CN109785725A - A kind of training simulation cable quadrant device - Google Patents
A kind of training simulation cable quadrant device Download PDFInfo
- Publication number
- CN109785725A CN109785725A CN201910202635.2A CN201910202635A CN109785725A CN 109785725 A CN109785725 A CN 109785725A CN 201910202635 A CN201910202635 A CN 201910202635A CN 109785725 A CN109785725 A CN 109785725A
- Authority
- CN
- China
- Prior art keywords
- cable quadrant
- simulation
- simulation cable
- quadrant
- training
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses a kind of training simulation cable quadrant devices, by the precast concrete foundation for setting simulation cable quadrant cavity in foundation pit is arranged, so that the setting position of cable quadrant is able to carry out fixation, work is excavated without carrying out duplicate cable drawing plate foundation consisting in advance, is greatly improved the efficiency for carrying out cable quadrant setting training;After opening cover board, precast concrete foundation is in half opening-wide state, and trainee can intuitively observe cable quadrant state in which by observing road, promote the effect of training.Training simulation cable quadrant device of the invention can Reusability, saved training cost.
Description
Technical field
The present invention relates to a kind of training for Phase of Electric Power Projects field simulation cable quadrant devices.
Background technique
Electric pole is the basis instrument set up in power grid to the transmission of cable.In the electric pole that the terminal of transmission line of electricity is arranged
Referred to as terminal polt, and for terminal polt, only have side to bear the pulling force of electric wire.In order to avoid terminal polt is due to stress
Unevenness generate deflection, need its bear conductor tension relative position be set into ground cable quadrant, by bracing wire by electric pole with
Cable quadrant connection is to balance the stress of electric pole, guarantee electric pole holding vertically and stablize.
The setting of cable quadrant and the connection of cable quadrant and electric pole are an important rings in Phase of Electric Power Projects training
Section.Due to the cable quadrant device currently without special training, carry out excavating the cable drawing plate foundation consisting earthwork in simulated training
Preparation, and earth excavation is not the important content of training, this preparation is time-consuming and laborious;The training of cable quadrant operation simultaneously
It needs to fill cable drawing plate foundation consisting in instruction, causes the cable drawing plate foundation consisting that can not reuse, training needs again next time
It is excavated.In addition, when filling to cable drawing plate foundation consisting, the earthwork can be caused to block and be interfered to sight, so that training is learned
Member can not intuitively observe state when cable quadrant draws electric pole, affect the effect of training.
Summary of the invention
The purpose of the invention is to overcome the deficiencies of the prior art and provide a kind of training simulation cable quadrant device, it
It can be realized the training for cable quadrant setting.
Realizing a kind of technical solution of above-mentioned purpose is: a kind of training simulation cable quadrant device, including simulation electric pole with
Cable quadrant is simulated, further includes precast concrete foundation,
The precast concrete foundation is arranged in the foundation pit that earth's surface is dug, and the precast concrete foundation includes concrete
Sole plate, simulation cable quadrant base and cover plate, the simulation cable quadrant pedestal are arranged on the concrete foundation pedestal, institute
It states and is equipped with simulation cable quadrant cavity in simulation cable quadrant pedestal, the cover board is covered on the simulation cable quadrant base-plates surface, institute
Cover board is stated equipped with bracing wire slot;
The simulation cable quadrant is arranged in the simulation cable quadrant cavity;
The simulation electric pole is arranged near the precast concrete foundation, passes through bracing wire at the top of the simulation electric pole
It is connect with the simulation cable quadrant.
Further, it is described simulation cable quadrant cavity include be vertically arranged simulation cable quadrant setting channel and with it is described
The simulation cable quadrant setting structure that the shape of simulation cable quadrant matches, the simulation cable quadrant setting structure and the simulation are drawn
Drum setting channel communicates.
Further, observation road is offered right above the simulation cable quadrant setting structure.
Further, the simulation cable quadrant is hollow structure.
Further, the concrete foundation pedestal uses C15 concrete, and the simulation cable quadrant pedestal is mixed using C30
Solidifying soil.
A kind of training of the invention simulation cable quadrant device, by setting the pre- of simulation cable quadrant cavity in foundation pit is arranged
Concrete foundation processed is opened so that the setting position of cable quadrant is able to carry out fixation without carrying out duplicate cable drawing plate foundation consisting in advance
Work is dug, the efficiency for carrying out cable quadrant setting training is greatly improved;After opening cover board, precast concrete foundation is opened wide in half
State, trainee can intuitively observe cable quadrant state in which by observing road, promote the effect of training.Training of the invention
Instruction with simulation cable quadrant device can Reusability, saved training cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that cable quadrant device is simulated in a kind of training of the invention.
Specific embodiment
In order to preferably understand technical solution of the present invention, below by specifically embodiment and in conjunction with attached drawing
It is described in detail:
Referring to Fig. 1, a kind of training of the invention simulation cable quadrant device, including simulation electric pole 1 and simulation cable quadrant
2, and the precast concrete foundation 3 for being fixed on underground certain position for cable quadrant 2 will to be simulated.
Precast concrete foundation 3 is arranged in the foundation pit that earth's surface is dug, and precast concrete foundation 3 includes concrete foundation bottom
Seat 31, simulation cable quadrant pedestal 32 and cover board 33.It simulates cable quadrant pedestal 32 to be arranged on concrete foundation pedestal 31, concrete
Sole plate 31 uses C15 concrete, and simulation cable quadrant pedestal 32 uses C30 concrete, and concrete foundation pedestal 31 is to hold
Carry the overall structure of precast concrete foundation 3, setting of the simulation cable quadrant pedestal 32 to carry out simulation cable quadrant 2.
It simulates and is equipped with simulation cable quadrant cavity in cable quadrant pedestal 32, simulation cable quadrant cavity includes the simulation being vertically arranged
Cable quadrant setting channel 34 and the simulation cable quadrant setting structure 35 to match with the shape for simulating cable quadrant 2, simulate bracing wire
Disk setting structure 35 is communicated with simulation cable quadrant setting channel 34, and the surface of simulation cable quadrant setting structure 35 offers observation
Road 36.Cover board 33 is covered on simulation 32 surface of cable quadrant pedestal, and cover board 33 is equipped with bracing wire slot.
The setting of cable quadrant 2 is simulated in simulation cable quadrant cavity, is connected in simulation cable quadrant setting structure 35.
It simulates electric pole 1 to be arranged near precast concrete foundation 3, the top of simulation electric pole 1 is drawn by bracing wire and simulation
Drum 2 connects.In order to reduce the difficulty and risk of cable quadrant setting training, simulation cable quadrant 2 uses hollow structure to mitigate
Quality.
When carrying out cable quadrant setting training with simulation cable quadrant device using training of the invention, it is first turned on cover board,
Channel 34 is arranged by simulation cable quadrant in simulation cable quadrant 2 to be placed into vertically in simulation cable quadrant cavity, then adjusts simulation and draws
The angles and positions of drum 2 make it face simulation cable quadrant setting structure 35.Then 1 top of simulation electric pole will be connected to
The position for being drawstring through observation road 36 and simulation cable quadrant 2, while adjusting simulation cable quadrant 2 is connected to simulation cable quadrant 2
It simulates in cable quadrant setting structure 35.Trainee can be by observing 36 observational learning whole process of road.Finally cover board 33 is covered
Cover the simulation setting that simulation cable quadrant 2 is completed on 3 surface of precast concrete foundation.
Those of ordinary skill in the art it should be appreciated that more than embodiment be intended merely to illustrate the present invention,
And be not used as limitation of the invention, as long as the change in spirit of the invention, to embodiment described above
Change, modification will all be fallen within the scope of claims of the present invention.
Claims (5)
1. a kind of training simulation cable quadrant device, including simulation electric pole and simulation cable quadrant, which is characterized in that further include prefabricated
Concrete foundation,
The precast concrete foundation is arranged in the foundation pit that earth's surface is dug, and the precast concrete foundation includes concrete foundation
Pedestal, simulation cable quadrant base and cover plate, the simulation cable quadrant pedestal are arranged on the concrete foundation pedestal, the mould
Simulation cable quadrant cavity is equipped in quasi- cable quadrant pedestal, the cover board is covered on the simulation cable quadrant base-plates surface, the lid
Plate is equipped with bracing wire slot;
The simulation cable quadrant is arranged in the simulation cable quadrant cavity;
The simulation electric pole is arranged near the precast concrete foundation, and the top of the simulation electric pole passes through bracing wire and institute
State simulation cable quadrant connection.
2. a kind of training according to claim 1 simulation cable quadrant device, which is characterized in that the simulation cable quadrant chamber
Body includes the simulation cable quadrant setting channel being vertically arranged and the simulation bracing wire to match with the shape for simulating cable quadrant
Disk setting structure, the simulation cable quadrant setting structure are communicated with simulation cable quadrant setting channel.
3. a kind of training according to claim 2 simulation cable quadrant device, which is characterized in that the simulation cable quadrant is set
It sets and offers observation road right above structure.
4. a kind of training according to claim 1 simulation cable quadrant device, which is characterized in that the simulation cable quadrant is
Hollow structure.
5. a kind of training according to claim 1 simulation cable quadrant device, which is characterized in that the concrete foundation bottom
Seat uses C15 concrete, and the simulation cable quadrant pedestal uses C30 concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910202635.2A CN109785725A (en) | 2019-03-18 | 2019-03-18 | A kind of training simulation cable quadrant device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910202635.2A CN109785725A (en) | 2019-03-18 | 2019-03-18 | A kind of training simulation cable quadrant device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109785725A true CN109785725A (en) | 2019-05-21 |
Family
ID=66488264
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910202635.2A Pending CN109785725A (en) | 2019-03-18 | 2019-03-18 | A kind of training simulation cable quadrant device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109785725A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202577339U (en) * | 2012-05-11 | 2012-12-05 | 中国电力工程顾问集团东北电力设计院 | Oblique cylinder composite foundation with pulling tray |
CN104533132A (en) * | 2015-01-08 | 2015-04-22 | 广东电网有限责任公司江门台山供电局 | Windproof stay wire structure for 10kV telegraph pole line |
CN105507341A (en) * | 2014-09-24 | 2016-04-20 | 胡广生 | Method for fixing electric pole |
CN206490407U (en) * | 2016-12-30 | 2017-09-12 | 通化电力勘测设计有限公司 | A kind of high-low pressure is with bridge ceases to be busy line structure |
CN107795181A (en) * | 2017-10-08 | 2018-03-13 | 国网江西省电力公司电力科学研究院 | A kind of power distribution network pole guy pulling plate method |
CN207332423U (en) * | 2017-08-24 | 2018-05-08 | 国网江苏省电力公司金湖县供电公司 | Easy to the electric pole antirust guy structure of monitoring |
-
2019
- 2019-03-18 CN CN201910202635.2A patent/CN109785725A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202577339U (en) * | 2012-05-11 | 2012-12-05 | 中国电力工程顾问集团东北电力设计院 | Oblique cylinder composite foundation with pulling tray |
CN105507341A (en) * | 2014-09-24 | 2016-04-20 | 胡广生 | Method for fixing electric pole |
CN104533132A (en) * | 2015-01-08 | 2015-04-22 | 广东电网有限责任公司江门台山供电局 | Windproof stay wire structure for 10kV telegraph pole line |
CN206490407U (en) * | 2016-12-30 | 2017-09-12 | 通化电力勘测设计有限公司 | A kind of high-low pressure is with bridge ceases to be busy line structure |
CN207332423U (en) * | 2017-08-24 | 2018-05-08 | 国网江苏省电力公司金湖县供电公司 | Easy to the electric pole antirust guy structure of monitoring |
CN107795181A (en) * | 2017-10-08 | 2018-03-13 | 国网江西省电力公司电力科学研究院 | A kind of power distribution network pole guy pulling plate method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203668968U (en) | Support supporting component used for transformer substation outdoor AIS electric equipment | |
CN103884827A (en) | Magnetic field force-seepage force model test device applicable to earth-rock slope | |
CN107700496B (en) | The inverse suitable combining construction method of deep basal pit | |
CN206397248U (en) | A kind of new concrete electric pole | |
CN109785725A (en) | A kind of training simulation cable quadrant device | |
CN104091509B (en) | A kind of cast-in-situ bored pile teaching physical model and teaching demonstration method | |
KR20210101760A (en) | Pole Installation Device And Construction Method Using Soil Compactor | |
CN216053576U (en) | Real analogue means that instructs of assembled component assembly | |
CN208818715U (en) | Friction pile soil arching effect evolution mechanism visible model testing device | |
CN105532122A (en) | Foot-operated garden excavating apparatus | |
CN215332882U (en) | Test device for simulating shield tunnel segment assembly and backfill grouting | |
CN109030781A (en) | Friction pile soil arching effect evolution mechanism visible model testing device and test method | |
CN107476315A (en) | A kind of prefabricated component and its construction method being directed to close to type foundation ditch | |
CN209040174U (en) | The fixed device of pile body of indoor pile-soil model test | |
CN100582389C (en) | Miniature similar anchor bar used for model experiment and its construction method | |
CN207833764U (en) | A kind of underground engineering geological disaster teaching demonstration device | |
CN109035998B (en) | Demonstration device for effective stress variation effect | |
CN208024363U (en) | The concrete filled steel tube perfusion simulation test arch that intuitively can be observed and measure | |
Amorosi et al. | Observed behaviour of reconstituted clay along stress paths typical of excavations | |
CN107102117B (en) | A kind of test method and its experimental rig for real-time measurement underground cavern excavation process | |
CN208501694U (en) | A kind of prefabricated component for close to type foundation pit | |
CN218264446U (en) | Landscape screen | |
CN212365338U (en) | Demonstration device for simulating broken pile and reinforcing effect of immersed tube cast-in-place pile | |
CN201955938U (en) | Direct-buried optical cable line construction teaching mold | |
CN111933018B (en) | Method for demonstrating pile breaking and reinforcing effects of immersed tube cast-in-place pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190521 |