CN109808840A - A kind of installation method of goods tank peculiar to vessel - Google Patents

A kind of installation method of goods tank peculiar to vessel Download PDF

Info

Publication number
CN109808840A
CN109808840A CN201910129665.5A CN201910129665A CN109808840A CN 109808840 A CN109808840 A CN 109808840A CN 201910129665 A CN201910129665 A CN 201910129665A CN 109808840 A CN109808840 A CN 109808840A
Authority
CN
China
Prior art keywords
goods tank
chock
heat
insulated
goods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910129665.5A
Other languages
Chinese (zh)
Other versions
CN109808840B (en
Inventor
李海滨
朱勇祥
邓健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengxi Shipyard Co Ltd
Original Assignee
Chengxi Shipyard Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengxi Shipyard Co Ltd filed Critical Chengxi Shipyard Co Ltd
Priority to CN201910129665.5A priority Critical patent/CN109808840B/en
Publication of CN109808840A publication Critical patent/CN109808840A/en
Application granted granted Critical
Publication of CN109808840B publication Critical patent/CN109808840B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a kind of installation methods of goods tank peculiar to vessel, the adjustment for drawing, building goods tank pedestal, goods tank lifting and goods tank is surveyed including the design of independent goods tank, goods tank base position, the invention goods tank installation method step is simple, it is practical, wherein goods tank bottom seat and goods tank pedestal matching are high, i.e., compactness is high, and the adjustment of goods tank further improves the compactness of goods tank bottom seat and goods tank pedestal, it ensure that heat-insulated chock stress equalization on goods tank pedestal, the stability after the weighing of goods tank has been effectively ensured;It is respectively equipped with the convex block and groove to match on goods tank bottom seat and goods tank pedestal, accurate positioning when goods tank pedestal is lifted on convenient for goods tank;Heat-insulated chock and partiting thermal insulation plate have blocked the heat transmitting between goods tank and goods tank pedestal, are conducive to thermostatic control inside goods tank.

Description

A kind of installation method of goods tank peculiar to vessel
Technical field
The present invention relates to shipbuilding technical fields, and in particular to a kind of installation method of goods tank peculiar to vessel.
Background technique
Ship is in mostly on the arm at harbour when goods tank peculiar to vessel is installed, and is influenced by factors such as stormy waves, ship is located always In quick condition, on the one hand cause goods tank installment work difficulty peculiar to vessel larger, the goods tank of another aspect conventional mounting arrangements installation There is a problem of that tank bottom and bilge plane compactness are poor, lead to chock discontinuity equalization on the bilge, and then goods tank is caused to be installed The unstable risk that rollover or sliding occurs, influences the Strength Safety of ship.
Summary of the invention
It is an object of the present invention to overcome defect existing in the prior art, a kind of installation method of goods tank peculiar to vessel is provided, This method by building the goods tank bottom seat to match and goods tank pedestal respectively in goods tank and cargo hold surface, improve goods tank bottom seat with Matching between goods tank pedestal, the stability after ensure that goods tank peculiar to vessel installation, for goods tank peculiar to vessel installation provide it is new Installation method.
To achieve the above object, the technical scheme is to design a kind of installation method of goods tank peculiar to vessel, including it is as follows Step:
S1: independent goods tank design is arranged in the bottom mounting seat of independent goods tank in pedestal lower end surface mounted array Gusset, the two sides of gusset lower end surface are respectively mounted horizontal flange, also install downward convex block in the crossover location of gusset, with The convex block connect gusset horizontal flange on also set up several mounting holes, in the peripheral surface of the pedestal, several people are set Hole is uniformly arranged several lifting lugs at the top of the independent goods tank;
S2: goods tank base position, which is surveyed, draws, and the hull center line marked along hull cephalocaudal direction is surveyed on cargo hold surface, described Standardized goods tank center line is respectively symmetrically surveyed on the cargo hold surface of hull center line two sides, surveyed on the goods tank center line draw it is several Goods tank installs contour line, also installation and independent goods pot bottom bars position, shape in step S1 inside the goods tank installation contour line The heat-insulated chock that shape and size uniformity cause installs band, and the goods tank of hull center line two sides installs contour line central symmetry;
S3: building goods tank pedestal, and the goods tank installation contour line drawn is surveyed according to step S2 and builds goods tank pedestal, described heat-insulated Several vertical baffles are installed at interval on chock installation band two sides, install limit in the crossover location of the heat-insulated chock installation band The groove matched with the independent goods pot bottom convex block is arranged on the limited block, also sets up on the limited block for block Several tapped through holes corresponding with goods tank bottom seat upper installing hole independent in the step S1, by the baffle and limited block with Cargo hold surface is welded to connect, and the heat-insulated chock installation between the baffle takes the heat-insulated chock of laying, in the heat-insulated chock Laying partiting thermal insulation plate in the cavity of composition, the height of the baffle, limited block and partiting thermal insulation plate are below the heat insulating mattress 10~30mm of the wooden height;
S4: the lifting of goods tank lifts the independent goods tank in step S1 on the goods tank pedestal into step S3, and make goods tank bottom It, will be on the mounting hole and goods tank pedestal on independent goods tank bottom seat with bolt in the groove on convex block insertion goods tank pedestal on seat Tapped through hole is fixedly connected;
S5: the adjustment of goods tank successively includes the filling in gap, the goods tank pedestal upper limit between partiting thermal insulation plate and heat-insulated chock Position block and goods tank bottom seat upper protruding block between gap filling and heat-insulated chock upper surface and goods tank bottom seat gusset lower end surface between The filling of gap.
The invention goods tank installation method step is simple, practical, and wherein goods tank bottom seat and goods tank pedestal matching are high, i.e., Compactness is high, and the adjustment of goods tank further improves the compactness of goods tank bottom seat and goods tank pedestal, ensure that on goods tank pedestal every Heat pad wood stress equalization, the stability after the weighing of goods tank has been effectively ensured;Phase is respectively equipped on goods tank bottom seat and goods tank pedestal The convex block and groove matched are lifted on accurate positioning when goods tank pedestal convenient for goods tank;Heat-insulated chock and partiting thermal insulation plate block Heat transmitting between goods tank and goods tank pedestal, is conducive to thermostatic control inside goods tank.
During cargo transport, cargo hold is chronically at low-temperature condition, easily formation condensed water, and condensed water can cause heat-insulated chock Corrosion squeezes the partiting thermal insulation plate of goods pot bottom so as to cause goods tank integral sinking, causes partiting thermal insulation plate to deform, leads to cargo hold Inside there is Heat transmission point, to influence cargo hold heat insulation effect, therefore, keeps the height of partiting thermal insulation plate high lower than the heat-insulated chock Degree;Baffle or limited block contact to form Heat transmission point with goods tank bottom seat stiffening plate in order to prevent, therefore, make baffle and limited block Height is below the heat-insulated chock height.
When being installed on cargo hold for the ease of goods tank, accurate positioning between goods tank and goods tank bottom seat, preferred technical solution Being further includes positioning pin, and the upper end of positioning pin is set as pyramidal structure, and the lower end of positioning pin is equipped with and limited block upper tapped through hole phase Matched thread outer surface, the positioning pin are at least three, further include being bolted in positioning pin respectively to be in the step S3 It further include by positioning pin point when the step S4 goods tank is lifted to goods tank pedestal in the tapped through hole of Triangle-Profile limited block Dui Ying not be in the mounting hole of goods tank bottom seat, and positioning pin is removed.
In order to further increase the compactness between heat-insulated chock and goods tank bottom seat gusset, guarantee that the stress of goods tank pedestal is equal Weighing apparatus, in addition, the step S3 further includes the leveling process of heat-insulated chock, concrete operation step is further preferred technical solution The gap of heat-insulated chock lower end surface and cargo hold surface is detected using laser transit auxiliary and the horizontal of heat-insulated chock upper surface misses Difference, modifies that heat-insulated chock makes the gap of heat-insulated chock lower end surface and cargo hold surface and the horizontal error of heat-insulated chock upper surface is ±1mm。
In order to further ensure the heat insulation of partiting thermal insulation plate, further preferred technical solution is in addition, described heat-insulated Insulation board is polyurethane cold-storage board, and the core material of polyurethane cold-storage board is flame-retardant hard polyurethane foamed material, polyurethane cold-storage Plate two sides are color steel plate, and the density of the flame-retardant hard polyurethane foamed material is 40~50kg/m3, thermal coefficient is less than 0.018w/(m.k).Wherein the thermal coefficient of polyurethane cold-storage board is low, thermal property is good, and hard polyurethane foam material has anti- The features such as tide, waterproof, fire prevention, fire-retardant, high temperature resistant, non-deformability strong, not easy to crack, highly-safe, goods tank is effectively blocked The internal heat transfer with cargo hold, convenient for thermostatic control inside goods tank.
In order to further ensure the compactness of goods tank bottom seat and goods tank pedestal, further preferred technical solution is in addition, institute State the filling in gap between step S5 interval thermal insulation panel and heat-insulated chock, concrete operation step are as follows: will with polyurethane foams Gap between partiting thermal insulation plate and heat-insulated chock carries out polyurethane foam filling;
In the step S5 between goods tank pedestal upper limit position block and goods tank bottom seat upper protruding block gap filling, concrete operations step Suddenly are as follows: cleaning treatment is done to limited block periphery, and makes the place of cracking of heat-insulated chock and partiting thermal insulation plate of plank or plastic plate Edge sealing processing, carries out the gap between goods tank pedestal upper limit position block and goods tank bottom seat upper protruding block to pour filling with epoxy resin;
In the step S5 between heat insulating mattress wood upper surface and goods tank bottom seat gusset lower end surface gap filling, concrete operations Step are as follows: the gap detected between heat-insulated chock upper surface and goods tank bottom seat gusset lower end surface using laser transit auxiliary is big It is small, and make appropriate length, the stainless steel gasket of width and thickness, with chock by heat-insulated chock upper surface and goods tank bottom seat gusset Gap between lower end surface is raised, and stainless steel gasket is filled between heat-insulated chock upper surface and goods tank bottom seat gusset lower end surface Gap in, remove chock, and with edge sealing batten to the side of heat-insulated chock upper surface and goods tank bottom seat gusset lower end surface joint Edge carries out edge sealing processing.
In order to ensure the integrality with slope surface pedestal filling space, the appearance of bubble when epoxy resin pours is reduced, into The preferred technical solution of one step is in addition, gap between goods tank pedestal upper limit position block and goods tank bottom seat upper protruding block in the step S5 Filling when the goods tank pedestal is slope surface, carries out epoxy resin from low to high and pours filling.
In order to guarantee that the heat insulation and service life of heat-insulated chock, the heat insulating mattress wood quality are red hophornbeam.Red hophornbeam The features such as material is very heavy, and intensity is high, and the durability of wood is good, and anti-corrosive properties are strong.
The advantages and beneficial effects of the present invention are:
1, the invention goods tank installation method step is simple, practical, and wherein goods tank bottom seat and goods tank pedestal matching are high, I.e. compactness is high, and the adjustment of goods tank further improves the compactness of goods tank bottom seat and goods tank pedestal, ensure that on goods tank pedestal Heat-insulated chock stress equalization, the stability after the weighing of goods tank has been effectively ensured;Phase is respectively equipped on goods tank bottom seat and goods tank pedestal Matched convex block and groove are lifted on accurate positioning when goods tank pedestal convenient for goods tank;Heat-insulated chock and partiting thermal insulation plate block Heat transmitting between goods tank and goods tank pedestal, is conducive to thermostatic control inside goods tank.
2, during cargo transport, cargo hold is chronically at low-temperature condition, easily formation condensed water, and condensed water can cause heat insulating mattress Wood corrosion squeezes the partiting thermal insulation plate of goods pot bottom so as to cause goods tank integral sinking, causes partiting thermal insulation plate to deform, leads to goods Occur Heat transmission point in cabin, to influence cargo hold heat insulation effect, therefore, makes the height of partiting thermal insulation plate lower than the heat-insulated chock Highly;Baffle or limited block are contacted with goods tank bottom seat stiffening plate in order to prevent to form Heat transmission point and therefore makes baffle and limited block Height be below the heat-insulated chock height.
It 3, further include positioning pin, the upper end of positioning pin is set as pyramidal structure, and the lower end of positioning pin is equipped with and spiral shell on limited block The thread outer surface that line through-hole matches, the positioning pin are at least three, further include distinguishing positioning pin in the step S3 Be bolted in the tapped through hole of distribution limited block triangular in shape, when the step S4 goods tank is lifted to goods tank pedestal, further include by Positioning pin respectively corresponds in the mounting hole of goods tank bottom seat, and positioning pin is removed.When being installed on cargo hold convenient for goods tank, goods tank With the accurate positioning between goods tank bottom seat.
4, the step S3 further includes the leveling process of heat-insulated chock, and concrete operation step is to be assisted using laser transit The gap of heat-insulated chock lower end surface and cargo hold surface and the horizontal error of heat-insulated chock upper surface are detected, is modified under heat-insulated chock makes The horizontal error in the gap and heat-insulated chock upper surface on end face and cargo hold surface is ± 1mm.Further increase heat-insulated chock with Compactness between goods tank bottom seat gusset guarantees the stress equalization of goods tank pedestal.
5, in the step S5 between goods tank pedestal upper limit position block and goods tank bottom seat upper protruding block gap filling, the goods tank When pedestal is slope surface, epoxy resin is carried out from low to high and pours filling.Ensure the integrality with slope surface pedestal filling space, Reduce the appearance of bubble when epoxy resin pours.
Detailed description of the invention
Fig. 1 is goods tank pedestal top view;
Fig. 2 is enlarged drawing at H in Fig. 1;
Fig. 3 is locating pin structure schematic diagram.
In figure: 1, baffle;2, limited block;3, groove;4, tapped through hole;5, heat-insulated chock;6, partiting thermal insulation plate;7, it positions Pin.
Specific embodiment
With reference to the accompanying drawings and examples, further description of the specific embodiments of the present invention.Following embodiment is only For clearly illustrating technical solution of the present invention, and not intended to limit the protection scope of the present invention.
As shown in Figures 1 to 3, the present invention is a kind of installation method of goods tank peculiar to vessel, is included the following steps:
S1: independent goods tank design is arranged in the bottom mounting seat of independent goods tank in pedestal lower end surface mounted array Gusset, the two sides of gusset lower end surface are respectively mounted horizontal flange, also install downward convex block in the crossover location of gusset, with The convex block connect gusset horizontal flange on also set up several mounting holes, in the peripheral surface of the pedestal, several people are set Hole is uniformly arranged several lifting lugs at the top of the independent goods tank;
S2: goods tank base position, which is surveyed, draws, and the hull center line marked along hull cephalocaudal direction is surveyed on cargo hold surface, described Standardized goods tank center line is respectively symmetrically surveyed on the cargo hold surface of hull center line two sides, surveyed on the goods tank center line draw it is several Goods tank installs contour line, also installation and independent goods pot bottom bars position, shape in step S1 inside the goods tank installation contour line The heat-insulated chock that shape and size uniformity cause installs band, and the goods tank of hull center line two sides installs contour line central symmetry;
S3: building goods tank pedestal, and the goods tank installation contour line drawn is surveyed according to step S2 and builds goods tank pedestal, described heat-insulated Several vertical baffles 1 are installed at interval on chock installation band two sides, install limit in the crossover location of the heat-insulated chock installation band Position block 2, is arranged the groove 3 matched with the independent goods pot bottom convex block, on the limited block 2 on the limited block 2 Several tapped through holes 4 corresponding with goods tank bottom seat upper installing hole independent in the step S1 are also set up, by the baffle 1 and limit Position block 2 is welded to connect with cargo hold surface, and the heat-insulated chock installation between the baffle 1 takes the heat-insulated chock 5 of laying, in institute Laying partiting thermal insulation plate 6 in the cavity that heat-insulated chock 5 is constituted is stated, the height of the baffle 1, limited block 2 and partiting thermal insulation plate 6 is equal Lower than the heat-insulated 5 10~30mm of height of chock;
S4: the lifting of goods tank lifts the independent goods tank in step S1 on the goods tank pedestal into step S3, and make goods tank bottom It, will be on the mounting hole and goods tank pedestal on independent goods tank bottom seat with bolt in the groove 3 on convex block insertion goods tank pedestal on seat Tapped through hole 4 be fixedly connected;
S5: the adjustment of goods tank successively includes the filling in gap between partiting thermal insulation plate 6 and heat-insulated chock 5, on goods tank pedestal Between limited block 2 and goods tank bottom seat upper protruding block the filling in gap and 5 upper surface of heat-insulated chock and goods tank bottom seat gusset lower end surface it Between gap filling.
It further include positioning pin 7, the upper end of positioning pin 7 is set as pyramidal structure, and the lower end of positioning pin 7 is equipped with and spiral shell on limited block The thread outer surface that line through-hole 4 matches, the positioning pin 7 are at least three, further include dividing positioning pin 7 in the step S3 It is not bolted in the tapped through hole 4 of distribution limited block 2 triangular in shape, when the step S4 goods tank is lifted to goods tank pedestal, also wraps It includes and respectively corresponds positioning pin 7 in the mounting hole of goods tank bottom seat, and positioning pin 7 is removed.
In order to further increase the compactness between heat-insulated chock and goods tank bottom seat gusset, guarantee that the stress of goods tank pedestal is equal Weighing apparatus, in addition, the step S3 further includes the leveling process of heat-insulated chock, concrete operation step is further preferred technical solution The gap of heat-insulated chock lower end surface and cargo hold surface is detected using laser transit auxiliary and the horizontal of heat-insulated chock upper surface misses Difference, modifies that heat-insulated chock makes the gap of heat-insulated chock lower end surface and cargo hold surface and the horizontal error of heat-insulated chock upper surface is ±1mm。
In order to further ensure the heat insulation of partiting thermal insulation plate, further preferred technical solution is in addition, described heat-insulated Insulation board is polyurethane cold-storage board, and the core material of polyurethane cold-storage board is flame-retardant hard polyurethane foamed material, polyurethane cold-storage Plate two sides are color steel plate, and the density of the flame-retardant hard polyurethane foamed material is 40~50kg/m3, thermal coefficient is less than 0.018w/(m.k).Wherein the thermal coefficient of polyurethane cold-storage board is low, thermal property is good, and hard polyurethane foam material has anti- The features such as tide, waterproof, fire prevention, fire-retardant, high temperature resistant, non-deformability strong, not easy to crack, highly-safe, goods tank is effectively blocked The internal heat transfer with cargo hold, convenient for thermostatic control inside goods tank.
In order to guarantee the environmental-protecting performance of partiting thermal insulation version, not fluorine-containing benefit in the flame-retardant hard polyurethane foamed material It is high.
In order to further ensure the compactness of goods tank bottom seat and goods tank pedestal, further preferred technical solution is in addition, institute State the filling in gap between step S5 interval thermal insulation panel and heat-insulated chock, concrete operation step are as follows: will with polyurethane foams Gap between partiting thermal insulation plate and heat-insulated chock carries out polyurethane foam filling;Goods tank pedestal upper limit position block in the step S5 The filling in gap, concrete operation step between goods tank bottom seat upper protruding block are as follows: cleaning treatment is done to limited block periphery, and uses plank Or edge sealing processing is done by plastic plate by the place of cracking of heat-insulated chock and partiting thermal insulation plate, with epoxy resin by goods tank pedestal upper limit position block Gap between goods tank bottom seat upper protruding block carries out pouring filling;Heat insulating mattress wood upper surface and goods tank bottom seat muscle in the step S5 The filling in gap, concrete operation step between plate lower end surface are as follows: using laser transit auxiliary detect heat-insulated chock upper surface with Gap size between goods tank bottom seat gusset lower end surface, and appropriate length, the stainless steel gasket of width and thickness are made, use chock Gap between heat-insulated chock upper surface and goods tank bottom seat gusset lower end surface is raised, and stainless steel gasket is filled in into heat-insulated chock In gap between upper surface and goods tank bottom seat gusset lower end surface, chock is removed, and with edge sealing batten to heat-insulated chock upper surface Edge sealing processing is carried out with the edge of goods tank bottom seat gusset lower end surface joint.
Wherein, in order to guarantee to be located at stainless steel gasket in heat-insulated chock upper surface and goods tank bottom seat gusset lower end surface gap Stability, gasket stacking number≤2.
In order to ensure the integrality with slope surface pedestal filling space, the appearance of bubble when epoxy resin pours is reduced, into The preferred technical solution of one step is in addition, gap between goods tank pedestal upper limit position block and goods tank bottom seat upper protruding block in the step S5 Filling when the goods tank pedestal is slope surface, carries out epoxy resin from low to high and pours filling.
In order to guarantee that the heat insulation and service life of heat-insulated chock, the heat insulating mattress wood quality are red hophornbeam.Red hophornbeam The features such as material is very heavy, and intensity is high, and the durability of wood is good, and anti-corrosive properties are strong.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvements and modifications can also be made, these improvements and modifications Also it should be regarded as protection scope of the present invention.

Claims (7)

1. a kind of installation method of goods tank peculiar to vessel, which comprises the steps of:
S1: independent goods tank design, in the bottom mounting seat of independent goods tank, in the muscle of pedestal lower end surface mounted array arrangement Plate, the two sides of gusset lower end surface are respectively mounted horizontal flange, also install downward convex block in the crossover location of gusset, with it is described Convex block connect gusset horizontal flange on also set up several mounting holes, in the peripheral surface of the pedestal, several manholes are set, Several lifting lugs are uniformly arranged at the top of the independent goods tank;
S2: goods tank base position, which is surveyed, draws, and the hull center line marked along hull cephalocaudal direction is surveyed on cargo hold surface, in the hull Standardized goods tank center line is respectively symmetrically surveyed on the cargo hold surface of center line two sides, draws dried food and nuts tank if surveying on the goods tank center line Contour line is installed, inside goods tank installation contour line also installation and independent goods pot bottom bars position in step S1, shape and The heat-insulated chock that size uniformity causes installs band, and the goods tank of hull center line two sides installs contour line central symmetry;
S3: building goods tank pedestal, and the goods tank installation contour line drawn is surveyed according to step S2 and builds goods tank pedestal, in the heat-insulated chock Several vertical baffles are installed at interval on installation band two sides, install limited block in the crossover location of the heat-insulated chock installation band, The groove matched with the independent goods pot bottom convex block is set on the limited block, is also set up on the limited block several Tapped through hole corresponding with goods tank bottom seat upper installing hole independent in the step S1, and cargo hold by the baffle and limited block Surface is welded to connect, and the heat-insulated chock installation between the baffle takes the heat-insulated chock of laying, is constituted in the heat-insulated chock Cavity in laying partiting thermal insulation plate, it is high that the height of the baffle, limited block and partiting thermal insulation plate is below the heat-insulated chock Spend 10~30mm;
S4: the lifting of goods tank lifts the independent goods tank in step S1 on the goods tank pedestal into step S3, and make on goods tank bottom seat Convex block insertion goods tank pedestal on groove in, with bolt by independent goods tank bottom seat mounting hole and goods tank pedestal on screw thread Through-hole is fixedly connected;
S5: the adjustment of goods tank successively includes the filling in gap, goods tank pedestal upper limit position block between partiting thermal insulation plate and heat-insulated chock The gap between the filling in gap and heat-insulated chock upper surface and goods tank bottom seat gusset lower end surface between goods tank bottom seat upper protruding block Filling.
2. the installation method of goods tank peculiar to vessel as described in claim 1, which is characterized in that further include positioning pin, positioning pin it is upper End is set as pyramidal structure, and the lower end of positioning pin is equipped with the thread outer surface to match with limited block upper tapped through hole, the positioning Pin is at least three, further includes the tapped through hole that positioning pin is bolted in distribution limited block triangular in shape respectively in the step S3 It is interior, it further include the mounting hole respectively corresponded positioning pin through goods tank bottom seat when the step S4 goods tank is lifted to goods tank pedestal It is interior, and positioning pin is removed.
3. the installation method of goods tank peculiar to vessel as claimed in claim 2, which is characterized in that the step S3 further includes heat-insulated chock Leveling process, concrete operation step is the gap for utilizing laser transit auxiliary to detect heat-insulated chock lower end surface and cargo hold surface With the horizontal error of heat-insulated chock upper surface, modifying heat-insulated chock makes the gap of heat-insulated chock lower end surface and cargo hold surface and heat-insulated The horizontal error of chock upper surface is ± 1mm.
4. the installation method of goods tank peculiar to vessel as claimed in claim 3, which is characterized in that the partiting thermal insulation plate is that polyurethane is cold Library plate, the core material of polyurethane cold-storage board are flame-retardant hard polyurethane foamed material, and polyurethane cold-storage board two sides are color steel plate, institute The density for stating flame-retardant hard polyurethane foamed material is 40~50kg/m3, thermal coefficient be less than 0.018w/ (m.k).
5. the installation method of goods tank peculiar to vessel as claimed in claim 4, which is characterized in that the step S5 interval thermal insulation panel with The filling in gap, concrete operation step between heat-insulated chock are as follows: with polyurethane foams by partiting thermal insulation plate and heat-insulated chock it Between gap carry out polyurethane foam filling;
In the step S5 between goods tank pedestal upper limit position block and goods tank bottom seat upper protruding block gap filling, concrete operation step Are as follows: cleaning treatment is done to limited block periphery, and is sealed the place of cracking of heat-insulated chock and partiting thermal insulation plate with plank or plastic plate Side processing, carries out the gap between goods tank pedestal upper limit position block and goods tank bottom seat upper protruding block to pour filling with epoxy resin;
In the step S5 between heat insulating mattress wood upper surface and goods tank bottom seat gusset lower end surface gap filling, concrete operation step Are as follows: the gap size between heat-insulated chock upper surface and goods tank bottom seat gusset lower end surface is detected using laser transit auxiliary, and Appropriate length, the stainless steel gasket of width and thickness are made, with chock by heat-insulated chock upper surface and goods tank bottom seat gusset lower end Gap between face is raised, and between stainless steel gasket is filled between heat-insulated chock upper surface and goods tank bottom seat gusset lower end surface In gap, remove chock, and with edge sealing batten to the edge of heat-insulated chock upper surface and goods tank bottom seat gusset lower end surface joint into The processing of row edge sealing.
6. the installation method of goods tank peculiar to vessel as claimed in claim 5, which is characterized in that the goods tank pedestal upper limit in the step S5 The filling in gap carries out epoxy resin when the goods tank pedestal is slope surface from low to high between position block and goods tank bottom seat upper protruding block Pour filling.
7. the installation method of goods tank peculiar to vessel as claimed in claim 6, which is characterized in that the heat insulating mattress wood quality is red iron Wood.
CN201910129665.5A 2019-02-21 2019-02-21 Installation method of cargo tank for ship Active CN109808840B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910129665.5A CN109808840B (en) 2019-02-21 2019-02-21 Installation method of cargo tank for ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910129665.5A CN109808840B (en) 2019-02-21 2019-02-21 Installation method of cargo tank for ship

Publications (2)

Publication Number Publication Date
CN109808840A true CN109808840A (en) 2019-05-28
CN109808840B CN109808840B (en) 2020-03-20

Family

ID=66607139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910129665.5A Active CN109808840B (en) 2019-02-21 2019-02-21 Installation method of cargo tank for ship

Country Status (1)

Country Link
CN (1) CN109808840B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115959260A (en) * 2022-12-15 2023-04-14 招商局金陵鼎衡船舶(扬州)有限公司 Full-pressure type LPG transport ship cargo tank integrity hoisting construction process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104443284A (en) * 2014-10-24 2015-03-25 上海交通大学 Liquefied natural gas carrier B type independent liquid cargo tank thermal insulation system and construction method thereof
CN105711738A (en) * 2014-12-03 2016-06-29 江南造船(集团)有限责任公司 Insulated mounting method for top-surface two-end rolling prevention supports of A-type independent liquid cargo tank
CN107110428A (en) * 2014-09-26 2017-08-29 气体运输技术公司 Sealing comprising the bridging element between the panelling of secondary isolation barrier completely cuts off tank
CN108082392A (en) * 2017-12-18 2018-05-29 湖北海洋工程装备研究院有限公司 A kind of freighter independence goods tank installation method
KR20180061946A (en) * 2016-11-30 2018-06-08 대우조선해양 주식회사 Heat insulation structure for cryogenic liquid storage tank and installation method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107110428A (en) * 2014-09-26 2017-08-29 气体运输技术公司 Sealing comprising the bridging element between the panelling of secondary isolation barrier completely cuts off tank
CN104443284A (en) * 2014-10-24 2015-03-25 上海交通大学 Liquefied natural gas carrier B type independent liquid cargo tank thermal insulation system and construction method thereof
CN105711738A (en) * 2014-12-03 2016-06-29 江南造船(集团)有限责任公司 Insulated mounting method for top-surface two-end rolling prevention supports of A-type independent liquid cargo tank
KR20180061946A (en) * 2016-11-30 2018-06-08 대우조선해양 주식회사 Heat insulation structure for cryogenic liquid storage tank and installation method thereof
CN108082392A (en) * 2017-12-18 2018-05-29 湖北海洋工程装备研究院有限公司 A kind of freighter independence goods tank installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115959260A (en) * 2022-12-15 2023-04-14 招商局金陵鼎衡船舶(扬州)有限公司 Full-pressure type LPG transport ship cargo tank integrity hoisting construction process

Also Published As

Publication number Publication date
CN109808840B (en) 2020-03-20

Similar Documents

Publication Publication Date Title
US3968764A (en) Ships for transport of liquefied gases
CN109808840A (en) A kind of installation method of goods tank peculiar to vessel
CN108517846A (en) Tail water cooler device convenient to overhaul
KR20160119343A (en) Storage tank for liquefied gas, and method for discharging liquefied gas from the same
CN113772042A (en) Cargo compartment segmentation design method for 8-million-cubic-level thin-film LNG ship and cargo compartment segmentation
KR20120136336A (en) Insualtion structure of storage tank for lng
KR101465621B1 (en) Platform for liquified gas fuel tank of oil tanker
KR20180046297A (en) Insulation apparatus of liquefied natural gas cargo
CN109267102B (en) Composite structure electrolytic cell and electrolytic cell assembly
CN111098977A (en) Side cable guide device suitable for lifeboat davit area
JP2000177681A (en) Independent tank support system
CN110877663A (en) LNG filling ship cargo tank and anti-swing device thereof
CN205381375U (en) Supporting mechanism is always organized in segmentation of super large vessel stern portion
CN112124523B (en) Installation method for film reinforcing wedge of Mark3 type liquid cargo tank
CN206654164U (en) The anti-floating structure of pitch cargo tank
CN115571266B (en) Anti-rolling and anti-floating combined supporting device and method for fuel tank of container ship
CN208377007U (en) A kind of novel LNG filling ship c-type tank floatation stopping device
CN220518512U (en) Engineering ship fastening connection device
CN111216841A (en) Closed stealthy bulwark
KR200467095Y1 (en) Access Floor System
CN217778896U (en) Outboard pipe drainage box structure of engineering platform ship exhaust board
CN220996655U (en) Methanol fuel oil dual-fuel ship
CN110952618A (en) Water taking device arranged on bottom-sitting type maritime work platform
CN220644104U (en) Quick installation supporting device for ship backing member
CN116620514B (en) Method for batch assembly and transportation of floating type offshore wind power equipment supporting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant