι coordination The position in cabin adjusts and the maintenance of chute replacement.Cantilever crane is hingedly mounted on column turntable by pin shaft, can pass through pitching Mechanism swings up and down, and column turntable is mounted on the front leg strut side of common support door frame by revolving support Ι, and passes through back The rotary motion of rotation mechanism Ι completion floating bearing superstructure.When bulk cargo is when the material of chute discharge port is filled, can pass through The stretching motion of chute lifting mechanism completion chute.
Break bulk cargo handling system is mainly by including cylinder, floating bearing II, turntable, lifting mechanism, column, rack gear luffing Mechanism, equalizer bar, cantilever crane, suspension hook, the equal composition of swing mechanism II.Break bulk cargo loading, unloading boat system is mounted on preceding branch by cylinder On leg door frame, turntable is mounted on cylinder by floating bearing II, and drives all of above machine of turntable by swing mechanism II Structure, structure do rotary motion.Lifting mechanism is installed on turntable, the lifting of cargo is carried out by lifting mechanism and suspension hook.Column On rack gear jib lubbing mechanism and equalizer bar are installed, cantilever crane can be completed by the coordinated of rack gear jib lubbing mechanism and equalizer bar Swing movement.The handling of break bulk cargo are completed by lifting mechanism, rack gear jib lubbing mechanism, swing mechanism.
In summary, the technical program equipment is made of loading bulk goods in ship system and break bulk cargo ship-loading system two parts, and two Set system is separately mounted to the two sides of common support door frame front leg strut by respective revolving support, and two systems can work simultaneously Make.It can also work independently respectively.It can complete loading bulk goods in ship task and complete the handling ship task of break bulk cargo, and Pier facilities occupied space is saved, while equipment purchase cost can also be saved for owner, reduces acquisition cost.
In the present invention unless specifically defined or limited otherwise, the arts such as term " installation ", " connected ", " connection ", " fixation " Language shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or integrally connected, can be two members Connection inside part.For those skilled in the art, above-mentioned term can be understood of the invention as the case may be Concrete meaning.

Claims (3)

1. a kind of dual-purpose harbour facilities of handling, including loading bulk goods in ship system and break bulk cargo ship-loading system, it is characterised in that: two sets of systems Altogether with a public door frame front leg strut and a public door frame rear support leg, the public door frame front leg strut includes cylinder Ι, circle Cylinder II, upper beam Ι, supporting leg Ι, flange support, cart equalizer bar, big mechanism of car Ι, connection bar and lower beam, the cylinder Ι It is welded on the inside of upper beam Ι with cylinder II, pass through supporting leg Ι between the upper beam Ι and lower beam and contacts bar welding, institute Big mechanism of car Ι is stated symmetrically to fix by cart equalizer bar and flange support with lower beam both ends;
The public door frame rear support leg include upper beam II, supporting leg II, pin shaft support, door frame girder truss, pin shaft, lifting lug support and One end of big mechanism of car II, the both ends the upper beam Ι and supporting leg II is by being formed by welding door frame, the other end pair of the supporting leg II Claim to connect by bolt with big mechanism of car II, door frame girder truss front end is connect with the upper beam Ι on front leg strut door frame, the door frame Girder truss rear end is hinged on the lower part of upper beam II by pin shaft support, pin shaft, lifting lug support.
2. a kind of dual-purpose harbour facilities of handling as described in claim 1, it is characterised in that: the loading bulk goods in ship system includes throwing Material machine chute, chute lifting mechanism, cantilever crane, steel cable winding system, luffing mechanism, pull rod, upper turntable, door frame Belt Conveying Machine, belt door frame, rear support leg, swing mechanism Ι, floating bearing Ι, public door frame front leg strut, column turntable, cantilever crane Belt Conveying Machine, bulk cargo is used to complete the material conveying of rear portion batcher on truss door frame by the door frame belt conveyor installed, by material Cantilever crane belt conveyor is passed to, then bulk cargo is packed by cabin by material-throwing sliding drum, material-throwing sliding drum is bolted in cantilever crane Lower part completes the stretching motion of throwing machine chute by chute lifting mechanism, adjusts material-throwing sliding drum lower part discharge port in cabin Position, luffing mechanism can carry out pitch regulation to cantilever crane by steel cable winding system, and cantilever crane is by stud connection in column On turntable, pull rod and upper turntable are installed on column turntable, luffing mechanism is installed on upper turntable, column turntable passes through rotating shaft All structures that column turntable can be made and be mounted above by holding Ι and swing mechanism Ι do rotary motion, entire loading bulk goods in ship system System is mounted on public door frame front leg strut, and big mechanism of car Ι and cart anchoring are equipped on public door frame front leg strut.
3. a kind of dual-purpose harbour facilities of handling as described in claim 1, it is characterised in that: the break bulk cargo loads and unloads boat system packet Floating bearing II, turntable, lifting mechanism, column, rack gear jib lubbing mechanism, equalizer bar, cantilever crane, suspension hook, swing mechanism II are included, part is miscellaneous Goods handling boat system is mounted on public door frame front leg strut by floating bearing II by bolt, and turntable is pacified by floating bearing II Upper turntable is driven on cylinder II, and through swing mechanism II, lifting mechanism is installed on upper turntable, passes through lifting mechanism The lifting of cargo is carried out with suspension hook, rack gear jib lubbing mechanism and equalizer bar are installed on column, passes through rack gear jib lubbing mechanism and balance The coordinated of beam can complete the swing movement of cantilever crane, and the lifting mechanism, rack gear jib lubbing mechanism, swing mechanism II are complete At the handling of break bulk cargo.
CN201910163132.9A 2019-03-05 2019-03-05 A kind of dual-purpose harbour facilities of handling Pending CN109823871A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910163132.9A CN109823871A (en) 2019-03-05 2019-03-05 A kind of dual-purpose harbour facilities of handling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910163132.9A CN109823871A (en) 2019-03-05 2019-03-05 A kind of dual-purpose harbour facilities of handling

Publications (1)

Publication Number Publication Date
CN109823871A true CN109823871A (en) 2019-05-31

Family

ID=66865273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910163132.9A Pending CN109823871A (en) 2019-03-05 2019-03-05 A kind of dual-purpose harbour facilities of handling

Country Status (1)

Country Link
CN (1) CN109823871A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112027557A (en) * 2019-06-04 2020-12-04 崔洪涛 An all-round automatic telescopic loading and unloading machine
CN114412861A (en) * 2022-01-14 2022-04-29 大连华锐重工集团股份有限公司 Pitching hydraulic system of arm support of continuous ship unloader and working method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2797296Y (en) * 2005-06-08 2006-07-19 杭州华新机电工程有限公司 Dual purpose machine for loading and unloading ship
CN202186850U (en) * 2011-07-13 2012-04-11 中山市装备制造业科技研究中心 Multipurpose single-boom gantry crane
CN103863845A (en) * 2012-12-13 2014-06-18 长江航运科学研究所 Environment-friendly linear forward swing type bulk cement ship loader
CN104291128A (en) * 2014-09-30 2015-01-21 泰富国际工程有限公司 Function boat integrating loading, unloading and conveying
CN205151582U (en) * 2015-11-03 2016-04-13 广东高达重工机械实业股份有限公司 Novel rack and pinion luffing single -boom multipurpose stationary crane
CN106044289A (en) * 2016-07-28 2016-10-26 河南起重机器有限公司 Bucket type elevating ship loader
CN207792167U (en) * 2017-12-26 2018-08-31 广州发展集团股份有限公司 A kind of traveling shiploader
CN209835098U (en) * 2019-03-05 2019-12-24 河南起重机器有限公司 Dual-purpose port equipment for loading and unloading

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2797296Y (en) * 2005-06-08 2006-07-19 杭州华新机电工程有限公司 Dual purpose machine for loading and unloading ship
CN202186850U (en) * 2011-07-13 2012-04-11 中山市装备制造业科技研究中心 Multipurpose single-boom gantry crane
CN103863845A (en) * 2012-12-13 2014-06-18 长江航运科学研究所 Environment-friendly linear forward swing type bulk cement ship loader
CN104291128A (en) * 2014-09-30 2015-01-21 泰富国际工程有限公司 Function boat integrating loading, unloading and conveying
CN205151582U (en) * 2015-11-03 2016-04-13 广东高达重工机械实业股份有限公司 Novel rack and pinion luffing single -boom multipurpose stationary crane
CN106044289A (en) * 2016-07-28 2016-10-26 河南起重机器有限公司 Bucket type elevating ship loader
CN207792167U (en) * 2017-12-26 2018-08-31 广州发展集团股份有限公司 A kind of traveling shiploader
CN209835098U (en) * 2019-03-05 2019-12-24 河南起重机器有限公司 Dual-purpose port equipment for loading and unloading

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112027557A (en) * 2019-06-04 2020-12-04 崔洪涛 An all-round automatic telescopic loading and unloading machine
CN114412861A (en) * 2022-01-14 2022-04-29 大连华锐重工集团股份有限公司 Pitching hydraulic system of arm support of continuous ship unloader and working method

Similar Documents

Publication Publication Date Title
CN105383955B (en) Harbour bulk goods unloading and shipment transhipment all-in-one
KR101454843B1 (en) Plants for transporting cargo from and to ships
US7523836B2 (en) Dual trolley, single boom crane system
CN111410061B (en) Movable continuous type catenary bucket ship unloader
CN101279640B (en) Ship-shore double supporting type cargo handling machine
CN106044289A (en) Bucket type elevating ship loader
CN109823871A (en) A kind of dual-purpose harbour facilities of handling
US6390006B1 (en) Sea bulk transfer vessel
CN212197629U (en) Integrated machine for loading and unloading bulk cargo of transfer platform
CN104291128B (en) Multi-functional boat integrating loading, unloading and conveying
CN104229080A (en) Conveying arm rest for self-discharging ship
CN2797296Y (en) Dual purpose machine for loading and unloading ship
CN104444417B (en) A kind of bucket wheel reclaimer
KR19980024162A (en) Bulk cargo handling equipment and cargo handling method
CN209835098U (en) Dual-purpose port equipment for loading and unloading
RU2381167C2 (en) Ship offshore loading and unloading device
CN204078016U (en) One is transferred and is loaded and unloaded transport bulge carrier
CN220054084U (en) Bulk cargo material loading and unloading's feed divider
US4106638A (en) Ship and shore load handling system with an asymmetrical shaped pontoon for supporting carriage cables
RU2320529C1 (en) Floating lifting facility of high capacity
CN208964142U (en) A kind of inner basin driving mobile multi-level lifting scissors bag packet, the two-in-one ship loader of bulk cargo
CN205892215U (en) Bucket type promotes shipment machine
CN208413688U (en) Gantry crane with floating body bearing
CN2587822Y (en) Combined continuous unloading machine for ship
CN204056248U (en) A kind of transfer system loading and unloading carrier and carrier with this system of transferring

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190531